Loading...
HomeMy WebLinkAbout2026-01-05 Exhibit 01_PL-SMM-2025-000079 Decision Letter Dated 12-04-2025 C. Kimo Alameda, Ph.D..' -. •** "'• Jeffrey Darrow tfa•o• Dire for :fj k far . o • William V. Brilhant ,Jr. -�_- ' ; Michelle S.Ahn Vlauaging Directo• . �_p Deputy Director West l-iawa1`i Office East 1-1 wai r Office 74-5044 Ane Kechok5lole • 101 Pauahi Street.Suite 3 Kailua-Kona,Ela► e`' 674,1 Coin o awai 1 !No,1 Ia at'i 967211 Phone(80 )3 3-4770 PLANNINGDEPARTMENT Phone ) 1- Fax( 0 ) 7-3 3 Fax( 1:8)961 8742 December 04, 2025 Daryn Arai Land Use Planning Consultant P. O. 4501 Hilo, HI 96720 VIA EMAIL Dear Daryn Arai: SUBJECT: Special Management Area (SMA) Use Permit Assessment Application (PL-SAA-2025-000312) Special Management Area (SMA) Minor Permit (PL-SMM-2025-000079) Applican s : Kaimu Cove LLC Landowner(s): Kaimu Cove LLC Project: Construction of New Single-Family Residence and Related Improvements Tax I1Iap_I ey: 1-2-018:001, K imti, Puna, Island of-Hawaii _--_ We have reviewed your completed Special Management Area (SMA) Use Permit Assessment Application PL-SAA-2025- 12), received by this office on September 15, 2025, with additional information provided by the State Historic Preservation Division (SHPD) on December 2, 2025, for a proposed single-family residence (SFR) and related improvements on the subject parcel. The . -acre parcel is zoned Residential-Agricultural 0.5-acre (RA-.5a) by the County and designated Urban by the State Land Use Commission (LVC). The subject parcel is designated as Extensive Agriculture(ea)by the Hawaii County General Plan Land Use Pattern Allocation Guide (LUPAG) map. The subject parcel is a shoreline parcel and situated entirely within the SMA, and the proposed single-family residence is defined as "development" pursuant to §205A-22, Hawaii i Revised Statutes (HRS). Staff notes that the applicant did obtain a certified shoreline survey, which was approved by the Board of Land and Natural Resources (BLNR) on March 29, 2023. %%MN%plannin .hawaiucountv.gov Hairnet County is an Equal Opportunity Provider and Employer planning fuhm‘aucounty.gov EXHIBIT 1 Daryn Arai Land Use Planning Consultant December 04, 2025 Page 2 Proposed Proms The Applicant is proposing to construct a 2-story dwelling,consisting of 2 bedrooms(one bedroom on each level), with the 1st level having 384 square feet of living area (1 bedroom & 1 bath)and a 320-square-foot porch with 2-car garage and the 2nd level having 768 square feet of living area (1 bedroom, 1 bath & living room with kitchen) and a 320-square-foot lanai. Additional work includes the construction of a 60' x 35' pickleball leball court, slab on grade only, no fencing around perimeter,,just a low perimeter landscaped hedge. A 10-foot-wide public access easement will be located along the property boundary with the State parcel to the north-east. Access to the proposed dwelling will be directly from the Kalapana-Kapoho Beach Road via a 15-foot-wide compacted gravel driveway. A 5-foot-tall rock wall and gate system is proposed at this entry point, having a total length of approximately 55 feet. County water is available to support the proposed single-family dwelling via an existing water meter located along Kalapana-Kapoho Beach Road. Wastewater will be accommodated modated by an Individual Wastewater System lWS to be designed in accordance with State Department of Health rules and regulations. No staging of material will occur within the shoreline setback area, and no other work is proposed at this time. Special Mana;ement Area Determination: According to Ha Arai'i Revised Statutes (HRS) Chapter 205A-44 and Planning Commission (PC) Rule No. 9-4 i 1 A & E , "development" includes " ' aceme i or erection qfany solid material or any gaseous, liquid, solid, or thermal waste"; and "Construction, reconslrcutio r, or alteration of the size ofany structure. "Therefore, the proposed construction of a new single-family residence and related improvements is considered to be development and will require a review against the Special Management Area rules and regulations. We find that the proposed project is not exempt from the definition of"development"; however, the project will not have a cumulative impact or a significant adverse environmental or ecological effect on the SMA. Therefore, pursuant to PC Rule Section 9-10 e , Special Management Area Minor Permit No. PL-SMM-2025-000079 is hereby issued for the project as described above. It is the applicant's responsibility to read and comply with the conditions listed in the enclosed permit. While further review of the proposed project against the SMA rules and regulations will not be required, all other applicable Zoning Code and Building Code requirements must be satisfied. Additionally, any future development or activities not included in this approval will require further review and approval as provided under Chapter 205A, HRS and Rule 9, Planning Commission Rules ofPractice and Procedure. Daryn Arai Land Use Planning Consultant December 04, 2025 Page 3 If you have questions regarding this document, please contact Alex J. Roy ofthis office at (808) 9 l- l 40 or via email at alex.roy@hawaiicounty.gov. Sincerely, J fe2c?tI't'W Jeffrey .Da rro (Dec 4,2025 13:57:151-I T JEFFREY W. DARROW Planning Director AJR:rms in60\c mismm\. 0 \pl-smm-2 25- 00791 ww)an MI-docx Enclosure: SMA Minor Permit No. PL-SMM-2025-000079 Exhibit 1 Site Plan Exhibit SHPD Ch. 6E-42 Review Letter cc via email /enclosure: Shichao Li, State-OPSD Lisa L. Webster, State-OPSD GIS Section Lisa Benham C. Kimo o Alameda, Ph.D. - : •. Jeffrey W. Darrow layor / Director William V. Brilhante,Jr. - ,� Michelle S. Ahn Ilanaging Drr•ti c for '•: :• Deputy Dire.or West Hawaii office East Eta ai i Office 4-5044 Ane Keoholaole I No, • 1 I Pauahi Street,s,-�t 3 ka.lua-Kona,I 1awau`i 674_i CountyofHawai‘ }-li10 H1awau`i 67 ..1 Phone( 08)3 3-477o �PLANNIN DEPARTMENT Phone( 1- Pax{ 08)3 7-3 3 Fax( 11 ) 61-874 Special Management Area Minor Permit No. PL-SMM-2025-000079 Project: Construct Single-Family Residence and Related Improvements Applican s : Kaimu Cove LLC Landowners : Iaimu Cove LLC T M K: (3) 1-2-018:001 Location: Kaimu, Puna, Island of Hawaii Land Area: 3.8 acres Applicant's Request 1. Project Description: The Applicant is proposing to construct a 2-story dwelling, consisting of 2 bedrooms(one bedroom on each level), with the 1st level having 384 square feet of living area(1 bedroom & 1 bath) and a 320-square-foot porch with 2-car garage and the 2nd level having 768 square feet of living area(1 bedroom, 1 bath & living room with kitchen) and a 320-square-foot lanai. Additional work includes the construction of a 60' : 35' pickleball court, slab on grade only, no fencing around perimeter, just a low perimeter landscaped hedge. A 10-foot-wide public access easement will be located along the property boundary with the State parcel to the north-east. Access to the proposed dwelling will be directly from the Kalapana-Kapoho Beach Road via a 15-foot-wide compacted gravel driveway. A 5-foot-tall rock wall and gate system is proposed at this entry point, having a total length of approximately 55 feet. County water is available to support the proposed single-family dwelling via an existing water meter located along Kalapana-Kapoho Beach Road. Wastewater will be accommodated by an Individual Wastewater System I WS to be designed in accordance with State Department of Health rules and regulations. No staging of material will occur within the shoreline setback area, and no other work is proposed at this time. 2. Project Valuation: $267,000. 3. Determination: According to Hawaii Revised Statutes (HRS) Chapter 205A-44 and Planning Commission (PC) Rule No. 9-4 i 1 A & , '`development" includes "Placement t or erection of any solid material or any gaseous, liquid, solid, or thermal wv,l‘planning,hawaiieount flau'aet Count}is an Equal Opportunity Provider and Employer planning rr.ha aalicounty, o% Daryn Arai Land Use Planning Consultant December 04, 2025 Page 2 waste"; and -Construction,truction, reconstruction, r alteration qft e size of any structure." Therefore, the proposed construction of a single-family residence and related improvements is considered to be development and will require a review against the Special Management Area (SMA) rules and regulations. Our review has resulted in the issuance of a SMA Minor Permit. �m � 1ll19S1\l\\%Gznzl>n>kSnl1011lll\l`StirinSikf lYD";`U'UU91i91C`Ni9\l!IMNN\951:11N1N1119}4lACbL "J9nt;NNllllllUU1101}9 State and County Plans 4. State Land Use District: The project area is within the State Land Use URBAN District. 5. General Plan: The parcel is designated as Extensive Agriculture (ea) by the Hawai`i County General Plan Land Use Pattern Allocation Guide (LUPAG) Map. 6. County Zoning: The parcel is currently zoned as Residential-Agricultural 0.5-acre (RA- 0.5a) 7. Special Management Area: The project parcel is located within the SMA, as well as within the "shoreline area" as defined by section 20 A- 1, Hawaii Revised Statutes (HRS). A Certified Shoreline Survey was approved by the BLNR on March 29, 2023. 8. Flood Zone: The subject parcel is designated as Flood Zone X, which are areas above the 500-year flood plain. A small portion ofthe makai side of the parcel is within Flood Zone V, however, no work will occur within that area. Compliance with Objectives and Policies of Chapter 205A, Hawaii Revised Statutes (HRS), Regarding the Special Management Area Check all objectives and policies found to be consistent with proposed development. Issuance of SMA Minor Permit requires that activity be consistent with all objectives & policies. The proposed development is consistent with the following objectives and policies: l� Development will not have any significant adverse environmental or ecological effect, except as any adverse effect is minimized to the extent practicable and clearly outweighed by public health, safety, or compelling public interest. Those adverse effects shall include but not be limited to the potential cumulative impact of individual developments, each of which taken by itself might not ha%e a significant adverse effect and the elimination of planning options. I The proposed development i.. consistent with the Hawai#i County General Plan, community plan, and zoning; provided that a finding of consistency shall not preclude concurrent processing where a general plan, community plan, or zoning amendment may also be required. Daryn Arai Land Use Planning Consultant December 04, 2025 Page 3 lJ The proposed development does not conflict with the following objectives of Chapter 205A, HRS (as amended), to: ❑ Provide coastal recreational opportunities accessible to the public. 0 Protect, preserve, and where desirable, restore those natural and man-made historic and pre-historic resources in the coastal zone management area that are significant in Hawaiian and American history and culture. 0 Protect, preserve, and where desirable, restore or improve the quality ofcoastal scenic and open space resources. EJ Protect valuable coastal ecosystems, including reefs, beaches, and coastal dunes, from disruption and minimize adverse impacts on all coastal ecosystems. El Provide public or private facilities and improvements important to the States economy in suitable locations. 0 Reduce hazard to life and property from coastal hazards. El improve the development review process, communication, and public participation in the management ofcoastal resources and hazards. El Stimulate public awareness, education, and participation in coastal management. El Protect beaches and coastal dunes for: Public use and recreation; The benefit of coastal ecosystems; Use as natural buffers against coastal hazards; and Coordinate and fund beach management and protection. I Promote the protection, use, and development of marine and coastal resources to assure their sustainability. El The proposed development is consistent with the following policies of Chapter 205A, HRS, relating to: 0 Recreational Resources D Historic Resources 0 Scenic and Open Space Resources El Coastal Ecosystems Daryn Arai Land Use Planning Consultant December 04, 2025 Page 4 Economic Uses El Coastal Hazards Managing Development ❑� Public Participation Beach and Coastal Dune Protection Marine and Coastal Resources l� The proposed development conforms to the requirements of Chapter 343, HRS, regarding Environmental Impact Statements. Findings 1. As discussed above, the proposed activities will not have any significant adverse environmental or ecological effect, except as such adverse effects are minimized to the extent practicable and clearly outweighed by public health, safety, or compelling public interest. 2 The proposed development is consistent with the objectives, policies, and SMA guidelines of Chapter 205A, HRS. 3. The estimated project cost of $267,000 is not in excess of $500,000. p »i»viurm„r.rv,i»i»ve�vninxvn .i,wiwm. .. Approved Uses, Activities and Operations Pursuant to Planning Commission Rule Section 9-10(e), Special Management Area Minor Permit No. PL-SMM-2025-000079 is hereby approved for the proposed project as described above, subject to the applicants' compliance with the conditions of approval as specified below. Conditions of Approval The Planning Director has approved SMA Minor Permit No. PL-SMM-2025-000079, subject to the following conditions: 1. The applicant(s), its .succ ssor s , or assign(s) (Applicant) shall be responsible for complying with all stated conditions of approval. 2. The Applicant shall secure all necessary approvals and permits from other affected federal, state, and county agencies as necessary to comply with all applicable laws and regulations. Daryn Arai Land Use Planning Consultant December 04, 2025 Page 5 Construction of the proposed development shall be completed within five (5) years from the effective date of this permit. 4. No land alteration, grubbing, landscaping or construction activities, including but not limited to, the stockpiling ofdebris, construction materials or equipment, shall occur in the shoreline setback area without securing a prior written determination of minor structure or activity pursuant to Rule 11-8 from the Planning Director or approval of a Shoreline Setback Variance from the Planning Commission. 5. Artificial light from exterior lighting fixtures, including, but not necessarily limited to floodlights, up-lights or spotlights used for decorative or aesthetic purposes shall be prohibited if the light directly illuminates, or is directed to project across property boundaries or toward the shoreline and ocean waters, except as may otherwise be permitted pursuant to Section 25A- 1 b , Hawai`i Revised Statutes. 6. In order to preserve the coastal access for fishing and gathering purposes the public currently uses, the Applicant shall establish a 10-foot-wide pedestrian public shoreline access easement on the subject parcel along the north-east property boundary adjacent to the State parcel that extends from Kalapana-Kapoho Beach Road to the shoreline fronting the subject parcel. The metes and bounds of the shoreline access trail shall be recorded with the Bureau of Conveyances as a deed instrument against the affected lot. The Applicant shall not, at any time, impede or otherwise restrict lateral public access along the shoreline and within the public pedestrian access easement. The Applicant shall purchase and install a Shoreline Public Access sign meeting with Planning Department approval at the entrance to the public access path at Kalapana-Kapoho Beach Road. The Shoreline Public Access Sign description may be obtained from the Planning Department. 7. All earthwork and grading activity shall conform to Chapter 10, Erosion and Sedimentation Control of the Hawaii County Code. 8. All construction and maintenance activities on the subject parcel shall comply with Chapter 27, Floodplain Management, ofthe Hawaii County Code. 9. Due to insufficient icient information regarding potential impacts to brf ace historic properties, the Applicant is required to prepare an Archaeological Monitoring Plan (AMP) meeting the requirements ofHawaii Administrative Rules HA Ch. 13-279-4 for review and approval by the State Historic Preservation Division (SHPD) prior to the issuance of Building Permits for the proposed development. The Applicant shall provide a copy ofthe approved AMP to the Planning Department once approved by SHPD. The Applicant shall comply with the approved AMP including, but not limited to, having an archaeologist onsite to conduct archaeological monitoring for identification purposes during all ground disturbing activities to adequately identify any archaeological historic properties present Daryn Arai Land Use Planning Consultant December 04, 2025 Page 6 and, if identified, to determine potential impacts to them, and to ensure that appropriate mitigation is implemented. 10. In the event that surface or subsurface historic resources, including human skeletal remains, structural remains e.g., rock walls,terraces, platforms,etc.),cultural deposits,marine shell concentrations, sand deposits, or sink holes are identified during the demolition and:or construction work, the Applicant shall cease work in the immediate vicinity of the find, protect the find from additional disturbance and contact the State Historic Preservation Division at (808) 9 - 6 1. Subsequent work shall proceed upon an archaeological clearance from DLNR-SHPD N -SHP1 when it finds that sufficient mitigation measures have been taken. 11. Any further development, including but not limited to, the construction of structures or improvements not included in this determination shall require further review and approval as provided under Chapter 205A, HRS,and Rule 9, Planning Commission Rules of Practice and Procedure. 12. That in issuing this permit, the Department has relied on the information and data that the applicant has provided in connection with this permit. If, subsequent to issuance ofthis permit, such information and data prove to be false, incomplete or inaccurate, this permit may be modified, suspended, or revoked, in whole or in part, and/or the Department may, in addition, institute appropriate legal proceedings. 13. An initial extension oftime for the performance f conditions within the permit may be granted by the Director upon the following circumstances: A. The non-performance is the result of conditions that could not have been foreseen or are beyond the control of the applicant, successors or assigns, and that are not the result of their fault or negligence. B. Granting of the time extension would not be contrary to the General Plan or Zoning Code. C. Granting ofthe time extension would not be contrary to the original reasons for the granting of the permit. I . The time extension shall be for a period not to exceed the period originally granted for performance i.e., a condition to be performed within one year may be extended for up to one additional year). E. If the applicant should require an additional extension of time, the Applicant will be required to submit for review and processing a new Special Management Area Asessment Application to to the Planning Department for appropriate action. Daryn Arai Land Use Planning Consultant December 04, 2025 Page 7 14. The Planning Director shall initiate procedures to revoke this permit should any of the conditions not be met or substantially complied with in a timely fashion. If you have any questions, please feel free to contact Alex Roy at 961-8140 r via email at ale .ro hawal i ount . ov. APPROVED: 1I1* Darrow December 04, 2025 JeffreyJeffice, arro (Dec 4,2025 13:57:15 HST: JEFFREY W. DARROW Date Planning Director KALAPANA-KAPOHO ROAD Proposed rock wall and gate at entry 1837r r + TERE 1 ER I r - -i. PlanningDept. rr/roe "."`' s1lb+rt iir E x h i b i t I - yr __ �+..1111. GRAVEL WOW 4 I • :" wT"r /11 Oft wide public shoreline access easement I ewe ini t I ,S..ar., y. 9, PROPOSED _ 11,,,„ ___DWELUNG PROPOSED SEPTIC SYSTEM 4 AuscMd C i�� '. *.r.r...r' Or r+►#br I.00 0+1*rt / I . f.,,,,A4:'? I IS't+ir ors N \ I L _ _..... _.._,... ...„..........---. .. . . _ _ ....,.....„ _ _ LOT - .f.�3 � a'o s► � ....*''' ...!M........, . 00 ACRES :;A7A''IN *ft, \Sa I ...*'''''' %.........\ \\\... 21........' g PLAN \..........:2\ scale'1-.40 JOSH GREEN,M.D. I' '4 DAWN N.S. HANG GOVERNOR.KE WAWA •A � 19 5 o CHAIRPERSON Oltf.f BOARD OF LAND AND NATURAL RESOURCES A COMMISSION ON WATER RESOURCE SYLVILIEUTENANT GOVERNOR° A HOPE KIIA'AINA i I- + MANAGEMENT RAH K.P.KANAKA'QL.E # 1, FIRST DEPUTY , s CIA RA WK.KAIiAHANE o )1‘ 0, . DEPUTY DIRECTOR•WATER . - AQUATIC RESOURCES r BOATING AND OCEAN RECREAT ON STATE OF HAWAII I KA M U'AINA 1 HAWAII BUREAU OF CONVEYANCES WATER'11411\ IPF RESOURCE DEPARTMENT OF LAND AND NATURAL F E U CE COMMISSION ONAN NT CONSERVATION AND COASTAL LANDS KA sOIHANA KUMUI All Al'AMA CONSERVATION AND RESOURCES ENFORCEMENT ENGINEERING FORESTRY AND WILDLIFE STATE HISTORIC Ply I '-i EF VAT1 N DIVISION HISTORIC PRESERVATION [ kUHIH�IA ISLAND 1 KAMOKILA BLVD,STE 555 STATE PARK!: KAPOLL I.HAWA11 96707 November 21,2024 IN REPLY REFER TO: Jeff Darrow,Director Project No.225PR108I Planning Department Doc.No.251 I J5 County of Hawaii Archaeology,History Hilo, HI 96720 Culture 101 Pauahi Street, Suite planning ,hawaiicount r. Dear Jeff Darrow: SUBJECT: Hawaii Revised Statutes HR Chapter 6E-42 Historic Preservation Review County of Hawaii Special Management Area Use Permit Permit Number: PL-SAA-2 2 - 12 Applicant: Kaimu Cove LLC (Landowners representative) IaimO Ahnpua'a,Puna District,Island of Hawaii T 'I K: 1-2-018:001 This letter provides the State Historic Preservation Division's (SHPD's) review of the subject County of Hawaii Special Management Area(SMA)Assessment permit application received by our office on September 25,2025.The submittal included an SMA Use Permit Assessment Application,construction plans,a previous field inspection letter report(Clark 2024), a draft cultural impact assessment report(CIA), project parcel related previous correspondence (see HICRIS submittal materials),and photos of the project area.Per the submitted correspondence,the current project and permit represent a reduction in scope of a previously reviewed project HIC;'RIS Project No.2 2 PR 9 ; Doc. No. 2409JG07). SHPD received subsequent information on November 7, 2025 in support of the project (HICRIS Submission Nos.2025PRO1081.003 and 225 PR l 1. . The previously proposed project area was comprised of the entire 3.677-acre parcel;the project proponent proposed the development of a 5-lot subdivision consisting ofparcel s ofat least 0.5 acre each for residential purposes and ground disturbing activities to facilitate the subdivision. The updated and current project area under the current permit application comprises a . -acre portion of the project parcel;the proposed project consists of the construction of residence and associated infrastructure and appurtenances. The proposed project will include the following: • Construction of a 2-story single-family dwelling 704 sq.ft.first floor and 1088 sq. ft.second floor). • Construction of a 60 ft.long by 35 ft.wide pickleball court(slab on grade only,no fencing around perimeter). • Construction of an access road that will measure 55 ft.by 15 ft. with a rock wall and gate system at the entry point. Access to the proposed dwelling will be directly from the Kalapana-Kapoho Beach Road. • Installation of a septic system(see construction plans in HI R1S submittal materials). • Grading or excavation associated with the installation of the residence foundation,pickleball court and septic system. • Installation of associated utility improvements,such as waterline installation and electrical utility poles. • A 1 -foot wide, cinder-surfaced public pedestrian access easement will also be provided along the entire northern boundary of the subject property, adjacent to the existing adjoining State lands once the subject permit approved. Planning Dept. 'Exhibit 2 Jeff Darrow November 21,2025 Page 2 Additionally,no use,land alteration or vertical construction will be permitted within the 40-foot shoreline setback area as established by a shoreline survey ofthe subject property certified by the Board of Land and Natural Resources on March 29,2023. The H1CRIS submittal data and materials indicate that the proposed project area has been included as part ofprevious archaeological studies (Spear 1992, Doc. No. 9 o2ks2 ; and Clark 2024, Doc. No. 2 9J o7) that resulted in the identification of historic properties. Per the submitted construction plans, none of the previously identified historic properties are located within the current permit area. SHPD received additional information subsequent to the initial submittal (Submission Nos. 2025PR010 1.003 and 2 2 PRolo l.00 ) that indicates that the proposed project area has been previously disturbed. SHPD previously reviewed an SMA permit (Permit # PL- MA-2o2 -0000 3 [see above for previous project scope description]; HICRIS IS Project No. 202 PR00930; Doc. No. 2 09J 07) in which SHPD reviewed a field inspection letter report (Clark 2024) and made a then-project effect determination of"No historic properties affected."The submitted CIA report(McGuire,October 2025)indicates that the coastline of Kaimu was a significant area to pre-contact and post-contact communities linked to traditional cultural practices. Moreover, interviews contained therein also indicate that a concern of the area is the potential for encountering subsurface deposits within the project area given the existing cemetery across the street from the subject parcel and the preservation of a coastal trail that that has not been identified by the previous studies(Spear 1992;and Clark 2024). Per correspondence(Joshua Gastilo ISHPD] to Jackson Bauer [DLNR DOFAW]; see HICRIS IS submittal materials), the trail alignment referred to in the CIA report(McGuire,October 2025)correlates with the existing highway corridor. While the proponent has previously indicated that the ground surface ofthe proposed project area is a result ofa 1960s lava flow;available data and the submitted field inspection letter report(Clark 2024)specifically indicates the that the project parcel lies atop a"Puna basalt flow that erupted between 400 and 750 years before present(BP)forming much of the central and southern part of the parcel; a younger Puna basalt flow of'ea lava dating to 200-400 years BP creating the northeastern edge;and a more recent pahoehoe flow that occurred between 1986 and 1992 present at the coast."The portion of the youngest flow(between 1986 and 1992)located in the project parcel is outside of the current project area.Moreover,the subject project area may lie within a previously disturbed area that that may have removed any surface features;however,any ground altering activity has the potential to impact subsurface features beneath the existing surface flow, including burials. Additionally,the portion ofthe lava flow on which the project is proposed is comprised of`a`a►lava.Due to the nature of`a` lava,potential exists for any unidentified historic properties,including human skeletal remains/burials to have fallen into the cracks and crevices and to have been deposited in subsurface contexts. Based on the information provided and the sensitivity of the area,SHPD has insufficient information to determine the potential for the project to adversely impact significant subsurface historic properties, including human skeletal remains:`burials.Therefore,SHPD requests that archaeological monitoring be conducted for identification purposes during all ground disturbing activities to adequately identify any archaeological historic properties present and, if identified,to determine potential impacts to them,and to ensure that appropriate mitigation is implemented. SHPD looks forward to receiving for review and acceptance an archaeological monitoring plan(AMP) meeting the requirements of HAIL §13-279-4 prior to permit issuance. Please submit the requested AMP and associated filing review fee to HICRIS Project No.202 PR010 l in response to our HICR1S 1 request. SHPD will notify the County of Hawaii Planning Department when the AMP has been reviewed and accepted,and the permit issuance process may continue. Please contact Traven Apiki at traven.apiki@hawaii.gov,hawaii.gov for any questions regarding burials and Joshua Gastilo at Joshua.gastilo@hawaii.gov_ for any questions regarding archaeological resources or concerns regarding this letter. Aloha, "-lerjrb Jessica L.Puff Administrator,State Historic Preservation Division Deputy State Historic Preservation Officer Jeff Darrow November 21,2025 Page 3 cc: Alex Roy,al c.roy c�hawai i oun y. o Daryn Arai,daryn.aai@outlook.com Kaimu Cove LLC,wyattinhawaii@gmail.eom Gina McGuire,meuire2@hawaii.edu Jackson Bauer,jackson.m.bauer@hawaii.gov 3 Daryn Arai Land Use Planning Consultant December 04, 2025 Page 4 bcc via email w enclosure: Leslie Enrique Enriquez Rosehill Gina McGuire Leila Kealoha K 'ulei Kealoha Cooper& Ohana