Loading...
HomeMy WebLinkAboutExhibit L_v1.pdfFLOOD1UUN MANAGEMENT § 27-16 (B) The certification of lowest floor elevation; (C) The certification of floodproofing for spaces below the base flood elevation; (D) The certification of final pad elevation where n site is filled above the base flood elevation; (E) The certification that an encroachment in the floodway will not result in any increase in flood levels during base flood discharge; and (I) The certification of elevation and structural support for structures in the coastal high hazard area. (3) Notification of actions that may alter the boundaries of flood hazard areas on Federal Emergency Management Agency Flood Insurance Rate Maps. (A) The floodplain administrator shall notify the council of the following actions when they relate to areas located within Hawaii County: (i) A Federal Emergency Management Agency initiated map study or restudy of flood hazard areas; (ii) A floodplain administrator initiated map revision process, pursuant to part 65 of the National Flood Insurance Program Regulations; and (iii) A floodplain administrator initiated map revision process, pursuant to a Federal Emergency Management Agency Cooperative Technical Partners Initiative. (B) Notification shall consist of a written message from the floodplain administrator to the County council and shall be submitted to the County council as soon as practical, but no litter than sixty days after the date the department of the floodplain administrator initiates any of the actions described in paragraph (3)(A) of this section. Notification shall include, but not be limited to: (i) Identification of the stream or general area being studied or revised; and (ii) The name of the entity undertaking the flood mapping study, restudy, or revision process. (4) Interpretation of maps. The floodplain administrator shall make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards (for example, where there appears to be it conflict between a mapped boundary and actual field conditions). A person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in article 5. (5) Initiating changes in base flood elevations. Whenever base flood elevations increase or decrease or result in a mappable alteration of the boundaries of any special flood hazard area, as a result of physical changes affecting flooding conditions, its soon as practical, but no litter than six months after the date such information becomes available, the floodplain administrator shall notify the Federal Emergency Management Agency of the changes by submitting technical or scientific data through the Letter of Map Revision process. Such it submission is necessary so that upon 27-15 SUPP. 4 (7.2018) § 27-16 HAWAII COUNTY CODE confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements will be based upon current data. (6) Using other base flood data. When base flood elevation data has not been provided in accordance with section 27-6, the floodplain administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a Federal or State agency, or other source, in order to administer article 4. Any such information shall be submitted to the floodplain administrator for consideration. (7) Whenever a watercourse is to be altered or relocated: (A) Require that the flood carrying capacity of the altered or relocated portion of said watercourse is maintained; (B) For riverine situations, notify the State of Hawaii department of land and natural resources (commission on water resource management) and all adjacent property owners, prior to such alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Emergency Management Agency; and (C) Whenever a proposed alteration or relocation occurs that would significantly change the base flood elevation or result in a mappable alteration of the boundaries of any special flood hazard area, technical and scientific data through the Conditional Letter of Map Revision shall be submitted to and approved by the Federal Emergency Management Agency. Such a submission is necessary so that upon completion of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements will be based upon current data. Work to be performed under an approved Conditional Letter of Map Revision shall be subject to the following: (i) Work shall not begin on any on -site development affecting or impacting the floodplain until an approved Conditional Letter of Map Revision is received from the Federal Emergency Management Agency; and (ii) Within sixty days of receiving final approval from the floodplain administrator for the completion of the alteration or relocation of a watercourse, the request for a Letter of Map Revision, and all other information required by the Letter of Map Revision process shall be submitted to the Federal Emergency Management Agency. (8) Violations. Take action to remedy violations of this chapter as specified in article 6. (1993, ord 93-78, sec 3; am 2001, ord 01-108, sec 1; am 2007, ord 07-169, sec 9; am 2017, ord 17-56, sec 8; am 2018, ord 18-25, sec 3.) SUPP.4 (7-2018) 27-16