HomeMy WebLinkAboutPD Background Report (PL-REZ-2024-000074) BKBXtremeAmendREZ.9.2.26
COUNTY OF HAWAIʻI PLANNING DEPARTMENT
BACKGROUND REPORT
KBXTREME HILO LLC (FORMERLY GILLIE & JANE SILVA) AMENDMENT TO ORDINANCE NO. 10-45 (PL-REZ-2024-000074)
KBXTREME HILO LLC has submitted an application to amend Ordinance No. 10-45 to
delete the 180-day timeframe for Condition B (water commitment), allow a 10-year time
extension to Condition E (complete construction), delete Condition G (access easement),
delete Condition H (limitations to Komohana Street access), delete Condition J (full
improvements to Komohana Street), delete Condition K (streetlights & traffic control
devices), and to add 2 new conditions. Ordinance No. 10-45 was approved to allow a
change of zoning district classification from Agricultural- 1 Acre (A-1a) to Neighborhood
Commercial-20,000 square feet (CN-20) for a 5.075-acre parcel. The subject property is
located at 279 Komohana Street, approximately 150 feet from its intersection with
Ponahawai Street, Hilo, South Hilo, Hawai‘i, TMK: (3) 2-3-037:006.
PROPOSED ACTION
1. Applicant’s Request: The applicant is requesting the following amendments to
Change of Zone Ordinance No. 10-45:
Amend Condition B (water commitment) to delete the 180-day timeframe for
payment.
Amend Condition E (complete construction) to allow a 10-year time extension
from the effective date of this amendment.
Delete Condition G (access easement).
Delete Condition H (limitations to Komohana Street access).
Delete Condition J (full improvements to Komohana Street).
Delete Condition K (streetlights & traffic control devices).
Add a new condition to allow partial relief from the easement along Komohana
Street to provide for driveway access.
Add a new condition to recommend that the Department of Public Works (DPW)
consider reducing the posted speed limit along Komohana Street fronting the
subject property.
-2-
The following are the applicant’s specific amendment requests (material to be
deleted is bracketed/struck through, material to be added is underscored):
Amend Condition B:
Prior to the issuance of a water commitment by the Department of Water
Supply, the applicants shall submit the anticipated maximum daily water
usage calculations as recommended by a registered engineer, and a water
commitment deposit in accordance with the “Water Commitment Guidelines
Policy” to the Department of Water Supply [within 180 days from the
effective date of this ordinance]prior to the issuance of a building permit.
Amend Condition E:
Construction of the proposed improvements shall be completed within [five
(5)]ten (10) years from the effective date of this amended ordinance. This
time period shall include securing Final Plan Approval from the Planning
Director in accordance with Section 25-2-70, Chapter 25 (Zoning Code),
Hawai‘i County Code.
Delete Condition G:
[Prior to issuance of Final Plan Approval, the applicants shall grant a
minimum 30-foot wide access easement on the subject property, in favor of
the adjacent landowner(s) (TMK: 2-3-37:14), in order to connect the access
at Ponahawai Street on TMK 2-3-37:14 to the access at Ponahawai Street
on the subject property for the purpose of providing internal traffic circulation
between the two properties.]
Delete Condition H:
[Access at Komohana Street shall be through road and utility easement
“RU-9”and shall be limited to right-turn in and right-turn out movements only.
This access shall be shared with the adjacent parcel (TMK: 2-3-37:22).
Prior to the issuance of a Certificate of Occupancy, the applicants shall
install “no left-turn” sign(s) and a physical barrier at the property access to
prevent left-turns into and out of the access driveway. All improvements
shall meet with the approval of the Department of Public Works.]
-3-
Delete Condition J:
[Prior to the issuance of a Certificate of Occupancy, the applicants shall
provide full improvements to the property’s frontage along Komohana Street
consisting of, but not limited to, pavement widening with concrete curb,
gutter and sidewalk, drainage improvements, and any required utility
relocation, meeting with the approval of the Department of Public Works.]
Delete Condition K:
[Streetlights and traffic control devices, as may be required by the Traffic
Division, Department of Public Works, shall be installed by the applicants at
no cost to the County.]
Add New Condition:
Partial relief from “NO VEHICULAR ACCESS” PLANTING SCREEN
EASEMENT in an area of the property fronting Komohana Street to provide
for commercial driveway access that will not interfere with neighboring
residential property access. Relief is requested for a length of approximately
45 feet at a location reviewed in coordination with the Department of Public
Works (DPW) Engineering Division and DPW Traffic Division to ensure
appropriate driveway placement and two‐way left turn lane (TWLTL)
spacing from the Ponahawai/Komohana intersection, consistent with
Chapter 22 (County Streets) of the Hawai‘i County Code and the completed
TIAR.
Add New Condition:
As a matter of public safety, the Planning Commission and County Council
recommend that the Department of Public Works (DPW) evaluate the
posted speed limit along Komohana Street fronting the subject property and
consider a reduction of the posted speed limit from forty‐five (45) miles per
hour to thirty‐five (35) miles per hour. This recommendation is intended to
support safe ingress and egress to the site and to improve overall traffic
safety in light of the proposed commercial driveway access and turning
movements. Nothing in this condition shall be construed to alter or
-4-
supersede the independent authority of DPW with respect to speed limit
determinations or traffic control measures.
It should be noted that if the applicant’s requested amendments are approved, the
existing CN-20 zoning would allow for the construction of approximately 104
double-family or 104 multiple-family residential units on the portion of the subject
property that is not located in flood zone A.
2. Applicant’s Reasons for the Request: The applicant acquired the property in
March 2017, after the original deadline of May 20, 2015, to complete construction,
as established by Condition E of Ordinance No. 10-45. The previous landowner
had proposed to construct a 30,000-square foot office building, with plans to
potentially construct an additional office building. The current applicant intends to
construct a 36,000-square foot family entertainment center on the subject property,
to include bowling, an arcade, laser tag, miniature glow golf, a restaurant, karaoke
rooms and a lounge. In 2019, the zoning code was amended to add indoor
amusement and recreation facilities to the list of permitted uses for the CN zoning
district, which would include the proposed use. However, given that an
administrative time extension for Condition E expired on May 20, 2020, the
10-year time extension is requested to allow adequate time to complete
construction. The applicant is requesting to amend or delete various conditions
that they believe are no longer relevant to the current proposal or that would
impede the feasible completion of the project. Additionally, the applicant proposes
to add two new conditions to allow driveway access and provide for safe vehicular
movement with a reduction of the speed limit along the subject property’s
Komohana Street frontage.
3. Construction Timetable and Cost: The applicant estimates that they will submit
for plan approval within approximately two years. Construction is anticipated to
take approximately 18-24 months, with costs expected to exceed $10 million.
4. Landowner: KBXtreme Hilo LLC.
5. Supporting Information: The applicant has submitted the attached in support of
the request. (Planning Department Exhibit 1 - Change of Zone Amendment
-5-
Application dated January 14, 2026 and Additional Information dated
June 12, 2026)
STATE & COUNTY PLANS
6. State Land Use District: Urban.
7. General Plan 2045 Land Use Map: Medium Density Urban (mdu). These areas
include uses such as village and neighborhood commercial and single family and
multiple family residential and related functions (multiple family residential - up to
35 units per acre).
8. County Zoning: Neighborhood Commercial-20,000 square feet (CN-20).
9. Hilo Community Development Plan (CDP): The Hilo CDP, adopted by
Resolution No. 1 on May 21, 1975, identifies the area as Single-Family Residential
and Multiple-Family Residential.
10. Special Management Area (SMA): The Special Management Area is a part of the
Coastal Zone Management Program and regulated by the County. The subject
property is not located within the Special Management Area and is situated
approximately 1.0 miles from the nearest coastline.
DESCRIPTION OF SUBJECT PROPERTY AND SURROUNDING AREA
11. Subject Property: The subject, 5.075-acre property has frontage along both
Ponahawai Street and Komohana Street. An approximately 30-foot wide “pole”
connects the main portion of the property to Ponahawai Street and there is
approximately 600 feet of frontage along Komohana Street. Two drainage
easements are located in the northern portion of the property. Drainage easement
“D-1” is 20 feet wide and drainage easement “D-2” is 80 feet wide. The property
is currently vacant but was formerly planted in sugar cane. Elevation ranges from
200 to 240 feet above sea level and the property slopes slightly to the east and
south.
12. Surrounding Zoning/Land Uses: Surrounding lands are zoned Single-Family
Residential (RS-7.5), Multiple-Family Residential (RM-4, RM-5.5), Neighborhood
Commercial (CN-20), Agricultural (A-1a) and Project District (PD). Existing
surrounding land uses include residential, medical and church uses, in addition to
-6-
vacant parcels.
13. Flood Insurance Rate Map (FIRM): Portions of the property are located in the “A”
flood zone, a special flood hazard area inundated by the 100-year flood where
base flood elevations have not been determined.
14. Flora/Fauna Resources: No professional floral or faunal study was submitted with
the application. As the property was historically used for sugar cane cultivation and
has been grubbed in recent years, and given development of the surrounding area,
it is unlikely to host endangered species of plants or animals.
15. Archaeological/Cultural/Historical Resources: No formal archaeological or
cultural studies were conducted as the subject property has been grubbed and
impacted by ground-disturbing activities associated with previous sugar cane
cultivation. By letter dated January 8, 2010, the Department of Land and Natural
Resources – State Historic Preservation Division (SHPD) provided comments
stating that no historic properties would be affected by the proposed development,
citing previous grading and grubbing (Planning Department Exhibit 2 – Letter
from SHPD dated January 8, 2010).
16. Public Access: There is no public access to the mountains or the shoreline that
runs through the property.
PUBLIC UTILITIES AND SERVICES
17. Vehicular Access/Traffic: The property has two legal access easements; a 30-
foot-wide road and utility easement identified as “RU-8” at Ponahawai Street which
is shared with parcel 21 and a 15-foot-wide road and utility easement from
Komohana Street identified as “RU-9” which is shared with parcel 22. Ponahawai
Street and Komohana Street are both County roadways with a right-of-way width
of 60 feet. An existing 10-foot wide no vehicular access planting screen easement
runs along the east side of Komohana Street. The previous applicant intended to
utilize the Ponahawai Street access as the primary access to the property but the
current project proposes a primary driveway access from Komohana Street. The
applicant commissioned a traffic impact analysis report (TIAR) for the proposed
project, dated July 21, 2025, which found that the proposed project is not expected
-7-
to significantly impact traffic on Komohana Street and expects the proposed
driveway to the subject property to operate at LOS “C” through year 2045 at peak
hours of traffic. Additionally, the Komohana Street and Ponahawai Street
intersection is expected to operate at acceptable levels of service through year
2045 at peak hours of traffic with the proposed project. The TIAR makes several
recommended access improvements as follows:
- Southbound Komohana Street should be widened at the proposed
driveway to provide an exclusive left turn lane.
- The south leg of Komohana Street should be widened at the proposed
driveway to provide a median refuge lane.
- The proposed driveway should provide separate left turn and right turn
lanes.
The Department of Public Works (DPW), Engineering Division, states that they
oppose deleting Condition J (full improvements to Komohana Street) and
Condition K (streetlights and traffic control devices), but are amenable to the
request to delete Condition H (limitations to Komohana Street access). Regarding
Condition H, DPW notes that access improvements shall be as required by the
TIAR and by DPW. Regarding Condition J, DPW states that installation of curb,
gutter and sidewalks along the subject property frontage is necessary for safe
pedestrian access to the proposed facility. Regarding Condition K, DPW opposes
the request for relief from installation of streetlights, but will defer to DPW, Traffic
Division, during construction plan review. Based on comments from Traffic
Division, they concur with DPW, Engineering Division, in opposing deletion of
Condition K. Traffic Division notes that the requirement for installation of roadway
lighting along the project area as deemed necessary by DPW is reasonable,
particularly due to added pedestrian and bike traffic and for safer ingress and
egress to the proposed development. Traffic Division goes on to state that the
applicant should make sure there is adequate room for proper channelization and
storage on Komohana Street, including a left turn lane and a median acceleration
lane for left turns out. Finally, Traffic Division recommends that the applicant
-8-
coordinate roadway improvements with the proposed Project District that will take
access from the top of Ponahawai Street, near the subject property. The
applicant’s response to DPW notes that requiring curb, gutter and sidewalk
improvements along the Komohana Street frontage would create an isolated
section of sidewalk that will not connect to a continuous pedestrian system and
requests reconsideration of the requirement to retain Condition J. The applicant
states they are agreeable to specific frontage improvements to be determined by
DPW during construction plan review, with consideration given to an alternative of
maintaining a safe paved shoulder or other bicycle and pedestrian-compatible
improvements. Regarding Condition K, the applicant proposes an alternative of
installing on-site lighting at the project driveway entrance to allow entrance lighting
to be installed and maintained directly by the applicant. Additionally, the applicant
requests that any retained condition allow flexibility for DPW, Traffic Division, to
make the final determination regarding necessary streetlights. Finally, the
applicant states that they will coordinate with DPW to implement recommendations
made in the TIAR.
18. Water: According to the Department of Water Supply (DWS), there is an existing
5/8-inch meter serving the subject property which is limited to an average daily
usage of 400 gallons and suitable for only one single-family dwelling. DWS notes
that previous comments, dated January 4, 2010, are still applicable and that they
are not supportive of the applicant’s request to submit water usage calculations
prior to issuance of a building permit as water availability may change. The 2010
comments requested submittal of estimated maximum daily water usage
calculations for the proposed use including the total estimated daily water usage
in gallons per day and the estimated peak flow in gallons per minute, including
irrigation use. Upon receipt of the water usage calculations, DWS stated that they
will determine the water commitment deposit amount, prevailing facilities charge
and any water system improvements required for final approval. DWS also stated
that CN zoning will require installation of a reduced pressure type backflow
prevention assembly, meeting DWS approval, and that the applicant shall be
-9-
responsible for relocation and adjustment of DWS’s affected water system
facilities, as necessary. DWS notes that the existing 12-inch water line within
Komohana Street is adequate to provide 2,000 gallons per minute for fire
protection, as required by DWS standards. The applicant has responded that they
understand the DWS requirements and though the application proposes to defer
certain project costs until later in the permit review process, they will work with
appropriate design professionals to determine what is needed to prepare the
required water usage calculations for DWS review. In an updated response letter,
dated September 8, 2026, the applicant states that they have submitted
preliminary water use calculations to DWS for review and are in discussion with
DWS to submit the required water commitment deposit.
19. Wastewater: There is currently no municipal sewer in the area. According to
comments from the Department of Environmental Management for the original
change of zone, the property is located in a Critical Wastewater Disposal Area. All
lots within this designated area are subject to the use of a septic tank system
approved by the Department of Health.
20. Environmental Site Assessment: DOH notes that environmental site
assessment may be appropriate for formerly cultivated agricultural lands where
historic activities could have resulted in releases of hazardous substances. The
applicant remains responsible for compliance with applicable DOH requirements
during subsequent development and permitting.
21. Solid Waste: The applicant states that solid waste will be properly disposed of at
an authorized county waste disposal or recycling facility.
22. Essential Utilities and Services: Electricity and telephone services can be made
available to the property. Police, fire and medical services are available nearby in
Hilo.
-10-
AGENCY COMMENTS
23. Department of Health: (Planning Department Exhibit 3 – July 14, 2026 memo)
24. Department of Water Supply: (Planning Department Exhibit 4 – July 24, 2026
letter)
25. Department of Public Works – Engineering Division: (Planning Department
Exhibit 5 – September 4, 2026 memo)
26. Department of Public Works – Traffic Division: (Planning Department
Exhibit 6 – September 15, 2026 email)
AGENCIES – NO RESPONSE
27. Department of Land and Natural Resources – Land and Engineering Divisions,
Department of Land and Natural Resources – Division of Forestry and Wildlife,
Department of Land and Natural Resources – State Historic Preservation Division,
Department of Environmental Management, Police Department, Fire Department,
Office of Housing and Community Development.
APPLICANT’S RESPONSE TO AGENCY COMMENTS
28. Applicant’s Response to DWS Comments: (Planning Department Exhibit 7 –
August 3, 2026 letter and September 8, 2026 letter)
29. Applicant’s Response to DPW Comments: (Planning Department Exhibit 8 –
September 8, 2026 letter)
PUBLIC COMMENTS
30. As of the date of this writing, the Planning Department has received no public
comments on this application.
Department of Planning
County of Hawaii
101 Pauahi Street
Hilo, Hawaii 96720
Dear Department of Planning:
Subject: Request for Rezoning and Ordinance Amendment – KBXtreme Hilo, LLC
REZ 09‐000113, Ordinance No. 10‐045
South Hilo, HI, TMK: 3‐2‐3‐037:006
The subject area, encompassing 221,067 square feet, was rezoned into the Neighborhood
Commercial (CN) district (EXHIBIT A) on May 20, 2010, originally intended for the construction of a
commercial office building. However, the construction failed to meet the deadline within the
permissible five‐year period, which expired on May 20, 2015, due to Condition E of the rezoning
ordinance. A time extension was requested and subsequently approved by the Planning Director
through a letter dated December 23, 2016 (EXHIBIT B), granting an additional period until May 20, 2020.
Shortly after obtaining the administrative time extension, the subject property was sold to
KBXtreme Hilo, LLC. (KBXTREME) on March 17, 2017. On October 2, 2019, the Hawaii County Council
passed Bill 94, which amended the Zoning Code to permit Indoor Amusement and Recreation Facilities
within the Neighborhood Commercial (CN) zoning districts. This change was eagerly awaited by
KBXTREME, as indoor amusement and recreation facilities were not previously allowed in Neighborhood
Commercial (CN) zoned areas. However, due to unforeseen circumstances related to the COVID‐19
pandemic the development plans were inadvertently delayed, leading to the expiration of the
administrative extension, where construction of the improvements had to be completed, on May 20,
2020.
KBXTREME now plans to construct and operate a comprehensive family entertainment center in
Hilo. The center will feature various attractions centering around bowling and restaurants, and including
an arcade, laser tag, miniature glow golf, karaoke rooms, and lounge. Its objective is to provide a diverse
range of recreational opportunities for both county residents and visitors, consistent with the primary
goals stated in section 12.2 of the general plan.
To proceed with the development of the family entertainment center, KBXTREME requires an
amendment of the rezoning ordinance for the CN zoning district, suitable ingress and egress to the
property, and a reduced speed limit on Komohana Street fronting the property.
I. GENERAL BACKGROUND
As noted earlier, the rezoning ordinance for the subject area, covering 221,067 square feet, was
implemented as Neighborhood Commercial (CN) district (Ord. No. 10‐045) on May 20, 2010, with the
original intention of constructing a commercial office building in conjunction with the neighboring
parcel. However, construction of the facility was not completed within the designated timeframe,
January 14, 2026
including the extension period. The subject property was purchased by KBXtreme Hilo, LLC on March
17, 2017 for the purpose of developing a family entertainment center. Progress on this project was
initially delayed by the Kilauea volcanic eruption, as the Planning Department appropriately prioritized
its response to the crisis. This, in turn, postponed the administrative process to amend the zoning code
to expand permitted uses within Neighborhood Commercial (CN) zoning to include “Indoor
Amusement.” These changes were ultimately approved by the Hawaii County Council in November
2019, allowing us to proceed with development efforts, including drafting construction documents.
However, just two months later, the COVID‐19 pandemic abruptly halted all progress, compounding the
delays caused by the earlier circumstances. Now that economic conditions have stabilized, we are
actively resuming development efforts and remain committed to completing this much‐needed facility
for the Hilo community. Due to these unusual and unavoidable circumstances, we respectfully request
relief from the lapse of the prior extension and seek an additional ten (10) years to fulfill the conditions
of Ordinance 10‐45.
KBXtreme's owners currently operate a popular 25,805 square foot family entertainment center in
Kailua Kona, which has been delighting patrons since 1987. The facility offers an array of exciting
activities, including sixteen lanes of bowling, a state‐of‐the‐art video arcade, a karaoke lounge, a sports
bar, and the renowned restaurant Chubby's Diner. KBXtreme purchased the property in Hilo with the
intention of constructing a similar 36,000‐square‐foot facility. However, the property was initially
rezoned for a commercial office building under the Neighborhood Commercial (CN) district, which did
not allow indoor amusement and recreation facilities as a permitted use. Although a time extension was
granted, the construction could not be completed within the given timeframe. On October 2, 2019, the
Hawaii County Council passed Bill 94, amending the Zoning Code to permit indoor amusement and
recreation facilities within the CN zoning districts, which KBXtreme had eagerly awaited. Unfortunately,
due to the unforeseen delays caused by the COVID‐19 pandemic, the administrative extension expired
on May 20, 2020. Undeterred, KBXtreme now plans to construct and operate a family entertainment
center in Hilo, featuring a range of exciting attractions such as bowling, an arcade, laser tag, miniature
glow golf, a restaurant, karaoke rooms and a lounge (EXHIBIT F), (EXHIBIT G), (EXHIBIT H).
The hours of this facility will closely follow those of our established Kona facility, which has been in
operation since 1987. The hours of operation will be 9:00 AM to 2:00 AM daily (Sunday–Saturday), with
earlier closing on Sunday through Thursday as business demand warrants. The total number of
employees for the facility is estimated to be around 80 people, with staffing adjusted during peak and
off‐peak periods to ensure operational efficiency. Given the facility’s size and diverse entertainment
offerings, it is anticipated that an average of 300 daily visitors will utilize the facility, with higher
volumes on weekends and during special events such as concerts or school field trips. Our Kona
location's historical data shows that peak days (typically weekends) could see up to 500‐600 visitors,
while weekdays might average closer to 200‐250 visitors, depending on the time of year and scheduled
events.
A very diverse clientele is anticipated, that will necessitate catering to a wide range of interests.
During the morning hours, seniors will be serviced through our bowling leagues and open lanes. The
restaurant will serve breakfast, lunch, and dinner for the local community, and the facility will host
bowling leagues during weeknights from Monday to Thursday. Ongoing communications with UH Hilo
and HCC are underway as they are very interested in reviving their weekly bowling intramural leagues,
which will bring in additional college‐aged patrons. The lounge area will also attract patrons for live
events and PPV broadcasts, particularly during major sports and entertainment events. Friday, Saturday,
and Sunday will be focused on providing entertainment for local families to enjoy, particularly after‐
school hours and on weekends. Plans to host school field trips throughout the year are in awaiting, as
evidenced by our experience at our Kona location, where we frequently serve local schools. Additionally,
we will continue our tradition of hosting Project Grad events to provide high school graduates with a
safe, alcohol‐free environment for their celebration.
Minimal conflict with school or institutional traffic is anticipated as the facility opens at 9:00 AM,
after most school and work traffic. Traffic patterns at the Kona facility during the morning are largely
driven by senior leagues and do not coincide with high traffic times for local schools or offices. The
facility will have 213 parking stalls (including 7 accessible stalls), which significantly exceeds the required
134 stalls. Based on the experience at the Kona facility, minimal morning and afternoon traffic is
expected, with the majority of traffic at those times due to scheduled senior league events. The varied
entertainment offerings and services will help spread out visitor traffic throughout the day, minimizing
peak congestion.
This is a highly leveraged project, with construction costs expected to exceed $10 million.
Conceptual planning and pre‐development documents are underway, and construction documents will
be completed as the project advances through plan approval and permitting. Once these factors are in
place, we estimate submitting for plan approval within the next two years. After obtaining the necessary
permits, we anticipate an 18‐to‐24‐month construction period. Attached is the street striping and sign
plan (EXHIBIT D), along with the site plan, which includes information such as property lines, and
proposed structures, parking lots, and entrance driveway (EXHIBIT F), as well as the grading plan
(EXHIBIT J) and ALTA survey (EXHIBIT K). Also attached is the tax map which reflects the easements
including road and utility easements RU‐9 and RU‐8, the "No Vehicular Access” Planting Screen
Easement, and drainage easements D‐2 and D‐1 (EXHIBIT I). Detailed plans, including construction
documents for the on‐site septic system, availability of water, and improvements will be provided during
final plan approval. Exterior elevations for the facility are attached (EXHIBIT H).
The vision is to provide a diverse range of recreational opportunities for both residents and visitors,
aligning with the county's general plan. To proceed with their development plans, KBXtreme requires an
amendment of the rezoning ordinance for the Neighborhood Commercial district, suitable ingress and
egress to the property, and a reduction of the speed limit on Komohana Street fronting the subject
property.
II. NATURE OF REQUEST
The applicant is eager to proceed with the development of the site but faces obstacles due to
certain rezoning conditions that are no longer relevant or impede the feasibility of the indoor
recreational facility – family entertainment center project. Moreover, the deadlines associated with the
previous rezoning have expired, necessitating an amendment of the current ordinance to move forward.
Consequently, the applicant is requesting an amendment of the rezoning ordinance for the completion
of the project and additionally for relief from the “NO VEHICULAR ACCESS” Plant Screening Easement for
a dedicated driveway of approximately 45 feet wide to enable ingress and egress at a commercial scale
on to Komohana Street as not to impede neighboring residential driveways and proposed driveway
location is crucial to ensuring safe and efficient access. The applicant is also requesting a reduction of
the speed limit along Komohana Street, specifically the portion fronting the subject property, from forty‐
five (45) miles per hour to thirty‐five (35) miles per hour. The applicant is also seeking a removal of the
rezoning conditions G, H, J, and K in the amendment to the ordinance.
III. PROJECT LOCATION
The subject area, consisting of 221,067 square feet, is located in the City of Hilo and more
specifically at 279 Komohana Street, southeast of the intersection with Ponahawai Street. TMK (3) 2‐3‐
037‐006‐0000 (EXHIBIT C), (EXHIBIT F), (EXHIBIT I).
IV. REZONING CONDITIONS
The subject area was initially rezoned into the CN‐20 district on May, 20, 2010, subject to a number
of conditions. An administrative time extension for completion of the project was granted on December
23, 2016. (EXHIBIT B) This section covers the status of the various conditions of the rezoning ordinance
(ORD. 10‐45) as originally enumerated and the changes to be made as if a new ordinance was to be
adopted.
A. The applicant(s), successors or assigns shall be responsible for complying with all of the
stated conditions of approval.
The property is owned by KBXtreme Hilo, LLC, and as such, intends to assume the
responsibility of complying with all pertinent conditions and any amendments thereto of
this rezoning ordinance.
B. Prior to the issuance of a water commitment by the Department of Water Supply the
applicants shall submit the anticipated maximum daily water usage calculations as
recommended by a registered engineer and a water commitment deposit in accordance
with the Water Commitment Guidelines Policy to the Department of Water Supply prior
to the issuance of a building permit.
The applicant shall comply with this requirement by making the required payment, if
needed, prior to the issuance of a building permit.
C. The applicants shall install a reduced pressure type backflow prevention assembly within
five 5 feet of the existing water meter and any additional water meters on private
property which must be inspected and approved by the Department of Water Supply
prior to issuance of a Certificate of Occupancy.
The applicant shall comply with this requirement.
D. The applicants shall relocate and adjust the Department of Water Supply water system
facilities that are affected by construction of improvements within the Ponahawai Street
right‐of‐way fronting the subject property that are required by this permit.
The applicant shall comply with this requirement when developing access to Ponahawai
Street.
E. Construction of the proposed improvements shall include securing Final Plan Approval
from the Planning Director in accordance with Section 25‐2‐70, Chapter 25 Zoning Code
Hawaii County Code.
The Applicant is requesting the Planning Department to allow a new or amended
rezoning ordinance with a 10 year time limit on the construction of improvements, due
to the scope and size of the project.
F. Development of the property shall be designed and constructed in a way to minimize
obstruction of the scenic views of Hilo Bay from Komohana Street.
The applicant shall comply with this and has planned for this in its construction design.
G. Deleted.
The requirement to provide a minimum 30‐foot‐wide access easement on the subject
property, in favor of the adjacent landowner(s) (TMK: 2‐3‐037:22) shall be deleted.
Initially, the rezoning ordinance was intended for the construction of a commercial
office building, and both TMKs mentioned were under the ownership of a single fee
owner. However, the circumstances have changed as the TMKs now have separate fee
owners, and the original plan for a commercial office building is no longer being
pursued. As a result, the need for internal traffic circulation between the two properties
is no longer relevant. Furthermore, the neighboring TMK to the east has its own
dedicated access to Ponahawai Street, making the provision of an easement through the
subject property unnecessary for accessing Ponahawai Street.
H. Deleted.
The applicant is seeking relief from Condition H, as the designated entrance through the
road and utility easement "RU‐9" on Komohana Street is not viable for commercial
property. This entrance would place excessive stress and traffic on the driveway of the
adjacent residential property, which is undesirable. The applicant has developed plans
that ensure unimpeded access from Komohana Street. The proposed entrance is located
at a sufficient distance from the traffic control device at the intersection of Komohana
Street and Ponahawai Street. Additionally, the applicant has made provisions for
necessary off‐site work to widen the pavement and accommodate left turn‐in channel
lane and left turn‐out merge lane, ensuring minimal interference with traffic flow along
Komohana Street. (EXHIBIT D; EXHIBIT L)
I. Access connections to Ponohawai Street and Komohana Street shall conform to Chapter
22 (County Streets) of the Hawai’i County Code.
The applicant shall comply with this requirement.
J. Deleted.
The applicant is seeking relief from Condition J, particularly the requirement to provide
curb, gutters, sidewalk, drainage improvements, and utility relocation along Komohana
Street. It should be noted that these improvements are absent on neighboring parcels
along Komohana Street as well. However, the applicant does intend to undertake
pavement widening as necessary to fulfill their Sign and Striping Plan (EXHIBIT D).
K. Deleted.
The applicant is seeking relief from this requirement, as they have planned to address
the need for lighting through the installation of sufficient light standards in the parking
lot and driveway entrances on the property. These on‐site improvements will effectively
fulfill the lighting requirements without the need for additional streetlights or traffic
control devices.
L. A Traffic Impact Analysis Report (TIAR) shall be submitted for review and approval by the
Department of Public Works prior to Final Plan Approval. The applicants shall implement
when required by the Department of Public Works, at no cost to the County, any
transportation improvements deemed necessary by the Department of Public Works.
TIAR Compliance (Completed and Attached)
A Traffic Impact Analysis Report (TIAR), dated July 21, 2025, which is within six (6)
months of this resubmittal, has been completed and is submitted herewith for review
and approval by the Department of Public Works (EXHIBIT L). The TIAR was prepared in
accordance with Hawai‘i County Code Chapter 25, Section 25‐2‐46 (Concurrency
Requirements) and evaluates the Komohana Street corridor, the Ponahawai Street
intersection area, and the proposed project driveway.
The TIAR analyzes the proposed family entertainment center (including bowling and
accessory restaurant/bar/arcade uses) and concludes that the project is not expected to
create significant adverse impacts to traffic operations on Komohana Street or nearby
intersections, with acceptable operations projected through the study horizon. The TIAR
also identifies and recommends specific access improvements at the Komohana Street
driveway to support safe and efficient ingress/egress, including turn‐lane and driveway
channelization improvements.
The applicant will implement TIAR‐recommended and DPW‐required transportation
improvements, at no cost to the County, in conjunction with final plan approval and
permitting.
M. Any construction within the designated FEMA flood zone shall comply with the
requirements of Chapter 27, Floodplain Management, of the Hawai’i County Code.
The applicant shall comply with this requirement.
N. All development‐generated runoff shall be disposed of on‐site and shall not be directed
toward any adjacent properties. A drainage study shall be prepared and submitted to
the Department of Public Works prior to the issuance of Final Plan Approval. Any
drainage improvements if required shall be constructed meeting with the approval of the
Department of Public Works prior to the issuance of a Certificate of Occupancy.
The applicant shall comply with this requirement.
O. During construction, measures shall be taken to minimize the potential of both fugitive
dust and runoff sedimentation. Such measures shall be in compliance with construction
industry standards and practices utilized during construction projects of the State of
Hawai’i.
The applicant shall comply with this requirement.
P. All earthwork activity, including grading and grubbing, shall conform to Chapter 10
Erosion and Sedimentation Control, of the Hawaii County Code.
The applicant shall comply with this requirement.
Q. Comply with Chapter 11‐55, Water Pollution Control, Hawai’i Administrative Rules,
Department of Health, which requires a NPDES permit for certain construction activity.
The applicant shall comply with this requirement.
R. Construction activities must comply with the provisions of Hawai’i Administrative Rules,
Chapter 11‐46, “Community Noise Control.”
The applicant shall comply with this requirement.
S. The applicants shall install a septic system(s) meeting with the requirements of the
Department of Health prior to the issuance of a Certificate of Occupancy. In the future,
should a public sewer system be installed in Ponahawai Street or Komohana Street
fronting the subject property, the applicants shall connect to the sewer system.
The applicant shall comply with this requirement.
T. A Solid Waste Management Plan shall be submitted to the Department of Environmental
Management for review and approval prior to Final Plan Approval.
The applicant shall comply with this requirement.
U. Should any remains of historic sites, such as rock walls, terraces, platforms, marine shell
concentrations or human burials be encountered, work in the immediate area shall cease
and the Department of Land and Natural Resources ‐ State Historic Preservation Division
(DLNR‐SHPD) shall be immediately notified. Subsequent work shall proceed upon an
archaeological clearance from the DLNR‐SHPD when it finds that sufficient mitigation
measures have been taken.
The applicant shall comply with this requirement.
V. To ensure that the Goals and Policies of the Housing Element of the General Plan are
implemented, the applicants shall comply with the requirements of Chapter 11, Article 1,
Hawai’i County Code relating to Affordable Housing Policy. This requirement shall be
approved by the Administrator of the Office of Housing and Community Development
prior to final plan approval or final subdivision approval for any new residential
structures.
The applicant shall comply with this requirement.
W. If the applicants, successors, or assigns develops residential units on the subject
property, the applicants shall make their fair share contribution to mitigate the potential
regional impacts of the property with respect to parks and recreation, fire, police, solid
waste disposal facilities and roads. The fair share contribution shall become due and
payable prior to receipt of Final Plan Approval. The fair share contribution for each lot
shall be based on the actual number of residential units developed. The fair share
contribution in a form of cash, land, facilities or any combination thereof shall be
determined by the County Council. The fair share contribution may be adjusted annually
beginning three years after the effective date of this ordinance based on the percentage
change in the Honolulu Consumer Price Index (HCPI). The fair share contribution shall
have a combined value of $7,698.11 per multiple family residential unit ($11,996.63 per
single family residential unit). The total amount shall be determined with the actual
number of units according to the calculation and payment provisions set forth in this
condition. The fair share contribution per multiple family residential unit (single family
residential unit) shall be allocated as follows:
1. $3,797.26 per multiple family residential unit ($5,784.99 per single family
residential unit) to the County to support park and recreational improvements
and facilities;
2. $120.01 per multiple family residential unit ($279.07 per single family residential
unit) to the County to support police facilities;
3. $369.17 per multiple family residential unit ($551.20 per single family residential
unit) to the County to support fire facilities;
4. $164.54 per multiple family residential unit ($241.32 per single family residential
unit) to the County to support solid waste facilities; and
5. $3,247.12 per multiple family residential unit ($5,140.06 per single family
residential unit) to the County to support road and traffic improvements.
In lieu of paying the fair share contribution, the applicants may contribute land and/or
construct improvements facilities related to parks and recreation, fire, police, solid waste
disposal facilities and roads within the region impacted by the proposed development,
subject to the review and recommendation of the Planning Director, upon consultation
with the appropriate agencies and approval of the County Council.
The applicant shall comply with this requirement.
X. Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for
imposition of exactions or the assessment of impact fees, conditions included herein shall
be credited towards the requirements of the Unified Impact Fees Ordinance.
The applicant shall comply with this requirement.
Y. The applicants shall comply with all applicable County State and Federal laws, rules,
regulations and requirements.
The applicant shall comply with this requirement.
Z. Deleted.
Considering the allowance of indoor amusement and recreation facilities within the
Neighborhood Commercial , no time limits shall be imposed on construction of
improvements.
AA. Deleted.
KBXtreme requests that the County Council approve a new rezoning ordinance to
ensure compliance with the conditions outlined above.
BB. Added.
Partial relief from “NO VEHICULAR ACCESS” PLANTING SCREEN EASEMENT in an area of
the property fronting Komohana Street to provide for commercial driveway access that
will not interfere with neighboring residential property access. Relief is requested for a
length of approximately 45 feet at a location reviewed in coordination with the
Department of Public Works (DPW) Engineering Division and DPW Traffic Division to
ensure appropriate driveway placement and two‐way left turn lane (TWLTL) spacing
from the Ponahawai/Komohana intersection, consistent with Chapter 22 (County
Streets) of the Hawai‘i County Code and the completed TIAR.
Due to the unsuitability of access and utility easement RU‐9, a new area of ingress and
egress to the parcel must be created. The area identified for relief is a stretch of
approximately 45 feet on the Komohana Street facing boundary that will accommodate
commercial traffic flow and left‐turn lanes into and out of the parcel. The completed
Traffic Impact Analysis Report (TIAR) (EXHIBIT L) evaluates the proposed driveway
location and associated traffic operations and concludes that, with the recommended
access improvements, the project is not expected to create significant adverse impacts
to traffic operations along Komohana Street or at nearby intersections. The TIAR further
identifies and recommends specific driveway and roadway improvements to support
safe and efficient ingress and egress, including turn‐lane and driveway channelization
improvements, which the applicant will implement as required during final plan
approval and permitting. The applicant has consulted with the Department of Public
Works (DPW) Engineering Division prior to submitting this application to discuss
necessary revisions regarding the “No Vehicular Access & Planting Screen” easement,
and has also engaged with the DPW Traffic Division to ensure that driveway placement
and the two‐way left‐turn lane (TWLTL) are positioned far enough away from the
Ponahawai/Komohana intersection. Based on consultations to date, the applicant
understands DPW Engineering may not support the requested relief and will document
any related technical concerns in their formal review comments on the resubmittal
materials. Additionally, the applicant has communicated with the neighboring TMK, and
their only request was to avoid sharing a driveway (specifically RU‐9) or having the
project driveway adjacent to theirs to prevent unintentional commercial traffic from
using a residential driveway; the applicant has worked to incorporate these
considerations to maintain good neighbor relationships. Notwithstanding any agency
comments, the applicant respectfully requests that the Planning Commission and
County Council consider and act upon the requested ordinance amendment and the
associated partial relief through the public process.
CC. Added
As a matter of public safety, the Planning Commission and County Council recommend
that the Department of Public Works (DPW) evaluate the posted speed limit along
Komohana Street fronting the subject property and consider a reduction of the posted
speed limit from forty‐five (45) miles per hour to thirty‐five (35) miles per hour. This
recommendation is intended to support safe ingress and egress to the site and to
improve overall traffic safety in light of the proposed commercial driveway access and
turning movements. Nothing in this condition shall be construed to alter or supersede
the independent authority of DPW with respect to speed limit determinations or traffic
control measures.
V. RESTATEMENT OF REQUEST
The applicant is seeking to move forward with the development of the site, facing challenges
presented by certain rezoning conditions that are either no longer applicable or impede the feasibility of
the Family Entertainment Center project. Additionally, the previous rezoning deadlines have lapsed,
requiring either a new or amended rezoning ordinance to proceed. Furthermore, the applicant seeks
partial relief from the “NO VEHICULAR ACCESS” planting screen easement to provide for commercial
driveway access, and a reduction in the speed limit along Komohana Street, specifically on the subject
property frontage, from 45 mph to 35 mph.
VI. JUSTIFICATION OF REQUESTS
From the 2005 General Plan, SECTION 12.2 (a) GOALS “Provide a wide variety of recreational
opportunities for the residents and visitors of the County”; From the 2005 General Plan, SECTION 12.3
(f) POLICIES “The "County of Hawaii Recreation Plan" shall be updated to reflect newly identified
recreational priorities”; From the 2005 General Plan, SECTION 12.3 (h) POLICIES “Provide facilities and a
broad recreational program for all age groups, with special considerations for the handicapped, the
elderly, and young children.”; From the 2005 General Plan, SECTION 12.3 (i) POLICIES “Coordinate
recreational programs and facilities with governmental and private agencies and organizations.
Innovative ideas for improving recreational facilities and opportunities shall be considered”. SECTION
12.5.2.1 SOUTH HILO – PROFILE “In many of the parks, there are drainage problems. Lack of playground
equipment, inadequate landscaping, and the lack of benches and adequate shelters have restricted the
use of some parks. Some residential areas do not have easy access to neighborhood parks, and newer
communities lack recreational areas altogether.” 12.5.2.2(m) COURSE OF ACTION “Develop a
center/complex for major cultural, educational and recreational activities.”
KBXTREME is in a unique position to help achieve many of the County’s goals and policies through
the nature of its recreational offerings. Bowling has always been a popular sport, and facilities are
frequently utilized by schools, adult leagues, and senior clubs and leagues. Bowling coupled with an
arcade space and other activities creates a space for young children, seniors, and people with disabilities
to remain active and social while participating in a recreational activity in a safe environment with the
necessary facilities to accommodate their needs. Providing an indoor space for recreation allows for
continuous use independent of the weather conditions. Justification for proposed amendments follow:
1. AMEND CONDITION E, EXTENSION OF REZONING ORDINANCE
i. KBXtreme justifiably requests an extension of rezoning ordinance no. 10‐045.
Granting an extension of this rezoning ordinance would align with the General
Plan and Zoning Code, as it allows KBXtreme to proceed with their intended
development of the Family Entertainment Center.
ii. Moreover, the extension of this rezoning ordinance would not be contrary to
the original reasons for granting the change of zone.
2. REMOVAL OF CONDITION G
i. The minimum 30 foot wide access easement in favor of the adjacent
landowner to the east (TMK 3‐2‐3‐037‐014) was provisioned previously when
a commercial office building was being contemplated on both parcels.
ii. The two properties were subsequently sold individually to two different
owners, and the previously planned commercial office building is no longer
contemplated.
iii. Each TMK has their own dedicated access to Ponahawai, and the previously
planned easement to provide for internal traffic circulation between both
neighboring properties is now irrelevant.
3. REMOVAL OF CONDITION H, PROVIDING RELIEF FROM RIGHT‐TURN IN/OUT TRAFFIC
FLOW AND ACCESS THROUGH UTILITY EASEMENT RU‐9 ONLY.
i. KBXtreme has engaged in discussions with the neighboring landowner to the
south (TMK 3‐2‐3‐037‐022) and sharing of the utility easement "RU‐9" is not
possible, nor does it provide reasonable access to the subject commercially
zoned property.
ii. The neighboring residential property would experience unnecessary
commercially related traffic down their driveway if forced to share access via
RU‐9.
iii. There are too many private utility poles located on RU‐9, that would present
unnecessary risk by routing commercial traffic through the narrow roadway.
iv. KBXtreme has been in discussion with the County of Hawaii Department of
Public Works Traffic Division regarding widening pavement, creating left turn
channel and merge lanes into and out of TMK: 3‐2‐3‐037:006 from Komohana
Street, and is planning for necessary off‐site work to provide smooth ingress
and egress to the subject property without interfering with neighboring
driveways or the flow of traffic on Komohana Street, while providing sufficient
distance from the traffic control device located at the Komohana and
Ponahawai intersection (EXHIBIT D).
4. REMOVAL OF CONDITION J WITH REGARD TO CURBS, GUTTERS, SIDEWALK, DRAINAGE
IMPROVEMENTS AND UTILITY RELOCATION ALONG KOMOHANA STREET.
i. KBXtreme requests relief from Condition J, which mandates the provision of
curbs, gutters, sidewalk, drainage improvements, and utility relocation along
Komohana Street.
ii. The requirement for these improvements greatly impedes the feasibility of our
project.
iii. Not only do neighboring parcels along Komohana Street lack these features, but
enforcing this condition exclusively on KBXtreme creates an undue burden.
iv. KBXtreme plans to address the necessary pavement widening to accommodate
the proposed striping and sign plan.
5. REMOVAL OF CONDITION K, STREETLIGHTS AND TRAFFIC CONTROL DEVICES.
i. Given the unique circumstances of the applicant's project, it is justifiable to
grant relief from the requirement of installing streetlights and traffic control
devices as stipulated by the Traffic Division Department of Public Works.
ii. The applicant has demonstrated proactive planning and commitment to public
safety by proposing an alternative strategy that is specifically tailored to the
project's requirements.
iii. The implementation of adequate lighting standards within the parking lot and
driveway entrances ensures that the necessary illumination will be provided on‐
site, thus negating the necessity for additional streetlights.
iv. This solution not only maintains safety standards but also minimizes potential
light pollution and cost to the county.
v. The traffic control needs, as well, are anticipated to be suitably addressed
through the well‐designed layout for ingress and egress to the property. This
approach reflects a careful consideration of both functionality and aesthetics,
while still upholding the core objective of ensuring safety and visibility.
vi. Therefore, it is reasonable to consider this request for exemption, recognizing
that the proposed on‐site improvements fulfill the intention of the original
condition.
6. REMOVAL OF CONDITION Z, TIME LIMITS.
i. The removal of the proposed improvements within a five year time frame
renders this condition moot.
7. ADDITION OF CONDITION BB, PARTIAL RELIEF FROM “NO VEHICULAR ACCESS”
PLANTING SCREEN EASEMENT FOR COMMERCIAL DRIVEWAY
i. Due to the unsuitability of access and utility easement RU‐9 a new area of
ingress and egress to the parcel must be created.
ii. The area identified for relief is a stretch of approximately 45 feet on the
Komohana Street facing boundary that will accommodate commercial traffic
flow and left turn lanes into and out of the parcel.
iii. The applicant has consulted with the Department of Public Works (DPW)
Engineering Division prior to submitting this application to discuss necessary
revisions regarding the "No Vehicular Access & Planting Screen" easement.
iv. The Traffic Division has also been engaged to ensure that the driveway
placement and two‐way left turn lane (TWLTL) are positioned far enough away
from the Ponahawai/Komohana intersection.
v. Additionally, there has been communication with the neighboring TMK, and
their only request was to avoid sharing a driveway or having our driveway
adjacent to theirs to prevent unintentional commercial traffic from using their
residential driveway.
vi. We have worked diligently to incorporate these considerations into our plans to
maintain good relationships with our neighbors.
8. ADDITION OF CONDITION CC, REDUCTION OF THE SPEED LIMIT ALONG KOMOHANA
STREET FRONTING THE SUBJECT PROPERTY FROM 45MPH, DOWN TO 35MPH.
i. While we understand that posted speed limits and traffic control measures
are administered by the Department of Public Works (DPW) and may be
outside the direct purview of the Planning Department, we respectfully
request that the Planning Commission and County Council, through action on
this rezoning ordinance amendment, include a recommendation that DPW
evaluate and, if appropriate, reduce the posted speed limit along Komohana
Street fronting the subject property from 45 mph to 35 mph as a matter of
public safety.
ii. The request for a reduction of the speed limit along Komohana Street fronting
the subject property from 45 mph to 35 mph warrants strong consideration,
primarily due to existing precedents and the potential for enhanced safety.
iii. It is notable that the speed limit has already reduced to 35 mph at the
Komohana Street property frontage. Our proposal is simply an extension of
this current regulation, moving the reduction point south closer to Mohouli
Street. This adjustment is projected to have significant benefits in terms of
public safety.
iv. By encouraging more uniform travel speeds along this stretch of road, the
proposed change would reduce the potential for abrupt speed adjustments,
which can be a contributing factor to accidents.
v. Furthermore, a lower speed limit in this area could lead to reduced severity of
accidents, should they occur, given the correlation between speed and crash
impact.
vi. By extending the 35 mph zone closer to Mohouli Street, it would create a
more consistent, predictable, and thus safer, driving environment for all users
of Komohana Street.
Pursuant to this amendment request, please find enclosed the following:
1. A copy of this letter, with appropriate enclosures; and
2. A list of the surrounding property owners within 300 feet of the subject property (EXHIBIT E);
3. and $500 filing fee.
KBXtreme Hilo LLC respectfully requests your favorable consideration of these requests so we can bring
this much needed facility to Hilo. Should you have any questions on this matter, please feel free to
contact me.
Sincerely,
Calvin C. M. Higa
President – KBXTREME HILO LLC
William L. Wong
Member Manager – WLW DEVELOPMENT METHODS INC
Enclosures:
APPLICATION FOR VARIANCE ZONING
EXHIBIT A – ORDINANCE 10‐045
EXHIBIT B – ADMINISTRATIVE EXTENSION OF REZONING ORDINANCE 10‐045
EXHIBIT C – PROPERTY MAP AND SITE LOCATION
EXHIBIT D – DRAFT KOMOHANA STREET STRIPING AND SIGN PLAN
EXHIBIT E – LIST OF PROPERTY OWNERS WITHIN 300FT OF SUBJECT PROPERTY
EXHIBIT F – SITE PLAN WITH FLOOR PLAN
EXHIBIT G – EXTERIOR RENDERING
EXHIBIT H – EXTERIOR ELEVATIONS
EXHIBIT I – TAX MAP
EXHIBIT J – GRADING PLAN
EXHIBIT K – ALTA SURVEY
EXHIBIT L – FINAL TRAFFIC IMPACT ANALYSIS REPORT (TIAR)
4p
COUNTY OF HAWAII STATE OF HAWAIITom
ITfpNI
ORDINANCE NO 10 E BI NO 228
AN ORDINANCE AMENDING SECTION 258 33 CITY OF HILO ZONE MAP
ARTICLE 8 CHAPTER 25 ZONING CODE OF THE HAWAII COUNTY CODE 1983
2005 EDITION BY CHANGING THE DISTRICT CLASSIFICATION FROM
AGRICULTURAL ONE ACRE A1a TO NEIGHBORHOOD COMMERCIAL 20000
SQUARE FEET CN20 AT PONAHAWAI SOUTH HILO HAWAII COVERED BY TAX
MAP KEY 23037006
BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII
SECTION 1 Section 25 833 Article 8 Chapter 25 Zoning Code of the Hawaii
County Code 1983 2005 Edition is amended to change the district classification of property
described hereinafter as follows
The district classification of the following area situated at Ponahawai South Hilo
Hawaii shall be Neighborhood Commercial 20000 square feet CN20
Beginning at the northeast corner of this parcel of land and on the south side of
Ponahawai Street the coordinates of said point of beginning referred to Government
Survey Triangulation Station HALAI being 110186 feet South and 15766 feet East
and running by azimuths measured clockwise from True South
1 345 40 44500 feet along Lot 11
2 252 20 17153 feet along Lot 11
3 246 05 15010 feet along Lot 10
4 333 10 22000 feet along Lot 7
5 69 08 64458 feet along Lot 13
1
EXHIBIT A - ORDINANCE 2010-045
6 Thence along the east side of Komohana Street along a curve to the right having a
radius of 296000 feet the chord azimuth
and distance being
163 26 25 22997 feet
7 165 40 23289 feet along the east side of Komohana Street
8 190 30 6934 feet along the east side of Komohana Street
9 140 00 4592 feet along the east side of Komohana Street
10 Thence along the south edge of Flood Zone A and all its windings as shown on
approved subdivision plan 7389 and Lot
12 A the direct azimuth and distance being
274 29 50 25699 feet
11 165 40 21411 feet along Lot 12A
12 255 40 3000 feet along the south side of Ponahawai Street
to the point of beginning and containing an
area of 5075 acres
All as shown on the map attached hereto marked Exhibit A and by reference
made a part hereof
SECTION 2 In accordance with Section 25244 Hawaii County Code 1983 2005
Edition the County Council finds the following conditions are
Necessary to prevent circumstances which may be adverse to the public health safety
and welfare or
1 Reasonably conceived to fulfill needs directly emanating from the land use
proposed with respect to
A Protection of the public from the potentially deleterious effects of
the proposed use or
B Fulfillment of the need for public service demands created by the
proposed use
2
EXHIBIT A - ORDINANCE 2010-045
A The applicants successors or assigns shall be responsible for complying with all of the
stated conditions of approval
B Prior to the issuance of a water commitment by the Department of Water Supply the
applicants shall submit the anticipated maximum daily water usage calculations as
recommended by a registered engineer and a water commitment deposit in accordance
with the Water Commitment Guidelines Policy to the Department of Water Supply
within 180 days from the effective date ofthis ordinance
C The applicants shall install a reduced pressure type backflow prevention assembly within
five 5 feet of the existing water meter and any additional water meters on private
property which must be inspected and approved by the Department of Water Supply
prior to issuance of a Certificate of Occupancy
D The applicants shall relocate and adjust the Department of Water Supplys water system
facilities that are affected by construction of improvements within the Ponahawai Street
rightofway fronting the subject property that are required by this permit
E Construction of the proposed improvements shall be completed within five 5 years from
the effective date of this ordinance This time period shall include securing Final Plan
Approval from the Planning Director in accordance with Section 25270 Chapter 25
Zoning Code Hawaii County Code
F Development of the property shall be designed and constructed in a way to minimize
obstruction of the scenic views of Hilo Bay from Komohana Street
3
EXHIBIT A - ORDINANCE 2010-045
G Prior to issuance of Final Plan Approval the applicants shall grant a minimum 30foot
wide access easement on the subject property in favor of the adjacent landowners
TMK 2 33714 in order to connect the access at Ponahawai Street on TMK 2 33714
to the access at Ponahawai Street on the subject property for the purpose of providing
internal traffic circulation between the two properties
H Access at Komohana Street shall be through road and utility easement RU9 and shall
be limited to rightturn ih and rightturn out movements only This access shall be shared
with the adjacent parcel TMK 233722 Prior to the issuance of a Certificate of
Occupancy the applicants shall install no leftturn signs and a physical barrier at the
property access to prevent leftturns into and out of the access driveway All
improvements shall meet with the approval of the Department of Public Works
Access connections to Ponahawai Street and Komohana Street shall conform to
Chapter 22 County Streets of the Hawaii County Code
J Prior to the issuance of a Certificate of Occupancy the applicants shall provide full
improvements to the propertys frontage along Komohana Street consisting of but not
limited to pavement widening with concrete curb gutter and sidewalk drainage
improvements and any required utility relocation meeting with the approval of the
Department of Public Works
K Streetlights and traffic control devices as may be required by the Traffic Division
Department of Public Works shall be installed by the applicants at no cost to the County
L Should the applicants submit plans to develop a land use beyond what is proposed in the
application which the Planning Department in consultation with the Department of
Public Works determines will generate over 50 peak hour trips a Traffic Impact Analysis
Report TZAR shall be submitted for review and approval by the Department of Public
Works prior to Final Plan Approval The applicants shall implement when required by
4
EXHIBIT A - ORDINANCE 2010-045
the Department of Public Works at no cost to the County any transportation
improvements deemed necessary by the Department of Public Works
M Any construction within the designated FEMA flood zone shall comply with the
requirements of Chapter 27 Floodplain Management of the Hawaii County Code
N All development generated runoff shall be disposed of onsite and shall not be directed
toward any adjacent properties A drainage study shall be prepared and submitted to the
Department of Public Works prior to the issuance of Final Plan Approval Any drainage
improvements if required shall be constructed meeting with the approval of the
Department of Public Works prior to the issuance of a Certificate of Occupancy
O During construction measures shall be taken to minimize the potential of both fugitive
dust and runoff sedimentation Such measures shall be in compliance with construction
industry standards and practices utilized during construction projects of the State of
Hawai i
P All earthwork activity including grading and grubbing shall conform to Chapter 10
Erosion and Sedimentation Control of the Hawaii County Code
Q Comply with Chapter 1155 Water Pollution Control Hawaii Administrative Rules
Department of Health which requires a NPDES permit for certain construction activity
R Construction activities must comply with the provisions of Hawaii Administrative Rules
Chapter 11 46 Community Noise Control
S The applicants shall install a septic systems meeting with the requirements of the
Department of Health prior to the issuance of a Certificate of Occupancy In the future
should a public sewer system be installed in Ponahawai Street or Komohana Street
fronting the subject property the applicants shall connect to the sewer system
5
EXHIBIT A - ORDINANCE 2010-045
T A Solid Waste Management Plan shall be submitted to the Department of Environmental
Management for review and approval prior to Final Plan Approval
U Should any remains of historic sites such as rock walls terraces platforms marine shell
concentrations or human burials be encountered work in the immediate area shall cease
and the Department of Land and Natural Resources State Historic Preservation Division
DLNRSHPD shall be immediately notified Subsequent work shall proceed upon an
archaeological clearance from the DLNRSHPD when it finds that sufficient mitigation
measures have been taken
V To ensure that the Goals and Policies of the Housing Element of the General Plan are
implemented the applicants shall comply with the requirements of Chapter 11 Article 1
Hawaii County Code relating to Affordable Housing Policy This requirement shall be
approved by the Administrator of the Office of Housing and Community Development
prior to final plan approval or final subdivision approval for any new residential
structures
W If the applicants successors or assigns develops residential units on the subject property
the applicants shall make their fair share contribution to mitigate the potential regional
impacts of the property with respect to parks and recreation fire police solid waste
disposal facilities and roads The fair share contribution shall become due and payable
prior to receipt of Final Plan Approval The fair share contribution for each lot shall be
based on the actual number of residential units developed The fair share contribution in
a form of cash land facilities or any combination thereof shall be determined by the
County Council The fair share contribution may be adjusted annually beginning three
years after the effective date ofthis ordinance based on the percentage change in the
Honolulu Consumer Price Index HCPI The fair share contribution shall have a
combined value of 769811 per multiple family residential unit 1199663 per single
6
EXHIBIT A - ORDINANCE 2010-045
family residential unit The total amount shall be determined with the actual number of
units according to the calculation and payment provisions set forth in this condition The
fair share contribution per multiple family residential unit single family residential unit
shall be allocated as follows
1 379726 per multiple family residential unit 578499 per single family
residential unit to the County to support park and recreational improvements and
facilities
2 12001 per multiple family residential unit 27907 per single family residential
unit to the County to support police facilities
3 36917 per multiple family residential unit 55120 per single family residential
unit to the County to support fire facilities
4 16454 per multiple family residential unit 24132 per single family residential
unit to the County to support solid waste facilities and
5 324712 per multiple family residential unit 514006 per single family
residential unit to the County to support road and traffic improvements
In lieu of paying the fair share contribution the applicants may contribute land andor
construct improvementsfacilities related to parks and recreation fire police solid waste
disposal facilities and roads within the region impacted by the proposed development
subject to the review and recommendation of the Planning Director upon consultation
with the appropriate agencies and approval of the County Council
7
EXHIBIT A - ORDINANCE 2010-045
J
X Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for
imposition of exactions or the assessment of impact fees conditions included herein shall
be credited towards the requirements of the Unified Impact Fees Ordinance
Y The applicants shall comply with all applicable County State and Federal laws rules
regulations and requirements
Z An initial extension of time for the performance of conditions within the ordinance may
be granted by the Planning Director upon the following circumstances
1 The non performance is the result of conditions that could not have been foreseen
or are beyond the control of the applicants successors or assigns and that are not
the result of their fault or negligence
2 Granting of the time extension would not be contrary to the General Plan or
Zoning Code
3 Granting ofthe time extension would not be contrary to the original reasons for
the granting of the change of zone
4 The time extension granted shall be for a period not to exceed the period
originally granted for performance ie a condition to be performed within one
year may be extended for up to one additional year
5 If the applicants should require an additional extension of time the Planning
Director shall submit the applicants request to the County Council for appropriate
action
8
EXHIBIT A - ORDINANCE 2010-045
AA Should any of the conditions not be met or substantially complied with in a timely
fashion the Planning Director may initiate rezoning of the subject area to its original or
more appropriate designation
SECTION 3 In the event that any portion of this ordinance is declared invalid such
invalidity shall not affect the other parts of this ordinance
SECTION 4 This ordinance shall take effect upon its approval
INTRODUCED BY
atiz
COUNCIL MEMBER COUNTY OF HAWAII
Kona Hawaii
Date of Introduction April 20 2010
Date of 1st Reading April 20 2010
Date of 2nd Reading May 5 2010
Effective Date May 20 2010
REFERENCES Comm 7
9
EXHIBIT A - ORDINANCE 2010-045
S
Ala
N
A Ala
PD CN20
p 110186 5 n
15Z66E
0 HALAI2
Y
cn
Ala
t1tll4 ItiliiiiNla1riPD11Jr
t1 1IY t I
Alait n t Y l x
rlIiN 4 Y It Y f 1 I
AGRICWLTURA ONE ACRE A1a la 3Y ttj
t
I aI Ijf 8575
t
AG HBORHOODCOMMER 4i4 I1t 111IS p I20000SQFrCN201411t75075ACRESII1111F
illit1
WCi 8575
R5
N ir051
fro r 413 it
eV tro IIIbpASStklA N alt
Feet
0 500 1000 1500 2000
AMENDMENT TO THE ZONING CODE
AMENDING SECTION 25833 CITY OF HILO ZONE MAP ARTICLE 8
CHAPTER 25 ZONING CODE OF THE HAWAII COUNTY CODE 1983 2005 EDITION
BY CHANGING THE DISTRICT CLASSIFICATION FROM
AGRICULTURAL ONE ACRE A1 a TO
NEIGHBORHOOD COMMERCIAL 20000 SQUARE FEET CN 20
AT PONAHAWAI SOUTH HILO HAWAII
MAP PREPARED BY
COUNTY OF HAWAII PLANNING DEPARTMENT
TMK 23037006 DATE December 22 2009
EXHIBIT A Gillie Jane Silva
Map 1284
EXHIBIT A - ORDINANCE 2010-045
OFFICE OF THE COUNTY CLERK
County of Hawaii
Kona Hawaii t D
Introduced By Donald Ikeda LV Y 99
Date Introduced April 20 2010 LAYESs i
NOES ABS EX
First Readin April 20 2010 titcgpEnriquesXClli
Published April 30 2010 Ford x43 a it a itrived
Greenwell X
REMARKS Hoffmann X
Ikeda X
NaeoleBeason X
Onishi X
Yagong X
Yoshimoto X
Second Reading May 5 2010 8 1 0 0
To Mayor May 13 2010
Returned May 20 2010 ROLL CALL VOTE
Effective May 20 2010 AYES NOES ABS EX
Published May 27 2010
Enriques X
Ford X
REMARKS Greenwell X
Hoffmann X
Ikeda X
NaeoleBeason X
Onishi X
Yagong X
Yoshimoto X
6 0 3 0
I DO HEREBY CERTIFY that the foregoing BILL was adopted by the County Council published as
indicated above a
APPROVED AS TO la
FOR tAND LEGALITY
amil COUNCIL CHAIRMAN
DEPUT CORPORATION CONSEL
COUNTY OF1 A
Date MAY 1 4 2010 COUNTY CLERK
Bill No
228
C 755PC 77
ApprovedD pproved this day Reference
of s 20
Ord No 10 4
S N
i
L
MAYOR COUNTY OF HAWAII
EXHIBIT A - ORDINANCE 2010-045
EXHIBIT B - ADMINISTRATIVE EXTENSION OF REZONING ORDINANCE 10-045
Parcel
ID
230370060000
Acreage 5.075
Class COMMERCIAL
Situs/Physical
Address
279 KOMOHANA
STREET
Mailing
Address
KBXTREME HILO
LLC
75-5591 PALANI RD
STE 3008
KAILUA KONA HI
96740 3633
Market Land
Value
$980,300
Dedicated Use
Value
$0
Land
Exemption
$0
Net Taxable
Land Value
$980,300
Assessed
Building Value
$0
Building
Exemption
$0
Net Taxable
Building Value
$0
Total Taxable
Value
$980300
Last 2 Sales
Date Price Reason Qual
3/14/2017 $575000 ARMS LENGTH
TRANSACTION
Q
3/25/2009 0 RELATED
INDIVIDUALS OR
CORPORATIONS
U
Brief
Tax Description
LOT 12-B 5.075 AC DES POR RPGR 252 KA PALANI KULA S/D
SUBJ/ESMTS
(Note: Not to be used on legal documents)
*Hawaii County makes every effort to produce the most accurate information possible. No warranties, expressed or implied, are provided for the data herein, its use or
interpretation. The assessment information is from the last certi ed taxroll. All data is subject to change before the next certi ed taxroll. The 'parcels' layer is intended to be used for
visual purposes only and should not be used for boundary interpretations or other spatial analysis beyond the limitations of the data. The 'parcels' data layer does not contain metes
and bounds described accuracy therefore, please use caution when viewing this data. Overlaying this layer with other data layers that may not have used this layer as a base may not
produce precise results. GPS and imagery data will not overlay exactly.
325 ft
Overview
Legend
Parcels
EXHIBIT C - PROPERTY MAP AND SITE LOCATION
Developed by
Date created: 5/19/2023
Last Data Uploaded: 5/18/2023 11:58:48 PM
EXHIBIT C - PROPERTY MAP AND SITE LOCATION
EXHIBIT D - STREET STRIPING AND SIGN PLAN
EXHIBIT F - SITE PLAN WITH FLOOR PLAN
DOES NOT ADD TO NUMBER
OF PARKING SPACES, ONLY
AMOUNT OF PAVING
EXHIBIT G - EXTERIOR RENDERING
EXHIBIT H - EXTERIOR ELEVATIONS
EXHIBIT I - TAX MAP
EXHIBIT J - SITE GRADING PLAN
All of that certain parcel of land (being portion(s) of the land(s) described
in and covered by Royal Grant Number 252 to B. Pitman) situated at Ponahawai,
District of South Hilo, Island of Hawaii, State of Hawaii, being Lot 12-B of
the KA PALANI KULA SUBDIVISION, and thus bounded and described:
Beginning at the northeast corner of this parcel of land and on the south side
of Ponahawai Street, the coordinates of said point of beginning referred to
Government Survey Triangulation Station "HALAI" being 1,101.86 feet south and
157.66 feet east and running by azimuths measured clockwise from true south:
1. 345° 40' 445.00 feet along Lot 11;
2. 252° 20' 171.53 feet along Lot 11; 3. 246° 05' 150.10 feet along lot 10;
4. 333° 10' 220.00 feet along Lot 7;
5. 69° 08' 644.58 feet along Lot 13;
6. Thence along the east side of Komohana Street, along a curve to the
right having a radius of 2960.00 feet,
the chord azimuth and distance being 163° 26' 25" 229.97 feet;
7. 165° 40' 232.89 feet along the east side of Komohana Street;
8. 190° 30' 69.34 feet along the east side of Komohana Street;
9. 140° 00' 45.92 feet along the east side of Komohana Street;
10. Thence along the south edge of Flood Zone "A" (sic "X") and all its
windings as shown on approved subdivision
plan 7389 and Lot 12-A, the direct
azimuth and distance being 274° 29' 50" 256.99 feet;
11. 165° 40' 214.11 feet along Lot 12-A;
12. 255° 40' 30.00 feet along the south side of Ponahawai Street
to the point of beginning and containing an area of 5.075 acres, more or less.
SUBJECT TO, Easements D-1, D-2, RU-8 (NEW) and RU-9 as well as restriction of
vehicle access as shown and described on approved subdivision plan 01-000134.
EXHIBIT K - ALTA SURVEY
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
PREPARED FOR
KBXTREME, LLC
JULY 21, 2025
PREPARED BY
THE TRAFFIC MANAGEMENT CONSULTANT TMC
EXHIBITJLJ-JTIAR
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
PREPARED FOR
KBXTREME, LLC
JULY 21, 2025
PREPARED BY
THE TRAFFIC MANAGEMENT CONSULTANT
RANDALL S. OKANEKU, P.E., PRINCIPAL 1188 BISHOP STREET, SUITE 1907 HONOLULU, HI 96813
4/30/2026
TMC
i
Table of Contents
Page
I. Introduction ............................................................................................................................... 1
A. Project Description........................................................................................................ 1
B. Purpose and Scope of the Study.................................................................................... 1
C. Methodologies............................................................................................................... 4
1. Capacity Analysis ............................................................................................. 4
2. Trip Generation ................................................................................................. 5
II. Existing Conditions ................................................................................................................... 5
A. Roadways ...................................................................................................................... 5
B. Existing Peak Hour Traffic Volumes and Operating Conditions ................................. 6
1. Field Investigation and Data Collection ........................................................... 6
2. Existing AM Peak Hour Traffic ........................................................................ 6
3. Existing Midday Peak Hour Traffic .................................................................. 6
4. Existing PM Peak Hour Traffic ........................................................................ 6
5. Existing Saturday Peak Hour Traffic ................................................................ 7
III. Future Traffic Conditions ......................................................................................................... 7
A. Background Growth in Traffic ...................................................................................... 7
B. Hilo Benioff Medical Center ........................................................................................ 7
C. Year 2030 Peak Hour Traffic Analysis Without Project .............................................. 9
D. Year 2035 Peak Hour Traffic Analysis Without Project .............................................. 9
E. Year 2045 Peak Hour Traffic Analysis Without Project .............................................. 9
ii
Table of Contents (Cont'd.)
Page
IV. Traffic Impact Analysis .......................................................................................................... 13
A. Trip Generation Characteristics .................................................................................. 13
B. Traffic Assignment ..................................................................................................... 13
C. Site Access Improvements .......................................................................................... 13
D. Year 2030 Peak Hour Traffic Impact Analysis........................................................... 17
V. Long-Range Traffic Analysis ................................................................................................. 17
A. Future Growth in Traffic ............................................................................................. 17
B. Year 2035 Peak Hour Traffic Impact Analysis........................................................... 17
C. Year 2045 Peak Hour Traffic Impact Analysis........................................................... 20
VI. Recommendations and Conclusions ....................................................................................... 20
A. Recommended Access Improvements ........................................................................ 20
B. Conclusions ................................................................................................................. 20
iii
List of Figures
Page
Figure 1. Project Location and Study Area .......................................................................................... 2
Figure 2. Hilo Entertainment Center Site Plan .................................................................................... 3
Figure 3. Existing Peak Hour Traffic ................................................................................................... 8
Figure 4. Year 2030 Peak Hour Traffic Without Project ................................................................... 10
Figure 5. Year 2035 Peak Hour Traffic Without Project ................................................................... 11
Figure 6. Year 2045 Peak Hour Traffic Without Project ................................................................... 12
Figure 7. Access Driveway Improvements ........................................................................................ 14
Figure 8. Years 2030 and 2035 Peak Hour Traffic Assignments ...................................................... 15
Figure 9. Year 2045 Peak Hour Traffic Assignments........................................................................ 16
Figure 10. Year 2030 Peak Hour Traffic With Project ...................................................................... 18
Figure 11. Year 2035 Peak Hour Traffic With Project ...................................................................... 19
Figure 12. Year 2045 Peak Hour Traffic With Project ...................................................................... 21
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
I. Introduction
A. Project Description
KBXtreme, LLC is proposing to develop the Hilo Entertainment Center in South Hilo,
Hawai`i Island. The project site is identified as Tax Map Key: 2-3-037:006. The 5.075-
acre property is located on the east side of Komohana Street, about 100 feet south of
Ponahawai Street. Figure 1 depicts the project location. The Hilo Entertainment Center is
expected to be fully built out and operational by the Year 2030.
The Hilo Entertainment Center will consist of a 20-lane bowling alley. In addition to
the bowling alley, commercial activities will include a restaurant, a bar, and an arcade,
totaling 23,287 square feet of gross floor area. KBXtreme, LLC will be submitting a change
of zone for the property to the County of Hawai`i from agricultural to commercial zoning.
Access to the Hilo Entertainment Center will be provided by one (1) driveway on the
east side of Komohana Street, about 450 feet south of Ponahawai Street. The proposed site
plan is depicted in Figure 2.
B. Purpose and Scope of the Study
The purpose of this study is to analyze the traffic impacts of the proposed Hilo
Entertainment Center. This Traffic Impact Analysis Report (TIAR) is prepared in
accordance with the Hawai`i County Code Chapter 25 Section 25-2-46 (Concurrency
Requirements). The scope of the TIAR for the proposed project includes the following:
1. Conduct turning movement traffic count surveys during the weekday AM, midday, and
PM peak periods of traffic and the Saturday peak period of traffic at the intersection of
Komohana Street and Ponahawai Street.
2. Analyze the data collected in Item No. 1 to establish the existing conditions.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
2
Figure 1. Project Location and Study Area
Study Intersection
PROJECT
LOCATION
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
3
Figure 2. Hilo Entertainment Center Site Plan
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
4
3. Estimate future traffic conditions for the 5-year, 10-year, and 20-year planning
horizons, including other developments and traffic improvements in the vicinity, which
have been approved or committed to within the time frame of this traffic study.
4. Analyze the 5-year, 10-year, and 20-year planning horizons traffic conditions without
the proposed project, during the weekday AM, midday, and PM peak hours of traffic
and the Saturday peak hour of traffic, in order to establish the baseline conditions from
which to measure the traffic impacts of the proposed project.
5. Develop weekday AM, midday, and PM peak hour and Saturday peak hour trip
generation characteristics for the proposed project, using generally accepted techniques
developed by the Institute of Transportation Engineers.
6. Analyze the weekday AM, midday, and PM peak hour and Saturday peak hour site-
generated traffic impacts for the 5-year, 10-year, and 20-year planning horizons.
7. Recommend traffic improvements that would mitigate the traffic impacts identified in
this traffic study.
C. Methodologies
1. Capacity Analysis
The highway capacity analysis, performed in this study, is based upon procedures
presented in the Highway Capacity Manual, 7th Edition (HCM), published by the
Transportation Research Board. HCM defines the Level of Service (LOS) as “a
quantitative stratification of a performance measure or measures representing quality
of service.” HCM defines the six (6) Levels of Service from the traveler’s perspective,
ranging from the best LOS “A” to the worst LOS “F”. LOS translates the complex
mathematical results of the highway capacity analysis into an A through F grading
system for the purpose of simplifying the roadway performance for decision-makers.
Synchro is a traffic analysis software that was developed by Trafficware. Synchro
is an intersection analysis program that is based upon the HCM 7th Edition
methodology. Synchro is used to calculate the Levels of Service for the intersections
in the study area. Worksheets for the capacity analysis, performed throughout this
report, are compiled in the Appendix.
LOS’s “A”, “B”, and “C” are generally considered to be satisfactory Levels of
Service. The Hawai`i County Code Chapter 25, Section 25-2-46 “Concurrency
Requirements” defines LOS “D” as the minimum acceptable Level of Service. LOS’s
“E” and “F” are defined as worse than acceptable Levels of Service. The intersection
LOS is primarily based upon average delay (d) in seconds per vehicle (sec/veh). The
delays at unsignalized intersections, which include stop-controlled intersections and
roundabouts, are generally shorter than signalized intersections, due to the drivers’
expectation and acceptance of longer delays at higher-volume signalized intersections.
Table 1 summarizes the HCM LOS criteria.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
5
Table 1. Intersection Level of Service Criteria (HCM)
LOS Signalized
Control
Unsignalized
Control Description
A d10 d10 Control delay is minimal.
B 10<d 20 10<d15 Control delay is not significant.
C 20<d35 15<d25 Stable operation. Queuing begins to occur.
D 35<d55 25<d35 Less stable condition. Increase in delays,
decrease in travel speeds.
E 55<d80 35<d50 Unstable operation, significant delays.
F d80 d50 High delays, extensive queuing.
2. Trip Generation
The trip generation methodology is based upon generally accepted techniques
developed by the Institute of Transportation Engineers (ITE) and published in the Trip
Generation Manual, 11th Edition. The ITE trip rates for a bowling alley were developed
by correlating the total vehicle trip generation data with various land use activities/
characteristics, such as the vehicle trips per hour (vph) per bowling lane.
II. Existing Conditions
A. Roadways
Komohana Street is a two-way, two-lane collector roadway between Waianuenue
Avenue and Ainaola Drive in South Hilo. North of Ponahawai Street, the posted speed
limit on Komohana Street is 35 miles per hour (mph). South of Ponahawai Street, the
posted speed limit on Komohana Street increases to 45 mph. Komohana Street provides
exclusive left-turn and right-turn lanes at its signalized intersection with Ponahawai Street.
Ponahawai Street is a two-way, two-lane collector roadway between Komohana Street
and Kamehameha Avenue. Ponahawai Street provides separate left-turn and right-turn
lanes at its signalized Tee-intersection with Ponahawai Street. The posted speed on
Ponahawai Street is 40 mph.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
6
B. Existing Peak Hour Traffic Volumes and Operating Conditions
1. Field Investigation and Data Collection
A traffic count survey was conducted at the intersection of Komohana Street and
Ponahawai Street in February 2025 from 7:00 AM to 9:00 AM and from 2:00 PM to
10:00 PM, during the weekdays and from 1:00 PM to 10:00 PM on a Saturday.
2. Existing AM Peak Hour Traffic
The existing weekday AM peak hour of traffic in the study area occurred from 7:15
AM to 8:15 AM. Komohana Street carried over 1,000 vehicles per hour (vph), total for
both directions. Ponahawai Street carried about 800 vph, total for both directions,
during the existing weekday AM peak hour of traffic.
During the existing weekday AM peak hour of traffic, the intersection of Komohana
Street and Ponahawai Street operated at an overall LOS “B”. The left-turn movement
from Ponahawai Street to Komohana Street operated at LOS “D”. The other traffic
movements at the intersection operated at satisfactory Levels of Service, i.e., LOS “C”
or better, during the existing weekday AM peak hour of traffic.
3. Existing Midday Peak Hour Traffic
The existing weekday midday peak hour of traffic in the study area occurred from
2:00 PM to 3:00 PM. Komohana Street carried about 1,100 vph, total for both
directions. Ponahawai Street carried about 650 vph, total for both directions, during
the existing weekday midday peak hour of traffic.
The Komohana Street and Ponahawai Street intersection operated at satisfactory
Levels of Service, during the existing weekday midday peak hour of traffic.
4. Existing PM Peak Hour Traffic
While the existing weekday midday peak hour of traffic was the actual PM peak
hour of traffic, the commuter PM peak hour of traffic was included in the traffic impact
analysis. The existing weekday PM peak hour of traffic in the study area occurred from
3:15 PM to 4:15 PM. Komohana Street carried over 1,000 vph, total for both directions
during the existing weekday PM peak hour of traffic. Ponahawai Street carried over
600 vph, total for both directions.
The intersection of Komohana Street and Ponahawai Street continued to operate at
satisfactory Levels of Service, during the existing weekday PM peak hour of traffic.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
7
5. Existing Saturday Peak Hour Traffic
The existing Saturday peak hour of traffic in the study area occurred from 1:15 PM
to 2:15 PM. Komohana Street carried about 650 vph, while Ponahawai Street carried
about 350 vph, total for both directions, during the existing Saturday peak hour of
traffic.
The intersection of Komohana Street and Ponahawai Street operated at satisfactory
Levels of Service, during the existing Saturday peak hour of traffic. The existing peak
hour traffic volumes are depicted in Figure 3.
III. Future Traffic Conditions
A. Background Growth in Traffic
The Federal-Aid Highways Transportation Plan for the District of Hawai`i (TPDH) was
prepared for the State of Hawai`i Department of Transportation (DOT), in cooperation with
the County of Hawai`i Department of Public Works and Planning Department. The TPDH
developed long-range travel forecasts for Hawai`i Island based upon future socio-economic
conditions. The TPDH projected an annual growth rate of about 1.14 percent in vehicle
trips in South Hilo.
For the purpose of this traffic study, the TPDH-projected 1.14 percent annual growth
rate in traffic was uniformly applied to existing weekday AM, midday, and PM peak hour
traffic and the Saturday peak hour of traffic to estimate the Year 2030, Year 2035, and Year
2045 traffic demands.
B. Hilo Benioff Medical Center
The expansion and redesign of the Hilo Benioff Medical Center (HBMC) is under
construction at this writing. The HBMC expansion will add over 93,000 SFGFA and 67
beds. The HBMC Cancer Center is also being expanded by about 17,000 SFGFA. A new
19,000 SFGFA medical office building will be constructed next to the HBMC Cancer
Center. The Final Environmental Assessment Proposed Hilo Medical Center Expansion
(FEA) was prepared for the Hawai`i Health Systems Corporation by Munekiyo & Hiraga,
Inc., dated April 2023. The FEA included a traffic impact analysis report. The FEA traffic
study trip generation and traffic assignments were included in the future traffic conditions.
C. Wailani Master Plan
Wailani Master Plan is a proposed mixed-use development in South Hilo, Hawai`i Island.
The 172-acre project site is identified as Tax Map Keys: 2-3-044:019, 023, 024, & 025.
The properties are located generally along the mauka (west) side of Komohana Street near
its intersection with Ponahawai Street and extends up to Mohouli Street.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
8
Existing AM Peak Hour Traffic Existing Midday Peak Hour Traffic
Existing PM Peak Hour Traffic Existing Saturday Peak Hour Traffic
Figure 3. Existing Peak Hour Traffic
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
9
The Wailani Master Plan will be developed in six (6) phases, which will include a total
of 612 dwelling units, a 250-room hotel, and a total of 320,000 square feet of commercial
floor area.
The development of the Wailani Master Plan is expected to begin along the Mohouli
Street Extension with completion of Phase 1 in the Year 2035. Ponahawai Street is
expected to be extended from Komohana Street to the Mohouli Street Extension by the
Year 2040. The Wailani Master Plan is expected to be fully built out and occupied by the
Year 2050. The Wailani Master Plan roadway improvements, trip generation, and traffic
assignments were included in the future traffic conditions without the proposed Hilo
Entertainment Center.
D. Year 2030 Peak Hour Traffic Analysis Without Project
The left-turn movement from Ponahawai Street onto Komohana Street is expected to
continue to operate at LOS “D”, during the Year 2030 weekday AM peak hour of traffic
without the proposed project. The other traffic movements at the intersection are expected
to operate at satisfactory Levels of Service. During the Year 2030 weekday midday and
PM peak hours of traffic and the Saturday peak hour of traffic without the proposed project,
the intersection of Komohana Street and Ponahawai Street is expected to operate at
satisfactory Levels of Service. Figure 4 depicts the Year 2030 weekday AM, midday and
PM peak hour traffic and the Saturday peak hour traffic without the proposed project.
E. Year 2035 Peak Hour Traffic Analysis Without Project
The left-turn movement from Ponahawai Street onto Komohana Street is expected to
continue to operate at LOS “D”, during the Year 2035 weekday AM peak hour of traffic
without the proposed project. The other traffic movements at the intersection are expected
to operate at satisfactory Levels of Service. The intersection of Komohana Street and
Ponahawai Street is expected to operate at satisfactory Levels of Service, during the Year
2035 weekday midday and PM peak hours of traffic and the Saturday peak hour of traffic.
The Year 2035 weekday AM, midday, and PM peak hour traffic and the Saturday peak hour
traffic without the proposed project are depicted in Figure 5.
F. Year 2045 Peak Hour Traffic Analysis Without Project
The extension of Ponahawai Street to Mohouli Street will improve the Komohana
Street intersection to a channelized four-legged intersection. During the Year 2045
weekday AM, midday, and PM peak hours of traffic and the Saturday peak hour of traffic
without the proposed project, the intersection of Komohana Street and Ponahawai Street is
expected to operate at acceptable Levels of Service, i.e., LOS “D” or better. Figure 6
depicts the Year 2045 weekday AM, midday, and PM peak hour traffic and the Saturday
peak hour traffic without the proposed project.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
10
AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project
PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project
Figure 4. Year 2030 Peak Hour Traffic Without Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
11
AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project
PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project
Figure 5. Year 2035 Peak Hour Traffic Without Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
12
AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project
PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project
Figure 6. Year 2045 Peak Hour Traffic Without Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
13
IV. Traffic Impact Analysis
A. Site Access Improvements
The following site access improvements, which are depicted in Figure 7, are proposed
at the Hilo Entertainment Center Driveway on Komohana Street:
1. Widen southbound Komohana Street at the Hilo Entertainment Center Driveway to
provide an exclusive left-turn lane.
2. Widen the south leg of Komohana Street at the Hilo Entertainment Center Driveway to
provide a median refuge lane.
3. Provide separate left-turn and right-turn lanes on the Hilo Entertainment Center
Driveway.
B. Trip Generation Characteristics
The ITE trip generation rates for a Bowling Alley (ITE Land Use Code 457) are used
to estimate the trip generation for the proposed Hilo Entertainment Center. The restaurant,
bar, and arcade are assumed to be typical commercial activities, which are included in a
bowling alley. Table 2 summarizes the trip generation characteristics of the proposed 20-
lane bowling alley.
Table 2. Trip Generation Characteristics
20-Lane
Bowling Alley
Peak Hour Vehicle Trips (vph)
AM Midday PM Saturday
Enter 86 68 17 19
Exit 5 23 9 29
Total 91 91 26 48
C. Traffic Assignment
The peak hour traffic assignments were based upon the projected traffic circulation
patterns. The Years 2030 and 2035 weekday AM, midday peak hour traffic assignments
and Saturday peak hour traffic assignment are depicted in Figure 8. Figure 9 depicts the
Year 2045 weekday AM, midday, and PM peak hour traffic assignments and the Saturday
peak hour traffic assignment.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
14
Figure 7. Access Driveway Improvements
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
15
AM Peak Hour Traffic Assignment Midday Peak Hour Traffic Assignment
PM Peak Hour Traffic Assignment Saturday Peak Hour Traffic Assignment
Figure 8. Years 2030 and 2035 Peak Hour Traffic Assignments
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
16
AM Peak Hour Traffic Assignment Midday Peak Hour Traffic Assignment
PM Peak Hour Traffic Assignment Saturday Peak Hour Traffic Assignment
Figure 9. Year 2045 Peak Hour Traffic Assignments
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
17
D. Year 2030 Peak Hour Traffic Impact Analysis
The Hilo Entertainment Center Driveway on Komohana Street is expected to operate
at LOS “C” , during the Year 2030 weekday AM, midday, PM peak hours of traffic, and
the Saturday peak hour of traffic with the proposed project. The Komohana Street
intersection at Ponahawai Street is expected to operate at satisfactory Levels of Service,
during the Year 2030 weekday AM, midday, PM peak hours of traffic, and the Saturday
peak hour of traffic with the proposed project. The Year 2030 weekday AM, midday, and
PM peak hour traffic volumes and the Saturday peak hour traffic volumes with the
proposed project are depicted on Figure 10.
V. Long-Range Traffic Analysis
A. Future Growth in Traffic
The proposed project is expected to be fully built out and operational by the Year 2030.
The trip generation for the proposed project is assumed to remain constant beyond the Year
2030. However, the Hawai`i County Concurrency Requirements require the analysis of
ten-year (2035) and twenty-year (2045) traffic projections for future growth in the project
area, which are beyond the development time frame of the proposed project.
B. Year 2035 Peak Hour Traffic Impact Analysis
During the Year 2035 weekday AM, midday, PM peak hours of traffic and the Saturday
peak hour of traffic with the proposed project, the Hilo Entertainment Center Driveway on
Komohana Street is expected to continue to operate at LOS “C”. The intersection of
Komohana Street and Ponahawai Street is also expected to continue to operate at
satisfactory Levels of Service during the Year 2035 weekday AM, midday, PM peak hours
of traffic, and the Saturday peak hour of traffic with the proposed project. Figure 11 depicts
the Year 2035 weekday AM, midday, and PM peak hour traffic volumes and the Saturday
peak hour traffic volumes with the proposed project.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
18
AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project
PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project
Figure 10. Year 2030 Peak Hour Traffic With Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
19
AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project
PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project
Figure 11. Year 2035 Peak Hour Traffic With Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
20
C. Year 2045 Peak Hour Traffic Impact Analysis
The Hilo Entertainment Center Driveway on Komohana Street is expected to continue
to operate at LOS “C”, during the Year 2045 weekday AM, midday, PM peak hours of
traffic, and the Saturday peak hour of traffic with the proposed project. The Komohana
Street intersection at Ponahawai Street is expected to operate at acceptable Levels of
Service, during the Year 2045 weekday AM, midday, PM peak hours of traffic, and the
Saturday peak hour of traffic with the proposed project. The Year 2045 weekday AM,
midday, and PM peak hour traffic volumes and the Saturday peak hour traffic volumes
with the proposed project are depicted in Figure 12.
VI. Recommendations and Conclusions
A. Recommended Access Improvements
1. Southbound Komohana Street should be widened at the Hilo Entertainment Center
Driveway to provide an exclusive left-turn lane.
2. The south leg of Komohana Street should be widened at the Hilo Entertainment Center
Driveway to provide a median refuge lane.
3. The Hilo Entertainment Center Driveway should provide separate left-turn and right-
turn lanes.
B. Conclusions
The Hilo Entertainment Driveway is expected to operate at LOS “C” through the Year
2045 peak hours of traffic. The intersection of Komohana Street and Ponahawai Street is
expected to operate at acceptable Levels of Service through the Year 2045 peak hours of
traffic with the proposed project. The development of the proposed Hilo Entertainment
Center in South Hilo, Hawai`i Island is not expected to significantly impact traffic
operations on Komohana Street. Table 3 summarizes the traffic impact analysis for this
study.
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
21
AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project
PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project
Figure 12. Year 2045 Peak Hour Traffic With Project
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
22
Table 3. Summary of Peak Hour Capacity Analysis
Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection
Existing AM
Peak Hour
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A D N/A A N/A B A A A N/A B
Delay N/A N/A N/A 36.1 N/A 10.0 N/A 15.0 4.3 6.4 4.0 N/A 11.9
v/c N/A N/A N/A 0.51 N/A 0.63 N/A 0.59 0.20 0.47 0.16 N/A Max: 0.63
Existing Midday
Peak Hour
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 26.0 N/A 6.8 N/A 8.5 2.0 7.6 7.0 N/A 8.9
v/c N/A N/A N/A 0.50 N/A 0.42 N/A 0.38 0.15 0.41 0.44 N/A Max: 0.50
Existing PM
Peak Hour
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 24.1 N/A 6.4 N/A 6.7 2.0 6.1 7.5 N/A 8.6
v/c N/A N/A N/A 0.49 N/A 0.40 N/A 0.23 0.11 0.27 0.45 N/A Max: 0.49
Existing Saturday
Peak Hour
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 22.8 N/A 7.2 N/A 7.6 2.8 3.9 4.5 N/A 8.1
v/c N/A N/A N/A 0.38 N/A 0.34 N/A 0.20 0.06 0.08 0.19 N/A Max: 0.38
Year 2030
AM Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A D N/A B N/A B A A A N/A B
Delay N/A N/A N/A 35.9 N/A 10.6 N/A 17.5 5.1 8.2 4.3 N/A 13.3
v/c N/A N/A N/A 0.51 N/A 0.66 N/A 0.67 0.21 0.55 0.18 N/A Max: 0.67
Year 2030
Midday Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A B
Delay N/A N/A N/A 26.2 N/A 6.7 N/A 9.2 2.0 9.3 8.0 N/A 9.5
v/c N/A N/A N/A 0.51 N/A 0.45 N/A 0.42 0.16 0.49 0.50 N/A Max: 0.51
Year 2030 PM
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A B
Delay N/A N/A N/A 24.4 N/A 6.3 N/A 7.2 2.0 6.7 8.2 N/A 10.2
v/c N/A N/A N/A 0.51 N/A 0.42 N/A 0.29 0.12 0.31 0.50 N/A Max: 0.56
Year 2030 Saturday
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 22.9 N/A 7.1 N/A 7.9 2.8 4.0 4.7 N/A 8.1
v/c N/A N/A N/A 0.39 N/A 0.37 N/A 0.23 0.07 0.09 0.21 N/A Max: 0.39
Legend
MOE–Measure of Effectiveness
LOS–Level of Service
Delay–Average Delay (seconds/vehicle)
v/c–Volume-to-Capacity Ratio
N/A–Not Applicable
EBL–Eastbound Left-Turn Movement
EBT–Eastbound Through Movement
EBR–Eastbound Right–Turn Movement
WBL–Westbound Left-Turn Movement
WBT–Westbound Through Movement
WBR–Westbound Right-Turn Movement
NBL–Northbound Left-Turn Movement
NBT–Northbound Through Movement
NBR–Northbound Right-Turn Movement
SBL–Southbound Left-Turn Movement
SBT–Southbound Through Movement
SBR–Southbound Right-Turn Movement
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
23
Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.)
Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection
Year 2035
AM Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A D N/A B N/A C A B A N/A B
Delay N/A N/A N/A 35.3 N/A 13.0 N/A 23.0 6.4 15.2 4.7 N/A 16.8
v/c N/A N/A N/A 0.52 N/A 0.71 N/A 0.75 0.24 0.66 0.19 N/A Max: 0.75
Year 2035
Midday Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A B A N/A B
Delay N/A N/A N/A 30.7 N/A 7.9 N/A 13.4 3.0 10.8 7.9 N/A 11.2
v/c N/A N/A N/A 0.56 N/A 0.61 N/A 0.49 0.18 0.61 0.50 N/A Max: 0.61
Year 2035 PM
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A A A N/A B
Delay N/A N/A N/A 30.8 N/A 7.2 N/A 11.7 2.8 6.5 7.9 N/A 10.4
v/c N/A N/A N/A 0.56 N/A 0.53 N/A 0.35 0.14 0.38 0.49 N/A Max: 0.56
Year 2035 Saturday
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A A A N/A A
Delay N/A N/A N/A 23.1 N/A 7.1 N/A 10.3 3.2 4.4 5.2 N/A 8.8
v/c N/A N/A N/A 0.41 N/A 0.47 N/A 0.30 0.09 0.16 0.24 N/A Max: 0.47
Year 2045
AM Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS C C A C C B A C A C B A B
Delay 29.6 24.3 5.8 31.4 23.6 12.5 9.9 23.5 6.0 20.0 12.6 1.5 17.5
v/c 0.52 0.38 0.41 0.57 0.33 0.63 0.38 0.76 0.27 0.67 0.19 0.07 Max: 0.76
Year 2045
Midday Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS D B A C C A D B A B C A C
Delay 44.4 19.8 7.2 26.5 22.8 4.9 52.7 17.1 3.4 14.6 25.4 3.3 21.5
v/c 0.80 0.16 0.50 0.50 0.37 0.30 0.92 0.40 0.22 0.56 0.74 0.25 Max: 0.92
Year 2045 PM
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS D C A D C A C B A A C A C
Delay 51.0 24.7 5.9 35.4 27.8 5.9 27.5 14.9 3.4 9.4 31.8 4.5 22.4
v/c 0.80 0.16 0.47 0.60 0.36 0.33 0.78 0.23 0.16 0.34 0.78 0.22 Max: 0.80
Year 2045 Saturday
Peak Hour
Without Project
Komohana Street &
Ponahawai Street
LOS D C A C C A B B A A B A B
Delay 36.0 20.5 5.5 25.4 23.7 5.8 12.2 10.6 3.2 7.5 14.1 3.3 14.4
v/c 0.68 0.15 0.44 0.40 0.36 0.23 0.51 0.14 0.08 0.10 0.30 0.19 Max: 0.68
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
24
Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.)
Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection
Year 2030
AM Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A D N/A A N/A C A A A N/A B
Delay N/A N/A N/A 36.6 N/A 9.2 N/A 20.5 6.1 9.5 4.7 N/A 14.6
v/c N/A N/A N/A 0.56 N/A 0.64 N/A 0.70 0.22 0.57 0.20 N/A Max: 0.70
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A
Delay N/A N/A N/A 15.5 N/A 15.5 N/A N/A N/A 10.1 - N/A 0.5
v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.07 - N/A N/A
Year 2030
Midday Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A A A N/A B
Delay N/A N/A N/A 31.2 N/A 7.1 N/A 13.2 2.8 8.1 8.0 N/A 11.0
v/c N/A N/A N/A 0.57 N/A 0.45 N/A 0.48 0.18 0.50 0.51 N/A Max: 0.57
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 16.5 N/A 12.6 N/A N/A N/A 9.0 - N/A 0.6
v/c N/A N/A N/A 0.03 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A
Year 2030 PM
Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A A A N/A B
Delay N/A N/A N/A 31.1 N/A 7.2 N/A 11.3 3.4 5.6 7.4 N/A 10.3
v/c N/A N/A N/A 0.56 N/A 0.44 N/A 0.33 0.20 0.31 0.47 N/A Max: 0.56
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 14.9 N/A 11.1 N/A N/A N/A 8.3 - N/A 0.2
v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.01 - N/A N/A
Year 2030 Saturday
Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 29.4 N/A 8.1 N/A 7.3 2.3 3.8 4.6 N/A 8.9
v/c N/A N/A N/A 0.46 N/A 0.39 N/A 0.24 0.07 0.10 0.22 N/A Max: 0.46
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 11.7 N/A 10.3 N/A N/A N/A 8.0 - N/A 0.5
v/c N/A N/A N/A 0.02 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A
Year 2035
AM Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A D N/A B N/A C A B A N/A B
Delay N/A N/A N/A 36.5 N/A 12.6 N/A 23.9 6.6 17.8 5.0 N/A 17.7
v/c N/A N/A N/A 0.57 N/A 0.71 N/A 0.76 0.25 0.69 0.21 N/A Max: 0.76
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A
Delay N/A N/A N/A 16.1 N/A 16.2 N/A N/A N/A 10.4 - N/A 0.4
v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.07 - N/A N/A
Year 2035
Midday Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A B A N/A B
Delay N/A N/A N/A 31.2 N/A 7.5 N/A 14.1 3.2 12.4 8.8 N/A 11.9
v/c N/A N/A N/A 0.58 N/A 0.60 N/A 0.51 0.19 0.64 0.53 N/A Max: 0.64
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 16.5 N/A 12.7 N/A N/A N/A 9.0 - N/A 0.6
v/c N/A N/A N/A 0.02 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
25
Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.)
Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection
Year 2035
PM Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A B A A A N/A B
Delay N/A N/A N/A 31.0 N/A 7.2 N/A 11.9 2.8 6.6 8.1 N/A 10.5
v/c N/A N/A N/A 0.57 N/A 0.52 N/A 0.35 0.14 0.39 0.49 N/A Max: 0.57
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 15.1 N/A 11.1 N/A N/A N/A 8.4 - N/A 0.2
v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.01 - N/A N/A
Year 2035
Saturday Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS N/A N/A N/A C N/A A N/A A A A A N/A A
Delay N/A N/A N/A 30.1 N/A 8.0 N/A 9.5 2.6 4.4 5.1 N/A 9.6
v/c N/A N/A N/A 0.50 N/A 0.51 N/A 0.30 0.09 0.17 0.26 N/A Max: 0.51
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 12.3 N/A 10.7 N/A N/A N/A 8.1 - N/A 0.5
v/c N/A N/A N/A 0.02 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A
Year 2045
AM Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS C C A C C B B C A C B A B
Delay 28.0 23.5 5.5 32.8 22.9 11.7 10.7 25.0 6.4 23.0 13.3 1.5 18.1
v/c 0.49 0.35 0.41 0.62 0.31 0.61 0.39 0.77 0.28 0.70 0.20 0.07 Max: 0.77
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A
Delay N/A N/A N/A 20.0 N/A 21.3 N/A N/A N/A 11.9 - N/A 0.4
v/c N/A N/A N/A 0.01 N/A 0.02 N/A N/A N/A 0.08 - N/A N/A
Year 2045
Midday Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS D C B C C A D C B B C B C
Delay 53.2 23.8 10.0 32.3 27.2 5.0 38.4 25.9 12.1 13.0 30.3 10.9 24.7
v/c 0.83 0.15 0.53 0.54 0.36 0.29 0.84 0.48 0.28 0.50 0.76 0.26 Max: 0.84
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 21.2 N/A 14.3 N/A N/A N/A 9.6 - N/A 0.5
v/c N/A N/A N/A 0.04 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A
Year 2045 PM
Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS D C A D C A C B A A C A C
Delay 51.0 24.7 5.9 35.8 27.8 5.9 29.3 14.9 3.4 9.5 32.5 4.6 22.8
v/c 0.80 0.16 0.48 0.61 0.36 0.33 0.79 0.23 0.16 0.35 0.79 0.22 Max: 0.80
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 19.5 N/A 13.2 N/A N/A N/A 9.1 - N/A 0.1
v/c N/A N/A N/A 0.02 N/A 0.01 N/A N/A N/A 0.02 - N/A N/A
Year 2045 Saturday
Peak Hour
With Project
Komohana Street &
Ponahawai Street
LOS D C A C C A B B A A B A B
Delay 36.0 20.5 5.5 25.8 23.7 5.8 12.6 10.7 3.5 7.5 14.2 3.3 14.5
v/c 0.68 0.15 0.44 0.42 0.36 0.23 0.53 0.15 0.09 0.10 0.30 0.19 Max: 0.68
Komohana Street &
Site Access Driveway
LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A
Delay N/A N/A N/A 14.3 N/A 12.0 N/A N/A N/A 8.6 - N/A 0.4
v/c N/A N/A N/A 0.03 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX A
EXISTIN TRAFFIC COUNT DATA
!"!
#$#%#& !' #!& !'(
#(#!"!)(#!"! *'
+,
-./
!#/01 0
1$#/2#3 #,
+#"/&& 44#!,
55(#6$ $#
22-751%$
*#$ 8,$ 8,$
.# !# 3 9 $
&#, 6666 :
) % 6666 :& ) % 6666 :
& % 6666 :--
/
5 1
55
5 5
15
;5;5
11;11;
/
1 17
5
1
1
;1;1
1;1;
/1
15 ;
55
77
;
55 11 11
/;
15 ;
55
5 5
;
77
17;17;
2 "&
;1
5 5 15
1
;7;7
7 ;7
7777 11
1/
1 ;
5
5
5
1
1
1
;
7575
11
1/
17 ;
55
55 5
7
7
;7
77
11
1/1
; ;
5 5
55
;
;;
1717
1/;
11
7; 5
;1
11
2 "&
;7 ;
1
; 57
1
1
157157
;/
; 1;
77 1
1
1
;; 1
;;
1111
;/
;1 1;
; ;
1
1 51 5
;/1
;
77 7
77
;; 1
77
1;51;5
;/;
1 17
;
11
5 5
2 "&
;
1 ;1 ;7
1;1;
; ;;
7;7;
1;1;
/
;
7777
7
55
1
1 1
/
; 1
55
5
7575
5 51
/1
1 1
7;7;
1
7;7;
1;
11
; ;
/;
77
1; 7
5 75
77
2 "&
;; 1
7 7
7;
71 71
11
;; ;;
7/
1
;1
5
5555
11
7/
11 1
7171
1
7171
;
77
5 5
7/1
5 17
;;
15 ;
;
7171
7/;
7
;7;7
1;
;1;1
77
2 "&
5 5
75 ;
5
5
;5 ;
7 7
755755
/
1;1;
7
1111
1
;;
77
/
1515
7
1111
;;
7 7
/1
1717
7 5
; ;
7;7;
; ;
/;
; 1
5
1
1
7 1;
;
;
2 "&
7 77
11
5
1; ;
5
5
;71;71
5/
; ;
11
1
;1;1
;
;
5/
55
1
5 5
5
11
5/1
7
5 5
1 ;
5/;
;
; ;
;
; ;
77
2 "&
17 ;
5151
1 ;
7
1 1
/
;
;
7 7
1 1
55
/
55
1
;;
/1
;
;
/;
7
;
; 5
;;
2 "&
1;
77
7;
7
7
7
; ;
7/
1
1 1
7171
;1 ;5
1
1
/
;1 1
11
;
;1
5151
1;71;7
/1
1
1
1
;5 ;1
7
55
;1;1
/;
;
; ;
;;
7
1
11
2 "&
1 5
151151
;
151151 ;5;5
5/
1
5 5
1 15
77
;; 7;
5
5
11
5/
; 1
77
57 1
7
11
57 57
5/1
7 1
11
;
1111
11 ;1
77
;5 ;5
5/;
7 11
;;
5 7
;
2 "&
5 ;
7 7
15 17
55
5 5
1717
;
;
/
1 ;
11
1
;;
1
;
;
17
17
/
;
;
55
5
5
5
51 ;
1 1
;
;
/1
1
1
77; 1
7; 7
5
5
1 1
/;
; 1
7 1
15
;
;
1 1
2 "&
;1 7
1
51
5 1
;5 ;5
; ;
751751
;1;1
1/
1 ;
;;
1717
1/
1 1
7575
;
1 ;1 ;
1/1
; 1
5 5
77
;1 7
1
1
1717
1/;
; 1
;
5151
;5
5
77
1717
2 "&
1
1
71
7
71 5
1;51;5
7 ;;
771771
11
;/
1; 11
77 71
55
; 7
77
1 1
;/
1 1
7;7;
7 1
55
;; 5
1111
57 57
;/1
15
71
5;5;
; ;
5 5
171171
;/;
11 15
; 5
17 5
1 1
2 "&
5 ;
1 51 5
71 ;;;
7
7
1; 1;
/
1; ;
;;;
1
1
1
/
15
7171
;
7171
7
5757
/1
;
5
7575
;
;;
55
1 1
/;
; 5
1
;;
5 7
77
2 "&
17
57
7 7
7 1
; ;
11
7/
1; 7
7
7
; ;
77
; 7
5
5
7/
5
11
7; 1
; ;7
7
7
;;
7/1
7 1
;7;7
;
1
7171
7;7;
7/;
1
;1;1
7
55
5
5
2 "&
5757
7 1
; ;
7
5
55 55
/
5
11
1;
;;;;
;;
11
1717
/
;
1;1;
;
7 7
;
77
/1
5
;
1 1
7 ;7
/;
1
5 5
11
; ;
2 "&
7 7
55
7
1
5
5
;;;;
5/
;
7
5 5
1 1
5/
11
7
7 1
1515
;;
5/1
;;
;
77
5/;
5 7
;;
1
11
1
1 1
2 "&
;; 17
5
5
71
5 5
7
1111
/
5
1
1
/
;
77
7
; ;
/1
55
1
1 1
1
/;
5
11
;
1 1
77
2 "&
7
7
55
/
1 ;
5
;;
1 11
/
;
15
55
7 7
; ;
;;;;
/1
5 51
;5
55
;1;1
/;
; 5
1 1
1
77
17
5555
;
;
2 "&
5
1
1
5 ;
5
15
15
5/
17 ;;
5
5
5 1;
1 1
; 7
;
;
1
1
5/
;
77
5
5
5
55
; ;
5/1
5
1;
; ;
; 7;
5; 5;
5/;
1
;;
1
1;1;
17
11
5 5
2 "&
; ;7
11 17
;5;5
;7 ;
1515
7 7
/
11 ;7
1
5
1;1;
/
15 7
;;
11
5 5
;1
;5;5
1
1
/1
17 1
1
1 1
7777
11
/;
;
;
55
55 1;
;
;
;
1;11;1
2 "&
; 5
1 1
1
;;
1 ;
7
;7
;
; 7; 7
1/
1
7777
57 5
;
;
;1
7
7
11
11
1/
1 ;
55
7
; 17
1;1;
1/1
; ;
;;
7 1
; ;
55
17 17
1/;
1; 1
77
5
5
;
; ;
11
2 "&
15
1
1
15 15
5 ;
775775
17
17
;/
;
7
55
1
1
;/
;5 ;
;
1
;
;
1
1
*#$ 8,$ 8,$
.# !# 3 9 $
&#, 6666 :
) % 6666 :& ) % 6666 :
& % 6666 :--
;/1
; ;1
7
5;5;
1 5
77
1;11;1
;/;
;1 ;
5;5;
;5 7
;;
;
1 1
2 "&
1717 ;1 55
1111
7 ;
7777
1
51
5
/
1 7
77;
7777
1 7
5 5
/
11
55
1 ;
;7 ;7
/1
11 1
77
;5 5
7777
7 75
;;
/;
1
1
5
5
5
5
2 "&
1
; ; ;
1
11
1
7 1
11
;;
7/
1
77
1
;;
7
5
5
7/
1 1
77
7
11
;;
5 5
7/1
1; ;
55
77
7
77
7/;
;;
; ;
77
1 ;7
77
2 "&
75 75
;
5; 5;
;;
/
5 1
55
11
1
;;
1717
/
1
1515
17
;5;5
7;
/1
;
11
5
11
7 15
;;
7 7
/;
11
7
11
17
;5;5
55
2 "&
; 7
5 1
11
; 7
; ;
11
5/
5
1 7
1;
;;;;
5/
5
1
1
1 1
1 5
;;
1
1
5/1
7
7 7
11
;
;
55
5/;
5
1
; ;
7
11
5555
2 "&
7 ;
17 ;
7
7
1717
/
1
1 1
5 5
;
; ;
5;5;
/
5 1
1 ;
;;
/1
7 11
11
/;
5
55
1 1
7 7
55
7 7
2 "&
;7 ;
1 5
5 /
1;
1 7
77
7
55
1 1
/
1
;5;5
7
;1
7;7;
5 5
/1
7
;
55
71
5555
; ;
/;
;7;7
77
;
77
77
2 "&
1
5
5 7
5 5
7
1 1
5555
1/
11 ;
;
77
55
77
1/
5 7
;;;;
;
;;
77
7 7
1/1
;;
17
77
1
5151
11
1/;
;;;;
1 7
77
5
5
11
2 "&
7
7 7
7;
11
;;;;
;/
;
;;
;
;1;1
5 ;;
7 7
;/
1
;5;5
1;
;;
1
7575
77
;/1
;7;7
;
;;
;
77
77
;/;
1
;;
;
7 17
7575
2 "&
5
5;5;
5
5
1
;1 ;1
7171
/
7
1515
;1
1 1
7777
/
1515 ;5 7
7;7;
5 1
11
/1
15
5 1
/;
;;
11
;
7777
7777
2 "&
5
7 7
; ;
57
7 7
77
7/
1
;;
1
;1;1
1 ;
7 7
7/
;1 7
;;
1
7;7;
7171
7/1
7
1515
7 7
5 ;
7/;
;
11
11
; 5
; ;
77
2 "&
; 7
;
11
;5
5 5
55
/
7 1
11
5 7
1;1;
;1
/
7 7
1 1
7 1
5 ;7
;;
/1
1
;
/;
; ;
; ;
1 ;
2 "&
; 77
5; 5
1
55
;;
5/
;
1 1
1
1
;
11
5;5;
5/
7
11
; 1
11
;
;
5
5
*#$ 8,$ 8,$
.# !# 3 9 $
&#, 6666 :
) % 6666 :& ) % 6666 :
& % 6666 :--
5/1
1
1 1
7 7
5/;
1
55
1
1
1
77
2 "&
1 17
77
5
55
5
5 5
1 1
/
55
77
/
7
;
; ;
/1
1 ;
7
/;
7
7
11
2 "&
1
77
7
5 7
5151
/
5 11
7 1
17 ;
/
1 7
1 ;
1 ;
1 1
/1
17 1;
7
11; ;; ;
/;
17
7 7
;5
1
1
1
;;
; 1; 1
2 "&
7 5
157157
1 77
;
; 7; 7 11
5/
1 ;;
77 17
55
;7 ;
1 1
5/
5 1;
7 7
1
1 1
17 7
77
5/1
1
1
77
7 ;;
1
;
5/;
1
77
;
;;
15 7
1
1
1
51
5
2 "&
;7
;
5
;
17;17;
55
&&
15 ;1
555 5 7; ; ;
151
;71
1 11 1 1 1 1
<66 !<66 ! ;70< 10<
< 70;< 107<
< 505< 0 <
<
<&<&
<
<07< 10;<
< 0
< 0
< 701< 50<
< 1;0;<1;0;<0< 50<
< ;
07<;
07<
!"! !"!
;
7
< !"!< !"!
0<
0 <
<
0<
0<
0 <
<
<
0 <
0 <
0<
0 <
<
0 <
0 <
0 <
#
#
17 ;1;;
5;
5;
5;; 71 7 7 177 17
1 71 7 1 1
<
#<
# 07< 0 <
< 0;<0;<505< 01<
< 50<50<501< 50<
< 50<50<0
<
$#%#& !'$#%#& !'
77 7
11
<$#%#& !'<$#%#& !'
01<
01<
<
01<
01<
07<
0;<
<
0<
0<
0;<
07<
<
0<
0<
0<
#!& !' #!& !'
1 1
77
< #!& !'< #!& !'
<
<
<
<
<
<
0<
<
0<
0<
<
<
<
<
<
<
((
;; 1
5 5 ;
7777
5
<(<(
0<
01<
<
0 <
0 <
01<
0<
<
0 <
0 <0<
01<
<
0<
0<
01<
(#!"!)(#!"!)
;
;; ;
<(#!"!)<(#!"!)
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
# ;
1
< #
< ;0<
<
(#!"! *'
;
<(#!"! *'
< 0<
<
*#$ 8,$ 8,$
.# !# 3 9 $
&#, 6666 :
) % 6666 :& ) % 6666 :
& % 6666 :--
: #(#!"! *'0
/
4)/)#&/& %/%&
!"!
# $#%# & !' #! & !' ( #
(#!"! ) (#!"! *'
+,
-./
!#/ 01 0
1 $# / 2# 3 #,
+# "/ & & 44#! ,
55 (#6 $ $#
2 2- 751 %$
!
"
! !
"
"
#
!
#
!#
!
!
!#
!
!!
!
!" #" $ %
$" %"&$ %"'
()"
*+,-
.-
/ ",-/0.-
. -0/.
!$,12"")""
($$,33" )"
""
--44%5! !-/.
1" 1* /4- #!
6
"'! 7)"! 7)"!
+" 2"$ 6"$ 8"$ !"$
) 5555
$9 & # 5555
$9 & # 5555
$9 # 5555
$9 *"*"
,
- :
..--
-:.-:./ -- -:-:
,-
: :/ 4/4/4-
. -4-4 4 -:
:
:
,
. ..-/: - -
-
: -- -4-4.
.
,:
:
. ././. -
-
4 -
-:-:
-
-
-: - 44 -. -
:4
:4
: :/ 44-:.-:.
;55;55 :0:; 0; ; .:0-;
0/; ;
04; .0
; ;
;; ;;/0.; --0
; ;
0/;
0/;
:0
; 40; ;
0.;
0.;-0
; -0
; ; :0:;:0:;
1
1 04- 04:
04040.. 04/ 04
04
0. 04
0.0.04..
- --- --
;; ; 0; ; 0;0;0; ; ; 0
;0
;; ; ; ;;0-;
-:- -:
-
: :.:.
: ..-:
; ; /40; //0:; ; //0;//0;/40; //0
; ; /404;/404;/40
; //0-; ; /404;/404;/404;
!" #"!" #"
- -
;!" #";!" #" -0:; ; ; 0;0;0; 04; ; 0:;0:;; 0:; ; 0;0;0:;
$$
;$;$ ; ; ; ;;; ; ; ;;; ; ; ;;;
%% :
/
;%;% ; ; ; ;;04; ; ; 0;0;-04; 0:; ; 0/;0/;0;
%"&$%"&$
;%"&$;%"&$ ; ; ; ;;; ; ; ;;; ; ; ;;;
$" -
;
$" -;
%"'
;%"' ;
9
$""$%"'0,3 &,& , #,#"
!" #" $ %
$"
% " &$ % " '
()"
*+, -
.-
/ ", -/0.-
. -0/.
! $, 1 2"")" "
($$ , 33 " )"
""
--44 %5 ! ! -/.
1" 1* /4- #!
!"# !$"%$!&' !'(&' )'
(!$ )!$*( )!$+
,-$
./0
10
2 !$/02310
1 0321
!(/4!5$!$-$$
,!((/&#&66!$"-$
$'$
00)!#7 '!021
4$'' 4. 280 %
"
$#+! -#$ -#$
!!$ 5'$( '$( #'$( '#'$(
&!- 7777
(9 * % 7777
(9 & * % 7777
(9 & % 7777
(9 .$.$
/
: 22 08 8282
8
0
0
/0
::8 0 11
0 : 8:8:0
0
/
8
2 1
: 00
8
:
:
/:
0
:8:8 0 1 0 8181 00 : 88 082082
&& 2 00
0
1 8
1
1 11
08
2
211
;77#;77# :31; :3; ; 1230;
32; ;
83; 131; ;
;&;& ;;0
30; 0:3; ;
83:;
83:;
3; 138; ; 83:;83:;23;
13:; ; 13
;13
;
4
4 320 30 3030 32:
38
33311 30 3
3
31
;; ; ; ; ;;; ; ; ;;; ; ; ;;;
!"# !"# 2 00
8
1
0
2
210
; !"#; !"# 0; 0; ; 0;0;23
; 0; ; 238;238;213:; 223; ; 223;223;2230;
!$"%$!&'!$"%$!&' 0 00 0 00
;!$"%$!&';!$"%$!&' ; ; ; ;;3:; ; ; 3;3;; 3; ; 3;3;3;
!'(&'!'(&'
;!'(&';!'(&' ; ; ; ;;; ; ; ;;; ; ; ;;;
)')'
:
;)';)' ; ; ; ;;32; ; ; 31;31;
38; ; ; 31;31;3;
)!$*()!$*( 0 00 0
;)!$*(;)!$*( ; ; ; ;;3:; ; ; 3;3;; ; ; ;;30;
(!$
;
(!$ ;
)!$+ 0
;)!$+ 0;
9
(!$$()!$+3 / 6 */*!"# &/&#' %/%&'$
!"# !$"%$! &' !'( &' )'
(!$
)! $ *( )! $ +
,-$
./ 0
10
2 !$/ 02310
1 0321
! (/ 4! 5$!$-$ $
,!(( / &# &66! $"-$
$'$
00 )!#7 '! 021
4$'' 4. 280 %
! "#$%&#'$('# # ) *
)#'*# ! '+)*# ! ',
-'
./ 0" #'012 1
0
2&#)#3'#'-''
#))!%44#
'$-'
''
*#%5&�
'.062(&
"$ 7 '%,#& 8-%'& 8-%'&
/# #' 3') 7') 9%') &%')
#- 5555 ):" + ( 5555 ): + ( 5555 ):" ( 5555 ):.'.'
2 6
0
0
2 ;
00
2 ;
20 20
2
0 0
00
26 2;
6 0
22; ;; ;
;
26 0
6 6
;
2
2
2
0;0;
; 2; 2
2 ;;
66 26
;6 ;0
00
2 02 0
0
;;0 6
6 6
2 00
;2;266
<55 %<55 % 01 <
1<
< 1
< 21
<
< 21< ;61 <
<
<<
<
<1< 16<
< 61 < 61 <21<
1<
< ;612<;612<;1< 1<
< 1< 1<
122
1
1
1
102
10
10;
10;
162
120
106
106
10 ;
!
!
<
! <
!
<
<
<
<
<
<
<
<
<
<
<
1<
<
1 <
1 <
1<
"#$%"#$%
0 0
;
;
6
2 0;
; ;
<"#$%<"#$% 001 < 0012<
< 0012<0012<0012<
<
< 001;<001;<0016< 01<
< 016<016<001 <
&#'$('# &#'$('#
;
<&#'$('# <&#'$('#
<
<
<
<
<
1;<
<
<
12<
12<
< 1
<
<
1<
1<
12<
# ) # )
<# ) <# )
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
**
22
<*<*
1<
1<
<
1<
1<
1;<
<
<
12<
12<
1;<
1<
<
1<
1<
1;<
*# ! '+)*# ! '+)
<*# ! '+)<*# ! '+)
<
<
<
<
<
<
<
<
<
<
<
1<
<
1 <
1 <
1<
)#'
<)#'
<
<
<
*# ! ',
<*# ! ',
<
<
<
:)#'')*# ! ',1""4++#$%%(('
! "#$% &#'$('# # ) * )#'
*# ! ' +) *# ! ' ,
-'
./ 0 " #' 012 1
0
2 &# ) # 3'#'-' '
#)) ! % 44#
'$-'
''
*#%5 & &# 0
' . 062 (&
!
!
"#
!
#
"
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX B
CAPACITY ANALYSIS WORKSHEETS
EXISTIN TRAFFIC CONDITIONS
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX C
CAPACITY ANALYSIS WORKSHEETS
YEAR 2030 PEAK HOUR TRAFFIC WITHOUT PRO ECT
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX D
CAPACITY ANALYSIS WORKSHEETS
YEAR 2035 PEAK HOUR TRAFFIC WITHOUT PROJECT
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX E
CAPACITY ANALYSIS WORKSHEETS
YEAR 204 PEAK HOUR TRAFFIC WITHOUT PRO ECT
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX F
CAPACITY ANALYSIS WORKSHEETS
YEAR 2030 PEAK HOUR TRAFFIC WITH PRO ECT
TRAFFIC IMPACT ANALYSIS REPORT
FOR THE PROPOSED
HILO ENTERTAINMENT CENTER
SOUTH HILO, HAWAI`I ISLAND
TAX MAP KEY: 2-3-037:006
APPENDIX
CAPACITY ANALYSIS WORKSHEETS
YEAR 203 PEAK HOUR TRAFFIC WITH PRO ECT
KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response
KBXTREME HILO, LLC
Revised Supplement to Application Documents
June 12, 2026
County of Hawai'i Planning Department
Attn: Jessica Andrews, Planner V
101 Pauahi Street, Suite 3
Hilo, Hawai'i 96720
Subject: Supplemental Application Materials and Clarification
Request for Rezoning and Ordinance Amendment ‐ KBXtreme Hilo, LLC
REZ 09‐000113; Ordinance No. 10‐045
South Hilo, Hawai'i; TMK: (3) 2‐3‐037:006; 279 Komohana Street, Hilo
Aloha Ms. Andrews:
KBXtreme Hilo, LLC respectfully submits this revised supplement to address the Planning Department
completeness review items for the above‐referenced application. This revised supplement is intended to
supplement and clarify the January 14, 2026 revised application package. To the extent any prior narrative
language is inconsistent with this revised supplement, this revised supplement is intended to supersede the
inconsistent language only for the subjects addressed below.
The applicant remains committed to moving the application forward in a clear and coordinated manner and
appreciates the Planning Department's guidance in identifying the items that should be clarified before the
application is accepted as complete.
1. Condition B ‐ Time Extension and Building Permit Timing
The applicant acknowledges that the original Condition B of Ordinance No. 10‐45 required the anticipated
maximum daily water usage calculations, as recommended by a registered engineer, and the water commitment
deposit to be submitted to the Department of Water Supply within 180 days from the effective date of the
ordinance. The applicant further acknowledges that this requirement was not completed within the original 180‐
day period.
To address this directly, the applicant hereby expands and clarifies the pending ordinance amendment request to
include a time extension and amendment to Condition B. The requested amendment would extend the original
180‐day deadline and align the water commitment requirement with the current project request by requiring the
water usage calculations and required water commitment deposit to be completed before issuance of a
Department of Water Supply water commitment and before issuance of the first building permit for the project.
The applicant is not requesting that the Department of Water Supply requirement be waived. Rather, the
applicant requests that the timing be updated to match the present stage and realities of the project while
preserving the Department of Water Supply's full review authority. The water calculations and deposit should be
tied to the current family entertainment center project, current engineering, and the site plan that will be used for
the Planning Commission presentation, rather than to the former commercial office concept associated with the
original rezoning.
This timing is also important to the financial feasibility of the project. KBXtreme Hilo, LLC is making a significant
private investment in a community‐based facility intended to serve Hilo families, students, seniors, leagues, local
KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response
employees, and community events. The application narrative identifies the project as highly leveraged, with
construction costs expected to exceed $10 million. Requiring a water commitment deposit before the entitlement,
plan approval, construction drawing, financing, and building permit pieces are aligned would unnecessarily tie up
capital that is needed to move the project through the remaining pre‐construction steps. Aligning the payment
with the building permit stage allows the applicant to preserve project capital until the project is ready to proceed,
while still ensuring that no water commitment or building permit is issued until the Department of Water Supply
requirement is satisfied.
The applicant understands that the Department of Water Supply may require time to review the calculations and
process any water commitment before building permit issuance. The applicant will coordinate with the
Department of Water Supply sufficiently in advance of the building permit stage so that this condition can be
resolved without delaying construction once the project is otherwise ready to proceed.
Requested amended Condition B:
B. Prior to the issuance of a water commitment by the Department of Water Supply and prior to the
issuance of the first building permit for the proposed development, the applicant(s), successors or assigns
shall submit to the Department of Water Supply the anticipated maximum daily water usage calculations,
as recommended by a registered engineer, and a water commitment deposit in accordance with the Water
Commitment Guidelines Policy, or as otherwise required or approved by the Department of Water Supply.
The time for performance of this condition is hereby extended and amended from the original requirement
that performance occur within one hundred eighty (180) days from the effective date of Ordinance No. 10‐
45 to the timing set forth in this amended condition. No water commitment shall be issued by the
Department of Water Supply, and no building permit for the proposed development shall be issued, until
the Department of Water Supply confirms that the requirements of this condition have been satisfied or
otherwise addressed to its satisfaction.
The applicant is willing to work with Planning Department staff, the Department of Water Supply, and the
Planning Commission on non‐substantive wording revisions needed to conform the requested Condition B
amendment to the County's preferred ordinance format, provided that the amended condition preserves the
requested extension to the building permit stage and continues to protect the Department of Water Supply's
authority.
2. Surrounding Property Owners Within 300 Feet
The applicant understands that the previously submitted surrounding property owner list was incomplete. The
applicant will replace the previously submitted Exhibit E with a revised Exhibit E generated using the County Real
Property Tax website buffer tool and consistent with the accurate list provided by the Planning Department.
The previously submitted Exhibit E should be considered superseded. Enclosed/uploaded with this supplement are
the corrected 300‐foot surrounding property owner list and corresponding mailing labels generated from the
County Real Property Tax website buffer tool. If the Planning Department requires any formatting change to the
mailing labels or owner list, the applicant will provide the requested revision promptly.
3. Controlling Site Plan for Planning Commission Presentation
The applicant confirms that the most accurate site plan for Planning Commission presentation is the site plan
included in the Final Traffic Impact Analysis Report dated July 21, 2025, specifically Figure 2, "Hilo Entertainment
Center Site Plan."
KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response
Any different site plans included in the application narrative or earlier exhibit materials should be treated as
preliminary, supporting, or superseded drawings for purposes of Planning Commission presentation. The TIAR site
plan should be used as the controlling conceptual site plan at this stage.
This clarification does not change the applicant's understanding that final building layout, parking layout, civil
improvements, drainage, utility details, and other design items will be reviewed and finalized through Final Plan
Approval, Department of Public Works review, Department of Water Supply review, and the Building Permit
process. The purpose of this clarification is simply to provide a single site plan for the Planning Commission record
and staff presentation.
4. EPIC Contact and Billing Contact Update
Ralph Brown should be removed as the billing contact in EPIC, and the billing contact information should be
updated. The updated billing contact is:
Billing Contact Nancy Wang‐Ponthier
Title / Entity Accountant / Accounts Payable
Mailing Address 75‐5591 Palani Road, Suite 3008, Kailua‐Kona, Hawai'i 96740‐3633
Phone / Email 808‐930‐9208 /
If Planning Department staff still sees Ralph Brown associated with any billing or application‐contact role that
should be removed, please advise and the applicant will correct the EPIC entry promptly.
5. Request for Acceptance as Complete
With this revised supplement, the revised 300‐foot surrounding property owner list, the mailing labels, the
controlling TIAR site plan clarification, and the EPIC billing contact update, the applicant respectfully requests that
the Planning Department accept the application as complete and continue processing it for the Planning
Commission.
Mahalo for your continued assistance.
Sincerely,
Calvin C. M. Higa
Senior Vice President
WLW Development Methods, Inc.
Managing Member for KBXtreme Hilo, LLC
Enclosures / uploads:
‐ Revised Exhibit E ‐ corrected surrounding property owner list within 300 feet of the subject property, generated
from the County Real Property Tax website buffer tool.
‐ Controlling site plan for Planning Commission presentation: Final TIAR dated July 21, 2025, Figure 2, "Hilo
Entertainment Center Site Plan" (or duplicate copy attached as supplemental site‐plan exhibit, if requested by
staff).
Hilo Entertainment Center
Traffic Impact Analysis Report July 21, 2025
3
Figure 2. Hilo Entertainment Center Site Plan
75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawaii 96740 (808) 329-0911 FAX (808) 329-0913
WLW Development Methods, Inc.
_______________________________________________________________________________________________________________ William L. Wong, President
Iris A. Wong, Vice President and Treasurer Calvin C.M. Higa Jr., Senior Vice President Elaine F. Higashi, Secretary Pamela M. Wong, Assistant Secretary
July 1, 2026
Jessica Andrews, Planner V County of Hawai‘i Planning Department 101 Pauahi Street, Suite 3
Hilo, Hawai‘i 96720 Re: Amendment to Rezone Application, PL-REZ-2024-000074 TMK: (3) 2-3-037-006:0000
Aloha Jessica, This letter is provided to clarify the ownership, applicant, and representative information for the above-referenced application. KBXtreme Hilo, LLC is the fee simple landowner of the property identified as TMK (3) 2-3-
037-006:0000. The application is being submitted by KBXtreme Hilo, LLC as the landowner, by and through its sole Managing Member, WLW Development Methods, Inc. WLW Development Methods, Inc. is the sole Managing Member of KBXtreme Hilo, LLC. I, Calvin C.M. Higa Jr., am a registered officer of WLW Development Methods, Inc. and serve
as Senior Vice President of WLW Development Methods, Inc. In my capacity as Senior Vice President of WLW Development Methods, Inc., I am authorized to represent WLW Development Methods, Inc., as sole Managing Member of KBXtreme Hilo, LLC, in connection with this application. This includes submitting documents, signing
correspondence, communicating with the Planning Department, and otherwise processing the application on behalf of KBXtreme Hilo, LLC, the fee simple landowner. Attached are DCCA records reflecting that WLW Development Methods, Inc. is the Managing Member of KBXtreme Hilo, LLC, and that I am a registered officer of WLW Development
Methods, Inc. Also attached is an updated Application Form for the above-referenced application. This updated form is intended to supersede and correct the applicant, landowner, title, and representative information contained in the prior application form currently on file. The
updated form clarifies that KBXtreme Hilo, LLC is the fee simple landowner and applicant, submitting the application by and through its sole Managing Member, WLW Development Methods, Inc., and that Calvin C.M. Higa Jr. is acting as the authorized representative/contact in his capacity as Senior Vice President of WLW Development Methods, Inc.
Please let me know if the Planning Department requires any additional documentation or a
formal corporate resolution.
Mahalo,
KBXtreme Hilo, LLC
Fee Simple Landowner
By: ___________________________ Calvin C.M. Higa Jr., Senior Vice President of WLW Development Methods, Inc.,
Sole Managing Member of KBXtreme Hilo, LLC
DCCA State of Hawaii
Downloaded on July 1, 2026.The information provided below is not a certification of good standing and does not constitute any other certification by the State.Website URL: http://hbe.ehawaii.gov/documents
Business Information
MASTER NAME KBXTREME HILO LLC
BUSINESS TYPE Domestic Limited Liability Company (LLC)
FILE NUMBER 168184 C5
STATUS Active
ORGANIZED IN Hawaii UNITED STATES
REGISTRATION DATE Jan 25, 2017
PRINCIPAL ADDRESS 75-5591 PALANI RD STE 3008
KAILUA-KONA, Hawaii 96740
UNITED STATES
MAILING ADDRESS 75-5591 PALANI RD STE 3008
KAILUA-KONA, Hawaii 96740
UNITED STATES
CROSS REFERENCE NAME KB XTREME HILO LLC
CROSS REFERENCE NAME KB EXTREME HILO LLC
MANAGED BY MANAGER(S)
AGENT NAME WLW DEVELOPMENT METHODS, INC.
AGENT ADDRESS 75-5591 PALANI RD STE 3008
KAILUA-KONA, Hawaii 96740
UNITED STATES
Annual Filings
FILING YEAR DATE RECEIVED STATUS
2026 Jan 26, 2026 Processed
2025 Feb 12, 2025 Processed
2024 Feb 22, 2024 Processed
2023 Jan 5, 2023 Processed
2022 Jan 14, 2022 Processed
2021 Feb 4, 2021 Processed
2020 Jan 9, 2020 Processed
2019 Jan 29, 2019 Processed
2018 Feb 5, 2018 Processed
Officers
NAME OFFICE DATE
WLW DEVELOPMENT METHODS, INC.MGR Mar 1, 2017
DCCA State of Hawaii
Downloaded on July 1, 2026.The information provided below is not a certification of good standing and does not constitute any other certification by the State.Website URL: http://hbe.ehawaii.gov/documents
Business Information
MASTER NAME WLW DEVELOPMENT METHODS, INC.
BUSINESS TYPE Domestic Profit Corporation
FILE NUMBER 58949 D1
STATUS Active
PURPOSE COMMERCIAL DEVELOPMENT OF REAL PROPERTY
ORGANIZED IN Hawaii UNITED STATES
INCORPORATION DATE Nov 30, 1984
PRINCIPAL ADDRESS 75-5591 PALANI RD STE 3008
KAILUA KONA, Hawaii 96740
UNITED STATES
MAILING ADDRESS 75-5591 PALANI RD STE 3008
KAILUA KONA, Hawaii 96740
UNITED STATES
TERM PER
AGENT NAME WILLIAM L. WONG
AGENT ADDRESS 75-5591 PALANI ROAD
SUITE 3008
KAILUA KONA, Hawaii 96740
UNITED STATES
Annual Filings
FILING YEAR DATE RECEIVED STATUS
2025 Oct 6, 2025 Processed
2024 Oct 24, 2024 Processed
2023 Oct 23, 2023 Processed
2022 Oct 28, 2022 Processed
2021 Oct 21, 2021 Processed
2020 Oct 21, 2020 Processed
2019 Oct 21, 2019 Processed
2018 Oct 2, 2018 Processed
2017 Oct 3, 2017 Processed
2016 Oct 25, 2016 Processed
2015 Oct 16, 2015 Processed
2014 Oct 23, 2014 Processed
2013 Oct 3, 2013 Processed
2012 Oct 3, 2012 Processed
2011 Oct 24, 2011 Processed
2010 Oct 20, 2010 Processed
2009 Oct 5, 2009 Processed
2008 Nov 6, 2008 Processed
2007 Oct 24, 2007 Processed
2006 Oct 18, 2006 Processed
2005 Nov 2, 2005 Processed
2004 Oct 19, 2004 Processed
2003 Jun 23, 2004 Processed
2002 Not Required
2001 Processed
2000 Processed
1999 Processed
Officers
NAME OFFICE DATE
WONG,WILLIAM L P/D Oct 1, 2018
HIGA,CALVIN C M JR SRV/D Oct 1, 2021
WONG,IRIS A V/T/D Oct 1, 2020
HIGASHI,ELAINE F S/D Oct 1, 2021
WONG, PAMELA M AS/D Oct 1, 2021
Stocks
DATE CLASS SHARES PAID SHARES PAR VALUE STOCK AMOUNT
Oct 1, 2015 COMMON 10,000 3,000 1.
CHANGE OF ZONE APPLICATION
COUNTY OF HAWAIދ, PLANNING COMMISSION (Type or legibly print the requested information)
APPLICANT(S):
APPLICANT’S SIGNATURE: DATE:
ADDRESS:
LIST APPLICANT’S INTEREST (if not owner):
PHONE: (Bus.) (Res.) (Email)
REQUEST: TO
(Existing Zoning) (Proposed Zoning)
TAX MAP KEY(S):
SIZEOFPROPERTY ORAFFECTED AREA(S)TO BE REZONED:
LANDOWNER(S):
FEE SIMPLE LANDOWNER(S) WRITTEN AUTHORIZATION
(may be provided by letter with the below statement included): DATE:
DATE:
AGENT:
AGENT ADDRESS:
PHONE: (Bus.) (Res.) (Email)
Please indicate to whom original correspondence and copies should be sent.
ORIGINAL: COPIES:
KBXtreme Hilo, LLC
12/06/2024
Calvin CM Higa Jr, Sr Vice President of WLW Development Methods, Inc.Managing Member for KBXtreme Hilo, LLC
75-5591 Palani Road, Suite 3008, Kailua Kona, HI 96740
808-329-0911 &
A-1a CN-20
(3) 2-3-037-006:0000
5.075 Acres
KBXtreme Hilo, LLC
Applicant
N/A - Applicant is the fee simple landowner N/A
Applicant
LINDA LINGLE
OOVIANOR OF HAWAII
PLANNING DJEPA ^I'ENTCfiV.
7010 JAN 1 1 AM 7: 55
January 8, 2010
STATE OF HAWAII
DEPARTMENT OF LAND AND NATURAL RESOURCES
STATE HISTORIC PRESERVATION DIVISION
601 KAMOIU ABOULEVARD, ROOM 555
KAPOLEI, HAWAII 96707
Bobby Jean Leithead-Todd, Planning Director
Attention: Norman Hayashi
County of Hawaii Planning Department
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720-4224
Dear Ms. Leithead-Todd:
AURA 11. n11ELNN
C1WRFIfl 4
BOARD OF LNN AND NATURAL RL'90URC19
CTWMBSIW ON WAMP R1300141I:MANA iIIAIIO'
RUSSELL Y. FUJI
PONT I)l1'Nl'
KEN C NAWAIIARA
INIUT1' WRR{l'DII . wait
AQUATIC, RESOUR tS
WMn1f AND UI,NN InteR ATION
BUREAU OFCONVEV WL 3
fWINLt4WN ON WATER RLSOURtl MMIMmIMINr
IONSERVAllaa AND l VAYrAL INBri
IUNSERVAl11W AND RISOURrON FNIRMRTMINr
FBOLIIYIFBSRTRyflISEIWAi0N
RMINl1AW!!BRAND INSF.RVE([W Ml1ICN
LADSTATRIANRR
LOG NO: 2009.4203
DOC NO: 1001TD08
Archaeology
SUBJECT: Chapter 6E-8 Historic Preservation Review —
Change of Zone Application (REZ 09-000113) for Gillie & Jane Silva
Ponahawai Ahupua'a, South Hilo District, Island of Hawaii
TMK: (3) 2-3-037: 006
Thank you for requesting our comments pertaining to the subject application, which was received in our
office December 10, 2009. The applicants are requesting a zone change from agriculture to commercial
neighborhood, in preparation for a new office building on the 5 -acre parcel. We have previously reviewed
this application (Log 2009.1575, Doc 0904MD01), and our letter to the Silvas is attached to the
application. We have received no new information regarding the condition of the property since our last
review. The property has been grubbing in the recent past and it was intensively cultivated for sugar prior
to 1971.
We determine that no historic properties will be affected by this project because:
Grubbing/grading has altered the land
Development/urbanization has altered the land
Intensive agriculture has altered the land
SHPD previously reviewed this project and determined that no historic properties would be
affected (see above)
In the event that historic resources, including human skeletal remains, lava tubes, and lava
blisters/bubbles are identified during the activities, all work should cease in the immediate vicinity of the
find, the find should be protected from additional disturbance, and the State Historic Preservation
Division, Hawaii Island Section, should be contacted immediately. Please contact Theresa Donham at
808) 933-7653 if you have any questions or concerns regarding this letter.
Al
heresa K. Donham, Lead Archaeologist
Hawaii Island Section
State Historic Preservation Division
053615
JOSH GREEN, M.D. KENNETH S. FINK, M.D, MGA, MPH GOVERNOR OF HAWAII DIRECTOR OF HEALTH KE KIA’AINA O KA MOKU’AINA O HAWAI’I KA LUNA HO’OKELE
STATE OF HAWAII DEPARTMENT OF HEALTH
P.O. BOX 916 HILO, HAWAII 96721-0916
MEMORANDUM
DATE: July 14, 2026
TO: Mr. Jeffrey W. Darrow Planning Director, County of Hawaii
FROM: Eric Honda District Environmental Health Program Chief SUBJECT: Change of Zone Amendment Application (PL-REZ-2024-000074) Amendment to Change of Zone Ordinance No. 10-45 (REZ-09-000113)
Applicant: KBXtreme Hilo, LLC Request: Amend Ordinance No. 10-45 to Delete the 180-Day Timeframe for Condition B (Water Commitment), Allow a 10-Year Time Extension to Condition E (Complete Construction), Delete Condition G (Access Easement), Delete Condition H (Limitations
to Komohana St. Access), Delete Condition J (Full Improvements to Komohana St.), Delete Condition K (Streetlights & Traffic Control Devices), and to Add 2 New Conditions TMK: 2-3-037:006, Ponahawai, South Hilo, Hawaiʻi
In most cases, the District Health Office will no longer provide individual comments to agencies or project owners to expedite the land use review and process.
Agencies, project owners, and their agents should apply Department of Health “Standard
Comments” regarding land use to their standard project comments in their submittal. Standard comments can be found on the Land Use Planning Review section of the Department of Health website: https://health.hawaii.gov/epo/landuse/. Contact information for each Branch/Office is available on that website.
Note: Agencies and project owners are responsible for adhering to all applicable standard comments and obtaining proper and necessary permits before the commencement of any work.
Jeffrey W. Darrow July 14, 2026
Page 2 of 4
General summary comments have been included for your convenience. However, these comments are not all-inclusive and do not substitute for review of and compliance with all applicable standard comments for the various DOH individual programs.
Clean Air Branch
1. All project activities shall comply with the Hawaii Administrative Rules (HAR),
Chapters 11-59 and 11-60.1.
2. Control of Fugitive Dust: You must reasonably control the generation of all
airborne, visible fugitive dust and comply with the fugitive dust provisions of
HAR §11-60.1-33. Note that activities that occur near existing residences,
businesses, public areas, and major thoroughfares exacerbate potential dust
concerns. It is recommended that a dust control management plan be developed
which identifies and mitigates all activities that may generate airborne and visible
fugitive dust and that buffer zones be established wherever possible.
3. Standard comments for the Clean Air Branch
are at: https://health.hawaii.gov/epo/landuse/
Clean Water Branch
1. All project activities shall comply with the HAR, Chapters 11-53, 11-54, and 11-55.
1. The following Clean Water Branch website contains
information for agencies and/or project owners who are
seeking comments regarding environmental compliance for
their projects with HAR, Chapters 11-53, 11-54, and 11-55:
https://health.hawaii.gov/cwb/clean-water-branch-home-
page/cwb- standard-comments/.
Hazard Evaluation & Emergency Response Office
1. A Phase I Environmental Site Assessment (ESA) and Phase II Site Investigation
should be conducted for projects wherever current or former activities on site may
have resulted in releases of hazardous substances, including oil or chemicals.
Areas of concern include current and former industrial areas, harbors, airports,
and formerly and currently zoned agricultural lands used for growing sugar,
pineapple or other agricultural products.
2. Standard comments for the Hazard Evaluation & Emergency Response Office
are at: https://health.hawaii.gov/epo/landuse/.
Indoor and Radiological Health Branch
1. Project activities shall comply with HAR Chapters 11-39, 11-45, 11-46, 11-501, 11-502,
11-503, and 11-504.
2. Noise may be generated during demolition and/or construction. The
applicable maximum permissible sound levels, as stated in Title 11, HAR,
Chapter 11-46, “Community Noise Control,” shall not be exceeded unless a
noise permit is obtained from the Department of Health.
Jeffrey W. Darrow July 14, 2026
Page 3 of 4
3. Construction/Demolition Involving Asbestos: If the proposed project includes
renovation/demolition activities that may involve asbestos, the applicant should
contact the Asbestos and Lead Section of the Branch at
https://health.hawaii.gov/irhb/asbestos/.
Safe Drinking Water Branch
1. Agencies and/or project owners are responsible for ensuring environmental
compliance for their projects in the areas of 1) Public Water Systems; 2)
Underground Injection Control; and 3) Groundwater and Source Water Protection
in accordance with HAR Chapters 11-19, 11-20, 11-21, 11-23, 11-23A, and 11-
25. They may be responsible for fulfilling additional requirements related to the
Safe Drinking Water program: https://health.hawaii.gov/sdwb/.
2. Standard comments for the Safe Drinking Water Branch can be
found at: https://health.hawaii.gov/epo/landuse/.
Solid & Hazardous Waste Branch
1. Hazardous Waste Program - The state regulations for hazardous waste and used
oil are in HAR Chapters 11-260.1 to 11-279.1. These rules apply to the
identification, handling, transportation, storage, and disposal of regulated
hazardous waste and used oil.
2. Solid Waste Programs - The laws and regulations are contained in HRS Chapters
339D, 342G, 342H, and 342I, and HAR Chapters 11-58.1 and 11-282.
Generators and handlers of solid waste shall ensure proper recycling or disposal
at DOH-permitted solid waste management facilities. If possible, waste
prevention, reuse, and recycling are preferred options over disposal. The Office
of Solid Waste Management also oversees the electronic device recycling and
recovery law, the glass advanced disposal fee program, and the deposit beverage
container program.
3. Underground Storage Tank Program – The state regulations for underground
storage tanks are in HAR Chapter 11-280.1. These rules apply to the design,
operation, closure, and release response requirements for underground storage
tank systems, including unknown underground tanks identified during
construction.
4. Standard comments for the Solid & Hazardous Waste Branch can be
found at: https://health.hawaii.gov/epo/landuse/.
Wastewater Branch
For comments, please email the Wastewater Branch at doh.wwb@doh.hawaii.gov.
Sanitation / Local DOH Comments:
1. According to HAR §11-26-35, No person, firm, or corporation shall demolish or
Jeffrey W. Darrow July 14, 2026
Page 4 of 4
clear any structure without first ascertaining the presence or absence of rodents
that may endanger public health by dispersal from such premises. Should any
such inspection reveal the presence of rodents, the rodents shall be eradicated
before demolishing or clearing the structure. A demolition permit is required prior
to demolition.
Other
1. CDC - Healthy Places - Healthy Community Design Checklist Toolkit
recommends that state and county planning departments, developers, planners,
engineers, and other interested parties apply these principles when planning or
reviewing new developments or redevelopment projects.
2. If new information is found or changes are made to your submittal, DOH reserves
the right to implement appropriate environmental health restrictions as required.
Should there be any questions on this matter, please contact the Department of
Health, Hawaii District Health Office, at (808) 933-0917.
F WATEg S
W4 GAA
19' 49
o DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAI`I
oF:..... 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAI'I 96720
TELEPHONE (808) 961-8050 • FAX (808)961-8657
July 24, 2026
RECT HAND DELIVERED
TO: Mr. Jeffrey Darrow, Director
Planning Department
N PLANNING EE r
FROM: Keith K. Okamoto, Manager-Chief Engineer JUL 27 9026 p2:4:
SUBJECT: Change of Zone Amendment Application
Amendment to Change of Zone Ordinance No. 10-45 (REZ-09-000113)
Applicant: KBXtreme Hilo,LLC
Request: Amend Ordinance No. 10-45 to Delete the 180-Day Timeframe for
Condition B (Water Commitment),Allow a 10-Year Time Extension to
Condition E (Complete Construction),Delete Condition G (Access Easement),
Delete Condition H(Limitations to Komohana St.Access),Delete Condition J
Full Improvements to Komohana St.),Delete Condition K(Streetlights&
Traffic Control Devices),and to Add 2 New Conditions
Tax Map Key 2-3-037:006 (PL-REZ-2024-000074)
We have reviewed the subject application for the proposed development and have the following comments:
Please be informed that there is an existing 5/8-inch meter serving the subject parcel (Acct.No. 300-58600,
Meter No. 221263754), which is limited to an average daily usage of 400 gallons and suitable for only one(1)
single-family dwelling. Comments from our January 4,2010 memo are still applicable and attached for your
reference.
We would also like to emphasize the importance of submitting the required water usage calculations and
establishing a water commitment with the Department as soon as possible rather than waiting until just prior to
the issuance of a building permit as proposed under Section IV. Rezoning Conditions, Item B of the application.
Unless a water commitment is officially issued, water availability is subject to change without notice, depending
on the water situation.
Should there be any questions, please contact Ms. Robyn Matsumoto of our Water Resources and Planning
Branch at(808) 961-8070,extension 255.
Sincerely yours,
Keith K. Okamoto, P.E.
Manager-Chief Engineer
RM:dfg
Enc.
copy— KBXtreme HILO LLC
Water, Our gliost Precious Resource. . . Ka Wai A Kane . . .
The Department of Water Supply is an Equal Opportunity provider and employer.
spa g.Y
f
f4 t49
r.,
l.
DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII
Gy- aFHAWP\\• 3 4 5 KF.KUANAO A STREET. SUITE 23 • HILO HAWAII 96720
TELEPHONE 808, 981-8050 • FAX ,808t 961-3657
January.4, 2010
TO: Ms. I3J Leithead-"Todd, Planning Director
Planning Department
FROM: Milton D. Pavao, Manager
SUBJECT: CHANGE OF ZONE APPLICATION (REZ 09-000113)
APPLICANT—GILLIE AND JANE SILVA
REQUEST: A-la TO CN-20
TAX MAP KEY 2-3-037:006
We have reviewed the subject application and have the following comments and conditions.
Water is available from an existing 8-inch waterline within Ponahawai Street and from an existing 12-
inch waterline within Komohana Street, both fronting the subject parcel. There is an existing 1-inch
service lateral to the subject parcel, capable of accommodating a 5/8-inch meter, which is limited to a
maximum daily usage of 600 gallons.
The Department has no objection to the proposed application: however, prior to issuing a water
commitment, the applicant shall comply with the following conditions:
1. The Department requests that the applicant submit estimated maximum daily water usage
calculations for review and approval. The water usage calculations shall be prepared by a
professional engineer licensed in the State of Hawaii and should include the estimated peak flow in
gallons per minute (GPM) and the total estimated maximum daily water usage in gallons per day,
including all irrigation'landscaping use.
Upon receipt of the water usage calculations above, the Department will make a determination as
to the water commitment deposit amount_ prevailing facilities charge(subject to change) to be paid.
and any water system improvements required for final approval. Based on the water usage
calculations provided, if the existing 5'8-inch meter cannot accommodate the estimated demand, a
larger or additional meter will need to be installed and remittance of the prevailing facilities charge,
will be required.
2. The proposed zoning will require the installation of a reduced pressure type backllow prevention
assembly, within live (5) feet ofthe existing meter on private property. if a larger or additional
meter is required, rt hackflow prevention assembly will also be required for that meter. The
installation of the backflow prevention assembly(s) must be inspected and approved by the
Department before water service can be activated.
t t titer, Our f%lost Precious RE c'urce . . .Mime . .
Ms. BJ Leithead-Todd, Planning Director
Page 2
January 4. 2010
3. For your information, the existing 12-inch waterline within Komohana Street is adequate to
provide 2,000 GPM for tare protection as required per our Water System Standards for the
proposed type of land use.
4. Subject to other agencies' requirements to construct improvements within the road right-of-way
fronting the property affected by the proposed development,the applicant shall be responsible for
the relocation and adjustment of the Department's affected water system facilities, should they be
necessary.
Should there be any questions, you may contact Mr. Finn McCall of our Water Resources and Planning
Branch at 961-8070, extension 255.
Sincerely yours,
i734
Milton D. Pavao, P.E.
Manager
FM:dfg
copy - Gillie and Jane Silva
All Aina Services
WL W Development Methods,
Inc.
William L. Wong,President
Iris A. Wong, Vice President and Treasurer
Calvin C.M.Higa Jr.,Senior Vice President
Elaine F.Higashi,Secretary
Pamela M. Wong,Assistant Secretary
COH PLANNING DEPT
August 3, 2026 AUG 10 7026 17'.4 07
Keith K. Okamoto, P.E. REC'Q BY iitAIL
Manager-Chief Engineer
Department of Water Supply, County of Hawaii
345 Kekuanao`a Street, Suite 20
Hilo, Hawaii 96720
Re: Change of Zone Amendment Application
Amendment to Change of Zone Ordinance No. 10-45, REZ-09-000113
Applicant: KBXtreme Hilo, LLC
Tax Map Key: (3) 2-3-037:006
Planning Department Application No. PL-REZ-2024-000074
Dear Mr. Okamoto:
Thank you for your July 24, 2026 letter regarding the above-referenced Change of Zone
Amendment Application for KBXtreme Hilo, LLC. We appreciate the Department of Water
Supply's review, comments, and recommendations regarding the existing water meter, the
need for anticipated water usage calculations, and the importance of establishing a water
commitment.
We understand DWS's comment that the existing 5/8-inch meter serving the subject parcel is
limited to an average daily usage of 400 gallons and is suitable only for one single-family
dwelling. We also understand DWS's recommendation that the required water usage
calculations be submitted and that a water commitment be established as soon as possible,
since water availability may change until a water commitment is officially issued.
In response, we have reached out to our project architect, Shane Labeth, and Bruce Meyers
of Okahara and Associates, Inc., to review the prior project files and assist us in determining
whether any prior water demand calculations, plumbing fixture schedules, mechanical plans,
or related documentation were previously prepared. If those calculations were not previously
completed, we will work with the appropriate design professionals to determine what is
needed to prepare the required water usage calculations for DWS review.
75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawaii 96740 (808) 329-0911 FAX(808) 329-0913
As background, this is a complex, community-based project with substantial private capital at
risk. We are working to move the project forward in a fiscally responsible manner while also
trying to defer certain project costs until the entitlement, plan approval, construction drawing,
financing, and building permit pieces are properly aligned. Bowling and family entertainment
facilities are not generally high-margin or financially lucrative businesses, but we believe this
project can provide a meaningful benefit to the Hilo community by creating a safe, indoor,
family-friendly recreational facility for residents, students, seniors, local families, and visitors.
Our intent is not to delay necessary coordination with DWS, but rather to proceed carefully
and responsibly as we get the project's requirements in order. We appreciate DWS's
guidance and will coordinate with our consultants regarding the water usage calculations and
next steps for establishing the appropriate water commitment.
Thank you again for your input and recommendations. We look forward to working with the
Department of Water Supply, the Planning Department, and the County as we continue
moving toward bringing this project to life for the Hilo community.
Mahalo,
KBXtreme Hilo, LLC
Fee Simple Landowner
By: ae. Z
Calvin C.M. Higa Jr.,
Senior Vice President of WLW Development Methods, Inc.,
Sole Managing Member of KBXtreme Hilo, LLC
cc: Jeffrey W. Darrow, Planning Director, County of Hawaii Planning Department
Robyn Matsumoto, Water Resources and Planning Branch, Department of Water Supply
September 8, 2026
Windward Planning Commission
County of Hawai‘i Planning Department
101 Pauahi Street, Suite 3
Hilo, Hawai‘i 96720
Re: Update Regarding Condition B / Department of Water Supply Water Commitment
KBXtreme Hilo, LLC
PL-REZ-2024-000074 / Amend REZ-09-000113
TMK: (3) 2-3-037:006
279 Komohana Street, Ponahawai, South Hilo, Hawai‘i
Dear Chair Daniele and Members of the Windward Planning Commission:
On behalf of KBXtreme Hilo, LLC, we respectfully submit this correspondence to provide an
update regarding Condition B of Change of Zone Ordinance No. 10-45, relating to the
Department of Water Supply water commitment requirement.
As part of our Change of Zone Amendment Application, KBXtreme Hilo, LLC requested
relief from the original 180-day timeframe in Condition B. The purpose of that request was
to address the fact that the original timeframe had passed and to better align the water
commitment requirement with the current status of the project, including the need to
complete entitlement, plan approval, construction drawing, financing, and building permit
steps in a fiscally responsible manner.
Since submitting the application, however, KBXtreme Hilo, LLC has been actively
coordinating with the Department of Water Supply to address its comments and move the
water commitment process forward. After receiving DWS’s comments, we contacted our
project consultants and coordinated with Okahara and Associates, Inc. to prepare
preliminary water use calculations for the proposed family entertainment center. Those
calculations were submitted to DWS for review.
We understand that DWS has reviewed the matter further and has advised regarding the
applicable water commitment requirements, including arranging for a payment plan for the
required fee. KBXtreme Hilo, LLC appreciates DWS’s assistance and guidance, and we are
continuing to work cooperatively with DWS to further the water commitment process.
Accordingly, while our application included a request for relief from the original 180-day
timeframe in Condition B, we wish to clarify for the Commission that KBXtreme Hilo, LLC is
not seeking to avoid the water commitment requirement. Rather, we requested relief to
address the expired timing condition and to allow the project to proceed in an orderly and
financially responsible manner. We have since taken active steps to satisfy DWS’s
concerns and are working toward securing the required water commitment.
To the extent the Planning Department, Department of Water Supply, or the Commission
determines that the requested Condition B relief is no longer necessary or should be
revised in light of the ongoing DWS coordination and payment-plan arrangement, KBXtreme
Hilo, LLC is amenable to modifying that portion of the request accordingly. Our intent is to
keep the record accurate, remain responsive to agency comments, and continue moving
this community-based project forward in cooperation with the County.
KBXtreme Hilo, LLC remains committed to developing a family entertainment center that
can provide a safe, indoor, community-oriented recreational facility for Hilo residents, local
families, students, seniors, and visitors. We appreciate the County’s review and the
opportunity to provide this update.
Respectfully submitted,
Calvin C. M. Higa Jr.
Senior Vice President
WLW Development Methods, Inc.
Managing Member for KBXtreme Hilo, LLC
75-5591 Palani Road, Suite 3008
Kailua-Kona, Hawai‘i 96740
Direct: (808) 930-9209
Email:
September 8, 2026
Jessica Andrews, Planner V
County of Hawai‘i Planning Department
101 Pauahi Street, Suite 3
Hilo, Hawai‘i 96720
Re: Response to Department of Public Works Engineering Comments
PL-REZ-2024-000074 / Amendment to REZ-09-000113
KBXtreme Hilo, LLC
TMK: (3) 2-3-037:006
Aloha Jessica:
Thank you for forwarding the September 4, 2026 comments from the Department of Public
Works, Engineering Division. We sincerely appreciate DPW’s review of our application and
the time taken to evaluate the requested amendments. KBXtreme Hilo, LLC respectfully
provides the following responses.
Item H – Komohana Street Access
We appreciate DPW Engineering’s concurrence with removing the existing right-turn-
in/right-turn-out restriction for the Komohana Street access.
We understand and agree that the ultimate access improvements, including any auxiliary
lanes along Komohana Street, should be consistent with the recommendations of the
favorable consideration of this requested amendment.
Item J – Komohana Street Frontage Improvements
We respectfully request further consideration of the requirement for full curb, gutter, and
sidewalk improvements along the project frontage.
There are presently no adjoining sidewalks immediately north or south of the subject
property extending toward the Ponahawai Street intersection. The existing condition along
this portion of Komohana Street consists primarily of paved roadway shoulders. Requiring
curb, gutter, and sidewalk improvements solely along the KBXtreme frontage would
therefore create an isolated section of sidewalk that would not presently connect to a
continuous pedestrian system.
We are also mindful that Komohana Street functions as a busy Hilo thoroughfare and that
including bicycle travel. The proposed KBXtreme Hilo facility intends to provide bicycle
racks for patrons, and we anticipate that University of Hawai‘i at Hilo students and other
nearby residents may utilize bicycles to access the facility.
Rather than constructing an isolated curb-and-sidewalk segment, we respectfully request
the opportunity to preserve and, where necessary, improve the existing paved shoulder in a
manner that safely accommodates bicycle and pedestrian movement and remains
consistent with the existing character of Komohana Street.
We recognize DPW Engineering’s recommendation that Condition J remain subject to
further discussion during construction plan review. As an alternative to complete deletion
tage
improvements to be determined by DPW during construction plan review, with
consideration given to maintaining a safe paved shoulder or other bicycle- and pedestrian-
compatible treatment in lieu of mandatory curb, gutter, and sidewalk improvements where
appropriate.
Our objective is to construct the frontage improvements in a safe, functional, and cost-
to similar infrastructure on adjoining properties.
Item K –
We agree with DPW that adequate lighting at the project entrance is necessary for public
safety, particularly given the anticipated evening operating hours of the facility.
However, existing street lighting is already present within the surrounding Komohana Street
project entrance is illuminated.
-site streetlight infrastructure, we propose installing
appropriately designed on-site lighting at the project driveway entrance. Our intent would
be to utilize downward-facing light standards designed to provide the maximum practical
illumination permitted under applicable County lighting requirements while minimizing
glare, light spill, and impacts to neighboring properties.
Locating these improvements on the project site would allow the necessary entrance
lighting to be installed and maintained directly by the applicant, while reducing the
-site streetlight
infrastructure.
-site entrance lighting can
satisfy the public--site streetlights.
We are not requesting relief from the responsibility to provide adequate lighting. Rather, we
Item L –
been included with the application. KBXtreme will continue to coordinate with DPW
required as part of project design and permitting.
We sincerely appreciate DPW Engineering’s review and recommendations. KBXtreme Hilo
is a substantial community-based project, and we are working to move it forward in a
manner that balances public safety, sound engineering, compatibility with existing
infrastructure, and the substantial costs associated with development.
We respectfully request that these responses and proposed alternatives be considered as
the Planning Department prepares its recommendation to the Windward Planning
Commission.
Mahalo,
Calvin C. M. Higa Jr.
Senior Vice President
Managing Memberfor KBXtreme Hilo, LLC
75-5591 Palani Road, Suite 3008
Kailua-Kona, Hawai‘i 96740
Direct: (808) 930-9209
Email: