Loading...
HomeMy WebLinkAboutB-4944 - Evaluation Tabulation (Bid Results) (2)County of Hawaii Public Works Wesley R Segawa, Director 25 Aupuni Street, Suite 1101, Hilo, HI 96720 EVALUATION TABULATION IFB No. B-4944 AUPUNI CENTER SEWER JUNCTION REPAIRS RESPONSE DEADLINE: September 10, 2026 at 2:00 pm Report Generated: Thursday, September 10, 2026 SELECTED VENDOR TOTALS Vendor Total Stan's Contracting, Inc. $223,500.00 Jas. W. Glover, Ltd. $320,300.00 Isemoto Contracting Co., Ltd. 702,377.00 B-4944 - BASE BID PART A. MOBILIZATION AND GENERAL WORK (NOTE: Bidders must complete all unit prices and amounts. Failure to do so may be grounds for rejection of bid) B-4944 - BASE BID Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 1 Mobilization (shall not exceed 5% of the overall base bid amount). 1 Lump Sum $30,414.00 $30,414.00 $11,000.00 $11,000.00 $5,000.00 $5,000.00 EVALUATION TABULATION IFB No. B-4944 AUPUNI CENTER SEWER JUNCTION REPAIRS EVALUATION TABULATION Invitation For Bid - AUPUNI CENTER SEWER JUNCTION REPAIRS Page 2 B-4944 - BASE BID Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 2 General Requirements: project engineer, clerical support, foreman/superintendent, utilities, temporary toilets, etc. (shall not exceed 10% of the overall basic bid amount). 1 Lump Sum $58,886.00 $58,886.00 $23,000.00 $23,000.00 $3,000.00 $3,000.00 X 3 Barricades: furnish, erect, install, and maintain perimeter barricades and warning signs throughout the project; remove then restore area upon project completion. 1 Lump Sum $25,426.00 $25,426.00 $40,000.00 $40,000.00 $6,000.00 $6,000.00 X 4 Demolition: Saw cut slab, excavation, including soil abatement measures. Nighttime work. 1 Lump Sum $55,204.00 $55,204.00 $80,700.00 $80,700.00 $56,500.00 $56,500.00 X 5 Removal of sewer snake obstruction, waterjet and flush sewer lines and all incidental work to complete. Nighttime work. 1 Lump Sum $388,741.00 $388,741.00 $54,000.00 $54,000.00 $63,500.00 $63,500.00 X 6 Restore Area: Patch back area to existing conditions perdrawings and specifications, add new cleanout. Nighttime work. 1 Lump Sum $48,977.00 $48,977.00 $22,000.00 $22,000.00 $8,000.00 $8,000.00 EVALUATION TABULATION IFB No. B-4944 AUPUNI CENTER SEWER JUNCTION REPAIRS EVALUATION TABULATION Invitation For Bid - AUPUNI CENTER SEWER JUNCTION REPAIRS Page 3 B-4944 - BASE BID Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 7 Record Documents: Tone existing sewer line, submit video camera inspection, update record drawing. 1 Lump Sum $12,229.00 $12,229.00 $2,000.00 $2,000.00 $4,000.00 $4,000.00 X 8 De-mobilization. Final site/facility cleanup (shall not exceed 2.5% ofthe overall basic bid amount. 1 Lump Sum $12,973.00 $12,973.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 Total $632,850.00 $237,700.00 $148,500.00 B-4944 - ALLOWANCE PART B. Disposal, shipping and handling of soil identified as hazardous waste. B-4944 - ALLOWANCE Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 1 Allowance: Disposal, shipping and handling of soil identified as hazardous waste. 1 Allowance $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 Total $75,000.00 $75,000.00 $75,000.00 B-4944 - ALTERNATE BID NO. 1 PART C. BASE BID. (DEDUCTIVE) (NOTE: Bidders must complete all unit prices and amounts. Failure to do so may be grounds for rejection of bid) EVALUATION TABULATION IFB No. B-4944 AUPUNI CENTER SEWER JUNCTION REPAIRS EVALUATION TABULATION Invitation For Bid - AUPUNI CENTER SEWER JUNCTION REPAIRS Page 4 B-4944 - ALTERNATE BID NO. 1 Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 1 DEDUCTIVE ALTERNATE: Daytime work, Monday to Friday, eight (8) hour workday, between the time frame of 7:00 A.M. to 4:30 P.M. a) Provide a deductive price less than the base bid) to perform the work during normal business hours. 1 Lump Sum -$5,473.00 -$5,473.00 $7,600.00 $7,600.00 $0.00 $0.00 Total -$5,473.00 $7,600.00 $0.00 B-4944 - TOTAL LUMP SUM BASIC BID WITH ALLOWANCE AND BID ALTERNATE PARTS A. THROUGH C. B-4944 - TOTAL LUMP SUM BASIC BID WITH ALLOWANCE AND BID ALTERNATE Isemoto Contracting Co., Ltd. Jas. W. Glover, Ltd. Stan's Contracting, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total X 1 PART A. SUBTOTAL 1 Lump Sum $632,850.00 $632,850.00 $237,700.00 $237,700.00 $148,500.00 $148,500.00 X 2 PART B. SUBTOTAL 1 Allowance $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00 X 3 PART C. SUBTOTAL 1 Lump Sum -$5,473.00 -$5,473.00 $7,600.00 $7,600.00 $0.00 $0.00 Total $702,377.00 $320,300.00 $223,500.00