ENVIRONMENTAL MANAGEMENT COMMISSION
COUNTY OF HAWAIʻI
DRAFT MEETING MINUTES
Wednesday, August 26, 2026
9:14 a.m. to 12:07 p.m.
West Hawai‘i Civic Center – Kona Council Chambers (Building A) and Zoom
A video recording is made part of these minutes, which is available at:
https://www.youtube.com/watch?v=ogLfSmLa_ys
Timestamps are provided for reference in accordance with the provisions of Chapter 92, Hawaiʻi
Revised Statutes.
Disclaimer: These meeting minutes were generated with assistance from AI and are intended to
provide a summary of discussions. While efforts have been made to ensure accuracy, they may
not capture the full context or details of the meeting. Readers are encouraged to reference official
recording for clarification if needed.
County Staff Present:
Daniel Girvan,Director of Department of Environmental Management (“DEM”); Craig Kawaguchi,
Deputy Director of DEM;Christopher Laude, Temporary Assignment (“TA”) Wastewater Division
Chief;Michael Rivera, Solid Waste Division Chief; Robin Bauman, Business Manager; Kelly
Hartman, Regulatory Administrator;Alexander White,TA Information and Education Specialist;
Matthew Jaroslawski, Civil Engineer V; Todd Wright, Recycling Specialist II, Lindsay Moore,
EnvironmentalCompliance Specialist; Ashley DeVera, Private Secretary;and Kevin Soong, Deputy
Corporation Counsel.
Others Present:
Two members of the public attended in-person and fourteen members of the public attended via
Zoom.
I.CALL TO ORDER [SEE YOUTUBE TIMESTAMP 0:34]
Chair Perez called the meeting to order at 9:14 a.m., noting that quorum was present.
Commissioner’s Present:
•Jim Beets (District 1) On Zoom
•Louisa “Sasa” Anthony Lee (District 3) On Zoom
•Erica Perez (District 4) On Zoom
•Justin Canelas (District 6) On Zoom
•John Kometani (District 9) On Zoom
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 2 of 13
Vacancies:
• District 2
• District 5
• District 7
• District 8
II. APPROVAL OF MINUTES FOR June 24, 2026 [SEE YOUTUBE TIMESTAMP 2:11]
The Environmental Management Commission (“EMC”) will consider approval of the
minutes from its meeting held on June 24, 2026. Chair Perez opened the item and
requested a motion.
Motion 1: Commissioner Kometani moved to approve the minutes, and Commissioner
Lee seconded. The motion passed with a unanimous aye voice vote.
III. PUBLIC STATEMENTS ON ITEMS ON THE AGENDA [SEE YOUTUBE TIMESTAMP 4:09]
Public Testimony – Georjean Adams on Agenda Item V.1. [SEE YOUTUBE TIMESTAMP
4:54]
IV. UPDATES FROM THE DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (DEM)
1. Solid Waste Updates:
a. On July 8th, Council committee voted to advance Resolution 594-26 for the
county to enter into a cooperative agreement with USDA to conduct control
operations of feral animals at the Hilo Reload facility and Hilo Wastewater Plant.
[SEE YOUTUBE TIMESTAMP 8:00]
Mr. Michael Rivera reported that on July 8th, the County Council voted to advance
the agreement with the United States Department of Agriculture (“USDA”). The
agreement was being routed for signature. Once the agreement was executed,
meetings with the USDA and Operations staff would be conducted to coordinate
the process.
b. On August 8th, work will begin at the Glenwood Transfer Station to repair and
replace the railings. Repair work will be conducted on closed days. There will be
bay closures at times which can cause wait time delays. [SEE YOUTUBE
TIMESTAMP 9:13]
Mr. Rivera noted that work began on August 8th at the Glenwood facility to repair
all of the railings. The work was scheduled to be completed on days when the
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 3 of 13
facility was closed to minimize impacts to residents. Bay closures occurred as
needed while the repairs were completed and the materials cured. In the interim,
recycling days were transferred to the Volcano Transfer Station.
c. On July 23rd, EPA and DOH conducted a site inspection at the Puʻuanahulu
Landfill. [SEE YOUTUBE TIMESTAMP 9:52]
Mr. Rivera reported that on July 23, a surprise inspection was conducted at the
Puʻuanahulu Landfill by the Environmental Protection Agency (“EPA”) and the
Department of Health (“DOH”). The inspection focused on the landfill gas
collection system and included surface emission monitoring (“SEM”), which
involved scanning landfill surfaces with a probe to ensure emissions remained
below the 500 parts-per-million (“ppm”) limit.
Several exceedances were identified during the inspection. Due to the porous rock
conditions at the landfill, several areas required remediation with finer material to
reduce emissions below the 500-ppm limit. Following remediation, the areas were
re-monitored 10 days later to confirm compliance. Mr. Rivera reported that all
identified areas had been remediated and that the facility was in compliance.
d. On July 28th, the Annual Operating Report (AOR) was submitted to DOH. [SEE
YOUTUBE TIMESTAMP 10:57]
Mr. Rivera noted that on July 28, the Annual Operating Report (“AOR”) was
submitted to DOH. The AOR provided an annual summary of activities conducted
by DEM Solid Waste during the previous fiscal year, including landfill tonnage,
recycling tonnage, and the number of abandoned vehicles.
Chair Perez asked, regarding Agenda Item IV.1.a., about the protocols for deploying the
effort. Mr. Rivera explained that the effort was primarily focused on feral pigs, which were
creating a hazard in the surrounding area. The USDA would habituate the pigs to traps
located in and around the sort station. The work would be conducted at night or after
hours and was expected to take approximately two to three weeks, or longer if necessary,
before the pigs could be trapped and controlled.
Chair Perez also asked about the significant feral cat population observed at the transfer
stations. Mr. Rivera responded that feral cats continued to be observed at the Keaʻau,
Kealakehe, and Hilo transfer stations, as well as near the front gate on Leilani Street, the
reload station, and the recycling area.
Vice Chair Canelas requested an update on the condition of the transfer stations in Kaʻū
following Hurricane Lala. Chair Perez added that status updates should be provided for
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 4 of 13
the entire County, including the impacts Hurricane Lala had on communities throughout
the County on the next agenda.
2. Wastewater Division Updates:
a. Carollo Engineers Draft Wastewater Facilities Plan and Draft Cesspool Conversion
Evaluation Report Presentations. [SEE YOUTUBE TIMESTAMP 16:51]
Mr. Chris Laude and Ms. Kelly Hartman introduced Carollo presenters, Mr. Gary
Deis and Mr. Jason Nikaido. Ms. Hartman explained that the team had been
working on the two reports since 2023 as components of the County’s Integrated
Wastewater Management Plan (“IWMP”). The reports included the Wastewater
Facilities Plan, which evaluated the condition of wastewater assets and prioritized
repairs, and the Cesspool Conversion Evaluation, which addressed the
requirements of Act 125 to close all cesspools.
Mr. Deis outlined the objectives of the presentation, including the condition and
needs of the County’s wastewater infrastructure, required maintenance, and
major capital improvement projects. He noted that Carollo had coordinated with
DEM and the Finance Department to develop near- and long-term capital
improvement plans (“CIP”) and related cash flow projections.
Mr. Deis explained that the two reports were components of the Integrated
Wastewater Master Plan required under the Administrative Order on Consent
(“AOC”) with the EPA. The Master Plan included additional elements scheduled for
completion by January 2027. He noted that the work had been underway for
approximately three years and involved extensive data collection and
coordination.
The analyses considered the condition of existing facilities and legally mandated
improvements under the AOC and Kealakehe Settlement. The Cesspool Conversion
Evaluation assessed the County’s ability to facilitate cesspool conversions,
primarily through reasonable extensions of existing sewer infrastructure. Mr. Deis
emphasized that the County’s wastewater needs were substantial, with estimated
costs in the billions of dollars, and noted that the team was working with the
Finance Department to identify available funding and develop a wastewater CIP
consistent with the County’s financial resources.
At 9:37 a.m. Commissioner Lee left the meeting, and Chair Perez noted that there was no longer
a quorum. The commission took a recess, and the meeting was called back to order at 9:42 a.m.
Mr. Kevin Soong noted that, since there was no quorum, testimony could still be taken and
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 5 of 13
questions regarding the presentation could still be asked; however, no deliberation or decision-
making could take place on these agenda items.
Ms. Hartman explained that the deliverables from DEM would provide context for
the County’s wastewater plans. She stated that the County was developing a 20-
year plan to address its aging sewer system, including a financial plan and priority
ranking for needed improvements. She noted that the sewer rate study would help
generate the revenues necessary to maintain the infrastructure and that the
County was required to provide the EPA with a 20-year financial plan.
Mr. Deis described the process used to develop the Facilities Plan, which began
with the legal requirements under the AOC and Kealakehe Settlement Agreement,
followed by an assessment of existing infrastructure conditions. Due to funding
limitations, the identified needs were prioritized and incorporated into a feasible
wastewater CIP.
Mr. Deis reported that engineers and operators assessed the County’s six
wastewater treatment plants (“WWTP”) and 17 sewage pump stations (“SPS”) in
July 2023, with follow-up inspections conducted in spring 2026. The assessments
used a 1-to-5 condition rating scale, with 1 representing excellent condition and 5
representing failure. Approximately 20 percent of facilities were rated in good
condition, 50 percent in fair condition, 25 percent in poor condition, and 5 percent
had failed components. He stated that the system remained operational, but the
identified deficiencies would require attention through the CIP.
Mr. Nikaido explained that the identified needs were divided into maintenance
actions and capital improvements. Forty-eight maintenance actions were
identified, with recommended schedules and budgets, while 70 potential CIP
projects were identified based on condition assessments and legal requirements.
CIP projects were prioritized according to legal mandates, health and safety,
rehabilitation and replacement, and reliability and redundancy.
Mr. Nikaido reported that the 10-year CIP focused primarily on legal mandates and
health and safety requirements under the AOC and totaled approximately $1.1
billion. An additional $500 million in rehabilitation and reliability projects brought
the 20-year CIP total to approximately $1.6 billion. Overall wastewater needs
beyond the 20-year horizon were estimated at approximately $2.3 billion,
including projects that remained unscheduled and unfunded.
In response to Chair Perez’s questions, Mr. Deis clarified that all above-ground
wastewater assets, including WWTPs and SPSs, had been assessed, but the
underground collection system had not been included in the assessment. Mr.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 6 of 13
Laude explained that the County was conducting a separate assessment of its
underground assets, which was expected to be completed in 2028, with identified
issues to be incorporated into future CIP budgets.
Chair Perez also questioned the use of the Enterprise Fund for maintenance
activities and the potential to use it for larger capital projects. Mr. Deis explained
that funding approaches varied among agencies, but Hawaiʻi County primarily
used general obligation bonds for major capital projects. Ms. Hartman added that
the County’s six-year CIP addressed major capital needs, while the operating
budget covered facility operations and maintenance. She noted that sewer rates
were intended to cover the cost of providing sewer services rather than relying on
the General Fund.
Regarding State Revolving Fund (“SRF”) financing, Ms. Hartman explained that the
County identified priority projects through its six-year CIP process and submitted
eligible projects for consideration through the State Intended Use Plan (“IUP”).
Mr. Deis then presented the Cesspool Conversion Evaluation, noting the
complexity and significant costs associated with converting approximately 48,600
cesspools statewide. The evaluation considered connections to existing sewer
systems, new decentralized or cluster wastewater systems, and conversion to
DOH-approved individual wastewater systems (“IWS”). He explained that although
several options were technically feasible, their costs would likely result in most
County cesspool conversions being addressed through IWS.
Mr. Deis also discussed the cesspool prioritization tool developed by the University
of Hawaiʻi (“UH”), which classified cesspools as Priority 1, 2, or 3 based on
potential public health and environmental impacts. Approximately 85 percent of
the County’s cesspools were classified as Priority 3, with Priority 1 and 2 cesspools
concentrated in certain areas. He noted that decentralized systems could be
pursued by neighborhoods or communities where appropriate.
At 10:12 a.m. Commissioner Lee returned to the meeting and Mr. Soong confirmed that a quorum
was present. The Commission proceeded with the meeting as normal.
Mr. Deis continued the presentation and explained that cesspool conversion
requirements were established through State legislation. Act 125, passed in 2017,
required all cesspools to be converted by January 1, 2050, with possible
exemptions determined by DOH based on factors such as lot size and slope. He
noted that Act 132 established the Cesspool Conversion Working Group in 2018
and that Act 217, passed in 2024, provided funding to the UH to update its
cesspool prioritization tool and identify priority areas for sewer extensions.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 7 of 13
Mr. Deis explained that the evaluation identified potential sewer connections by
analyzing areas with 50 or more cesspools within an eighth-mile radius. The
analysis identified 77 groups, which were further evaluated based on projected
wastewater flows and the capacity of existing sewer infrastructure. Areas near
existing sewer systems were identified as potential sewer extension projects, while
areas without nearby infrastructure were evaluated for decentralized wastewater
systems or IWS.
The evaluation identified 39 potential County sewer extension projects, four
potential non-County sewer extension projects, and two potential areas for
decentralized wastewater systems. Approximately 30,000 cesspools were
identified as potentially requiring conversion to IWS.
Mr. Nikaido explained that cost estimates were based on a May 2025 baseline and
incorporated information from wastewater projects throughout Hawaiʻi, the DOH
database, and contractor estimates. The total potential cost of cesspool
conversions was estimated at approximately $5 billion. County sewer connections
were estimated at approximately $780 million, non-County sewer connections at
approximately $122 million, decentralized systems at nearly $3 billion, and IWS
conversions at approximately $1.2 billion.
Mr. Nikaido noted that IWS conversions were the most cost-effective option at
approximately $40,000 per cesspool, followed by County sewer connections at
approximately $93,000, non-County sewer connections at approximately
$140,000, and decentralized systems at approximately $300,000 per cesspool.
Mr. Nikaido explained that the County had the greatest control over County-led
sewer extension projects and that Priority 1 cesspools would receive priority. Of
the 39 potential County projects, 10 were prioritized at an estimated cost of
approximately $266 million, potentially converting approximately 3,066 cesspools.
Keaukaha, a Department of Hawaiian Home Lands (“DHHL”) community in Hilo,
was included in the cost estimates but was not included in the funding.
Implementation would depend on available CIP funds and outside funding
sources. Non-County sewer connections would be led by the respective utility
owners, decentralized systems would generally be community-led, and IWS
conversions would be the responsibility of individual property owners.
Mr. Nikaido stated that the team was briefing the EMC and would present the
findings to the County Council on September 15, 2026, to meet the AOC deadline
of January 2027.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 8 of 13
Commissioner Lee asked about the availability and approval of alternative IWS
technologies. Mr. Nikaido explained that DOH maintained a list of approved
technologies and had an acceptance process for new technologies that required
installation, testing, and monitoring. Mr. Laude noted that approval of new
technologies was a State responsibility, but the County remained open to
evaluating alternative technologies and their potential impacts.
Commissioner Lee also asked whether property owners in areas identified for
County sewer connections would be required to connect or could pursue
alternative technologies. Mr. Laude explained that the County was still evaluating
the issue, with funding being a significant consideration. He noted that outside
funding would likely be necessary and that alternative technologies would require
DOH approval and consideration of their long-term implications.
Chair Perez discussed State legislation and the Hawaiʻi On-Site Wastewater
Treatment Evaluation Project, which was intended to evaluate innovative
wastewater technologies and establish a more streamlined State approval process.
Chair Perez asked how the County planned to manage the additional solids
generated by cesspool conversions. Mr. Laude acknowledged that increased solids
management would create additional operational and financial considerations. He
stated that the County was working to increase flexibility, redundancy, and
capacity within its treatment systems and was also evaluating its pretreatment
program to better manage solids-generating entities.
Vice Chair Canelas asked whether Pāhala and Nāʻālehu WWTPs could serve as
collection or disposal points for septage from nearby IWS systems. Mr. Laude
stated that this had not yet been specifically evaluated and that the facilities would
first require DOH approval. He noted that the option could be considered as part
of future solids management planning.
Vice Chair Canelas asked whether the Aliʻi Drive project was identified as a top
priority. Ms. Hartman clarified that the Kāhaluʻu project involved connection to a
private WWTP and would be discussed under the next agenda item. Mr. Laude
noted that a pilot program could also be considered in the future.
Chair Perez discussed the County of Kauaʻi’s efforts to secure SRF and IUP funding
to assist homeowners with cesspool conversions. She asked whether DEM had
reviewed Kauaʻi’s approach and was coordinating with the Office of Community
and Housing Development (“OHCD”). Mr. Laude stated that DEM regularly worked
with OHCD on wastewater projects. Ms. Hartman added that the County was
evaluating grants and low-interest loans for homeowner-specific cesspool
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 9 of 13
conversions and was considering directing eligible residents to OHCD programs
that could provide financial assistance, including potential loan forgiveness.
Chair Perez requested that the next agenda include a discussion of Kauaʻi County’s
approach to securing approximately $2 million in IUP and SRF funding for
homeowners, noting that Kauaʻi had secured such funding on two occasions to
assist with cesspool conversions.
At 10:54 a.m., Mr. Soong clarified that when the Commission lost quorum, it continued pursuant
to HRS § 92-2.5(d) to receive testimony. Since that time, the Commission had not engaged in any
deliberation or decision-making. Although Commissioner Lee subsequently returned and the
Commission regained quorum, Mr. Soong explained that, upon further review, the cancellation of
the meeting when quorum was lost could not be undone in order to comply with the Sunshine Law
and applicable notice requirements.
Mr. Soong further explained that, moving forward, when the Commission reached Agenda Item
V.1., no deliberation or decision-making could occur. Any matters requiring deliberation or a
decision would need to be postponed to the September 23, 2026, meeting or a subsequent
meeting.
b. Summary of findings for the Preliminary Engineering Report for Aliʻi Drive Sewer
Line Extension. [SEE YOUTUBE TIMESTAMP 1:42:27]
Public Testimony – Debbie Hecht [SEE YOUTUBE TIMESTAMP 1:42:42]
Director Girvan reported that the preliminary engineering report had been
completed and identified 77 properties along Aliʻi Drive. The report evaluated two
potential wastewater collection options: a traditional gravity-flow sewer system
and a low-pressure sewer system.
Director Girvan explained that a gravity sewer system would require minimal
maintenance and little involvement from individual property owners but would be
significantly more expensive to construct in the area. A portion of the system
would be installed below the saltwater groundwater table, increasing the potential
for infiltration and long-term operation and maintenance costs. A low-pressure
system would use smaller-diameter, shallower pipes installed above the
groundwater table, reducing infiltration and installation costs; however, individual
property owners would need to install a collection vessel and pump.
The report also evaluated extending the system north or south. The southern
extension would connect to a privately owned wastewater treatment system that
did not have sufficient capacity and would require reconstruction and expansion
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 10 of 13
of its lift station. The northern extension would connect to an existing lift station
with sufficient capacity and convey wastewater to the Kealakehe WWTP. Mr. Laude
noted that the gravity line leading to the northern lift station had limited but
adequate capacity to accommodate the proposed expansion.
Mr. Laude noted that cultural and historical resources along the corridor could
complicate environmental reviews and required clearances. In response to Chair
Perez’s questions, he explained that a low-pressure system could provide greater
flexibility in routing around sensitive areas because it would not require the same
gravity-based alignment and manhole requirements as a gravity system.
Chair Perez asked whether a low-pressure system could still connect to County
infrastructure or whether it would require a private system. Mr. Laude explained
that either the County or a private provider could potentially accommodate the
additional flow, subject to capacity, cost, and regulatory considerations. He noted
that private systems would also be subject to Public Utilities Commission (“PUC”)
review and rate requirements. Director Girvan clarified that the County did not yet
have technical specifications or a rate structure for low-pressure systems but
stated that this would not prevent the project from moving forward.
Vice Chair Canelas raised concerns regarding water quality and illnesses reported
by community members following swimming in the bay. Mr. Laude stated that the
project was a County priority and emphasized the need to transition from
cesspools and IWS to centralized wastewater collection and treatment. He also
noted the potential for future water reuse.
Vice Chair Canelas asked about the anticipated timeline for advancing the project
and securing funding. Mr. Laude explained that the County had committed funding
during the current fiscal year to develop a detailed conceptual plan. The plan
would establish project costs and could be used to pursue either a design-build
contract or a traditional design-bid-build procurement.
Chair Perez emphasized the importance of the project because the priority areas
were located along the shoreline and included critical habitat and heavily visited
areas. She recommended that future analyses include the potential costs and
consequences of taking no action, including risks to public and private
infrastructure and potential impacts to County assets. She stated that considering
the cost of inaction would provide a more comprehensive assessment of the risks
associated with continued reliance on cesspools and IWS, in addition to the costs
of constructing new wastewater infrastructure.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 11 of 13
There were no further questions or comments. Chair Perez stated that she looked
forward to reviewing the conceptual plan and receiving an update as the project
progressed.
At 11:26 a.m. the commission took a recess, and the meeting was called back to order at 11:36
a.m.
V. NEW BUSINESS
1. EMC review of the sewer rate Bill 183, to discuss comments and recommendations
and plan to submit prior to the October 2nd deadline at noon, pursuant to Hawaiʻi
County Code § 2-207(c-d). [SEE YOUTUBE TIMESTAMP 2:23:17]
Commissioner Lee asked how the EMC’s comments and recommendations would be
incorporated into the process. Ms. Hartman explained that this was the EMC’s first
review of the proposed sewer rate bill, which had been referred to the EMC for
comments. She stated that the bill consisted of a table outlining the proposed rate
increases.
Chair Perez questioned the equity of the proposed rates. She expressed support for
maintaining safe and reliable wastewater infrastructure and acknowledged the
financial gap that needed to be addressed. She also noted that the County’s sewer
rates were relatively low compared to other counties and privately operated utility
systems.
Chair Perez asked about developer connection fees and their relationship to the
proposed sewer rates. Ms. Hartman explained that connection fees were not included
because the bill addressed sewer service rates, which covered wastewater treatment
and County services. Connection fees were separate and would be evaluated in the
future.
Director Girvan explained that connection fees were intended to recover capital
investment costs associated with new infrastructure, rather than operating expenses.
He stated that the fees addressed in the proposed bill were legally and administratively
required to cover wastewater system operating expenses.
Chair Perez asked whether the rate study provided the basis for the proposed bill and
rate increases. Director Girvan confirmed that it did, explaining that the study
identified the County’s financial needs and operating costs and provided a basis for
allocating those costs among wastewater customers.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 12 of 13
Regarding the proposed charge for gang cesspools, Director Girvan explained that the
County continued to operate and maintain the collection system serving those
properties, even though gang cesspools did not use a County treatment system. He
noted that the current monthly charge was $25 for gang cesspools compared to $52
for private residences, with the difference reflecting the additional cost of operating
and maintaining the treatment system for private residences.
Chair Perez questioned whether other sanitation-related charges or developer-related
costs fell outside the scope of the rate study and proposed bill. She expressed concern
that new development could increase infrastructure and wastewater treatment needs
without developers contributing to future costs associated with expanding or
connecting communities to the County sewer system.
Director Girvan reiterated that the proposed bill addressed operating costs, while
connection fees would address capital expenses. He noted that Hawaiʻi County did not
currently have a connection fee, although other counties did, and stated that
establishing such a fee could be considered in the future.
Director Girvan clarified that the requirement for developers to provide sewer
infrastructure was a County Code requirement rather than a connection fee.
Developers were responsible for the capital cost of installing sewer systems within
their developments and were required to construct the systems to County standards
before transferring them to the County. He explained that this was separate from a
connection fee that could potentially be charged when an existing property was
connected to a newly installed County sewer line. Ms. Hartman added that residents
in a subdivision would begin paying the sewer service rate once water service was
activated for their individual residences.
Commissioner Lee requested access to the full rate study to better understand how
the proposed rates were developed. She expressed concern about the impact of the
proposed rates on communities in her district, including approximately 430
households that would be required to connect to the sewer system.
Commissioner Lee also noted that a majority of Hawaiʻi County residents were not
connected to the County sewer system. Director Girvan confirmed that most residents
did not pay sewer rates and explained that the wastewater system was therefore
effectively subsidized by the general taxpayer. He stated that the goal was to move
toward a user-pay system in which wastewater system users covered the costs of the
services they received. He further explained that State and federal requirements
obligated the County to maintain a rate structure sufficient to cover wastewater
system operating expenses.
DR
A
F
T
Environmental Management Commission
Draft Meeting Minutes of August 26, 2026
Page 13 of 13
Commissioner Lee expressed concern that some affected communities were required
to connect to the sewer system without being provided alternatives and asked
whether different rates could be established for different customer groups. Director
Girvan explained that applicable laws limited how wastewater operating expenses
could be allocated among customer categories. He noted that the proposed bill
distinguished among private residences, non-private residences, and hotels, with each
rate category supported by financial analysis.
Director Girvan emphasized that the County could not arbitrarily shift costs among
customer categories and that the rate structure had to be supported by financial and
legal analysis. Commissioner Lee again requested access to the full rate study, and
Director Girvan stated that he would follow up regarding its availability.
Chair Perez requested clarification regarding the remaining agenda items and, since the agenda
had not been completed, suggested that the meeting be concluded and adjourned, with the
remaining agenda items carried over to the following month. Mr. Soong agreed.
Mr. Laude added that the rate study was a necessary step forward. He noted that DEM
needed to examine how new connections could be charged for their proportional use
of the sewer system and how costs incurred for new connections could be recouped.
Chair Perez noted that this discussion would continue at the next meeting and that
the EMC would have an opportunity to develop its recommendations to County
Council.
Chair Perez then proceeded to Agenda Item VIII.
VIII. ANNOUNCEMENTS
1. The EMC has Commissioner vacancies for Districts 2, 5, 7, and 8. [SEE YOUTUBE
TIMESTAMP 2:52:23]
IX. ADJOURNMENT [SEE YOUTUBE TIMESTAMP 2:52:43]
The meeting was adjourned at 12:07 p.m.