HomeMy WebLinkAboutPD Recommendation (PL-SPP-2026-000115)
-1-
R130HoldingsLLCSPPAmend.crk.4.10.26
COUNTY OF HAWAI‘I PLANNING DEPARTMENT
RECOMMENDATION
130 HOLDINGS LLC AMENDMENT TO CONDITION NOS. 3, 5, 6 & 7 AND PROJECT SCOPE CHANGES OF SPECIAL PERMIT NO. 870 (PL-SPP-2026-000115/AMEND SPP 870)
Upon review of the request against guidelines for approving a Special Permit, the
Planning Director recommends that the request to amend Special Permit No. 870 to
reduce the size of a proposed regional trade center to two buildings totaling 10,400 square
feet; add a 600-square-foot volunteer fire truck parking area; amend Condition No. 3
(Complete Construction) for a 5-year time extension to complete construction; delete
Condition No. 5 (Water Supply); and delete Condition No. 7 (Highway 130/Orchidland
Drive Intersection Improvements) be approved by the Planning Commission.
Additionally, the Planning Director recommends that the request to delete Condition No. 6
(Improvements to Orchidland Drive) be denied by the Planning Commission. The
Planning Director reserves the right to modify and/or alter this position based upon
additional information presented at the public hearing. These recommendations are
based on the following findings:
The applicant is requesting amendments to various conditions of Special
Permit No. 870, which was originally approved to allow the establishment of a
regional trade center on 2.311 acres of land within the State Land Use Agricultural
District. The regional trade center was originally intended to be developed with five
buildings, parking and related improvements. General services approved for the
regional trade center include a variety of home, garden and animal supplies;
catchment supplies, sales & service; solar water heaters; office space for service
businesses such as electrical, plumbing, landscaping, gardening, auto repair,
farmer cooperative and home business outlet. Additionally, the permit was
amended in 2003 to include food service uses.
The applicant is requesting to downsize the project from five buildings to
two buildings totaling 10,400 square feet and is requesting to include a 600-
-2-
square-foot compacted gravel parking area for volunteer fire trucks. The applicant
proposes the following project elements as part of the Special Permit amendment
request:
Existing Building Use: 1,000 square feet of Building 2 will be converted into
a restaurant. The remainder of Building 2 (approximately 3,000 square feet) is
proposed to be used for hot and cold certified kitchen uses with no retail activity
or customer visits. The remaining building areas will be improved and allocated
for trade bays consisting of 800 to 1,200 square feet each. Prospective tenants
are expected to provide similar services to those proposed in the original permit
and would include specialty trade contractors, such as electricians, plumbers,
landscapers, auto repair providers, catchment suppliers and solar water heater
installers. The trade center will not include any retail sales.
Parking: 47 standard and 2 ADA-accessible stalls.
Volunteer Fire Truck Parking: A 20’ x 30’ (600-square-foot) compacted gravel
parking area is proposed for the Orchidland Volunteer Fire Department truck.
The Volunteer Fire Department will also have access to water on site.
Water: Water is available through County water service. The water line has
been connected to the property, and a fire hydrant has been installed.
Hours of operation: 6:00 a.m. to 11:00 p.m.
Landscaping: Landscaping will mitigate potential noise and visual impacts to
surrounding properties.
Revoke School Special Permit: If this amendment request is approved, the
applicant requests that the previous Special Permit for an Elementary School
(Special Permit No. SPP 21-000228) be revoked.
The following amendments have been requested by the applicant:
Condition No. 3 (Time to Complete Construction): The applicant is
requesting a 5-year time extension to complete construction of the proposed
development. The proposed Trade Center was briefly planned to be replaced by
the ASC elementary school campus proposed under SPP 21-000228. However,
-3-
as that project is no longer planned, the landowner intends to complete
construction of the Trade Center on the property as soon as possible. The
applicant will obtain Final Plan Approval from the Planning Director prior to
obtaining any building permits and will ensure that the trade center complies with
all necessary fire protection, access, parking and landscaping requirements.
The non-performance is the result of conditions that could not have
been foreseen or are beyond the control of the applicants, successors or
assigns, and that are not the result of their fault or negligence. Rather, the
applicant was unable to complete the conditions of the last (2014) Special Permit
Amendment within the requisite 5-year time frame due to the combined cost of all
improvements required and decided to instead pursue an opportunity to lease the
property to the Arts and Sciences Center (ASC) so that they could develop an
elementary school on the parcel. However, after obtaining a Special Permit for
elementary school operations, the applicant and ASC were unable to settle on
agreeable lease terms and so ASC decided to establish their school facilities
elsewhere. Considering these events, the applicant would now like to revert to the
original uses approved under Special Permit No. 870.
Since the last 2014 amendment request, the applicant has successfully
extended County water to the subject property and constructed a fire hydrant.
Moreover, the applicant is poised to complete construction within 5 years of the
date of this amended permit, including securing a Final Plan Approval, building
permits, and a Certificate of Occupancy in accordance with County Code and
conditions of this amended permit.
Based on the overall information, the non-performance is the result of
conditions that could not have been foreseen and are beyond the control of the
applicant and was not the result or their fault or negligence.
Approval of the selected requests would not be contrary to the
General Plan or Zoning Code, or the original reasons for the granting of the
Special Permit. The General Plan Land Use Pattern Allocation Guide (LUPAG)
-4-
Map designates the subject parcel and surrounding area as Rural. Additionally,
there is a Medium Density Urban node located across the street on the Pāhoa side
of Orchidland Drive between 35th Street and Highway 130. The zoning for the area
and the property has remained the same, which is designated as State Land Use
Agricultural and County Agricultural (A-3a). Therefore, the approval of this request
would not be contrary to the General Plan or the Zoning Code.
The Puna Community Development Plan (CDP) was adopted by the Hawai‘i
County Council, Ordinance 08 116, on September 10, 2008. The Puna CDP has
identified this area as the Orchidland Neighborhood Village Center. The
Orchidland neighborhood village center location was identified by the community
association to be “located along Orchidland Drive from Highway 130 to halfway
between 34th and 35th Avenues”, which encompasses 15 parcels and an area of
about 16 acres. The subject property is located on the boundary within the village
center; thus, the proposed regional trade center is consistent with the Puna CDP.
The approval of this time extension request and the selected
amendments would not be contrary to the original reasons for granting
Special Permit No. 870, which was approved to allow the establishment of a
regional trade center and include a variety of home, garden and animal supplies;
catchment supplies, sales & service; solar water heaters; office space for service
businesses such as electrical, plumbing, landscaping, gardening, auto repair,
farmer cooperative, home business outlet and later to include food service uses.
One of the original reasons for approval for the regional trade center was to provide
and promote limited industrial uses to serve the needs of residents in this area of
Puna, which would not be available in the existing Orchidland Estates
Convenience Center.
Based on the preceding, the Planning Director recommends that the 5-year
time extension request to Condition No. 3 be approved. Please note, the condition
has been updated to reflect current standard condition language and to address
the addition of the proposed volunteer fire truck parking.
-5-
Condition No. 5 (Water Supply Requirements): The applicant is
requesting that Condition No. 5 be deleted as the property has been connected to
the County water system and a fire hydrant has been installed. The proposed
project will comply with all Department of Health and Fire Department
requirements. The condition currently states:
“The applicant shall develop sufficient water storage to meet the
requirements of the Department of Health and the Fire Department for
sanitation and firefighting purposes for the proposed development. The
storage facility shall be completed prior to Certificate of Occupancy and kept filled with enough water to meet the applicable Department of Health and
Fire Department requirements. If an improvement district or similar project
is proposed which would make county water available to the property, the
owner shall participate and pay its fair share of any applicable construction
costs and connect to the County water system.”
County water is available to the property from the Orchidland Gulsons LLC
water system (served by the Department of Water Supply(DWS)) via an 8-inch
waterline and a fire hydrant has been constructed fronting the subject property. A
water commitment for 17 units of water (approximately 6,800 gallons per day) was
secured as part of the previously proposed school use and the applicant
anticipates that water needs for the current proposed project will not exceed the
17 units of water.
DWS notes that despite an existing water agreement between the applicant
and Orchidland Gulson, LLC, it must verify whether sufficient water supply and
meter capacity are available for the project, especially since the previously
allocated 17 units were tied to an expired water commitment. The applicant must
submit engineer-certified estimated water needs calculations of peak flow in
gallons per minute (gpm) and maximum daily water usage (including irrigation) for
review. Based on these, DWS will determine a water commitment deposit and
facilities charges, determine existing meter size adequacy, and any required
system adjustments, with facilities charges to be paid prior to issuance of a
certificate of occupancy. The preceding will be added as a condition of approval.
-6-
Finally, despite the presence of a fire hydrant fronting the property, the
8-inch water line supplying the project does not meet DWS’s 2,000 gpm fire flow
rate standard for commercial use, thus the applicant will need to comply with any
applicable requirements of the Fire Department for providing adequate access
and sufficient quantities and flow rates of water for fire suppression. The preceding
will be added as a condition of approval.
Based on the preceding, the Planning Director recommends that the
request to delete Condition No. 5 be approved.
Condition No. 6 (Improvements to Orchidland Drive): The applicant is
requesting that Condition No. 6 be deleted given that the required improvements
would be contained to the subject parcel’s frontage and would be out of place with
the general road design and the rural/agricultural character of the surrounding
area. Additionally, other Special Permits for similar commercial-type uses, such as
SPP 09-00098, which allowed for the establishment of a commercial retail and
office building on TMK 1-6-010:137, and SPP-2022-000017, which legitimized the
use of a warehouse and office facility on TMK 1-6-009:385, have been approved
in this area along Orchidland Drive without requiring such roadway improvements,
further rendering the improvements out of place for the area. The condition
currently states:
“The applicant shall provide pavement improvements to the northern half of
Orchidland Drive along the subject property's entire Orchidland Drive
frontage meeting with the Department of Public Works Standard Detail R-33 for Rural Collector Standards, prior to the issuance of a certificate of
occupancy for any portion of the proposed project.”
The subject parcel is accessed via Orchidland Drive, approximately
1,000 feet west of the intersection of Orchidland Drive and the Keaʻau-Pāhoa
Road. The project will not take access from 34th Avenue. Orchidland Drive is
privately owned by Hilo Development, Inc. (the original developer of the
subdivision) and maintained by the Orchidland Community Association (OLCA).
Orchidland Drive is a 60-foot-wide right-of-way with a pavement width of
approximately 28 feet at the intersection with Keaʻau-Pāhoa Road. The pavement
-7-
width narrows to approximately 24 feet at the point of access to the subject parcel.
Maintenance of subdivision roads is funded through mandatory road maintenance
fees charged to landowners of the subdivision.
The applicant is proposing to install a single, full-turn driveway serving as
the main entrance connecting to Orchidland Drive. There will be no separate
driveway for the volunteer fire trucks.
The Director does not support the request to delete Condition 6 for the
following reasons.
The requirement to improve the Orchidland Drive frontage has been part of
this permit since it was first approved in 1994. It has continued to be required, in
some form, through four later amendments. This shows that the Commission has
consistently found these improvements to be necessary.
In 2014, the condition was revised to make it less burdensome for the
applicant, but it was not removed. Instead, the Commission chose to keep the
requirement while adjusting its scope, showing that the improvements were still
considered important.
More recently, under SPP 21-000228, which allowed for the development
of an elementary school on the property, the frontage improvement requirement
was kept and updated to meet current Department of Public Works (DPW)
standards. This reflects that the condition is still relevant, especially with increased
use of the site.
The Planning Department also consulted with the Department of Public
Works (DPW) for this amendment request, and they confirmed that the
requirement is still appropriate and remain consistent with the intent of the 2014
revision.
Given that this requirement has been in place for decades, has been
repeatedly retained by the Planning Commission, and is still supported by DPW,
there is no clear reason to remove it. Removing Condition No. 6 would go against
-8-
past decisions and could result in needed roadway improvements needed to
support the commercial use of the property not being completed.
For these reasons, the Planning Director recommends that the request to
delete Condition No. 6 be denied.
Condition No. 7 (Highway 130/Orchidland Drive Intersection
Improvements): The applicant is requesting that Condition No. 7 be deleted. The
request to delete this condition was previously denied by the Planning Commission
in 2014 at the request of the Department of Transportation (DOT), but the applicant
has renewed the request, citing that the cost burden of the required improvements
is unreasonable for a single applicant. DOT has since programmed intersection
improvements (via a roundabout) in the Statewide Transportation Improvement
Program, with construction anticipated in 2026 to address congestion and safety
concerns. It is further noted that a more recent Special Permit for a school at the
same site (SPP 21-000228), which was expected to generate greater traffic
impacts, did not require such intersection improvements. The condition currently
states:
“Channelization, signalization and street lighting improvements to the
intersection of Highway 130 and Orchidland Drive shall be provided by
the applicant if required by the Department of Transportation, prior to the issuance of a certificate of occupancy for any portion of the proposed
development.”
Traffic on Orchidland Drive is primarily generated by local residents and
nearby commercial uses, with the proposed project expected to add approximately
27 peak-hour vehicle trips. This estimate is based on ITE Trip Generation Manual
(11th Edition) rates for specialty trade contractor space and high-turnover sit-down
restaurant uses, with contractor rates applied to the commercial kitchen due to the
absence of a standard classification. The commercial kitchen component is not
expected to significantly increase traffic, as it will not include customer visits or
retail activity.
The State Department of Transportation (DOT) anticipates completion of a
roundabout and related safety improvements at the Keaʻau-Pāhoa Road and
-9-
Orchidland Drive intersection by 2027. DOT recommends that the applicant
prepare a Traffic Assessment or Traffic Impact Analysis Report, prepared by a
licensed engineer, to evaluate trip patterns, queuing, and potential impacts,
including consideration of the planned roundabout. The study must also address
any phased development, multimodal connectivity, and include any necessary
mitigation measures at no cost to the state, subject to DOT review and approval
prior to the issuance of building permits for the project. The preceding will be added
as a condition of approval.
Based on the preceding, the Director recommends deletion of Condition 7,
with the understanding that the applicant will be responsible for constructing any
mitigation measure that may be recommended by the traffic studies as discussed
above.
Project Scope Changes: The applicant is requesting to downsize the
project from five buildings to two buildings totaling 10,400 square feet. This will
focus the buildout and operation within and adjacent to the existing building shells
that will be completed to house the proposed uses. Additionally, the applicant is
requesting to include a 600-square-foot, compacted gravel parking area for
volunteer fire trucks to the southwest of the proposed development. Finally, the
applicant indicated that the project would share potable water with the volunteer
fire department.
The Planning Director supports the project scope reduction as it will
continue to comply with the requirements of the regional trade center and supports
the location of volunteer fire truck parking on the property as it is a needed
community resource that is not currently available in the area.
The request will not have a significant adverse impact to traditional
and customary Hawaiian rights. In view of the Hawaiʻi State Supreme Court’s
“PASH” and “Ka Paʻakai O Ka ʻAina” decisions, the issue relative to Native
Hawaiian gathering and fishing rights must be addressed in terms of the cultural,
-10-
historical, and natural resources and the associated traditional and customary
practices of the site.
Investigation of valued resources: The subject property has been previously
cleared and is currently vacant. No archaeological reconnaissance survey,
cultural impact assessment, or biological studies were submitted with the
application. However, a review of Planning Department records, available
GIS data, and the State Historic Preservation Division (SHPD) records did
not identify any previously recorded cultural within the subject property. By
letter dated July 13, 2008, the State Historic Preservation Division issued a
determination that “no historic properties will be affected” by the proposed
development, citing previous urbanization and grading/grubbing that had
altered the land.
The valued cultural, historical, and natural resources found in the permit
area: The subject property has been previously grubbed and graded, and
based on available information, it is unlikely that valued cultural, historical,
or natural resources are present within the rezoning area. No known
archaeological or historic resources have been identified on the property,
and it is not listed on either the State or National Register of Historic Places.
According to the applicant, there is no known recent use of the property or
surrounding area for traditional cultural or gathering practices. Additionally,
due to the prior ground disturbance, the presence of threatened or
endangered plant or animal species within the project area is considered
unlikely.
Possible adverse effect or impairment of valued resources: Native plants
and/or endangered species are unlikely to be impacted by the proposed
development due to the already cleared property and surrounding urban
environment. The proposed development is not expected to adversely
impact cultural, historical, or natural resources, including traditional and
customary Native Hawaiian practices. Due to the previously disturbed
-11-
condition of the property and surrounding area, the likelihood of impacts to
native flora, fauna, or endangered species habitat is considered low.
Feasible actions to protect native Hawaiian rights: To address the potential
for inadvertent discovery of cultural resources, a condition of approval will
require that all work cease in the immediate area if any historic or cultural
remains (e.g., rock walls, terraces, platforms, shell concentrations, or
human burials) are encountered. The applicant shall contact the
Department of Land and Natural Resources – State Historic Preservation
Division (DLNR-SHPD), and work shall not resume until appropriate
mitigation measures have been implemented and clearance is provided by
DLNR-SHPD.
Lastly, this approval is made with the understanding that the applicant
remains responsible for complying with all other applicable governmental
requirements in connection with the approved use, prior to its commencement or
establishment upon the subject property. Additional governmental requirements
may include the issuance of building permits, compliance with the Fire Code,
installation of improvements required by the American with Disabilities Act (ADA),
among many others. Compliance with all applicable governmental requirements is
a condition of this approval; failure to comply with such requirements will be
considered a violation that may result in enforcement action by the Planning
Department and/or affected agencies.
Based on the preceding findings the Planning Director recommends that
the 5-year time extension request to Condition No. 3 and deletion of
Condition Nos. 5 and 7 should be approved by the Planning Commission,
while the deletion of Condition No. 6 should be denied.
The following amended conditions of approval have been updated to reflect
current standard condition language, been revised or deleted based on compliance
with certain conditions and to reflect requirements from governmental agencies as
-12-
part of this amendment request (Material to be deleted is bracketed and struck
through; material to be added is underscored):
1. The applicant, successors or assigns (Applicant) shall be responsible for
complying with all of the stated conditions of approval.
2. [If County water becomes available for this project, the applicant(s) shall
submit the anticipated maximum daily water usage calculations as prepared
by a professional engineer licensed in the State of Hawai'i and submit a
water commitment deposit in accordance with the "Water Commitment
Guidelines Policy" to the Department of Water Supply within 180 days from
the effective date of this amended permit.] Prior to the issuance of a water
commitment by the Department of Water Supply (DWS), the Applicant(s)
shall submit the anticipated maximum daily water usage calculations as
prepared by a professional engineer licensed in the State of Hawai‘i to the
DWS. A water commitment deposit shall be paid to the DWS within 180
days from the effective date of this ordinance in accordance with Rule 5 of
the Department of Water Supply’s Rules and Regulations. The applicant is
responsible for maintaining valid water commitments to support the
proposed use until such time that required water facilities charges are paid
in full. The Applicant shall be responsible for constructing any water system
improvements that may be required by the DWS prior to receipt of
Certificate of Occupancy for any portion of the proposed project.
3. [Construction of the proposed development shall be completed within five
(5) years from the effective date of this amendment. This time period shall
include securing Final Plan Approval from the Planning Director in
accordance with the Zoning Code. Plans shall identify proposed
structure(s), fire protection measures, access roadway, driveway and
parking stalls. Landscaping shall be indicated on the plans for the purpose
of mitigating any potential adverse noise or visual impacts to adjoining
parcels. Landscaping shall be provided in accordance with the
-13-
requirements of Planning Department's Rule No. 17 (Landscaping
Requirements) standards for CV zones adjoining a RS zone.] Construction
of the proposed development shall be completed within five (5) years from
the effective date of this amended permit. Prior to construction, the
Applicant(s) shall secure Final Plan Approval for the proposed development
from the Planning Director in accordance with Section 25-2-70, Chapter 25
(Zoning Code), Hawai‘i County Code. Plans shall identify all existing and/or
proposed structure(s), paved driveway access and paved parking stalls
(except for the volunteer fire truck parking area) associated with the
proposed development. Landscaping shall be indicated on the plans for the
purpose of mitigating any adverse noise or visual impacts to adjacent
properties in accordance with the requirements of Planning Department’s
Rule No. 17 (Landscaping Requirements) and Chapter 25 (Zoning Code),
Hawai‘i County Code for CV zones adjoining a RS zone.
4. The [applicants] Applicant shall comply with the design guidelines in the
development of the proposed regional trade center as detailed by the
Orchidland Estates Community Association in their letter to the Planning
Director dated February 24, 1994 [, except for the requirement for the
project to operate on county water and provide an additional fire hydrant].
5. [The applicant shall develop sufficient water storage to meet the
requirements of the Department of Health and the Fire Department for
sanitation and firefighting purposes for the proposed development. The
storage facility shall be completed prior to Certificate of Occupancy and kept
filled with enough water to meet the applicable Department of Health and
Fire Department requirements. If an improvement district or similar project
is proposed which would make county water available to the property, the
owner shall participate and pay its fair share of any applicable construction
costs and connect to the County water system.] The Applicant shall install,
construct and maintain any fire suppression improvements on the subject
-14-
property that may be required by the Fire Department. Upon successful
installation of the improvements and prior to issuance of a Certificate of
Occupancy for any portion of the proposed project, the Applicant shall
provide the Planning Department documentation from the Fire Department
indicating that the improvements meet Fire Code standards.
6. [The applicant shall provide pavement improvements to the northern half of
Orchidland Drive along the subject property's entire Orchidland Drive
frontage meeting with the Department of Public Works Standard Detail R-
33 for Rural Collector Standards, prior to the issuance of a certificate of
occupancy for any portion of the proposed project.] The Applicant shall
provide pavement improvements to the northern half of Orchidland Drive
along the subject property’s entire Orchidland Drive frontage consisting of
a 12-foot wide travel lane, 8-foot wide shoulder, and 10-foot wide swale,
meeting with the Department of Public Works Standard Detail R-19 for
“Half-Section of Street with Shoulder” within the existing 60-foot right of way,
prior to the issuance of a certificate of occupancy for any portion of the
proposed project.
7. [Channelization, signalization and street lighting improvements to the
intersection of Highway 130 and Orchidland Drive shall be provided by the
applicant if required by the Department of Transportation, prior to the
issuance of a certificate of occupancy for any portion of the proposed
development.] The Applicant shall conduct a Traffic Assessment or a Traffic
Impact Analysis Report prepared by a professional engineer, licensed in the
State of Hawaiʻi for review and acceptance by the Hawaiʻi Department of
Transportation, which should include the following: a)An evaluation to
identify whether the daily operations relating to trip patterns and queuing
concerns based on proposed uses will have any local or regional impacts
to the nearby State-owned Keaʻau-Pāhoa Road which should include the
new roundabout in the analysis. The study should also provide any
-15-
recommended mitigations to be implemented at no cost to the State; b) If
the project construction is phased over multiple years, interim horizon years
should be analyzed for the completion of each phase; and c) The study
should provide a discussion on multimodal (bicycle/ pedestrian) paths within
the proposed site and connectivity to the rest of the area.
8. [The regional trade center operations shall be limited to 6:00 a.m. to 11 :00
p.m. Uses permitted within the proposed regional trade center shall be
limited to those uses specified by the applicants within the Planning
Director's Background Report dated May 10, 1994 as Exhibit E - Orchidland
Trade Center - Project Overview and food service uses.]
The regional trade center operations shall be limited to 6:00 a.m. to 11:00
p.m. Uses permitted within the proposed regional trade center shall be
limited to those uses specified in Exhibit 1 of the Planning Director's
Background Report for this amendment and food service uses but excluding
retail sales.
9. The [a]Applicant shall provide an 8-foot-high chain link fence or of
comparable security effect along the boundaries with the adjacent
properties identified by TMK: 1-6-010: 046 and :081.
10. A Solid Waste Management Plan shall be submitted to the Department of
Environmental Management for review and approval prior to the issuance
of a Certificate of Occupancy.
11. The [applicant(s)] Applicant shall comply with applicable laws, rules and
regulations of the affected agencies, including those of the Department of
Public Works and Department of Health [and the Fire Department].
12. An annual progress report shall be submitted to the Planning Director prior
to the anniversary date of the approval of the permit. The report shall
include, but not be limited to, the status of the development and the extent
to which the conditions of approval are being complied. This condition shall
remain in effect until all of the conditions of approval have been complied
-16-
and the Planning Director acknowledges that further reports are not
required.
13. [If the applicants should require an additional extension of time, the
Planning Director shall submit the applicants' request to the Planning
Commission for appropriate action.]The proposed regional trade center
shall be developed and operated in a manner that is substantially
representative of plans and details contained within the Special Permit
Amendment Request Application dated January 9, 2026, any supplemental
material, and the representations made before the Windward Planning
Commission. Any expansion of uses beyond what is represented in these
documents shall require an amendment to this permit.
14. In the event that surface or subsurface historic resources, including human
skeletal remains, structural remains (e.g. rock walls, terraces, platforms,
etc.), cultural deposits, marine shell concentrations, sand deposits, or sink
holes are identified during the demolition and/or construction work, the
Applicant shall cease work in the immediate vicinity of the find, protect the
find from additional disturbance and contact the State Historic Preservation
Division at (808) 933-7651. Subsequent work shall proceed upon an
archaeological clearance from DLNR-SHPD when it finds that sufficient
mitigation measures have been taken.
15. If the Applicant should require an additional extension of time, the Planning
Director shall submit the Applicants' request to the Planning Commission
for appropriate action.
[Further, should any of the conditions not be met or substantially complied
with in a timely fashion, the Director shall initiate procedures to revoke this
permit.]
16. Should any of the conditions not be met or substantially complied with in a
timely fashion, the Planning Director may initiate procedures to revoke the
permit.