Purpose of Bill No. 170
is
Distinguish data processing 20 Revise the existing definition and
facilities from modern data centersexpressly exclude data centers
Create a new definition for Keep data processing facilities
3' industrial-scale data centers 4. permitted in MCX; data centers are
not permitted in any zoning district
TIONALE
"According to the County Council, the existing definition is broad and could
allow a data center to be interpreted as a permitted use in MCX districts as a
data processing facility."
Proposed Definitions in Bill 170
"Data processing facility" means an
establishment primarily involved in "Data center" means a facility used for
the industrial-scale operation of
the compiling, storage and
computer systems
maintenance of documents, records, and associated
and other types of information in equipment for the processing.
digital form utilizing a mainframe computing transmission, or
computer. This term does not include dissemination of digital data, and that
data centers, general business offices, requires supporting infrastructure
computer-related sales bevond that typically accessory or
establishments, and business or incidental to office, commercial, or
personal services. public institutional uses.
ZoningContext — Data ProcessingFacilities
MCX DISTRICT DATA PROCESSING FACILITIES DATA CENTERS
Industrial-Commercial Defined but Not
Mixed Use Permitted under Permitted by Bill
HCC § 25-5-132(a) 170
Ordinance 96-160 created the MCX zoning district to accommodate emerging technology
and compatible industrial-commercial uses. Bill 170 preserves the original permitted use
of data processing facilities while drawing a new boundary around modern data centers.
What Changes and What Remains the Same?
Current Code Under Bill 170
Data processing facility is defined Definition is revised
Data processing facility is permitted in Still permitted in M CX
MCX
No separate data center definition New data center definition
Potential overlap in interpretation Uses clearly distinguished
Data centers are not separately Data centers remain prohibited in all
identified zoning districts unless later authorized
COUNTY COUNCIL INITIATED BILL NO . 170
PLANNING DIRECTOR
ANALYSIS
WhyDistinguishing Matters
1990s 2000s-2010s TODAY
Data processing Emerging digital Modern standalone data
facilities were added infrastructure including centers may have
to reflect emerging artificial intelligence, infrastructure and operational
technology. digital storage, etc... characteristics that differ
from data processing
facilities.
The land-use category has evolved from an office-like activity into a
distinct, infrastructure-intensive use.
Comparative RegutatoryApproaches
INDUSTRIAL DISTRICTS OVERLAY DISTRICTS TEMPORARY MORATORIUMS
Counties such as Counties such as Prince Boone County has
Loudoun, Fairfax, William and Hancock use adopted a temporary
Albemarle, Tippecanoe mapped or site specific moratorium while
direct data centers to overlay approaches tied regulations are developed.
specific industrial or to industrial areas and
commercial districts, infrastructure.
often with size limits or
discretionary review.
II
These examples are comparative approaches, not binding national standards.
Larger or more intensive facilities are often subject to discretionary review.
Planning Director's Recommendation Overview
Supports Bill 170's distinction between
modern data centers and traditional data processing facilities
OComplete exclusionof data centers may unnecessarily
preclude appropriately scaled facilities
OStandalone data centers are more appropriately
accommodated in the General Industrial(MG) District
3O. Subject to asize limitation and discretionary review.
COUNTY COUNCIL INITIATED BILL NO . 170
PLANNING DIRECTOR
RECOMMENDATION
The Planning Director recommends that the Planning Commissions
send a favorable recommendation of Bill 147 to the County Council
with suggested revisions in the recommendation report. The
recommendations are as follow.
Recommendations 1 & 2 — Permitting Paths
<_ 10,000 SQ. FT. � > 10,000 SQ. FT.
DATA CENTER DATA CENTER USE
PERMITTED USE PERMIT REQUIRED
General Industrial (MG) Site-specific review amend HCC
district subject to § 25-4-19 section §§ 25-2-61 and
25-5-152(b)
The threshold changes the review path and not the need to meet
applicable development standards.
Why a 10,000-Square-Foot Threshold?
SMALLER FACILITIES I F LARGER FACILITIES
• At or below 10,000 sq. ft. Above 10,000 sq. ft.
• Permitted use in MG Use permit and site-specific
review
BALANCE
The threshold supports access for smaller facilities while adding
oversight for developments with greater potential impacts.
Recommendation 3 — Amended Definition of "Data Center-9-9
y
""Data center" means a building, portion of a building, or group of buildings used principally for
an industrial-scale operation that houses computer systems, servers, networking equipment, or
similar equipment for the processing, computing, storage, transmission, hosting, or
dissemination of digital data, together with supporting electrical, cooling, ventilation, security,
fire-suppression, backup-power, and telecommunications equipment or facilities. The term does
not include computer servers, server rooms, telecommunications equipment, or similar data-
processing equipment that:
1) is located on the some building site as an otherwise permitted principal use;
2) is accessory and subordinate in area, function, and operation to that principal use;
3) primarily supports the operation of that onsite principal use; and
4) is not separately leased, licensed, or operated as a data center or as a data-processing,
hosting, storage, or transmission service for unrelated offsite users."
Recommendation 3 — Amended Definition of "Data Center-9-9
F_ -I
I=-
An industrial-scale data center LEGAL EXCLUSIONS — ALL FOUR MUST APPLY
facility that houses computer 1. Located on the same site as a permitted
equipment and supporting principal use
infrastructure. 2. Accessory and subordinate in area,
VS. function, and operation
Onsite data center facilities (ie /T 3. Primarily supports the onsite principal. use
equipments that remains accessory 4. Not separately leased or operated for
when it supports a permitted
principal use. offsite users
REASON: Distinguish incidental onsite IT infrastructure from standalone or
tenant-operated data center.
Recommendation 4 — Standards for Data Centers (§ 25-4-19)
Create a new section in HCC for data centers as follows:
"Section 25-4-19. Data centers
1. For purposes of this section, "gross floor area devoted to data center use" includes floor
area containing computer systems, servers, networking equipment, or supporting
electrical, cooling, ventilation, security, fire-suppression, backup-power, and
telecommunications equipment principally serving the data center use.
2.The gross floor area of all data center buildings and portions of buildings shall be
aggregated when located on the same building site, on contiguous building sites under
common ownership or control, or as part of a unified or phased plan of development.
3.A data center development shall not be divided among separate buildings, building sites,
ownership entities, tenants, applications, or phases for the purpose of avoiding the Use
Permit threshold.
4.Any change or expansion that causes the aggregate gross floor area devoted to data
center use to exceed 10,000 square feet shall require approval of a Use Permit prior to
construction or establishment of such change or expansion.
Recommendation 4 — Standards for Data Centers (§ 25-4-19)
Create a new section in HCC for data centers as follows: (cont.)
5. For a data center requiring a Use Permit, the following matters may be considered, as
applicable, through the Use Permit review process and conditions of approval:
A.Electrical demand and capacity, generation source, necessary transmission or
distribution improvements, and cumulative effects on the electrical system;
B.Water source and demand, cooling technology, wastewater generation, and water-
conservation measures;
C.Operational and emergency-generator noise, including preconstruction modeling
and post-occupancy verification, as appropriate;
D.Emergency access and response, fire suppression, hazardous materials, battery
energy storage systems, and emergency-response planning;
E. Building mass and setbacks, landscaping, equipment screening, exterior lighting, and
compatibility with surrounding land uses; and
F. Construction and operational traffic, solid and electronic waste, heat rejection, air
emissions, and greenhouse-gas considerations."
Recommendation 4 - Why Standards and Aggregation Matter
One Consistent Threshold No Project Segmentation
These standards provide a consistent
method for applying the 10,000-square- The aggregation provisions prevent
foot threshold and ensure that the overall larger projects from being divided to
scale of a data center development is avoid discretionary review and clarify
when an expansion requires a Use
considered, including related buildings,
sites, and phases. Permit.
Site-Specific Evaluation Targeted Conditions of Approval
Because data centers can vary
substantially in their energy and water Addressed through appropriate
demands, cooling systems, noise, conditions of approval.
emergency systems, and other
operational impacts, the identified
considerations allow these matters to be
evaluated on a site-specific basis
PlanningCommission Action and Accessibility
120 DAYS NOV. 4, 2026
JULY 7, ward � Leeward 2026 Wind COUNTY COUNCIL
Recommendation Three (3) hearings
Referral Planning Commission review deadline
The Windward and Leeward Planning Commissions are required to act on Bill 170. Each
commission may recommend approval in while or in part, approval with modifications or
rejection. The recommendations will be forwarded separately and concurrently to the
County Council.
Failure to act within the 120-day period constitutes an unfavorable recommendation