COUNTY OF HAWAI‘I PLANNING DEPARTMENT
RECOMMENDATION
TALON 1 PROPERTIES LLC
SPECIAL MANAGEMENT AREA USE PERMIT APPLICATION
(PL-SMA-2025-000085)_________________________________________________
Upon careful review of the applicant’s request against the guidelines for granting
a Special Management Area Use Permit, the Planning Director recommends that this
request to construct and operate a three-story, approximately 98,500-square-foot
self-storage warehouse with associated parking, loading areas, access
improvements, utility extensions, landscaping, drainage improvements, and
related development on approximately 2.57 acres of land within the Special
Management Area (SMA) be approved by the Planning Commission. Since this
recommendation is made without the benefit of public testimony, the Director reserves
the right to modify and/or alter this recommendation based upon additional information
presented at the public hearing. This approval recommendation is based on the following:
The applicant is requesting a Special Management Area Use Permit to
construct and operate a three-story self-storage warehouse on approximately 2.57
acres of land situated at 525 Piʻilani Street, Waiākea, South Hilo, Hawaiʻi, TMK: (3)
2-2-033:011. The approximately 98,500-square-foot facility would contain
approximately 264 individual storage units together with restrooms, elevators, two
covered porte-cocheres, parking and loading areas, landscaping, drainage
improvements, utility connections, and related site improvements. The proposed
building would have a maximum height of approximately 41 feet 8 inches.
The project includes approximately 28 parking stalls, including ADA-
accessible stalls, and seven 12-foot by 50-foot loading areas. Existing vehicular
access is from Piʻilani Street. The applicant also proposes to extend the presently
undeveloped portion of Mililani Street north of Piʻilani Street along the western side
of the property to County dedicable standards and to extend the County sewer line
north from its existing terminus near the Piʻilani Street/Mililani Street intersection.
-2-
OPSD summarized the project as including the three-story warehouse, storage
units, loading and parking areas, Mililani Street extension, and sewer extension.
The estimated development cost is approximately $5 million, and
construction is anticipated to be completed within approximately five years. A
concurrent application, PL-REZ-2026-000104, requests an amendment to Change
of Zone Ordinance No. 92-122 to provide additional time to satisfy outstanding
conditions relating to Final Plan Approval and construction.
The project site is currently vacant and has previously been used for
industrial and warehouse-related activities. The site has also been subject to
previous clearing and disturbance. The applicant obtained Special Management
Area Minor Permit PL-SMM-2022-000012 for clearing of the property.
A Final Environmental Assessment and Finding of No Significant Impact for
the Talon 1 Properties Self-Storage Warehouse, PL-ENV-2024-000028, was
published in the September 8, 2025, edition of The Environmental Notice.
Environmental studies supporting the project include an Archaeological Inventory
Survey, Cultural Impact Assessment, biological survey, Traffic Impact Analysis
Report, Storm Water Pollution Prevention Plan, and other technical evaluations.
The grounds for approving development within the Special
Management Area are based on HRS, Chapter 205A-26(2) (Special
Management Area guidelines) and Rule 9-11(e) of the Planning Commission
Rules of Practice and Procedure. Planning Commission Rule 9-11(e) states
that the Authority (Planning Commission) may permit the proposed
development only upon finding that:
1. The development will not have any substantial adverse environmental or
ecological effect except as such adverse effect is minimized to the extent
practicable and is clearly outweighed by public health, safety or compelling
public interest;
2. The development is consistent with the objectives and policies and the
Special Management Area guidelines as provided by Chapter 205A, HRS;
-3-
3. The development is consistent with the General Plan, Community Plan,
Zoning Code and other applicable ordinances;
4. The development will, to the extent feasible, reasonably protect native
Hawaiian rights if they are found to exist, including specific factual findings
regarding:
a. The identity and scope of valued cultural historical or natural
resources in the petition area, including the extent to which traditional
and customary native Hawaiian rights are exercised in the petition
area;
b. The extent to which those resources including traditional and
customary native Hawaiian rights, will be affected or impaired by the
proposed action; and
c. The feasible action, if any, to be taken by the Authority to reasonably
protect any valued cultural, historical or natural resources including
any existing traditional and customary native Hawaii rights.
In review of the SMA guidelines as listed under HRS 205A-26(2)(A), the
proposed development will not have any substantial adverse environmental
or ecological effect, except as such adverse effect is minimized to the extent
practicable and clearly outweighed by public health, safety, or compelling
public interest. The approximately 2.57-acre project site is located in an
urbanized portion of Hilo and has been subject to historic industrial, warehouse,
clearing, and other land-disturbing activities. Construction of the proposed facility
will nevertheless involve substantial site work, including grading, paving, building
construction, utility installation, drainage improvements, landscaping, and roadway
improvements. The Storm Water Pollution Prevention Plan (SWPPP) estimates
that approximately 2.52 acres may be disturbed during construction of the project.
Potential temporary environmental impacts will primarily involve
construction-related erosion and sedimentation, stormwater runoff, dust, noise,
traffic, and disturbance associated with grading and building activity. These
impacts can be minimized through compliance with County grading and erosion-
-4-
control requirements, implementation of the project SWPPP, application of
appropriate Best Management Practices (BMPs), and compliance with applicable
State Department of Health requirements.
The SWPPP requires installation and maintenance of stormwater controls
and BMPs throughout construction, regular inspections, corrective action when
deficiencies are identified, and continued monitoring for compliance with
applicable permit conditions. Because more than one acre of land is expected to
be disturbed, OPSD has also recommended consultation with the State
Department of Health Clean Water Branch regarding applicable National Pollutant
Discharge Elimination System requirements.
Long-term environmental effects are expected to be relatively limited. The
proposed use is primarily an enclosed storage facility and does not involve
industrial processing, manufacturing emissions, extraction of natural resources, or
routine use of substantial quantities of hazardous materials. Wastewater will be
directed to the County wastewater system rather than disposed of through an
individual wastewater system, and site drainage improvements will be required to
manage project-generated runoff.
The Final Environmental Assessment concluded that the proposed project
would not result in significant environmental impacts, and a Finding of No
Significant Impact (FONSI) was issued.
Based on the foregoing and subject to appropriate conditions of approval,
the proposed development is not anticipated to result in any substantial adverse
environmental or ecological effect. Any potential impacts can be minimized through
adherence to BMPs, regulatory requirements, and appropriate conditions of
approval. Accordingly, the project is consistent with the intent and requirements of
HRS §205A-26(2)(A). This determination is based on the following:
In review of the SMA guidelines as listed under HRS 205A-26, the
proposed development is consistent with the objectives and policies as
provided by Chapter 205A-26, HRS, and Special Management Area
guidelines contained in Rule No. 9 of the Planning Commission Rules of
-5-
Practice and Procedure.
The purpose of Chapter 205A-26, Hawaiʻi Revised Statutes (HRS) and Rule
9 of the Planning Commission Rules of Practice and Procedure, is to preserve,
protect, and where possible, to restore the natural resources of the coastal zone
areas. Therefore, special controls on development within an area along the
shoreline are necessary to avoid permanent loss of valuable resources and the
foreclosure of management options. The objectives and policies of Chapter 205A-
26, HRS and Rule 9-10(h) include, but are not limited to, the protection of coastal
recreational resources, historic resources, scenic and open space resources,
coastal ecosystems, marine resources, beaches, and controlling development in
coastal hazard areas.
The proposed development has been reviewed in accordance with the
objectives and policies of the Coastal Zone Management Act, Chapter 205A,
Hawaiʻi Revised Statutes (HRS), including the Special Management Area (SMA)
guidelines set forth under HRS §205A-26, and Rule No. 9 of the County of Hawaiʻi
Planning Commission Rules of Practice and Procedure. The following provides an
evaluation of the project’s consistency with applicable resource categories:
Recreational Resources:
The subject property itself does not contain public recreational facilities.
However, the property is located approximately 625 feet east of the Wailoa
River/Waiākea Fishpond and Wailoa River State Recreation Area, while the
Hoʻolulu Park recreational complex is located generally east and northeast of the
site. The FEA determined that existing access to Wailoa River State Recreation
Area via Piʻilani Street would not be affected by the proposed development.
Construction traffic and project operations will occur in an area already used
for commercial, recreational, residential, and other urban activities. A Traffic
Impact Analysis Report was completed for the project and found that existing study
intersections generally operate at acceptable levels of service. At Manono Street
and Piʻilani Street, existing movements were identified as operating at Level of
Service C or better during the analyzed peak periods. The Hawaiʻi Police
-6-
Department reviewed the proposal and does not anticipate significant traffic or
public-safety concerns. The project is therefore not anticipated to adversely affect
access to or use of nearby recreational resources.
Historic Resources:
An Archaeological Inventory Survey (AIS) conducted in 2018 identified one
historic site consisting of a concrete slab interpreted as a historic foundation or
walkway associated with previous industrial activity on the property. The site was
determined significant for its informational value. Mapping, written descriptions,
and photography were considered adequate documentation, and no further work
or preservation was recommended. Four displaced isolated objects associated
with historic activities were also identified.
The proposed project is not anticipated to adversely affect known historic
properties. A standard archaeological discovery condition should nevertheless be
imposed requiring work to cease and SHPD to be contacted if previously
unidentified historic or cultural resources are encountered during construction. In
connection with the 2018 Special Management Area Use Permit and Change of
Zone amendment applications for a proposed potable water well and bottling
facility, SHPD reviewed and accepted the Archaeological Inventory Survey for the
subject property and issued a determination of “no historic properties affected” for
that prior project. Although that determination applied to a different development
proposal, the accepted AIS remains relevant to the archaeological resources
documented on the subject property. Planning Staff notes that the current self-
storage project was also submitted to SHPD for review pursuant to HRS Chapter
6E-42; to date, no response has been received.
Scenic and Open Space Resources:
Wailoa River State Recreation Area and the Waiākea Fishpond are
significant scenic and open-space resources located west of the project site. The
Hoʻolulu Park complex also provides substantial recreational open space to the
east and northeast.
-7-
The proposed building will be approximately three stories and 41 feet 8
inches high. Although the project site is presently separated from Wailoa River
State Recreation Area by intervening vacant lands and vegetation, protection of
scenic resources should not rely exclusively on vegetation located on property
outside the applicant’s control. The project will therefore incorporate landscaping,
building treatment, setbacks, and other design measures to reduce the visual mass
of the structure and minimize potential effects on surrounding recreational and
open-space areas.
The proposed building height is below the 45-foot height limit applicable to
the ML district. Landscaping and final architectural treatment will be reviewed
through Plan Approval. Exterior lighting will also be designed and shielded to
minimize unnecessary glare and light spill onto surrounding properties and toward
coastal and recreational resources.
Coastal Ecosystems and Marine Resources:
The project site is not a shoreline parcel and does not contain beaches,
dunes, wetlands, or identified sensitive coastal ecosystems. However, the property
is approximately 625 feet from the Wailoa River/Waiākea Fishpond, which is
hydrologically connected to Hilo Bay. Protection of water quality is therefore an
important consideration.
The project proposes connection to the County wastewater system,
together with an engineered drainage system and construction BMPs to control
stormwater runoff. The FEA concluded that wastewater and stormwater controls
would prevent significant adverse effects on coastal ecosystems and downstream
resources.
OPSD has further recommended incorporation of Low Impact Development
(LID) measures, including infiltration basins or trenches, rain gardens, vegetated
filter strips, and similar approaches intended to preserve or enhance
predevelopment hydrology and reduce runoff. Incorporation of Low-Impact
Development (LID) measures, as required by a condition of approval, together with
implementation of the SWPPP and applicable NPDES requirements, will reduce
-8-
the potential for sediment, pollutants, and increased runoff to enter downstream
coastal waters.
Economic Uses:
The subject property does not support fishing, aquaculture, agriculture,
navigation, or other coastal-dependent economic activity. Development of the
property will therefore not displace existing coastal-dependent economic use. The
proposed project represents approximately $5 million private investment and will
generate construction activity and ongoing commercial use of a presently vacant
urban parcel.
Coastal Hazards:
The property is located within the SMA as well as within FEMA Flood Zone
X. The FEA concluded that the property is outside the mapped 500-year floodplain
and is not expected to be significantly affected by coastal flooding or the analyzed
sea-level-rise exposure. The project would replace a vacant parcel with a
nonresidential, primarily storage-oriented use rather than establishing intensive
residential occupancy in proximity to coastal hazard areas. Compliance with
applicable flood-control, drainage, building-code, and emergency-access
requirements will further reduce risks to life and property.
Based on the foregoing, the proposed development is consistent with the
applicable objectives, policies, and guidelines of Chapter 205A, HRS, and Rule
No. 9 of the Planning Commission Rules of Practice and Procedure.
The proposed development is consistent with the County General
Plan, Hilo Community Development Plan (HCDP), Zoning Code, and other
applicable ordinances. The subject property is classified Urban by the State Land
Use Commission and was designated Industrial on the 2005 General Plan Land
Use Pattern Allocation Guide Map pursuant to General Plan Amendment
Ordinance No. 91-72. The Industrial designation was intended to accommodate
manufacturing and processing uses, wholesaling, large storage and transportation
facilities, and light industrial and industrial-commercial activities. A self-storage
-9-
warehouse is consistent with the storage and service-industrial character
contemplated by this designation.
The property is currently zoned Limited Industrial-20,000 square feet (ML-
20) pursuant to Change of Zone Ordinance No. 92-122. The proposed self-storage
warehouse represents a storage-oriented use compatible with the purpose and
intent of the ML district. Approval of the concurrently processed amendment to
Ordinance No. 92-122 will be required to provide additional time for compliance
with outstanding Final Plan Approval and construction conditions.
The Hilo Community Development Plan predates the General Plan
amendment and subsequent rezoning of the property and recommends residential
and recreational/open-space uses in portions of the broader area. The project does
not expand industrial zoning into adjacent recreational or residential lands and is
confined to a parcel that has been designated and zoned for industrial use for more
than three decades.
Surrounding zoning and land uses are mixed. The Hoʻolulu Park complex
and Wailoa River State Recreation Area are zoned Open; lands to the south and
southeast are primarily General Commercial-7,500 square feet (CG-7.5); lands
farther west and southwest are primarily Resort-Hotel, 750 square feet (V-.75); and
residential neighborhoods zoned RS-10 occur farther south. The proposed self-
storage use is comparatively passive relative to many manufacturing or processing
uses potentially allowed within an industrial district and can be made compatible
with surrounding uses through appropriate landscaping, lighting, drainage, access,
and operational controls.
General Plan 2045
Subsequent to acceptance of the subject application, the County adopted
General Plan 2045 through Ordinance No. 26-44, effective June 26, 2026. While
the application is being evaluated under the General Plan in effect when the
application was accepted, staff have also reviewed the project for general
consistency with the County’s newly adopted long-range land use framework.
-10-
The new Plan establishes a Light/Service Industrial designation for uses
such as business parks, distribution centers, product assembly, research and
development, laboratories, and other light service-industrial activities, and
identifies ML and MCX zoning as compatible. Significantly, the Industrial Center
Standard Guidelines specifically identify Waiākea Houselots as an existing Service
and Innovation industrial location associated with Light Industrial land use and
ML/MCX zoning. Such areas are described as being located close to population
centers and supporting non-noxious business and industrial uses on reasonably
level lands with access to paved roads.
General Plan 2045 also provides that industrial development should occur
in areas adequately served by transportation, utilities, and other essential
infrastructure; supports warehouse uses near major transportation corridors,
airports, and harbors; and calls for mitigation of industrial impacts on surrounding
uses through landscaping, trees, open space, buffers, and other appropriate
conditions.
The proposed development utilizes an existing industrially zoned parcel
within Hilo rather than expanding industrial development into rural, agricultural,
natural, or undeveloped lands. Water, wastewater, roadway, electrical, police, fire,
and other urban services are available in the surrounding area, although additional
improvements and agency approvals will be required. Accordingly, the proposed
development is not contrary to and is generally consistent with the land use pattern
and applicable industrial development policies of General Plan 2045.
Infrastructure and Public Services
The Department of Water Supply has indicated that water can be made
available from an existing six-inch waterline within Piʻilani Street and has no
objection to the proposed SMA Use Permit, subject to compliance with its
requirements. DWS requires engineered water-demand calculations, appropriate
facilities charges and meter sizing, installation of reduced-pressure backflow
prevention, and relocation or adjustment of water facilities where necessary. DWS
additionally noted that the existing six-inch Piʻilani Street waterline and eight-inch
-11-
Manono Street waterline are inadequate to provide the 2,000-gallons-per-minute
fire-flow requirement under its Water System Standards. This matter must
therefore be resolved with DWS and the Hawaiʻi Fire Department prior to
occupancy of the proposed building.
Wastewater will be handled through the County wastewater system. The
project proposes to extend the existing sewer line from its present terminus near
Piʻilani Street and Mililani Street. The Department of Environmental Management
may require additional sewer analysis and facility improvements prior to
connection.
The proposed extension of Mililani Street and other roadway improvements
will remain subject to review and approval by the Department of Public Works. The
project TIAR identifies no unacceptable existing intersection operations
attributable to the proposed use, although future background traffic growth may
warrant improvements to the Manono Street/Piʻilani Street intersection. Police
does not anticipate significant traffic or public-safety concerns.
The development will to the extent feasible, reasonably protect native
Hawaiian rights if they are found to exist. In view of the Hawai‘i State Supreme
Court’s “PASH” and “Ka Paʻakai O KaʻAina” decisions, the issue relative to native
Hawaiian rights, such as gathering and fishing rights, must be addressed in terms
of the cultural, historical, and natural resources and the associated traditional and
customary practices of the site.
Investigation of valued resources: A Cultural Impact Assessment (CIA) was
prepared for the project and included archival research, review of historic and
cultural literature, agency and organizational consultation, public notices, and
consultation with persons knowledgeable about the cultural history of Waiākea and
the broader Hilo area. The CIA documents the substantial cultural significance of
Waiākea Ahupuaʻa and Hilo Bay, including traditional settlement, agriculture,
freshwater resources, fishponds, fishing, gathering, religious sites, and other
cultural practices.
The CIA notes that letters of inquiry were sent to organizations and
-12-
individuals with knowledge of the project area, public notices were published,
historical and cultural source material was reviewed extensively, and cultural
consultation was undertaken. An Archaeological Inventory Survey was also
completed for the subject property and identified one historic concrete feature
associated with prior industrial use.
The valuable cultural, historical, and natural resources found in the area:
Waiākea Ahupuaʻa and the Hilo Bay area contain important cultural and natural
resources, including Wailoa River/Waiākea Fishpond, freshwater resources,
former agricultural areas, traditional settlement areas, historic and cultural sites,
and areas historically associated with fishing and gathering.
During consultation, members of the Waiākea Ahupuaʻa Crown Land Heirs
emphasized the cultural importance of the broader Hilo landscape and expressed
a desire that development recognize and, where feasible, incorporate traditional
cultural places and practices. However, the CIA found no evidence that the subject
2.57-acre parcel itself was historically used for religious practices, canoeing,
fishing, gathering of river or marine resources, culturally significant gathering or
collecting, or agricultural practices. The CIA concluded that significant cultural
practices occurred elsewhere in the broader area, particularly north and west of
the project site, but that there was no evidence that those practices occurred on
the subject property.
Possible adverse effects or impairment of valued resources: The subject
property has experienced substantial previous disturbance and industrial use. No
ongoing traditional or customary Native Hawaiian gathering, fishing, access, or
other practice has been identified on the parcel. The proposed project will not
obstruct public access to Wailoa River State Recreation Area or known cultural
resources located outside the property. The known archaeological feature on the
property has been adequately documented, and no further preservation work was
recommended. Therefore, based on the available record, the development is not
expected to adversely affect identified traditional and customary Native Hawaiian
practices.
-13-
Feasible actions to protect native Hawaiian rights: No additional project-
specific mitigation is presently necessary to protect any identified traditional or
customary practices on the subject parcel as none were identified or described by
the community.
Based on the foregoing, the Planning Director finds that the proposed
development will, to the extent feasible, reasonably protect Native Hawaiian
traditional and customary rights. In addition, if archaeological or cultural materials
are encountered during project implementation, work should cease in the vicinity
of the discovery and further coordination with SHPD should occur before
construction resumes. These measures provide the practical mechanism for
identifying valued cultural resources, assessing any traditional and customary
practices that may be associated with them, and ensuring that native Hawaiian
rights are reasonably protected to the extent feasible in accordance with PASH,
Ka Paʻakai O Ka ʻĀina, HRS Chapter 6E, and HRS §205A-26.
Lastly, this approval is made with the understanding that the Applicant
remains responsible for complying with all other applicable government
requirements in connection with the approved use, prior to its commencement or
establishment upon the subject property. Additional governmental requirements
may include the issuance of building permits, the installation of approved
wastewater disposal systems, compliance with Fire Code, installation of
improvements required by the American with Disabilities Act (ADA), among many
others. Compliance with all applicable governmental requirements is a condition
of this approval; failure to comply with such requirements will be considered a
violation that may result in enforcement action by the Planning Department and/or
the affected agencies.
Based on the above findings, the proposed development will not have
substantial adverse impacts on the environment, nor will its approval be contrary to the
objectives and policies of Chapter 205A, HRS, relating to Coastal Zone Management and
Rule No. 9 of the Planning Commission relating to the Special Management Area.
Approval of this request is subject to the following conditions:
-14-
1. The applicant(s), its successor(s), or assign(s) (Applicant) shall be responsible for
complying with all stated conditions of approval.
2. The Applicant shall secure all necessary approvals and permits from other affected
Federal, State, and County agencies as necessary to comply with all applicable
laws and regulations.
3. Other than the proposed project as described in this permit, no further work is
permitted under this approval.
4. The effective date of this Special Management Area Use Permit shall be the
effective date of the amendment to Change of Zone Ordinance No. 92-122
associated with PL-REZ-2026-000104.
5. The Applicant shall comply with conditions of the approved amendment to Change
of Zone Ordinance No. 92 122 (REZ 727).
6. Construction of the storage facility and related improvements shall be conducted
in a manner that is substantially representative of plans and details as contained
within the SMA Application dated June 4, 2026, and representations made to the
Windward Planning Commission.
7. Construction shall be completed within five (5) years from the effective date of
this permit. Prior to construction, the Applicant shall secure Final Plan Approval
for the proposed development from the Planning Director in accordance with
Section 25-2-70, Chapter 25 (Zoning Code), Hawai‘i County Code. Plans shall
identify all existing and/or proposed structures, paved driveway access, parking
stalls, landscaping, and other improvements associated with the proposed
development. Landscaping shall be indicated on the plans for the purpose of
mitigating adverse noise or visual impacts to adjacent properties in accordance
with the requirements of Planning Department Rule No. 17 (Landscaping
Requirements) and Chapter 25, Hawai‘i County Code.
8. Artificial light from exterior lighting fixtures, including, but not necessarily limited to
floodlights, up-lights or spotlights used for decorative or aesthetic purposes shall
be prohibited if the light directly illuminates, or is directed to project across property
boundaries toward, the shoreline and ocean waters, except as may otherwise be
-15-
permitted pursuant to Section 205A-71(b), Hawai‘i Revised Statutes.
9. The applicant shall comply with Chapter 27 - Flood Control, of the Hawai‘i County
Code.
10. All earthwork and grading shall conform to Chapter 10, Erosion and Sedimentation
Control of the Hawai‘i County Code.
11. The property shall connect to the public sewer in accordance with Section 21-5 of
the Hawai‘i County Code prior to issuance of a Certificate of Occupancy.
12. All development generated runoff shall be disposed of on site and shall not be
directed toward any adjacent properties.
13. The Applicant shall ensure that excessive siltation and turbidity are contained or
otherwise minimized through the use of silt containment devices or barriers, or
other approved Best Management Practices to minimize impacts to the nearshore
and riverine areas.
14. During construction, measures shall be taken to minimize the potential of both
fugitive dust and runoff sedimentation. Such measures shall be in compliance with
construction industry standards and practices utilized during construction projects
of the State of Hawai‘i.
15. In the event that surface or subsurface historic resources, including human skeletal
remains, structural remains (e.g., rock walls, terraces, platforms, etc.), cultural
deposits, marine shell concentrations, sand deposits, or sink holes are identified
during the demolition and/or construction work, the Applicant shall cease work in
the immediate vicinity of the find, protect the find from additional disturbance and
contact the State Historic Preservation Division at (808) 933-7651. Subsequent
work shall proceed upon an archaeological clearance from DLNR-SHPD when it
finds that sufficient mitigation measures have been taken.
16. An initial extension of time for the performance of conditions within this permit may
be granted by the Planning Director upon the following circumstances:
A. The non-performance is the result of conditions that could not have
been foreseen or are beyond the control of the applicant, successors
or assigns, and that are not the result of their fault or negligence.
-16-
B. Granting of the time extension would not be contrary to the General
Plan or Zoning Code.
C. Granting of the time extension would not be contrary to the original
reasons for the granting of this permit.
D. The time extension granted shall be for a period not to exceed the
period originally granted for performance (i.e., a condition to be
performed within one year may be extended for up to one additional
year).
E. If the Applicant should require an additional extension of time, the
Planning Department shall submit the applicant's request to the
Planning Commission for appropriate action.
17. That in issuing this permit, the Commission has relied on the information and data
that the Applicant has provided in connection with this permit. If, subsequent to
this permit, such information and data prove to be false, incomplete or inaccurate,
this permit may be modified, suspended or revoked, in whole or in part, and/or the
Commission may, in addition, institute appropriate legal proceedings.
18. Should any of the foregoing conditions not be met or substantially complied with in
a timely fashion, the Planning Director may initiate procedures to revoke the
permit.