Loading...
HomeMy WebLinkAboutAgenda Item IV.2.a_Draft Wastewater Facilities Plan and Cesspool Conversion Evaluation EMC PresentationEnvironmental Management Commission Briefing County of Hawaii, Department of Environmental Management Draft Wastewater Facilities Plan and Cesspool Conversion Evaluation August 26, 2026 C A R O L L O / 2 up d a t e f o o t e r 0 3 2 3 . p p t x / 2 Briefing Objectives •Provide an overview of the Wastewater Facilities Plan »Infrastructure condition and needs »Required maintenance actions and capital projects »Near and long-term capital improvement plan (CIP) •Provide an overview of the Cesspool Conversion Evaluation »Basis of analysis »Range of conversion options »Suggested County-led projects •Discuss next steps C A R O L L O / 2 C A R O L L O / 3 up d a t e f o o t e r 0 3 2 3 . p p t x / 3 The Facilities Plan and Cesspool Conversion Evaluation are key elements of the Integrated Wastewater Master Plan required by the AOC Cesspool Conversion Evaluation Wastewater Facilities Plan Integrated Wastewater Master Plan Organizational Chart Operations and Maintenance Manuals Regional Plans Sewer Service Expansion Program C A R O L L O / 4 up d a t e f o o t e r 0 3 2 3 . p p t x / 4 The Wastewater Facilities Plan and Cesspool Conversion Evaluation are the result of a 3-year effort •Contract number c.01120 between the County of Hawaii and Carollo Engineers »Contract executed June 27, 2023 »Notice to proceed issued July 10, 2023 C A R O L L O / 5 up d a t e f o o t e r 0 3 2 3 . p p t x / 5 Analysis and findings are driven by several factors Available funding Condition of existing facilities Legally mandated wastewater improvements County’s limited role in cesspool conversions Total cost of all wastewater needs C A R O L L O . C O M Overview of the Draft Wastewater Facilities Plan C A R O L L O / 7 up d a t e f o o t e r 0 3 2 3 . p p t x / 7 Agenda Wastewater Facilities Plan •Background and basis of the plan •Overall condition of existing wastewater infrastructure •Wastewater needs »Maintenance actions »Capital projects •Proposed wastewater CIP »Near term (10-year) »Long term (20-year) C A R O L L O / 7 C A R O L L O / 8 up d a t e f o o t e r 0 3 2 3 . p p t x / 8 Hawaii County Wastewater Roadmap C A R O L L O / 9 up d a t e f o o t e r 0 3 2 3 . p p t x / 9 Development of the Plan Establish Requirements of Legal Mandates Assess Wastewater Infrastructure Condition Identify Total Potential Wastewater Needs Establish Priorities Based on Funding Limitations Develop Proposed Wastewater CIP C A R O L L O / 10 up d a t e f o o t e r 0 3 2 3 . p p t x / 10 Site visits were a key element in the condition assessment of existing wastewater infrastructure July 24-28, 2023 – site visits to all 6 existing WWTPs and 17 SPSs April 13-15, 2026 – follow-up site visits to WWTPs and select SPSs C A R O L L O / 11 up d a t e f o o t e r 0 3 2 3 . p p t x / 11 Condition Assessment Methodology Condition Rating Scale 1.Excellent: Asset is in very good condition (no defects) 2.Good: Asset has minor defects 3.Fair: Asset has significant defects that will affect reliability or efficiency 4.Poor: Asset is highly unreliable or inefficient 5.Failed: Asset is no longer able to function in its current state C A R O L L O / 12 up d a t e f o o t e r 0 3 2 3 . p p t x / 12 Qualitative Summary of Overall Wastewater Infrastructure Condition (2<CS<=3) (3<CS<=4) (1<CS<=2) 20% Good, Minor Defects 50% Fair, Significant Defects 25% Poor, Unreliable Failed 5% C A R O L L O / 13 up d a t e f o o t e r 0 3 2 3 . p p t x / 13 Identified Maintenance Actions from the Condition Assessment •General criteria »Smaller in scale »Enterprise funded •48 maintenance action items •Categorized as:»Urgent (ASAP) »Near term (within 2 years) »Long term (>2 years) •Budget cost:»Small (<$100K) »Medium ($100-$500K) »Large (>$500K) C A R O L L O / 13 C A R O L L O / 14 up d a t e f o o t e r 0 3 2 3 . p p t x / 14 Examples of Maintenance Actions Kulaimano WWTP Replace gate actuator Honokaa WWTP Remove vegetation from lagoon Paukaa SPS Replace hatch and ladder C A R O L L O / 15 up d a t e f o o t e r 0 3 2 3 . p p t x / 15 Summary of Maintenance Actions by Priority and Relative Cost Urgent, 16, 33% Near-Term, 19, 40% Long-Term, 13, 27% Small, 29, 49% Medium, 23, 38% Large, 8, 13% Priority Relative Cost C A R O L L O / 16 up d a t e f o o t e r 0 3 2 3 . p p t x / 16 Identified capital projects are based on legal mandates and the condition assessment •General criteria »Large in scale »Debt financed •70 potential projects •Categorized by type of project »Legal Mandates/Health and Safety »Rehabilitation and Replacement »Reliability and Redundancy •Developed prioritized CIP based on available funding C A R O L L O / 17 up d a t e f o o t e r 0 3 2 3 . p p t x / 17 Examples of Capital Projects Kulaimano WWTP Failed Equipment Hilo WWTP Rehabilitation and Replacement Kapehu WWTP Safety and Code Violations C A R O L L O / 18 up d a t e f o o t e r 0 3 2 3 . p p t x / 18 Near-term (10-year) CIP is focused on highest priority wastewater capital project needs (2<CS<=3) Note: Costs in 2025 dollars. Priority wastewater needs $1.08B Legal Mandates/ Health & Safety C A R O L L O / 19 up d a t e f o o t e r 0 3 2 3 . p p t x / 19 Long-term (20-year) CIP includes additional rehabilitation and replacement projects Note: Costs in 2025 dollars. Priority wastewater needs $1.08B 20-year wastewater needs $1.59B (Rehabilitation and replacement & reliability and redundancy) Legal Mandates/ Health & Safety C A R O L L O / 20 up d a t e f o o t e r 0 3 2 3 . p p t x / 20 Total wastewater needs amount to $2.3B, of which $0.7 billion are unscheduled projects Priority wastewater needs $1.08B 20-year wastewater needs $1.59B Total identified wastewater needs $2.29B (Includes additional unscheduled and unfunded projects) Legal Mandates/ Health & Safety Note: Costs in 2025 dollars. C A R O L L O / 21 up d a t e f o o t e r 0 3 2 3 . p p t x / 21 Distribution of 20-Year CIP by Category (2025 dollars) Priority 1: Legal Mandates/Health & Safety, $1.08 Billion Priority 2: Rehabilitation and Replacement, $0.26 Billion Priority 3: Reliability and Redundancy, $0.24 Billion C A R O L L O / 22 up d a t e f o o t e r 0 3 2 3 . p p t x / 22 Distribution of 20-Year CIP by Project Timing and Category Note: Costs in 2025 dollars. $- $0.2 $0.4 $0.6 $0.8 $1.0 $1.2 $1.4 $1.6 $1.8 2026-2030 2031-2035 2036-2040 2041-2045 Bi l l i o n s Priority 3: Reliability and Redundancy Priority 2: Rehabilitation and Replacement Priority 1: Legal Mandates, Health and Safety Cumilative CIP (20-year) C A R O L L O . C O M Overview of the Draft Cesspool Conversion Evaluation C A R O L L O / 24 up d a t e f o o t e r 0 3 2 3 . p p t x / 24 Agenda Cesspool Conversion Evaluation •Background and basis of analysis •Full-range of potential cesspool conversion options and projects •Suggested County approach and priority sewer extension projects C A R O L L O / 24 C A R O L L O / 25 up d a t e f o o t e r 0 3 2 3 . p p t x / 25 Purpose: Address methodology and cost for converting all 48,600 cesspools in the County Priority Category Number of Cesspools 1 4,170 (9%) 2 2,762 (6%) 3 41,651 (85%) Total 48,583 cesspools Conversions of more than 2,000 cesspools per year is needed to meet the 2050 deadline Hawaii County Cesspools C A R O L L O / 26 Considers cesspool conversions by one of three methods Conversion to a DOH-Approved Individual Wastewater System (IWS)New Decentralized or Cluster Wastewater System Connection to Existing County or Non-County Wastewater System https://gis.hawaiicounty.gov/arcgisportal/apps/webappviewer/index.html?id=9517e052e2464706bfc81165e35b7fcchttps://twri.tamu.edu/publications/txh2o/2022/winter-2022/bigger-is-not-always-better-decentralizing-texas-wastewater-infrastructure/https://www.epa.gov/septic/types-septic-systems Kealakehe WWTP C A R O L L O / 27 up d a t e f o o t e r 0 3 2 3 . p p t x / 27 Driven by Hawaii Legislation 2017: Act 125 - Required all cesspools to be converted by January 1, 2050* 2018: Act 132 - Formed the Cesspool Conversion Working Group (CCWG) •Technologies and finance studies commissioned by the CCWG 2024: Act 217 - Required UH to develop additional mapping and identify priority areas * Exemptions may be considered by DOH C A R O L L O / 28 up d a t e f o o t e r 0 3 2 3 . p p t x / 28 Approach to identifying cesspool areas for potential connection to existing or new sewer infrastructure Cesspool density analysis »50 cesspools within 1/8 mile »77 density groups identified Combined groups where feasible Wastewater flow generation »CCH design standards Proximity to Existing Infrastructure »County »Non-County Available system capacity »Development of sewer models for County systems C A R O L L O / 29 up d a t e f o o t e r 0 3 2 3 . p p t x / 29 Extension of County-Owned Wastewater Systems 39 potential projects identified •Hilo – 14 •Papaikou – 5 •Kulaimano – 3 •Honokaa – 5 •Kapehu – None •Kealakehe – 10 •Pahala – 1 •Naalehu – 1 Summary 4,299 Priority 2 and 3 cesspools can potentially be connected to the Hilo sewer system. Facility Existing Average Annual Flow (gpd)Average Annual Flow Design Capacity (gpd) Hilo WWTP 3,010,000 5,000,000 Projects Number of Cesspools Estimated Average Annual Wastewater Flow (gpd) Gravity System LPS System Hilo-1 423 178,000 127,000 Hilo-2 723 304,000 217,000 Hilo-3 47 21,000 15,000 Hilo-4 279 117,000 84,000 Hilo-5 153 50,000 35,000 Hilo-6 227 95,000 68,000 Hilo-7 397 167,000 119,000 Hilo-10 268 113,000 80,000 Hilo-11 145 72,000 52,000 Hilo-12 721 303,000 216,000 Hilo-13 669 271,000 194,000 Hilo-15 18 14,000 10,000 Hilo-161 18 8,000 5,000 Keaukaha2 211 89,000 63,000 Total 4,299 1,802,000 1,285,000 1 Prior EPA commitment area2The Keaukaha project is being developed by DHHL C A R O L L O / 30 up d a t e f o o t e r 0 3 2 3 . p p t x / 30 Extension of Non-County Wastewater Systems •Waimea »Parker Ranch WWTP »246 cesspools •Waikoloa Village »Waikoloa Village WWTP (A-Plant) »371 cesspools •Kahaluu-Keauhou »Heeia WWTP »80 cesspools •Puako »Mauna Lani WWTP »177 cesspools Four potential project areas identified: C A R O L L O / 31 Potential New Decentralized Wastewater Facilities 26 projects identified Project Number1 Community Development Plan Area Cesspool Priority Category Number of Cesspools Average Annual Flow (gpd) Gravity System LPS System D-1 Puna 3 123 52,000 37,000 D-2 Puna 3 230 97,000 69,000 D-3 Puna 3 88 37,000 26,000 D-4 Puna 3 190 80,000 57,000 D-5 Hilo 3 3,079 1,293,000 924,000 D-6 Hilo 3 156 66,000 47,000 D-7 Hilo 3 92 39,000 28,000 D-8 Hamakua 3 135 57,000 41,000 D-9 Hamakua 3 86 36,000 26,000 D-10 Hamakua 3 136 57,000 41,000 D-112 Hamakua 3 126 53,000 38,000 D-12 Hamakua 3 335 141,000 101,000 D-13 North Kohala 3 181 76,000 54,000 D-14 North Kohala 3 180 76,000 54,000 D-15 North Kohala 3 822 345,000 247,000 D-16 South Kohala 3 199 50,000 36,000 D-19 Kona 3 1,609 676,000 483,000 D-20 Kona 3 273 115,000 82,000 D-21 Kona 3, 2 56 34,000 17,000 D-22 Kona 3 191 80,000 57,000 D-23 Kona 3 127 53,000 38,000 D-24 Kau 3 76 32,000 23,000 D-27 South Kohala 1 196 82,000 59,000 D-28 North Kohala 3 281 118,000 84,000 D-29 North Kohala 3 196 82,000 59,000 D-302 Milolii 3 42 17,640 12,600 D-312 Ocean View 3 697 292,740 209,100 1 Cesspools in project areas that are not deemed feasible should be converted to an approved IWS.2 Projects D-11, D-30, D-31 are areas of interest identified by the County. C A R O L L O / 32 up d a t e f o o t e r 0 3 2 3 . p p t x / 32 Conversion to Approved Individual Wastewater Systems Project Number of Cesspools IWS Conversions in priority 1 areas 2,002 IWS Conversions in priority 2 areas 1,453 IWS Conversions in priority 3 areas 26,136 Total 29,591 Summary of Potential Conversions to an Approved IWS C A R O L L O / 33 up d a t e f o o t e r 0 3 2 3 . p p t x / 33 Summary of Potential Cesspool Conversion Options Conversion Method Number of Cesspools TotalPriority 1 Priority 2 Priority 3 County Sewer System Extensions 1,620 1,201 5,591 8,412 Non-County Sewer System Extensions 548 80 246 874 New Decentralized Systems 196 28 9,678 9,706 IWS Conversions 2,002 1,453 26,136 29,591 Total 4,366 2,762 41,651 48,583 C A R O L L O / 34 up d a t e f o o t e r 0 3 2 3 . p p t x / 34 Summary of Potential Cesspool Conversion Options County Sewer System Extension, 8,412, 17% Non-County Sewer System Extension, 874, 2% Decentralized System, 9,706, 20% IWS Conversions, 29,591, 61% C A R O L L O / 35 up d a t e f o o t e r 0 3 2 3 . p p t x / 35 Unit costs were developed to support project cost estimates •May 2025 baseline •Local costs from various constructed projects »Laterals »Gravity sewers »Force mains »Low pressure sewers »Grinder pumps »Pump stations »Decentralized systems •DOH database and contractor quotes »IWS C A R O L L O / 36 up d a t e f o o t e r 0 3 2 3 . p p t x / 36 Summary of Potential Cesspool Conversion Options (2025 dollars) Conversion Method Number of Projects Number of Cesspools Cost(1) ($ million) Cost per Cesspool ($ thousand) County Sewer System Extension 39 8,412 $783.6 $93 Non-County Sewer System Extension 4 874 $122.2 $140 New Decentralized System 26 9,706 $2,923.4 $300 IWS Conversions ---29,591 $1,183.6 $40 Total Potential Cesspool Conversions 69 48,583 $5,012.8 $103 C A R O L L O / 37 up d a t e f o o t e r 0 3 2 3 . p p t x / 37 Total Potential Cesspool Conversion Costs (2025 dollars) $784 $122 $2,923 $1,184 $5,013 $- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 Connections to County Systems Connections to Non- County Systems Decentralized IWS Total Co s t ( $ M ) C A R O L L O / 38 up d a t e f o o t e r 0 3 2 3 . p p t x / 38 Suggested Cesspool Conversion Approach •County led. •Limited to Priority 1 cesspools and previously identified infill areas, if funded. •Other projects remain unplanned and unfunded. County Sewer Extension Projects Non-County Sewer Extension Projects New Decentralized Wastewater Systems Conversions to DOH-Approved IWS •Led by private owner/operator and community. •County assistance limited to facilitation with non-County entities. •Community led. •County assistance limited to facilitation of project viability. •Responsibility of the property owner, working with DOH. C A R O L L O / 39 up d a t e f o o t e r 0 3 2 3 . p p t x / 39 Summary of Priority County Sewer Extension Projects •10 Sewer system extension projects »Priority 1 cesspools and previously identified infill areas »Keaukaha (DHHL funded) »3,066 cesspools converted »$266M »Based on availability of outside funding •Remaining projects unplanned and unfunded Project Cesspool Priority Category Number of Cesspools Existing County Service Extensions Estimated Capital Cost ($million)1 Cost per Conversion ($thousand) Hilo-3 3 47 $3.8 $81 Hilo-4 3 279 $18.9 $68 Hilo-16 2 18 $3.7 $206 Keaukaha2 2 211 $10.8 $51 Kealakehe-1A 1 9 $1.5 $167 Kealakehe-1B 1 9 $2.5 $278 Kealakehe-1C 1 19 $2.2 $116 Kealakehe-3 1 670 $58.0 $87 Kealakehe-4 1 97 $12.6 $130 Kealakehe-5 1, 2, 3 1,707 $162.8 $95 Priority 1 Total $131.1 $53 Priority 2 Total $58.0 $2,762 Priority 3 Total $77.0 $228 Total 3,066 $266.0 $93 1 Total cost assumes 50 percent gravity system and 50 percent LPS system.2 Cost is for informational use only and is not included in the total cost since the Keaukaha is being developed by DHHL.3 Costs shown include the collection system only. Costs do not include connection fees or “buy-in” costs to existing wastewater infrastructure, nor any WWTP costs. C A R O L L O / 40 up d a t e f o o t e r 0 3 2 3 . p p t x / 40 Priority County Sewer Extension Areas Keaukaha (DHHL) Hilo Service Area Kealakehe Service Area C A R O L L O / 41 up d a t e f o o t e r 0 3 2 3 . p p t x / 41 Revised Total Potential Cesspool Conversion Costs (2025 dollars) $784 $122 $2,923 $1,184 $5,013 $266 $38 0 $1,814 $2,118 $- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 Connections to County Systems Connections to Non- County Systems Decentralized IWS Total Co s t ( $ M ) C A R O L L O / 42 up d a t e f o o t e r 0 3 2 3 . p p t x / 42 Number of Cesspool Conversions County Sewer System Extension, 8,412, 17% Non-County Sewer System Extension, 874, 2% Decentralized System, 9,706, 20% IWS Conversions, 29,591, 61% County Sewer System Extension, 3,066, 6% Non-County Sewer System Extension, 177, 1% IWS Conversions, 45,340, 93% Total Potential Suggested Approach C A R O L L O . C O M Next Steps C A R O L L O / 44 up d a t e f o o t e r 0 3 2 3 . p p t x / 44 Next Steps AOC Compliance Date January 31 EMC Briefing August 26 Council Committee Briefing September 15 C A R O L L O . C O M Mahalo!