HomeMy WebLinkAboutPD Background Report (PL-REZ-2024-000074) BKBXtremeAmendREZ.9.2.26 COUNTY OF HAWAIʻI PLANNING DEPARTMENT BACKGROUND REPORT KBXTREME HILO LLC (FORMERLY GILLIE & JANE SILVA) AMENDMENT TO ORDINANCE NO. 10-45 (PL-REZ-2024-000074) KBXTREME HILO LLC has submitted an application to amend Ordinance No. 10-45 to delete the 180-day timeframe for Condition B (water commitment), allow a 10-year time extension to Condition E (complete construction), delete Condition G (access easement), delete Condition H (limitations to Komohana Street access), delete Condition J (full improvements to Komohana Street), delete Condition K (streetlights & traffic control devices), and to add 2 new conditions. Ordinance No. 10-45 was approved to allow a change of zoning district classification from Agricultural- 1 Acre (A-1a) to Neighborhood Commercial-20,000 square feet (CN-20) for a 5.075-acre parcel. The subject property is located at 279 Komohana Street, approximately 150 feet from its intersection with Ponahawai Street, Hilo, South Hilo, Hawai‘i, TMK: (3) 2-3-037:006. PROPOSED ACTION 1. Applicant’s Request: The applicant is requesting the following amendments to Change of Zone Ordinance No. 10-45:  Amend Condition B (water commitment) to delete the 180-day timeframe for payment.  Amend Condition E (complete construction) to allow a 10-year time extension from the effective date of this amendment.  Delete Condition G (access easement).  Delete Condition H (limitations to Komohana Street access).  Delete Condition J (full improvements to Komohana Street).  Delete Condition K (streetlights & traffic control devices).  Add a new condition to allow partial relief from the easement along Komohana Street to provide for driveway access.  Add a new condition to recommend that the Department of Public Works (DPW) consider reducing the posted speed limit along Komohana Street fronting the subject property. -2- The following are the applicant’s specific amendment requests (material to be deleted is bracketed/struck through, material to be added is underscored): Amend Condition B: Prior to the issuance of a water commitment by the Department of Water Supply, the applicants shall submit the anticipated maximum daily water usage calculations as recommended by a registered engineer, and a water commitment deposit in accordance with the “Water Commitment Guidelines Policy” to the Department of Water Supply [within 180 days from the effective date of this ordinance]prior to the issuance of a building permit. Amend Condition E: Construction of the proposed improvements shall be completed within [five (5)]ten (10) years from the effective date of this amended ordinance. This time period shall include securing Final Plan Approval from the Planning Director in accordance with Section 25-2-70, Chapter 25 (Zoning Code), Hawai‘i County Code. Delete Condition G: [Prior to issuance of Final Plan Approval, the applicants shall grant a minimum 30-foot wide access easement on the subject property, in favor of the adjacent landowner(s) (TMK: 2-3-37:14), in order to connect the access at Ponahawai Street on TMK 2-3-37:14 to the access at Ponahawai Street on the subject property for the purpose of providing internal traffic circulation between the two properties.] Delete Condition H: [Access at Komohana Street shall be through road and utility easement “RU-9”and shall be limited to right-turn in and right-turn out movements only. This access shall be shared with the adjacent parcel (TMK: 2-3-37:22). Prior to the issuance of a Certificate of Occupancy, the applicants shall install “no left-turn” sign(s) and a physical barrier at the property access to prevent left-turns into and out of the access driveway. All improvements shall meet with the approval of the Department of Public Works.] -3- Delete Condition J: [Prior to the issuance of a Certificate of Occupancy, the applicants shall provide full improvements to the property’s frontage along Komohana Street consisting of, but not limited to, pavement widening with concrete curb, gutter and sidewalk, drainage improvements, and any required utility relocation, meeting with the approval of the Department of Public Works.] Delete Condition K: [Streetlights and traffic control devices, as may be required by the Traffic Division, Department of Public Works, shall be installed by the applicants at no cost to the County.] Add New Condition: Partial relief from “NO VEHICULAR ACCESS” PLANTING SCREEN EASEMENT in an area of the property fronting Komohana Street to provide for commercial driveway access that will not interfere with neighboring residential property access. Relief is requested for a length of approximately 45 feet at a location reviewed in coordination with the Department of Public Works (DPW) Engineering Division and DPW Traffic Division to ensure appropriate driveway placement and two‐way left turn lane (TWLTL) spacing from the Ponahawai/Komohana intersection, consistent with Chapter 22 (County Streets) of the Hawai‘i County Code and the completed TIAR. Add New Condition: As a matter of public safety, the Planning Commission and County Council recommend that the Department of Public Works (DPW) evaluate the posted speed limit along Komohana Street fronting the subject property and consider a reduction of the posted speed limit from forty‐five (45) miles per hour to thirty‐five (35) miles per hour. This recommendation is intended to support safe ingress and egress to the site and to improve overall traffic safety in light of the proposed commercial driveway access and turning movements. Nothing in this condition shall be construed to alter or -4- supersede the independent authority of DPW with respect to speed limit determinations or traffic control measures. It should be noted that if the applicant’s requested amendments are approved, the existing CN-20 zoning would allow for the construction of approximately 104 double-family or 104 multiple-family residential units on the portion of the subject property that is not located in flood zone A. 2. Applicant’s Reasons for the Request: The applicant acquired the property in March 2017, after the original deadline of May 20, 2015, to complete construction, as established by Condition E of Ordinance No. 10-45. The previous landowner had proposed to construct a 30,000-square foot office building, with plans to potentially construct an additional office building. The current applicant intends to construct a 36,000-square foot family entertainment center on the subject property, to include bowling, an arcade, laser tag, miniature glow golf, a restaurant, karaoke rooms and a lounge. In 2019, the zoning code was amended to add indoor amusement and recreation facilities to the list of permitted uses for the CN zoning district, which would include the proposed use. However, given that an administrative time extension for Condition E expired on May 20, 2020, the 10-year time extension is requested to allow adequate time to complete construction. The applicant is requesting to amend or delete various conditions that they believe are no longer relevant to the current proposal or that would impede the feasible completion of the project. Additionally, the applicant proposes to add two new conditions to allow driveway access and provide for safe vehicular movement with a reduction of the speed limit along the subject property’s Komohana Street frontage. 3. Construction Timetable and Cost: The applicant estimates that they will submit for plan approval within approximately two years. Construction is anticipated to take approximately 18-24 months, with costs expected to exceed $10 million. 4. Landowner: KBXtreme Hilo LLC. 5. Supporting Information: The applicant has submitted the attached in support of the request. (Planning Department Exhibit 1 - Change of Zone Amendment -5- Application dated January 14, 2026 and Additional Information dated June 12, 2026) STATE & COUNTY PLANS 6. State Land Use District: Urban. 7. General Plan 2045 Land Use Map: Medium Density Urban (mdu). These areas include uses such as village and neighborhood commercial and single family and multiple family residential and related functions (multiple family residential - up to 35 units per acre). 8. County Zoning: Neighborhood Commercial-20,000 square feet (CN-20). 9. Hilo Community Development Plan (CDP): The Hilo CDP, adopted by Resolution No. 1 on May 21, 1975, identifies the area as Single-Family Residential and Multiple-Family Residential. 10. Special Management Area (SMA): The Special Management Area is a part of the Coastal Zone Management Program and regulated by the County. The subject property is not located within the Special Management Area and is situated approximately 1.0 miles from the nearest coastline. DESCRIPTION OF SUBJECT PROPERTY AND SURROUNDING AREA 11. Subject Property: The subject, 5.075-acre property has frontage along both Ponahawai Street and Komohana Street. An approximately 30-foot wide “pole” connects the main portion of the property to Ponahawai Street and there is approximately 600 feet of frontage along Komohana Street. Two drainage easements are located in the northern portion of the property. Drainage easement “D-1” is 20 feet wide and drainage easement “D-2” is 80 feet wide. The property is currently vacant but was formerly planted in sugar cane. Elevation ranges from 200 to 240 feet above sea level and the property slopes slightly to the east and south. 12. Surrounding Zoning/Land Uses: Surrounding lands are zoned Single-Family Residential (RS-7.5), Multiple-Family Residential (RM-4, RM-5.5), Neighborhood Commercial (CN-20), Agricultural (A-1a) and Project District (PD). Existing surrounding land uses include residential, medical and church uses, in addition to -6- vacant parcels. 13. Flood Insurance Rate Map (FIRM): Portions of the property are located in the “A” flood zone, a special flood hazard area inundated by the 100-year flood where base flood elevations have not been determined. 14. Flora/Fauna Resources: No professional floral or faunal study was submitted with the application. As the property was historically used for sugar cane cultivation and has been grubbed in recent years, and given development of the surrounding area, it is unlikely to host endangered species of plants or animals. 15. Archaeological/Cultural/Historical Resources: No formal archaeological or cultural studies were conducted as the subject property has been grubbed and impacted by ground-disturbing activities associated with previous sugar cane cultivation. By letter dated January 8, 2010, the Department of Land and Natural Resources – State Historic Preservation Division (SHPD) provided comments stating that no historic properties would be affected by the proposed development, citing previous grading and grubbing (Planning Department Exhibit 2 – Letter from SHPD dated January 8, 2010). 16. Public Access: There is no public access to the mountains or the shoreline that runs through the property. PUBLIC UTILITIES AND SERVICES 17. Vehicular Access/Traffic: The property has two legal access easements; a 30- foot-wide road and utility easement identified as “RU-8” at Ponahawai Street which is shared with parcel 21 and a 15-foot-wide road and utility easement from Komohana Street identified as “RU-9” which is shared with parcel 22. Ponahawai Street and Komohana Street are both County roadways with a right-of-way width of 60 feet. An existing 10-foot wide no vehicular access planting screen easement runs along the east side of Komohana Street. The previous applicant intended to utilize the Ponahawai Street access as the primary access to the property but the current project proposes a primary driveway access from Komohana Street. The applicant commissioned a traffic impact analysis report (TIAR) for the proposed project, dated July 21, 2025, which found that the proposed project is not expected -7- to significantly impact traffic on Komohana Street and expects the proposed driveway to the subject property to operate at LOS “C” through year 2045 at peak hours of traffic. Additionally, the Komohana Street and Ponahawai Street intersection is expected to operate at acceptable levels of service through year 2045 at peak hours of traffic with the proposed project. The TIAR makes several recommended access improvements as follows: - Southbound Komohana Street should be widened at the proposed driveway to provide an exclusive left turn lane. - The south leg of Komohana Street should be widened at the proposed driveway to provide a median refuge lane. - The proposed driveway should provide separate left turn and right turn lanes. The Department of Public Works (DPW), Engineering Division, states that they oppose deleting Condition J (full improvements to Komohana Street) and Condition K (streetlights and traffic control devices), but are amenable to the request to delete Condition H (limitations to Komohana Street access). Regarding Condition H, DPW notes that access improvements shall be as required by the TIAR and by DPW. Regarding Condition J, DPW states that installation of curb, gutter and sidewalks along the subject property frontage is necessary for safe pedestrian access to the proposed facility. Regarding Condition K, DPW opposes the request for relief from installation of streetlights, but will defer to DPW, Traffic Division, during construction plan review. Based on comments from Traffic Division, they concur with DPW, Engineering Division, in opposing deletion of Condition K. Traffic Division notes that the requirement for installation of roadway lighting along the project area as deemed necessary by DPW is reasonable, particularly due to added pedestrian and bike traffic and for safer ingress and egress to the proposed development. Traffic Division goes on to state that the applicant should make sure there is adequate room for proper channelization and storage on Komohana Street, including a left turn lane and a median acceleration lane for left turns out. Finally, Traffic Division recommends that the applicant -8- coordinate roadway improvements with the proposed Project District that will take access from the top of Ponahawai Street, near the subject property. The applicant’s response to DPW notes that requiring curb, gutter and sidewalk improvements along the Komohana Street frontage would create an isolated section of sidewalk that will not connect to a continuous pedestrian system and requests reconsideration of the requirement to retain Condition J. The applicant states they are agreeable to specific frontage improvements to be determined by DPW during construction plan review, with consideration given to an alternative of maintaining a safe paved shoulder or other bicycle and pedestrian-compatible improvements. Regarding Condition K, the applicant proposes an alternative of installing on-site lighting at the project driveway entrance to allow entrance lighting to be installed and maintained directly by the applicant. Additionally, the applicant requests that any retained condition allow flexibility for DPW, Traffic Division, to make the final determination regarding necessary streetlights. Finally, the applicant states that they will coordinate with DPW to implement recommendations made in the TIAR. 18. Water: According to the Department of Water Supply (DWS), there is an existing 5/8-inch meter serving the subject property which is limited to an average daily usage of 400 gallons and suitable for only one single-family dwelling. DWS notes that previous comments, dated January 4, 2010, are still applicable and that they are not supportive of the applicant’s request to submit water usage calculations prior to issuance of a building permit as water availability may change. The 2010 comments requested submittal of estimated maximum daily water usage calculations for the proposed use including the total estimated daily water usage in gallons per day and the estimated peak flow in gallons per minute, including irrigation use. Upon receipt of the water usage calculations, DWS stated that they will determine the water commitment deposit amount, prevailing facilities charge and any water system improvements required for final approval. DWS also stated that CN zoning will require installation of a reduced pressure type backflow prevention assembly, meeting DWS approval, and that the applicant shall be -9- responsible for relocation and adjustment of DWS’s affected water system facilities, as necessary. DWS notes that the existing 12-inch water line within Komohana Street is adequate to provide 2,000 gallons per minute for fire protection, as required by DWS standards. The applicant has responded that they understand the DWS requirements and though the application proposes to defer certain project costs until later in the permit review process, they will work with appropriate design professionals to determine what is needed to prepare the required water usage calculations for DWS review. In an updated response letter, dated September 8, 2026, the applicant states that they have submitted preliminary water use calculations to DWS for review and are in discussion with DWS to submit the required water commitment deposit. 19. Wastewater: There is currently no municipal sewer in the area. According to comments from the Department of Environmental Management for the original change of zone, the property is located in a Critical Wastewater Disposal Area. All lots within this designated area are subject to the use of a septic tank system approved by the Department of Health. 20. Environmental Site Assessment: DOH notes that environmental site assessment may be appropriate for formerly cultivated agricultural lands where historic activities could have resulted in releases of hazardous substances. The applicant remains responsible for compliance with applicable DOH requirements during subsequent development and permitting. 21. Solid Waste: The applicant states that solid waste will be properly disposed of at an authorized county waste disposal or recycling facility. 22. Essential Utilities and Services: Electricity and telephone services can be made available to the property. Police, fire and medical services are available nearby in Hilo. -10- AGENCY COMMENTS 23. Department of Health: (Planning Department Exhibit 3 – July 14, 2026 memo) 24. Department of Water Supply: (Planning Department Exhibit 4 – July 24, 2026 letter) 25. Department of Public Works – Engineering Division: (Planning Department Exhibit 5 – September 4, 2026 memo) 26. Department of Public Works – Traffic Division: (Planning Department Exhibit 6 – September 15, 2026 email) AGENCIES – NO RESPONSE 27. Department of Land and Natural Resources – Land and Engineering Divisions, Department of Land and Natural Resources – Division of Forestry and Wildlife, Department of Land and Natural Resources – State Historic Preservation Division, Department of Environmental Management, Police Department, Fire Department, Office of Housing and Community Development. APPLICANT’S RESPONSE TO AGENCY COMMENTS 28. Applicant’s Response to DWS Comments: (Planning Department Exhibit 7 – August 3, 2026 letter and September 8, 2026 letter) 29. Applicant’s Response to DPW Comments: (Planning Department Exhibit 8 – September 8, 2026 letter) PUBLIC COMMENTS 30. As of the date of this writing, the Planning Department has received no public comments on this application. Department of Planning  County of Hawaii  101 Pauahi Street   Hilo, Hawaii 96720    Dear Department of Planning:   Subject: Request for Rezoning and Ordinance Amendment – KBXtreme Hilo, LLC     REZ 09‐000113, Ordinance No. 10‐045     South Hilo, HI, TMK: 3‐2‐3‐037:006  The subject area, encompassing 221,067 square feet, was rezoned into the Neighborhood  Commercial (CN) district (EXHIBIT A) on May 20, 2010, originally intended for the construction of a  commercial office building. However, the construction failed to meet the deadline within the  permissible five‐year period, which expired on May 20, 2015, due to Condition E of the rezoning  ordinance.  A time extension was requested and subsequently approved by the Planning Director  through a letter dated December 23, 2016 (EXHIBIT B), granting an additional period until May 20, 2020.  Shortly after obtaining the administrative time extension, the subject property was sold to  KBXtreme Hilo, LLC. (KBXTREME) on March 17, 2017.  On October 2, 2019, the Hawaii County Council  passed Bill 94, which amended the Zoning Code to permit Indoor Amusement and Recreation Facilities  within the Neighborhood Commercial (CN) zoning districts. This change was eagerly awaited by  KBXTREME, as indoor amusement and recreation facilities were not previously allowed in Neighborhood  Commercial (CN) zoned areas.  However, due to unforeseen circumstances related to the COVID‐19  pandemic the development plans were inadvertently delayed, leading to the expiration of the  administrative extension, where construction of the improvements had to be completed, on May 20,  2020.  KBXTREME now plans to construct and operate a comprehensive family entertainment center in  Hilo. The center will feature various attractions centering around bowling and restaurants, and including  an arcade, laser tag, miniature glow golf, karaoke rooms, and lounge. Its objective is to provide a diverse  range of recreational opportunities for both county residents and visitors, consistent with the primary  goals stated in section 12.2 of the general plan.  To proceed with the development of the family entertainment center, KBXTREME requires an  amendment of the rezoning ordinance for the CN zoning district, suitable ingress and egress to the  property, and a reduced speed limit on Komohana Street fronting the property.    I. GENERAL BACKGROUND  As noted earlier, the rezoning ordinance for the subject area, covering 221,067 square feet, was  implemented as Neighborhood Commercial (CN) district (Ord. No. 10‐045) on May 20, 2010, with the  original intention of constructing a commercial office building in conjunction with the neighboring  parcel. However, construction of the facility was not completed within the designated timeframe,  January 14, 2026 including the extension period.  The subject property was purchased by KBXtreme Hilo, LLC on March  17, 2017 for the purpose of developing a family entertainment center. Progress on this project was  initially delayed by the Kilauea volcanic eruption, as the Planning Department appropriately prioritized  its response to the crisis. This, in turn, postponed the administrative process to amend the zoning code  to expand permitted uses within Neighborhood Commercial (CN) zoning to include “Indoor  Amusement.” These changes were ultimately approved by the Hawaii County Council in November  2019, allowing us to proceed with development efforts, including drafting construction documents.  However, just two months later, the COVID‐19 pandemic abruptly halted all progress, compounding the  delays caused by the earlier circumstances. Now that economic conditions have stabilized, we are  actively resuming development efforts and remain committed to completing this much‐needed facility  for the Hilo community. Due to these unusual and unavoidable circumstances, we respectfully request  relief from the lapse of the prior extension and seek an additional ten (10) years to fulfill the conditions  of Ordinance 10‐45.  KBXtreme's owners currently operate a popular 25,805 square foot family entertainment center in  Kailua Kona, which has been delighting patrons since 1987. The facility offers an array of exciting  activities, including sixteen lanes of bowling, a state‐of‐the‐art video arcade, a karaoke lounge, a sports  bar, and the renowned restaurant Chubby's Diner. KBXtreme purchased the property in Hilo with the  intention of constructing a similar 36,000‐square‐foot facility. However, the property was initially  rezoned for a commercial office building under the Neighborhood Commercial (CN) district, which did  not allow indoor amusement and recreation facilities as a permitted use. Although a time extension was  granted, the construction could not be completed within the given timeframe. On October 2, 2019, the  Hawaii County Council passed Bill 94, amending the Zoning Code to permit indoor amusement and  recreation facilities within the CN zoning districts, which KBXtreme had eagerly awaited. Unfortunately,  due to the unforeseen delays caused by the COVID‐19 pandemic, the administrative extension expired  on May 20, 2020. Undeterred, KBXtreme now plans to construct and operate a family entertainment  center in Hilo, featuring a range of exciting attractions such as bowling, an arcade, laser tag, miniature  glow golf, a restaurant, karaoke rooms and a lounge (EXHIBIT F), (EXHIBIT G), (EXHIBIT H).   The hours of this facility will closely follow those of our established Kona facility, which has been in  operation since 1987. The hours of operation will be 9:00 AM to 2:00 AM daily (Sunday–Saturday), with earlier closing on Sunday through Thursday as business demand warrants. The total number of  employees for the facility is estimated to be around 80 people, with staffing adjusted during peak and  off‐peak periods to ensure operational efficiency. Given the facility’s size and diverse entertainment  offerings, it is anticipated that an average of 300 daily visitors will utilize the facility, with higher  volumes on weekends and during special events such as concerts or school field trips. Our Kona  location's historical data shows that peak days (typically weekends) could see up to 500‐600 visitors,  while weekdays might average closer to 200‐250 visitors, depending on the time of year and scheduled  events.   A very diverse clientele is anticipated, that will necessitate catering to a wide range of interests.  During the morning hours, seniors will be serviced through our bowling leagues and open lanes. The  restaurant will serve breakfast, lunch, and dinner for the local community, and the facility will host  bowling leagues during weeknights from Monday to Thursday. Ongoing communications with UH Hilo  and HCC are underway as they are very interested in reviving their weekly bowling intramural leagues,  which will bring in additional college‐aged patrons. The lounge area will also attract patrons for live  events and PPV broadcasts, particularly during major sports and entertainment events. Friday, Saturday,  and Sunday will be focused on providing entertainment for local families to enjoy, particularly after‐ school hours and on weekends. Plans to host school field trips throughout the year are in awaiting, as  evidenced by our experience at our Kona location, where we frequently serve local schools. Additionally,  we will continue our tradition of hosting Project Grad events to provide high school graduates with a  safe, alcohol‐free environment for their celebration.  Minimal conflict with school or institutional traffic is anticipated as the facility opens at 9:00 AM,  after most school and work traffic. Traffic patterns at the Kona facility during the morning are largely  driven by senior leagues and do not coincide with high traffic times for local schools or offices. The  facility will have 213 parking stalls (including 7 accessible stalls), which significantly exceeds the required  134 stalls. Based on the experience at the Kona facility, minimal morning and afternoon traffic is  expected, with the majority of traffic at those times due to scheduled senior league events. The varied  entertainment offerings and services will help spread out visitor traffic throughout the day, minimizing  peak congestion.  This is a highly leveraged project, with construction costs expected to exceed $10 million.  Conceptual planning and pre‐development documents are underway, and construction documents will  be completed as the project advances through plan approval and permitting. Once these factors are in  place, we estimate submitting for plan approval within the next two years. After obtaining the necessary  permits, we anticipate an 18‐to‐24‐month construction period. Attached is the street striping and sign  plan (EXHIBIT D), along with the site plan, which includes information such as property lines, and  proposed structures, parking lots, and entrance driveway (EXHIBIT F), as well as the grading plan  (EXHIBIT J) and ALTA survey (EXHIBIT K). Also attached is the tax map which reflects the easements  including road and utility easements RU‐9 and RU‐8, the "No Vehicular Access” Planting Screen  Easement, and drainage easements D‐2 and D‐1 (EXHIBIT I). Detailed plans, including construction  documents for the on‐site septic system, availability of water, and improvements will be provided during  final plan approval. Exterior elevations for the facility are attached (EXHIBIT H).  The vision is to provide a diverse range of recreational opportunities for both residents and visitors,  aligning with the county's general plan. To proceed with their development plans, KBXtreme requires an  amendment of the rezoning ordinance for the Neighborhood Commercial district, suitable ingress and  egress to the property, and a reduction of the speed limit on Komohana Street fronting the subject  property.  II. NATURE OF REQUEST  The applicant is eager to proceed with the development of the site but faces obstacles due to  certain rezoning conditions that are no longer relevant or impede the feasibility of the indoor  recreational facility – family entertainment center project. Moreover, the deadlines associated with the  previous rezoning have expired, necessitating an amendment of the current ordinance to move forward.  Consequently, the applicant is requesting an amendment of the rezoning ordinance for the completion  of the project and additionally for relief from the “NO VEHICULAR ACCESS” Plant Screening Easement for  a dedicated driveway of approximately 45 feet wide to enable ingress and egress at a commercial scale  on to Komohana Street as not to impede neighboring residential driveways and proposed driveway  location is crucial to ensuring safe and efficient access. The applicant is also requesting a reduction of  the speed limit along Komohana Street, specifically the portion fronting the subject property, from forty‐ five (45) miles per hour to thirty‐five (35) miles per hour. The applicant is also seeking a removal of the  rezoning conditions G, H, J, and K in the amendment to the ordinance.  III. PROJECT LOCATION  The subject area, consisting of 221,067 square feet, is located in the City of Hilo and more  specifically at 279 Komohana Street, southeast of the intersection with Ponahawai Street. TMK (3) 2‐3‐ 037‐006‐0000 (EXHIBIT C), (EXHIBIT F), (EXHIBIT I).    IV. REZONING CONDITIONS  The subject area was initially rezoned into the CN‐20 district on May, 20, 2010, subject to a number  of conditions.  An administrative time extension for completion of the project was granted on December  23, 2016. (EXHIBIT B) This section covers the status of the various conditions of the rezoning ordinance  (ORD. 10‐45) as originally enumerated and the changes to be made as if a new ordinance was to be  adopted.  A. The applicant(s), successors or assigns shall be responsible for complying with all of the  stated conditions of approval.    The property is owned by KBXtreme Hilo, LLC, and as such, intends to assume the  responsibility of complying with all pertinent conditions and any amendments thereto of  this rezoning ordinance.    B. Prior to the issuance of a water commitment by the Department of Water Supply the  applicants shall submit the anticipated maximum daily water usage calculations as  recommended by a registered engineer and a water commitment deposit in accordance  with the Water Commitment Guidelines Policy to the Department of Water Supply prior  to the issuance of a building permit.    The applicant shall comply with this requirement by making the required payment, if  needed, prior to the issuance of a building permit.    C. The applicants shall install a reduced pressure type backflow prevention assembly within  five 5 feet of the existing water meter and any additional water meters on private  property which must be inspected and approved by the Department of Water Supply  prior to issuance of a Certificate of Occupancy.    The applicant shall comply with this requirement.    D. The applicants shall relocate and adjust the Department of Water Supply water system  facilities that are affected by construction of improvements within the Ponahawai Street  right‐of‐way fronting the subject property that are required by this permit.    The applicant shall comply with this requirement when developing access to Ponahawai  Street.    E. Construction of the proposed improvements shall include securing Final Plan Approval  from the Planning Director in accordance with Section 25‐2‐70, Chapter 25 Zoning Code  Hawaii County Code.    The Applicant is requesting the Planning Department to allow a new or amended  rezoning ordinance with a 10 year time limit on the construction of improvements, due  to the scope and size of the project.    F. Development of the property shall be designed and constructed in a way to minimize  obstruction of the scenic views of Hilo Bay from Komohana Street.    The applicant shall comply with this and has planned for this in its construction design.    G. Deleted.    The requirement to provide a minimum 30‐foot‐wide access easement on the subject  property, in favor of the adjacent landowner(s) (TMK: 2‐3‐037:22) shall be deleted.  Initially, the rezoning ordinance was intended for the construction of a commercial  office building, and both TMKs mentioned were under the ownership of a single fee  owner. However, the circumstances have changed as the TMKs now have separate fee  owners, and the original plan for a commercial office building is no longer being  pursued. As a result, the need for internal traffic circulation between the two properties  is no longer relevant. Furthermore, the neighboring TMK to the east has its own  dedicated access to Ponahawai Street, making the provision of an easement through the  subject property unnecessary for accessing Ponahawai Street.    H. Deleted.    The applicant is seeking relief from Condition H, as the designated entrance through the  road and utility easement "RU‐9" on Komohana Street is not viable for commercial  property. This entrance would place excessive stress and traffic on the driveway of the  adjacent residential property, which is undesirable. The applicant has developed plans  that ensure unimpeded access from Komohana Street. The proposed entrance is located  at a sufficient distance from the traffic control device at the intersection of Komohana  Street and Ponahawai Street. Additionally, the applicant has made provisions for  necessary off‐site work to widen the pavement and accommodate left turn‐in channel  lane and left turn‐out merge lane, ensuring minimal interference with traffic flow along  Komohana Street. (EXHIBIT D; EXHIBIT L)    I. Access connections to Ponohawai Street and Komohana Street shall conform to Chapter  22 (County Streets) of the Hawai’i County Code.    The applicant shall comply with this requirement.     J. Deleted.    The applicant is seeking relief from Condition J, particularly the requirement to provide  curb, gutters, sidewalk, drainage improvements, and utility relocation along Komohana  Street. It should be noted that these improvements are absent on neighboring parcels  along Komohana Street as well. However, the applicant does intend to undertake  pavement widening as necessary to fulfill their Sign and Striping Plan (EXHIBIT D).    K. Deleted.    The applicant is seeking relief from this requirement, as they have planned to address  the need for lighting through the installation of sufficient light standards in the parking  lot and driveway entrances on the property. These on‐site improvements will effectively  fulfill the lighting requirements without the need for additional streetlights or traffic  control devices.    L. A Traffic Impact Analysis Report (TIAR) shall be submitted for review and approval by the  Department of Public Works prior to Final Plan Approval. The applicants shall implement  when required by the Department of Public Works, at no cost to the County, any  transportation improvements deemed necessary by the Department of Public Works.    TIAR Compliance (Completed and Attached)  A Traffic Impact Analysis Report (TIAR), dated July 21, 2025, which is within six (6)  months of this resubmittal, has been completed and is submitted herewith for review  and approval by the Department of Public Works (EXHIBIT L). The TIAR was prepared in  accordance with Hawai‘i County Code Chapter 25, Section 25‐2‐46 (Concurrency  Requirements) and evaluates the Komohana Street corridor, the Ponahawai Street  intersection area, and the proposed project driveway.     The TIAR analyzes the proposed family entertainment center (including bowling and  accessory restaurant/bar/arcade uses) and concludes that the project is not expected to  create significant adverse impacts to traffic operations on Komohana Street or nearby  intersections, with acceptable operations projected through the study horizon. The TIAR  also identifies and recommends specific access improvements at the Komohana Street  driveway to support safe and efficient ingress/egress, including turn‐lane and driveway  channelization improvements.    The applicant will implement TIAR‐recommended and DPW‐required transportation  improvements, at no cost to the County, in conjunction with final plan approval and  permitting.      M. Any construction within the designated FEMA flood zone shall comply with the  requirements of Chapter 27, Floodplain Management, of the Hawai’i County Code.    The applicant shall comply with this requirement.    N. All development‐generated runoff shall be disposed of on‐site and shall not be directed  toward any adjacent properties. A drainage study shall be prepared and submitted to  the Department of Public Works prior to the issuance of Final Plan Approval.  Any  drainage improvements if required shall be constructed meeting with the approval of the  Department of Public Works prior to the issuance of a Certificate of Occupancy.    The applicant shall comply with this requirement.    O. During construction, measures shall be taken to minimize the potential of both fugitive  dust and runoff sedimentation. Such measures shall be in compliance with construction  industry standards and practices utilized during construction projects of the State of  Hawai’i.    The applicant shall comply with this requirement.    P. All earthwork activity, including grading and grubbing, shall conform to Chapter 10  Erosion and Sedimentation Control, of the Hawaii County Code.    The applicant shall comply with this requirement.    Q. Comply with Chapter 11‐55, Water Pollution Control, Hawai’i Administrative Rules,  Department of Health, which requires a NPDES permit for certain construction activity.    The applicant shall comply with this requirement.    R. Construction activities must comply with the provisions of Hawai’i Administrative Rules,  Chapter 11‐46, “Community Noise Control.”    The applicant shall comply with this requirement.    S. The applicants shall install a septic system(s) meeting with the requirements of the  Department of Health prior to the issuance of a Certificate of Occupancy. In the future,  should a public sewer system be installed in Ponahawai Street or Komohana Street  fronting the subject property, the applicants shall connect to the sewer system.    The applicant shall comply with this requirement.    T. A Solid Waste Management Plan shall be submitted to the Department of Environmental  Management for review and approval prior to Final Plan Approval.    The applicant shall comply with this requirement.    U. Should any remains of historic sites, such as rock walls, terraces, platforms, marine shell  concentrations or human burials be encountered, work in the immediate area shall cease  and the Department of Land and Natural Resources ‐ State Historic Preservation Division  (DLNR‐SHPD) shall be immediately notified. Subsequent work shall proceed upon an  archaeological clearance from the DLNR‐SHPD when it finds that sufficient mitigation  measures have been taken.    The applicant shall comply with this requirement.    V. To ensure that the Goals and Policies of the Housing Element of the General Plan are  implemented, the applicants shall comply with the requirements of Chapter 11, Article 1,  Hawai’i County Code relating to Affordable Housing Policy. This requirement shall be  approved by the Administrator of the Office of Housing and Community Development  prior to final plan approval or final subdivision approval for any new residential  structures.    The applicant shall comply with this requirement.    W. If the applicants, successors, or assigns develops residential units on the subject  property, the applicants shall make their fair share contribution to mitigate the potential  regional impacts of the property with respect to parks and recreation, fire, police, solid  waste disposal facilities and roads. The fair share contribution shall become due and  payable prior to receipt of Final Plan Approval. The fair share contribution for each lot  shall be based on the actual number of residential units developed. The fair share  contribution in a form of cash, land, facilities or any combination thereof shall be  determined by the County Council. The fair share contribution may be adjusted annually  beginning three years after the effective date of this ordinance based on the percentage  change in the Honolulu Consumer Price Index (HCPI). The fair share contribution shall  have a combined value of $7,698.11 per multiple family residential unit ($11,996.63 per  single family residential unit).  The total amount shall be determined with the actual  number of units according to the calculation and payment provisions set forth in this  condition. The fair share contribution per multiple family residential unit (single family  residential unit) shall be allocated as follows:    1. $3,797.26 per multiple family residential unit ($5,784.99 per single family  residential unit) to the County to support park and recreational improvements  and facilities;    2. $120.01 per multiple family residential unit ($279.07 per single family residential  unit) to the County to support police facilities;    3. $369.17 per multiple family residential unit ($551.20 per single family residential  unit) to the County to support fire facilities;    4. $164.54 per multiple family residential unit ($241.32 per single family residential  unit) to the County to support solid waste facilities; and    5. $3,247.12 per multiple family residential unit ($5,140.06 per single family  residential unit) to the County to support road and traffic improvements.    In lieu of paying the fair share contribution, the applicants may contribute land and/or  construct improvements facilities related to parks and recreation, fire, police, solid waste  disposal facilities and roads within the region impacted by the proposed development,  subject to the review and recommendation of the Planning Director, upon consultation  with the appropriate agencies and approval of the County Council.     The applicant shall comply with this requirement.     X. Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for  imposition of exactions or the assessment of impact fees, conditions included herein shall  be credited towards the requirements of the Unified Impact Fees Ordinance.    The applicant shall comply with this requirement.    Y. The applicants shall comply with all applicable County State and Federal laws, rules,  regulations and requirements.    The applicant shall comply with this requirement.    Z. Deleted.    Considering the allowance of indoor amusement and recreation facilities within the  Neighborhood Commercial , no time limits shall be imposed on construction of  improvements.    AA. Deleted.    KBXtreme requests that the County Council approve a new rezoning ordinance to  ensure compliance with the conditions outlined above.    BB. Added.    Partial relief from “NO VEHICULAR ACCESS” PLANTING SCREEN EASEMENT in an area of  the property fronting Komohana Street to provide for commercial driveway access that  will not interfere with neighboring residential property access. Relief is requested for a  length of approximately 45 feet at a location reviewed in coordination with the  Department of Public Works (DPW) Engineering Division and DPW Traffic Division to  ensure appropriate driveway placement and two‐way left turn lane (TWLTL) spacing  from the Ponahawai/Komohana intersection, consistent with Chapter 22 (County  Streets) of the Hawai‘i County Code and the completed TIAR.    Due to the unsuitability of access and utility easement RU‐9, a new area of ingress and  egress to the parcel must be created. The area identified for relief is a stretch of  approximately 45 feet on the Komohana Street facing boundary that will accommodate  commercial traffic flow and left‐turn lanes into and out of the parcel. The completed  Traffic Impact Analysis Report (TIAR) (EXHIBIT L) evaluates the proposed driveway  location and associated traffic operations and concludes that, with the recommended  access improvements, the project is not expected to create significant adverse impacts  to traffic operations along Komohana Street or at nearby intersections. The TIAR further  identifies and recommends specific driveway and roadway improvements to support  safe and efficient ingress and egress, including turn‐lane and driveway channelization  improvements, which the applicant will implement as required during final plan  approval and permitting. The applicant has consulted with the Department of Public  Works (DPW) Engineering Division prior to submitting this application to discuss  necessary revisions regarding the “No Vehicular Access & Planting Screen” easement,  and has also engaged with the DPW Traffic Division to ensure that driveway placement  and the two‐way left‐turn lane (TWLTL) are positioned far enough away from the  Ponahawai/Komohana intersection. Based on consultations to date, the applicant  understands DPW Engineering may not support the requested relief and will document  any related technical concerns in their formal review comments on the resubmittal  materials. Additionally, the applicant has communicated with the neighboring TMK, and  their only request was to avoid sharing a driveway (specifically RU‐9) or having the  project driveway adjacent to theirs to prevent unintentional commercial traffic from  using a residential driveway; the applicant has worked to incorporate these  considerations to maintain good neighbor relationships. Notwithstanding any agency  comments, the applicant respectfully requests that the Planning Commission and  County Council consider and act upon the requested ordinance amendment and the  associated partial relief through the public process.    CC. Added    As a matter of public safety, the Planning Commission and County Council recommend  that the Department of Public Works (DPW) evaluate the posted speed limit along  Komohana Street fronting the subject property and consider a reduction of the posted  speed limit from forty‐five (45) miles per hour to thirty‐five (35) miles per hour. This  recommendation is intended to support safe ingress and egress to the site and to  improve overall traffic safety in light of the proposed commercial driveway access and  turning movements. Nothing in this condition shall be construed to alter or supersede  the independent authority of DPW with respect to speed limit determinations or traffic  control measures.      V. RESTATEMENT OF REQUEST  The applicant is seeking to move forward with the development of the site, facing challenges  presented by certain rezoning conditions that are either no longer applicable or impede the feasibility of  the Family Entertainment Center project. Additionally, the previous rezoning deadlines have lapsed,  requiring either a new or amended rezoning ordinance to proceed.  Furthermore, the applicant seeks  partial relief from the “NO VEHICULAR ACCESS” planting screen easement to provide for commercial  driveway access, and a reduction in the speed limit along Komohana Street, specifically on the subject  property frontage, from 45 mph to 35 mph.        VI. JUSTIFICATION OF REQUESTS  From the 2005 General Plan, SECTION 12.2 (a) GOALS  “Provide a wide variety of recreational  opportunities for the residents and visitors of the County”; From the 2005 General Plan, SECTION 12.3  (f) POLICIES “The "County of Hawaii Recreation Plan" shall be updated to reflect newly identified  recreational priorities”; From the 2005 General Plan, SECTION 12.3 (h) POLICIES “Provide facilities and a  broad recreational program for all age groups, with special considerations for the handicapped, the  elderly, and young children.”; From the 2005 General Plan, SECTION 12.3 (i) POLICIES “Coordinate  recreational programs and facilities with governmental and private agencies and organizations.  Innovative ideas for improving recreational facilities and opportunities shall be considered”. SECTION  12.5.2.1 SOUTH HILO – PROFILE “In many of the parks, there are drainage problems. Lack of playground  equipment, inadequate landscaping, and the lack of benches and adequate shelters have restricted the  use of some parks. Some residential areas do not have easy access to neighborhood parks, and newer  communities lack recreational areas altogether.” 12.5.2.2(m) COURSE OF ACTION “Develop a  center/complex for major cultural, educational and recreational activities.”   KBXTREME is in a unique position to help achieve many of the County’s goals and policies through  the nature of its recreational offerings. Bowling has always been a popular sport, and facilities are  frequently utilized by schools, adult leagues, and senior clubs and leagues. Bowling coupled with an  arcade space and other activities creates a space for young children, seniors, and people with disabilities  to remain active and social while participating in a recreational activity in a safe environment with the  necessary facilities to accommodate their needs. Providing an indoor space for recreation allows for  continuous use independent of the weather conditions. Justification for proposed amendments follow:         1. AMEND CONDITION E, EXTENSION OF REZONING ORDINANCE  i. KBXtreme justifiably requests an extension of rezoning ordinance no. 10‐045.  Granting an extension of this rezoning ordinance would align with the General  Plan and Zoning Code, as it allows KBXtreme to proceed with their intended  development of the Family Entertainment Center.    ii. Moreover, the extension of this rezoning ordinance would not be contrary to  the original reasons for granting the change of zone.    2. REMOVAL OF CONDITION G  i. The minimum 30 foot wide access easement in favor of the adjacent  landowner to the east (TMK 3‐2‐3‐037‐014) was provisioned previously when  a commercial office building was being contemplated on both parcels.    ii. The two properties were subsequently sold individually to two different  owners, and the previously planned commercial office building is no longer  contemplated.    iii. Each TMK has their own dedicated access to Ponahawai, and the previously  planned easement to provide for internal traffic circulation between both  neighboring properties is now irrelevant.      3. REMOVAL OF CONDITION H, PROVIDING RELIEF FROM RIGHT‐TURN IN/OUT TRAFFIC  FLOW AND ACCESS THROUGH UTILITY EASEMENT RU‐9 ONLY.  i. KBXtreme has engaged in discussions with the neighboring landowner to the  south (TMK 3‐2‐3‐037‐022) and sharing of the utility easement "RU‐9" is not  possible, nor does it provide reasonable access to the subject commercially  zoned property.  ii. The neighboring residential property would experience unnecessary  commercially related traffic down their driveway if forced to share access via  RU‐9.  iii. There are too many private utility poles located on RU‐9, that would present  unnecessary risk by routing commercial traffic through the narrow roadway.  iv. KBXtreme has been in discussion with the County of Hawaii Department of  Public Works Traffic Division regarding widening pavement, creating left turn  channel and merge lanes into and out of TMK: 3‐2‐3‐037:006 from Komohana  Street, and is planning for necessary off‐site work to provide smooth ingress  and egress to the subject property without interfering with neighboring  driveways or the flow of traffic on Komohana Street, while providing sufficient  distance from the traffic control device located at the Komohana and  Ponahawai intersection (EXHIBIT D).    4. REMOVAL OF CONDITION J WITH REGARD TO CURBS, GUTTERS, SIDEWALK, DRAINAGE  IMPROVEMENTS AND UTILITY RELOCATION ALONG KOMOHANA STREET.  i. KBXtreme requests relief from Condition J, which mandates the provision of  curbs, gutters, sidewalk, drainage improvements, and utility relocation along  Komohana Street.   ii. The requirement for these improvements greatly impedes the feasibility of our  project.   iii. Not only do neighboring parcels along Komohana Street lack these features, but  enforcing this condition exclusively on KBXtreme creates an undue burden.   iv. KBXtreme plans to address the necessary pavement widening to accommodate  the proposed striping and sign plan.     5. REMOVAL OF CONDITION K, STREETLIGHTS AND TRAFFIC CONTROL DEVICES.  i. Given the unique circumstances of the applicant's project, it is justifiable to  grant relief from the requirement of installing streetlights and traffic control  devices as stipulated by the Traffic Division Department of Public Works.   ii. The applicant has demonstrated proactive planning and commitment to public  safety by proposing an alternative strategy that is specifically tailored to the  project's requirements.   iii. The implementation of adequate lighting standards within the parking lot and  driveway entrances ensures that the necessary illumination will be provided on‐ site, thus negating the necessity for additional streetlights.   iv. This solution not only maintains safety standards but also minimizes potential  light pollution and cost to the county.   v. The traffic control needs, as well, are anticipated to be suitably addressed  through the well‐designed layout for ingress and egress to the property. This  approach reflects a careful consideration of both functionality and aesthetics,  while still upholding the core objective of ensuring safety and visibility.  vi.  Therefore, it is reasonable to consider this request for exemption, recognizing  that the proposed on‐site improvements fulfill the intention of the original  condition.    6. REMOVAL OF CONDITION Z, TIME LIMITS.  i. The removal of the proposed improvements within a five year time frame  renders this condition moot.    7. ADDITION OF CONDITION BB, PARTIAL RELIEF FROM “NO VEHICULAR ACCESS”  PLANTING SCREEN EASEMENT FOR COMMERCIAL DRIVEWAY   i. Due to the unsuitability of access and utility easement RU‐9 a new area of  ingress and egress to the parcel must be created.  ii. The area identified for relief is a stretch of approximately 45 feet on the  Komohana Street facing boundary that will accommodate commercial traffic  flow and left turn lanes into and out of the parcel.   iii. The applicant has consulted with the Department of Public Works (DPW)  Engineering Division prior to submitting this application to discuss necessary  revisions regarding the "No Vehicular Access & Planting Screen" easement.   iv. The Traffic Division has also been engaged to ensure that the driveway  placement and two‐way left turn lane (TWLTL) are positioned far enough away  from the Ponahawai/Komohana intersection.  v. Additionally, there has been communication with the neighboring TMK, and  their only request was to avoid sharing a driveway or having our driveway  adjacent to theirs to prevent unintentional commercial traffic from using their  residential driveway.   vi. We have worked diligently to incorporate these considerations into our plans to  maintain good relationships with our neighbors.    8. ADDITION OF CONDITION CC, REDUCTION OF THE SPEED LIMIT ALONG KOMOHANA  STREET FRONTING THE SUBJECT PROPERTY FROM 45MPH, DOWN TO 35MPH.  i. While we understand that posted speed limits and traffic control measures  are administered by the Department of Public Works (DPW) and may be  outside the direct purview of the Planning Department, we respectfully  request that the Planning Commission and County Council, through action on  this rezoning ordinance amendment, include a recommendation that DPW  evaluate and, if appropriate, reduce the posted speed limit along Komohana  Street fronting the subject property from 45 mph to 35 mph as a matter of  public safety.  ii. The request for a reduction of the speed limit along Komohana Street fronting  the subject property from 45 mph to 35 mph warrants strong consideration,  primarily due to existing precedents and the potential for enhanced safety.   iii. It is notable that the speed limit has already reduced to 35 mph at the  Komohana Street property frontage. Our proposal is simply an extension of  this current regulation, moving the reduction point south closer to Mohouli  Street. This adjustment is projected to have significant benefits in terms of  public safety.   iv. By encouraging more uniform travel speeds along this stretch of road, the  proposed change would reduce the potential for abrupt speed adjustments,  which can be a contributing factor to accidents.   v. Furthermore, a lower speed limit in this area could lead to reduced severity of  accidents, should they occur, given the correlation between speed and crash  impact.   vi. By extending the 35 mph zone closer to Mohouli Street, it would create a  more consistent, predictable, and thus safer, driving environment for all users  of Komohana Street.    Pursuant to this amendment request, please find enclosed the following:  1. A copy of this letter, with appropriate enclosures; and  2. A list of the surrounding property owners within 300 feet of the subject property (EXHIBIT E);   3. and $500 filing fee.  KBXtreme Hilo LLC respectfully requests your favorable consideration of these requests so we can bring  this much needed facility to Hilo.  Should you have any questions on this matter, please feel free to  contact me.  Sincerely,          Calvin C. M. Higa  President – KBXTREME HILO LLC          William L. Wong  Member Manager – WLW DEVELOPMENT METHODS INC    Enclosures:  APPLICATION FOR VARIANCE ZONING  EXHIBIT A – ORDINANCE 10‐045  EXHIBIT B – ADMINISTRATIVE EXTENSION OF REZONING ORDINANCE 10‐045  EXHIBIT C – PROPERTY MAP AND SITE LOCATION  EXHIBIT D – DRAFT KOMOHANA STREET STRIPING AND SIGN PLAN  EXHIBIT E – LIST OF PROPERTY OWNERS WITHIN 300FT OF SUBJECT PROPERTY  EXHIBIT F – SITE PLAN WITH FLOOR PLAN  EXHIBIT G – EXTERIOR RENDERING  EXHIBIT H – EXTERIOR ELEVATIONS  EXHIBIT I – TAX MAP  EXHIBIT J – GRADING PLAN  EXHIBIT K – ALTA SURVEY  EXHIBIT L – FINAL TRAFFIC IMPACT ANALYSIS REPORT (TIAR)        4p COUNTY OF HAWAII STATE OF HAWAIITom ITfpNI ORDINANCE NO 10 E BI NO 228 AN ORDINANCE AMENDING SECTION 258 33 CITY OF HILO ZONE MAP ARTICLE 8 CHAPTER 25 ZONING CODE OF THE HAWAII COUNTY CODE 1983 2005 EDITION BY CHANGING THE DISTRICT CLASSIFICATION FROM AGRICULTURAL ONE ACRE A1a TO NEIGHBORHOOD COMMERCIAL 20000 SQUARE FEET CN20 AT PONAHAWAI SOUTH HILO HAWAII COVERED BY TAX MAP KEY 23037006 BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII SECTION 1 Section 25 833 Article 8 Chapter 25 Zoning Code of the Hawaii County Code 1983 2005 Edition is amended to change the district classification of property described hereinafter as follows The district classification of the following area situated at Ponahawai South Hilo Hawaii shall be Neighborhood Commercial 20000 square feet CN20 Beginning at the northeast corner of this parcel of land and on the south side of Ponahawai Street the coordinates of said point of beginning referred to Government Survey Triangulation Station HALAI being 110186 feet South and 15766 feet East and running by azimuths measured clockwise from True South 1 345 40 44500 feet along Lot 11 2 252 20 17153 feet along Lot 11 3 246 05 15010 feet along Lot 10 4 333 10 22000 feet along Lot 7 5 69 08 64458 feet along Lot 13 1 EXHIBIT A - ORDINANCE 2010-045 6 Thence along the east side of Komohana Street along a curve to the right having a radius of 296000 feet the chord azimuth and distance being 163 26 25 22997 feet 7 165 40 23289 feet along the east side of Komohana Street 8 190 30 6934 feet along the east side of Komohana Street 9 140 00 4592 feet along the east side of Komohana Street 10 Thence along the south edge of Flood Zone A and all its windings as shown on approved subdivision plan 7389 and Lot 12 A the direct azimuth and distance being 274 29 50 25699 feet 11 165 40 21411 feet along Lot 12A 12 255 40 3000 feet along the south side of Ponahawai Street to the point of beginning and containing an area of 5075 acres All as shown on the map attached hereto marked Exhibit A and by reference made a part hereof SECTION 2 In accordance with Section 25244 Hawaii County Code 1983 2005 Edition the County Council finds the following conditions are Necessary to prevent circumstances which may be adverse to the public health safety and welfare or 1 Reasonably conceived to fulfill needs directly emanating from the land use proposed with respect to A Protection of the public from the potentially deleterious effects of the proposed use or B Fulfillment of the need for public service demands created by the proposed use 2 EXHIBIT A - ORDINANCE 2010-045 A The applicants successors or assigns shall be responsible for complying with all of the stated conditions of approval B Prior to the issuance of a water commitment by the Department of Water Supply the applicants shall submit the anticipated maximum daily water usage calculations as recommended by a registered engineer and a water commitment deposit in accordance with the Water Commitment Guidelines Policy to the Department of Water Supply within 180 days from the effective date ofthis ordinance C The applicants shall install a reduced pressure type backflow prevention assembly within five 5 feet of the existing water meter and any additional water meters on private property which must be inspected and approved by the Department of Water Supply prior to issuance of a Certificate of Occupancy D The applicants shall relocate and adjust the Department of Water Supplys water system facilities that are affected by construction of improvements within the Ponahawai Street rightofway fronting the subject property that are required by this permit E Construction of the proposed improvements shall be completed within five 5 years from the effective date of this ordinance This time period shall include securing Final Plan Approval from the Planning Director in accordance with Section 25270 Chapter 25 Zoning Code Hawaii County Code F Development of the property shall be designed and constructed in a way to minimize obstruction of the scenic views of Hilo Bay from Komohana Street 3 EXHIBIT A - ORDINANCE 2010-045 G Prior to issuance of Final Plan Approval the applicants shall grant a minimum 30foot wide access easement on the subject property in favor of the adjacent landowners TMK 2 33714 in order to connect the access at Ponahawai Street on TMK 2 33714 to the access at Ponahawai Street on the subject property for the purpose of providing internal traffic circulation between the two properties H Access at Komohana Street shall be through road and utility easement RU9 and shall be limited to rightturn ih and rightturn out movements only This access shall be shared with the adjacent parcel TMK 233722 Prior to the issuance of a Certificate of Occupancy the applicants shall install no leftturn signs and a physical barrier at the property access to prevent leftturns into and out of the access driveway All improvements shall meet with the approval of the Department of Public Works Access connections to Ponahawai Street and Komohana Street shall conform to Chapter 22 County Streets of the Hawaii County Code J Prior to the issuance of a Certificate of Occupancy the applicants shall provide full improvements to the propertys frontage along Komohana Street consisting of but not limited to pavement widening with concrete curb gutter and sidewalk drainage improvements and any required utility relocation meeting with the approval of the Department of Public Works K Streetlights and traffic control devices as may be required by the Traffic Division Department of Public Works shall be installed by the applicants at no cost to the County L Should the applicants submit plans to develop a land use beyond what is proposed in the application which the Planning Department in consultation with the Department of Public Works determines will generate over 50 peak hour trips a Traffic Impact Analysis Report TZAR shall be submitted for review and approval by the Department of Public Works prior to Final Plan Approval The applicants shall implement when required by 4 EXHIBIT A - ORDINANCE 2010-045 the Department of Public Works at no cost to the County any transportation improvements deemed necessary by the Department of Public Works M Any construction within the designated FEMA flood zone shall comply with the requirements of Chapter 27 Floodplain Management of the Hawaii County Code N All development generated runoff shall be disposed of onsite and shall not be directed toward any adjacent properties A drainage study shall be prepared and submitted to the Department of Public Works prior to the issuance of Final Plan Approval Any drainage improvements if required shall be constructed meeting with the approval of the Department of Public Works prior to the issuance of a Certificate of Occupancy O During construction measures shall be taken to minimize the potential of both fugitive dust and runoff sedimentation Such measures shall be in compliance with construction industry standards and practices utilized during construction projects of the State of Hawai i P All earthwork activity including grading and grubbing shall conform to Chapter 10 Erosion and Sedimentation Control of the Hawaii County Code Q Comply with Chapter 1155 Water Pollution Control Hawaii Administrative Rules Department of Health which requires a NPDES permit for certain construction activity R Construction activities must comply with the provisions of Hawaii Administrative Rules Chapter 11 46 Community Noise Control S The applicants shall install a septic systems meeting with the requirements of the Department of Health prior to the issuance of a Certificate of Occupancy In the future should a public sewer system be installed in Ponahawai Street or Komohana Street fronting the subject property the applicants shall connect to the sewer system 5 EXHIBIT A - ORDINANCE 2010-045 T A Solid Waste Management Plan shall be submitted to the Department of Environmental Management for review and approval prior to Final Plan Approval U Should any remains of historic sites such as rock walls terraces platforms marine shell concentrations or human burials be encountered work in the immediate area shall cease and the Department of Land and Natural Resources State Historic Preservation Division DLNRSHPD shall be immediately notified Subsequent work shall proceed upon an archaeological clearance from the DLNRSHPD when it finds that sufficient mitigation measures have been taken V To ensure that the Goals and Policies of the Housing Element of the General Plan are implemented the applicants shall comply with the requirements of Chapter 11 Article 1 Hawaii County Code relating to Affordable Housing Policy This requirement shall be approved by the Administrator of the Office of Housing and Community Development prior to final plan approval or final subdivision approval for any new residential structures W If the applicants successors or assigns develops residential units on the subject property the applicants shall make their fair share contribution to mitigate the potential regional impacts of the property with respect to parks and recreation fire police solid waste disposal facilities and roads The fair share contribution shall become due and payable prior to receipt of Final Plan Approval The fair share contribution for each lot shall be based on the actual number of residential units developed The fair share contribution in a form of cash land facilities or any combination thereof shall be determined by the County Council The fair share contribution may be adjusted annually beginning three years after the effective date ofthis ordinance based on the percentage change in the Honolulu Consumer Price Index HCPI The fair share contribution shall have a combined value of 769811 per multiple family residential unit 1199663 per single 6 EXHIBIT A - ORDINANCE 2010-045 family residential unit The total amount shall be determined with the actual number of units according to the calculation and payment provisions set forth in this condition The fair share contribution per multiple family residential unit single family residential unit shall be allocated as follows 1 379726 per multiple family residential unit 578499 per single family residential unit to the County to support park and recreational improvements and facilities 2 12001 per multiple family residential unit 27907 per single family residential unit to the County to support police facilities 3 36917 per multiple family residential unit 55120 per single family residential unit to the County to support fire facilities 4 16454 per multiple family residential unit 24132 per single family residential unit to the County to support solid waste facilities and 5 324712 per multiple family residential unit 514006 per single family residential unit to the County to support road and traffic improvements In lieu of paying the fair share contribution the applicants may contribute land andor construct improvementsfacilities related to parks and recreation fire police solid waste disposal facilities and roads within the region impacted by the proposed development subject to the review and recommendation of the Planning Director upon consultation with the appropriate agencies and approval of the County Council 7 EXHIBIT A - ORDINANCE 2010-045 J X Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for imposition of exactions or the assessment of impact fees conditions included herein shall be credited towards the requirements of the Unified Impact Fees Ordinance Y The applicants shall comply with all applicable County State and Federal laws rules regulations and requirements Z An initial extension of time for the performance of conditions within the ordinance may be granted by the Planning Director upon the following circumstances 1 The non performance is the result of conditions that could not have been foreseen or are beyond the control of the applicants successors or assigns and that are not the result of their fault or negligence 2 Granting of the time extension would not be contrary to the General Plan or Zoning Code 3 Granting ofthe time extension would not be contrary to the original reasons for the granting of the change of zone 4 The time extension granted shall be for a period not to exceed the period originally granted for performance ie a condition to be performed within one year may be extended for up to one additional year 5 If the applicants should require an additional extension of time the Planning Director shall submit the applicants request to the County Council for appropriate action 8 EXHIBIT A - ORDINANCE 2010-045 AA Should any of the conditions not be met or substantially complied with in a timely fashion the Planning Director may initiate rezoning of the subject area to its original or more appropriate designation SECTION 3 In the event that any portion of this ordinance is declared invalid such invalidity shall not affect the other parts of this ordinance SECTION 4 This ordinance shall take effect upon its approval INTRODUCED BY atiz COUNCIL MEMBER COUNTY OF HAWAII Kona Hawaii Date of Introduction April 20 2010 Date of 1st Reading April 20 2010 Date of 2nd Reading May 5 2010 Effective Date May 20 2010 REFERENCES Comm 7 9 EXHIBIT A - ORDINANCE 2010-045 S Ala N A Ala PD CN20 p 110186 5 n 15Z66E 0 HALAI2 Y cn Ala t1tll4 ItiliiiiNla1riPD11Jr t1 1IY t I Alait n t Y l x rlIiN 4 Y It Y f 1 I AGRICWLTURA ONE ACRE A1a la 3Y ttj t I aI Ijf 8575 t AG HBORHOODCOMMER 4i4 I1t 111IS p I20000SQFrCN201411t75075ACRESII1111F illit1 WCi 8575 R5 N ir051 fro r 413 it eV tro IIIbpASStklA N alt Feet 0 500 1000 1500 2000 AMENDMENT TO THE ZONING CODE AMENDING SECTION 25833 CITY OF HILO ZONE MAP ARTICLE 8 CHAPTER 25 ZONING CODE OF THE HAWAII COUNTY CODE 1983 2005 EDITION BY CHANGING THE DISTRICT CLASSIFICATION FROM AGRICULTURAL ONE ACRE A1 a TO NEIGHBORHOOD COMMERCIAL 20000 SQUARE FEET CN 20 AT PONAHAWAI SOUTH HILO HAWAII MAP PREPARED BY COUNTY OF HAWAII PLANNING DEPARTMENT TMK 23037006 DATE December 22 2009 EXHIBIT A Gillie Jane Silva Map 1284 EXHIBIT A - ORDINANCE 2010-045 OFFICE OF THE COUNTY CLERK County of Hawaii Kona Hawaii t D Introduced By Donald Ikeda LV Y 99 Date Introduced April 20 2010 LAYESs i NOES ABS EX First Readin April 20 2010 titcgpEnriquesXClli Published April 30 2010 Ford x43 a it a itrived Greenwell X REMARKS Hoffmann X Ikeda X NaeoleBeason X Onishi X Yagong X Yoshimoto X Second Reading May 5 2010 8 1 0 0 To Mayor May 13 2010 Returned May 20 2010 ROLL CALL VOTE Effective May 20 2010 AYES NOES ABS EX Published May 27 2010 Enriques X Ford X REMARKS Greenwell X Hoffmann X Ikeda X NaeoleBeason X Onishi X Yagong X Yoshimoto X 6 0 3 0 I DO HEREBY CERTIFY that the foregoing BILL was adopted by the County Council published as indicated above a APPROVED AS TO la FOR tAND LEGALITY amil COUNCIL CHAIRMAN DEPUT CORPORATION CONSEL COUNTY OF1 A Date MAY 1 4 2010 COUNTY CLERK Bill No 228 C 755PC 77 ApprovedD pproved this day Reference of s 20 Ord No 10 4 S N i L MAYOR COUNTY OF HAWAII EXHIBIT A - ORDINANCE 2010-045 EXHIBIT B - ADMINISTRATIVE EXTENSION OF REZONING ORDINANCE 10-045 Parcel ID 230370060000 Acreage 5.075 Class COMMERCIAL Situs/Physical Address   279 KOMOHANA STREET Mailing Address   KBXTREME HILO LLC 75-5591 PALANI RD STE 3008 KAILUA KONA HI 96740 3633 Market Land Value   $980,300 Dedicated Use Value   $0 Land Exemption   $0 Net Taxable Land Value   $980,300 Assessed Building Value   $0 Building Exemption   $0 Net Taxable Building Value   $0 Total Taxable Value   $980300 Last 2 Sales Date   Price   Reason  Qual   3/14/2017   $575000   ARMS LENGTH TRANSACTION   Q   3/25/2009   0   RELATED INDIVIDUALS OR CORPORATIONS   U   Brief Tax Description LOT 12-B 5.075 AC DES POR RPGR 252 KA PALANI KULA S/D SUBJ/ESMTS (Note: Not to be used on legal documents) *Hawaii County makes every effort to produce the most accurate information possible. No warranties, expressed or implied, are provided for the data herein, its use or interpretation. The assessment information is from the last certied taxroll. All data is subject to change before the next certied taxroll. The 'parcels' layer is intended to be used for visual purposes only and should not be used for boundary interpretations or other spatial analysis beyond the limitations of the data. The 'parcels' data layer does not contain metes and bounds described accuracy therefore, please use caution when viewing this data. Overlaying this layer with other data layers that may not have used this layer as a base may not produce precise results. GPS and imagery data will not overlay exactly. 325 ft Overview Legend Parcels EXHIBIT C - PROPERTY MAP AND SITE LOCATION Developed by Date created: 5/19/2023 Last Data Uploaded: 5/18/2023 11:58:48 PM EXHIBIT C - PROPERTY MAP AND SITE LOCATION EXHIBIT D - STREET STRIPING AND SIGN PLAN EXHIBIT F - SITE PLAN WITH FLOOR PLAN DOES NOT ADD TO NUMBER OF PARKING SPACES, ONLY AMOUNT OF PAVING EXHIBIT G - EXTERIOR RENDERING EXHIBIT H - EXTERIOR ELEVATIONS EXHIBIT I - TAX MAP EXHIBIT J - SITE GRADING PLAN All of that certain parcel of land (being portion(s) of the land(s) described in and covered by Royal Grant Number 252 to B. Pitman) situated at Ponahawai, District of South Hilo, Island of Hawaii, State of Hawaii, being Lot 12-B of the KA PALANI KULA SUBDIVISION, and thus bounded and described: Beginning at the northeast corner of this parcel of land and on the south side of Ponahawai Street, the coordinates of said point of beginning referred to Government Survey Triangulation Station "HALAI" being 1,101.86 feet south and 157.66 feet east and running by azimuths measured clockwise from true south: 1. 345° 40' 445.00 feet along Lot 11; 2. 252° 20' 171.53 feet along Lot 11; 3. 246° 05' 150.10 feet along lot 10; 4. 333° 10' 220.00 feet along Lot 7; 5. 69° 08' 644.58 feet along Lot 13; 6. Thence along the east side of Komohana Street, along a curve to the right having a radius of 2960.00 feet, the chord azimuth and distance being 163° 26' 25" 229.97 feet; 7. 165° 40' 232.89 feet along the east side of Komohana Street; 8. 190° 30' 69.34 feet along the east side of Komohana Street; 9. 140° 00' 45.92 feet along the east side of Komohana Street; 10. Thence along the south edge of Flood Zone "A" (sic "X") and all its windings as shown on approved subdivision plan 7389 and Lot 12-A, the direct azimuth and distance being 274° 29' 50" 256.99 feet; 11. 165° 40' 214.11 feet along Lot 12-A; 12. 255° 40' 30.00 feet along the south side of Ponahawai Street to the point of beginning and containing an area of 5.075 acres, more or less. SUBJECT TO, Easements D-1, D-2, RU-8 (NEW) and RU-9 as well as restriction of vehicle access as shown and described on approved subdivision plan 01-000134. EXHIBIT K - ALTA SURVEY TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 PREPARED FOR KBXTREME, LLC JULY 21, 2025 PREPARED BY THE TRAFFIC MANAGEMENT CONSULTANT TMC EXHIBITJLJ-JTIAR TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 PREPARED FOR KBXTREME, LLC JULY 21, 2025 PREPARED BY THE TRAFFIC MANAGEMENT CONSULTANT RANDALL S. OKANEKU, P.E., PRINCIPAL  1188 BISHOP STREET, SUITE 1907  HONOLULU, HI 96813 4/30/2026 TMC i Table of Contents Page I. Introduction ............................................................................................................................... 1 A. Project Description........................................................................................................ 1 B. Purpose and Scope of the Study.................................................................................... 1 C. Methodologies............................................................................................................... 4 1. Capacity Analysis ............................................................................................. 4 2. Trip Generation ................................................................................................. 5 II. Existing Conditions ................................................................................................................... 5 A. Roadways ...................................................................................................................... 5 B. Existing Peak Hour Traffic Volumes and Operating Conditions ................................. 6 1. Field Investigation and Data Collection ........................................................... 6 2. Existing AM Peak Hour Traffic ........................................................................ 6 3. Existing Midday Peak Hour Traffic .................................................................. 6 4. Existing PM Peak Hour Traffic ........................................................................ 6 5. Existing Saturday Peak Hour Traffic ................................................................ 7 III. Future Traffic Conditions ......................................................................................................... 7 A. Background Growth in Traffic ...................................................................................... 7 B. Hilo Benioff Medical Center ........................................................................................ 7 C. Year 2030 Peak Hour Traffic Analysis Without Project .............................................. 9 D. Year 2035 Peak Hour Traffic Analysis Without Project .............................................. 9 E. Year 2045 Peak Hour Traffic Analysis Without Project .............................................. 9 ii Table of Contents (Cont'd.) Page IV. Traffic Impact Analysis .......................................................................................................... 13 A. Trip Generation Characteristics .................................................................................. 13 B. Traffic Assignment ..................................................................................................... 13 C. Site Access Improvements .......................................................................................... 13 D. Year 2030 Peak Hour Traffic Impact Analysis........................................................... 17 V. Long-Range Traffic Analysis ................................................................................................. 17 A. Future Growth in Traffic ............................................................................................. 17 B. Year 2035 Peak Hour Traffic Impact Analysis........................................................... 17 C. Year 2045 Peak Hour Traffic Impact Analysis........................................................... 20 VI. Recommendations and Conclusions ....................................................................................... 20 A. Recommended Access Improvements ........................................................................ 20 B. Conclusions ................................................................................................................. 20 iii List of Figures Page Figure 1. Project Location and Study Area .......................................................................................... 2 Figure 2. Hilo Entertainment Center Site Plan .................................................................................... 3 Figure 3. Existing Peak Hour Traffic ................................................................................................... 8 Figure 4. Year 2030 Peak Hour Traffic Without Project ................................................................... 10 Figure 5. Year 2035 Peak Hour Traffic Without Project ................................................................... 11 Figure 6. Year 2045 Peak Hour Traffic Without Project ................................................................... 12 Figure 7. Access Driveway Improvements ........................................................................................ 14 Figure 8. Years 2030 and 2035 Peak Hour Traffic Assignments ...................................................... 15 Figure 9. Year 2045 Peak Hour Traffic Assignments........................................................................ 16 Figure 10. Year 2030 Peak Hour Traffic With Project ...................................................................... 18 Figure 11. Year 2035 Peak Hour Traffic With Project ...................................................................... 19 Figure 12. Year 2045 Peak Hour Traffic With Project ...................................................................... 21 TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 I. Introduction A. Project Description KBXtreme, LLC is proposing to develop the Hilo Entertainment Center in South Hilo, Hawai`i Island. The project site is identified as Tax Map Key: 2-3-037:006. The 5.075- acre property is located on the east side of Komohana Street, about 100 feet south of Ponahawai Street. Figure 1 depicts the project location. The Hilo Entertainment Center is expected to be fully built out and operational by the Year 2030. The Hilo Entertainment Center will consist of a 20-lane bowling alley. In addition to the bowling alley, commercial activities will include a restaurant, a bar, and an arcade, totaling 23,287 square feet of gross floor area. KBXtreme, LLC will be submitting a change of zone for the property to the County of Hawai`i from agricultural to commercial zoning. Access to the Hilo Entertainment Center will be provided by one (1) driveway on the east side of Komohana Street, about 450 feet south of Ponahawai Street. The proposed site plan is depicted in Figure 2. B. Purpose and Scope of the Study The purpose of this study is to analyze the traffic impacts of the proposed Hilo Entertainment Center. This Traffic Impact Analysis Report (TIAR) is prepared in accordance with the Hawai`i County Code Chapter 25 Section 25-2-46 (Concurrency Requirements). The scope of the TIAR for the proposed project includes the following: 1. Conduct turning movement traffic count surveys during the weekday AM, midday, and PM peak periods of traffic and the Saturday peak period of traffic at the intersection of Komohana Street and Ponahawai Street. 2. Analyze the data collected in Item No. 1 to establish the existing conditions. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 2 Figure 1. Project Location and Study Area Study Intersection PROJECT LOCATION Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 3 Figure 2. Hilo Entertainment Center Site Plan Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 4 3. Estimate future traffic conditions for the 5-year, 10-year, and 20-year planning horizons, including other developments and traffic improvements in the vicinity, which have been approved or committed to within the time frame of this traffic study. 4. Analyze the 5-year, 10-year, and 20-year planning horizons traffic conditions without the proposed project, during the weekday AM, midday, and PM peak hours of traffic and the Saturday peak hour of traffic, in order to establish the baseline conditions from which to measure the traffic impacts of the proposed project. 5. Develop weekday AM, midday, and PM peak hour and Saturday peak hour trip generation characteristics for the proposed project, using generally accepted techniques developed by the Institute of Transportation Engineers. 6. Analyze the weekday AM, midday, and PM peak hour and Saturday peak hour site- generated traffic impacts for the 5-year, 10-year, and 20-year planning horizons. 7. Recommend traffic improvements that would mitigate the traffic impacts identified in this traffic study. C. Methodologies 1. Capacity Analysis The highway capacity analysis, performed in this study, is based upon procedures presented in the Highway Capacity Manual, 7th Edition (HCM), published by the Transportation Research Board. HCM defines the Level of Service (LOS) as “a quantitative stratification of a performance measure or measures representing quality of service.” HCM defines the six (6) Levels of Service from the traveler’s perspective, ranging from the best LOS “A” to the worst LOS “F”. LOS translates the complex mathematical results of the highway capacity analysis into an A through F grading system for the purpose of simplifying the roadway performance for decision-makers. Synchro is a traffic analysis software that was developed by Trafficware. Synchro is an intersection analysis program that is based upon the HCM 7th Edition methodology. Synchro is used to calculate the Levels of Service for the intersections in the study area. Worksheets for the capacity analysis, performed throughout this report, are compiled in the Appendix. LOS’s “A”, “B”, and “C” are generally considered to be satisfactory Levels of Service. The Hawai`i County Code Chapter 25, Section 25-2-46 “Concurrency Requirements” defines LOS “D” as the minimum acceptable Level of Service. LOS’s “E” and “F” are defined as worse than acceptable Levels of Service. The intersection LOS is primarily based upon average delay (d) in seconds per vehicle (sec/veh). The delays at unsignalized intersections, which include stop-controlled intersections and roundabouts, are generally shorter than signalized intersections, due to the drivers’ expectation and acceptance of longer delays at higher-volume signalized intersections. Table 1 summarizes the HCM LOS criteria. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 5 Table 1. Intersection Level of Service Criteria (HCM) LOS Signalized Control Unsignalized Control Description A d10 d10 Control delay is minimal. B 10<d 20 10<d15 Control delay is not significant. C 20<d35 15<d25 Stable operation. Queuing begins to occur. D 35<d55 25<d35 Less stable condition. Increase in delays, decrease in travel speeds. E 55<d80 35<d50 Unstable operation, significant delays. F d80 d50 High delays, extensive queuing. 2. Trip Generation The trip generation methodology is based upon generally accepted techniques developed by the Institute of Transportation Engineers (ITE) and published in the Trip Generation Manual, 11th Edition. The ITE trip rates for a bowling alley were developed by correlating the total vehicle trip generation data with various land use activities/ characteristics, such as the vehicle trips per hour (vph) per bowling lane. II. Existing Conditions A. Roadways Komohana Street is a two-way, two-lane collector roadway between Waianuenue Avenue and Ainaola Drive in South Hilo. North of Ponahawai Street, the posted speed limit on Komohana Street is 35 miles per hour (mph). South of Ponahawai Street, the posted speed limit on Komohana Street increases to 45 mph. Komohana Street provides exclusive left-turn and right-turn lanes at its signalized intersection with Ponahawai Street. Ponahawai Street is a two-way, two-lane collector roadway between Komohana Street and Kamehameha Avenue. Ponahawai Street provides separate left-turn and right-turn lanes at its signalized Tee-intersection with Ponahawai Street. The posted speed on Ponahawai Street is 40 mph. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 6 B. Existing Peak Hour Traffic Volumes and Operating Conditions 1. Field Investigation and Data Collection A traffic count survey was conducted at the intersection of Komohana Street and Ponahawai Street in February 2025 from 7:00 AM to 9:00 AM and from 2:00 PM to 10:00 PM, during the weekdays and from 1:00 PM to 10:00 PM on a Saturday. 2. Existing AM Peak Hour Traffic The existing weekday AM peak hour of traffic in the study area occurred from 7:15 AM to 8:15 AM. Komohana Street carried over 1,000 vehicles per hour (vph), total for both directions. Ponahawai Street carried about 800 vph, total for both directions, during the existing weekday AM peak hour of traffic. During the existing weekday AM peak hour of traffic, the intersection of Komohana Street and Ponahawai Street operated at an overall LOS “B”. The left-turn movement from Ponahawai Street to Komohana Street operated at LOS “D”. The other traffic movements at the intersection operated at satisfactory Levels of Service, i.e., LOS “C” or better, during the existing weekday AM peak hour of traffic. 3. Existing Midday Peak Hour Traffic The existing weekday midday peak hour of traffic in the study area occurred from 2:00 PM to 3:00 PM. Komohana Street carried about 1,100 vph, total for both directions. Ponahawai Street carried about 650 vph, total for both directions, during the existing weekday midday peak hour of traffic. The Komohana Street and Ponahawai Street intersection operated at satisfactory Levels of Service, during the existing weekday midday peak hour of traffic. 4. Existing PM Peak Hour Traffic While the existing weekday midday peak hour of traffic was the actual PM peak hour of traffic, the commuter PM peak hour of traffic was included in the traffic impact analysis. The existing weekday PM peak hour of traffic in the study area occurred from 3:15 PM to 4:15 PM. Komohana Street carried over 1,000 vph, total for both directions during the existing weekday PM peak hour of traffic. Ponahawai Street carried over 600 vph, total for both directions. The intersection of Komohana Street and Ponahawai Street continued to operate at satisfactory Levels of Service, during the existing weekday PM peak hour of traffic. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 7 5. Existing Saturday Peak Hour Traffic The existing Saturday peak hour of traffic in the study area occurred from 1:15 PM to 2:15 PM. Komohana Street carried about 650 vph, while Ponahawai Street carried about 350 vph, total for both directions, during the existing Saturday peak hour of traffic. The intersection of Komohana Street and Ponahawai Street operated at satisfactory Levels of Service, during the existing Saturday peak hour of traffic. The existing peak hour traffic volumes are depicted in Figure 3. III. Future Traffic Conditions A. Background Growth in Traffic The Federal-Aid Highways Transportation Plan for the District of Hawai`i (TPDH) was prepared for the State of Hawai`i Department of Transportation (DOT), in cooperation with the County of Hawai`i Department of Public Works and Planning Department. The TPDH developed long-range travel forecasts for Hawai`i Island based upon future socio-economic conditions. The TPDH projected an annual growth rate of about 1.14 percent in vehicle trips in South Hilo. For the purpose of this traffic study, the TPDH-projected 1.14 percent annual growth rate in traffic was uniformly applied to existing weekday AM, midday, and PM peak hour traffic and the Saturday peak hour of traffic to estimate the Year 2030, Year 2035, and Year 2045 traffic demands. B. Hilo Benioff Medical Center The expansion and redesign of the Hilo Benioff Medical Center (HBMC) is under construction at this writing. The HBMC expansion will add over 93,000 SFGFA and 67 beds. The HBMC Cancer Center is also being expanded by about 17,000 SFGFA. A new 19,000 SFGFA medical office building will be constructed next to the HBMC Cancer Center. The Final Environmental Assessment Proposed Hilo Medical Center Expansion (FEA) was prepared for the Hawai`i Health Systems Corporation by Munekiyo & Hiraga, Inc., dated April 2023. The FEA included a traffic impact analysis report. The FEA traffic study trip generation and traffic assignments were included in the future traffic conditions. C. Wailani Master Plan Wailani Master Plan is a proposed mixed-use development in South Hilo, Hawai`i Island. The 172-acre project site is identified as Tax Map Keys: 2-3-044:019, 023, 024, & 025. The properties are located generally along the mauka (west) side of Komohana Street near its intersection with Ponahawai Street and extends up to Mohouli Street. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 8 Existing AM Peak Hour Traffic Existing Midday Peak Hour Traffic Existing PM Peak Hour Traffic Existing Saturday Peak Hour Traffic Figure 3. Existing Peak Hour Traffic Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 9 The Wailani Master Plan will be developed in six (6) phases, which will include a total of 612 dwelling units, a 250-room hotel, and a total of 320,000 square feet of commercial floor area. The development of the Wailani Master Plan is expected to begin along the Mohouli Street Extension with completion of Phase 1 in the Year 2035. Ponahawai Street is expected to be extended from Komohana Street to the Mohouli Street Extension by the Year 2040. The Wailani Master Plan is expected to be fully built out and occupied by the Year 2050. The Wailani Master Plan roadway improvements, trip generation, and traffic assignments were included in the future traffic conditions without the proposed Hilo Entertainment Center. D. Year 2030 Peak Hour Traffic Analysis Without Project The left-turn movement from Ponahawai Street onto Komohana Street is expected to continue to operate at LOS “D”, during the Year 2030 weekday AM peak hour of traffic without the proposed project. The other traffic movements at the intersection are expected to operate at satisfactory Levels of Service. During the Year 2030 weekday midday and PM peak hours of traffic and the Saturday peak hour of traffic without the proposed project, the intersection of Komohana Street and Ponahawai Street is expected to operate at satisfactory Levels of Service. Figure 4 depicts the Year 2030 weekday AM, midday and PM peak hour traffic and the Saturday peak hour traffic without the proposed project. E. Year 2035 Peak Hour Traffic Analysis Without Project The left-turn movement from Ponahawai Street onto Komohana Street is expected to continue to operate at LOS “D”, during the Year 2035 weekday AM peak hour of traffic without the proposed project. The other traffic movements at the intersection are expected to operate at satisfactory Levels of Service. The intersection of Komohana Street and Ponahawai Street is expected to operate at satisfactory Levels of Service, during the Year 2035 weekday midday and PM peak hours of traffic and the Saturday peak hour of traffic. The Year 2035 weekday AM, midday, and PM peak hour traffic and the Saturday peak hour traffic without the proposed project are depicted in Figure 5. F. Year 2045 Peak Hour Traffic Analysis Without Project The extension of Ponahawai Street to Mohouli Street will improve the Komohana Street intersection to a channelized four-legged intersection. During the Year 2045 weekday AM, midday, and PM peak hours of traffic and the Saturday peak hour of traffic without the proposed project, the intersection of Komohana Street and Ponahawai Street is expected to operate at acceptable Levels of Service, i.e., LOS “D” or better. Figure 6 depicts the Year 2045 weekday AM, midday, and PM peak hour traffic and the Saturday peak hour traffic without the proposed project. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 10 AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project Figure 4. Year 2030 Peak Hour Traffic Without Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 11 AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project Figure 5. Year 2035 Peak Hour Traffic Without Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 12 AM Peak Hour Traffic Without Project Midday Peak Hour Traffic Without Project PM Peak Hour Traffic Without Project Saturday Peak Hour Traffic Without Project Figure 6. Year 2045 Peak Hour Traffic Without Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 13 IV. Traffic Impact Analysis A. Site Access Improvements The following site access improvements, which are depicted in Figure 7, are proposed at the Hilo Entertainment Center Driveway on Komohana Street: 1. Widen southbound Komohana Street at the Hilo Entertainment Center Driveway to provide an exclusive left-turn lane. 2. Widen the south leg of Komohana Street at the Hilo Entertainment Center Driveway to provide a median refuge lane. 3. Provide separate left-turn and right-turn lanes on the Hilo Entertainment Center Driveway. B. Trip Generation Characteristics The ITE trip generation rates for a Bowling Alley (ITE Land Use Code 457) are used to estimate the trip generation for the proposed Hilo Entertainment Center. The restaurant, bar, and arcade are assumed to be typical commercial activities, which are included in a bowling alley. Table 2 summarizes the trip generation characteristics of the proposed 20- lane bowling alley. Table 2. Trip Generation Characteristics 20-Lane Bowling Alley Peak Hour Vehicle Trips (vph) AM Midday PM Saturday Enter 86 68 17 19 Exit 5 23 9 29 Total 91 91 26 48 C. Traffic Assignment The peak hour traffic assignments were based upon the projected traffic circulation patterns. The Years 2030 and 2035 weekday AM, midday peak hour traffic assignments and Saturday peak hour traffic assignment are depicted in Figure 8. Figure 9 depicts the Year 2045 weekday AM, midday, and PM peak hour traffic assignments and the Saturday peak hour traffic assignment. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 14 Figure 7. Access Driveway Improvements Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 15 AM Peak Hour Traffic Assignment Midday Peak Hour Traffic Assignment PM Peak Hour Traffic Assignment Saturday Peak Hour Traffic Assignment Figure 8. Years 2030 and 2035 Peak Hour Traffic Assignments Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 16 AM Peak Hour Traffic Assignment Midday Peak Hour Traffic Assignment PM Peak Hour Traffic Assignment Saturday Peak Hour Traffic Assignment Figure 9. Year 2045 Peak Hour Traffic Assignments Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 17 D. Year 2030 Peak Hour Traffic Impact Analysis The Hilo Entertainment Center Driveway on Komohana Street is expected to operate at LOS “C” , during the Year 2030 weekday AM, midday, PM peak hours of traffic, and the Saturday peak hour of traffic with the proposed project. The Komohana Street intersection at Ponahawai Street is expected to operate at satisfactory Levels of Service, during the Year 2030 weekday AM, midday, PM peak hours of traffic, and the Saturday peak hour of traffic with the proposed project. The Year 2030 weekday AM, midday, and PM peak hour traffic volumes and the Saturday peak hour traffic volumes with the proposed project are depicted on Figure 10. V. Long-Range Traffic Analysis A. Future Growth in Traffic The proposed project is expected to be fully built out and operational by the Year 2030. The trip generation for the proposed project is assumed to remain constant beyond the Year 2030. However, the Hawai`i County Concurrency Requirements require the analysis of ten-year (2035) and twenty-year (2045) traffic projections for future growth in the project area, which are beyond the development time frame of the proposed project. B. Year 2035 Peak Hour Traffic Impact Analysis During the Year 2035 weekday AM, midday, PM peak hours of traffic and the Saturday peak hour of traffic with the proposed project, the Hilo Entertainment Center Driveway on Komohana Street is expected to continue to operate at LOS “C”. The intersection of Komohana Street and Ponahawai Street is also expected to continue to operate at satisfactory Levels of Service during the Year 2035 weekday AM, midday, PM peak hours of traffic, and the Saturday peak hour of traffic with the proposed project. Figure 11 depicts the Year 2035 weekday AM, midday, and PM peak hour traffic volumes and the Saturday peak hour traffic volumes with the proposed project. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 18 AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project Figure 10. Year 2030 Peak Hour Traffic With Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 19 AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project Figure 11. Year 2035 Peak Hour Traffic With Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 20 C. Year 2045 Peak Hour Traffic Impact Analysis The Hilo Entertainment Center Driveway on Komohana Street is expected to continue to operate at LOS “C”, during the Year 2045 weekday AM, midday, PM peak hours of traffic, and the Saturday peak hour of traffic with the proposed project. The Komohana Street intersection at Ponahawai Street is expected to operate at acceptable Levels of Service, during the Year 2045 weekday AM, midday, PM peak hours of traffic, and the Saturday peak hour of traffic with the proposed project. The Year 2045 weekday AM, midday, and PM peak hour traffic volumes and the Saturday peak hour traffic volumes with the proposed project are depicted in Figure 12. VI. Recommendations and Conclusions A. Recommended Access Improvements 1. Southbound Komohana Street should be widened at the Hilo Entertainment Center Driveway to provide an exclusive left-turn lane. 2. The south leg of Komohana Street should be widened at the Hilo Entertainment Center Driveway to provide a median refuge lane. 3. The Hilo Entertainment Center Driveway should provide separate left-turn and right- turn lanes. B. Conclusions The Hilo Entertainment Driveway is expected to operate at LOS “C” through the Year 2045 peak hours of traffic. The intersection of Komohana Street and Ponahawai Street is expected to operate at acceptable Levels of Service through the Year 2045 peak hours of traffic with the proposed project. The development of the proposed Hilo Entertainment Center in South Hilo, Hawai`i Island is not expected to significantly impact traffic operations on Komohana Street. Table 3 summarizes the traffic impact analysis for this study. Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 21 AM Peak Hour Traffic With Project Midday Peak Hour Traffic With Project PM Peak Hour Traffic With Project Saturday Peak Hour Traffic With Project Figure 12. Year 2045 Peak Hour Traffic With Project Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 22 Table 3. Summary of Peak Hour Capacity Analysis Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection Existing AM Peak Hour Komohana Street & Ponahawai Street LOS N/A N/A N/A D N/A A N/A B A A A N/A B Delay N/A N/A N/A 36.1 N/A 10.0 N/A 15.0 4.3 6.4 4.0 N/A 11.9 v/c N/A N/A N/A 0.51 N/A 0.63 N/A 0.59 0.20 0.47 0.16 N/A Max: 0.63 Existing Midday Peak Hour Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 26.0 N/A 6.8 N/A 8.5 2.0 7.6 7.0 N/A 8.9 v/c N/A N/A N/A 0.50 N/A 0.42 N/A 0.38 0.15 0.41 0.44 N/A Max: 0.50 Existing PM Peak Hour Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 24.1 N/A 6.4 N/A 6.7 2.0 6.1 7.5 N/A 8.6 v/c N/A N/A N/A 0.49 N/A 0.40 N/A 0.23 0.11 0.27 0.45 N/A Max: 0.49 Existing Saturday Peak Hour Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 22.8 N/A 7.2 N/A 7.6 2.8 3.9 4.5 N/A 8.1 v/c N/A N/A N/A 0.38 N/A 0.34 N/A 0.20 0.06 0.08 0.19 N/A Max: 0.38 Year 2030 AM Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A D N/A B N/A B A A A N/A B Delay N/A N/A N/A 35.9 N/A 10.6 N/A 17.5 5.1 8.2 4.3 N/A 13.3 v/c N/A N/A N/A 0.51 N/A 0.66 N/A 0.67 0.21 0.55 0.18 N/A Max: 0.67 Year 2030 Midday Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A B Delay N/A N/A N/A 26.2 N/A 6.7 N/A 9.2 2.0 9.3 8.0 N/A 9.5 v/c N/A N/A N/A 0.51 N/A 0.45 N/A 0.42 0.16 0.49 0.50 N/A Max: 0.51 Year 2030 PM Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A B Delay N/A N/A N/A 24.4 N/A 6.3 N/A 7.2 2.0 6.7 8.2 N/A 10.2 v/c N/A N/A N/A 0.51 N/A 0.42 N/A 0.29 0.12 0.31 0.50 N/A Max: 0.56 Year 2030 Saturday Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 22.9 N/A 7.1 N/A 7.9 2.8 4.0 4.7 N/A 8.1 v/c N/A N/A N/A 0.39 N/A 0.37 N/A 0.23 0.07 0.09 0.21 N/A Max: 0.39 Legend MOE–Measure of Effectiveness LOS–Level of Service Delay–Average Delay (seconds/vehicle) v/c–Volume-to-Capacity Ratio N/A–Not Applicable EBL–Eastbound Left-Turn Movement EBT–Eastbound Through Movement EBR–Eastbound Right–Turn Movement WBL–Westbound Left-Turn Movement WBT–Westbound Through Movement WBR–Westbound Right-Turn Movement NBL–Northbound Left-Turn Movement NBT–Northbound Through Movement NBR–Northbound Right-Turn Movement SBL–Southbound Left-Turn Movement SBT–Southbound Through Movement SBR–Southbound Right-Turn Movement Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 23 Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.) Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection Year 2035 AM Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A D N/A B N/A C A B A N/A B Delay N/A N/A N/A 35.3 N/A 13.0 N/A 23.0 6.4 15.2 4.7 N/A 16.8 v/c N/A N/A N/A 0.52 N/A 0.71 N/A 0.75 0.24 0.66 0.19 N/A Max: 0.75 Year 2035 Midday Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A B A N/A B Delay N/A N/A N/A 30.7 N/A 7.9 N/A 13.4 3.0 10.8 7.9 N/A 11.2 v/c N/A N/A N/A 0.56 N/A 0.61 N/A 0.49 0.18 0.61 0.50 N/A Max: 0.61 Year 2035 PM Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A A A N/A B Delay N/A N/A N/A 30.8 N/A 7.2 N/A 11.7 2.8 6.5 7.9 N/A 10.4 v/c N/A N/A N/A 0.56 N/A 0.53 N/A 0.35 0.14 0.38 0.49 N/A Max: 0.56 Year 2035 Saturday Peak Hour Without Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A A A N/A A Delay N/A N/A N/A 23.1 N/A 7.1 N/A 10.3 3.2 4.4 5.2 N/A 8.8 v/c N/A N/A N/A 0.41 N/A 0.47 N/A 0.30 0.09 0.16 0.24 N/A Max: 0.47 Year 2045 AM Peak Hour Without Project Komohana Street & Ponahawai Street LOS C C A C C B A C A C B A B Delay 29.6 24.3 5.8 31.4 23.6 12.5 9.9 23.5 6.0 20.0 12.6 1.5 17.5 v/c 0.52 0.38 0.41 0.57 0.33 0.63 0.38 0.76 0.27 0.67 0.19 0.07 Max: 0.76 Year 2045 Midday Peak Hour Without Project Komohana Street & Ponahawai Street LOS D B A C C A D B A B C A C Delay 44.4 19.8 7.2 26.5 22.8 4.9 52.7 17.1 3.4 14.6 25.4 3.3 21.5 v/c 0.80 0.16 0.50 0.50 0.37 0.30 0.92 0.40 0.22 0.56 0.74 0.25 Max: 0.92 Year 2045 PM Peak Hour Without Project Komohana Street & Ponahawai Street LOS D C A D C A C B A A C A C Delay 51.0 24.7 5.9 35.4 27.8 5.9 27.5 14.9 3.4 9.4 31.8 4.5 22.4 v/c 0.80 0.16 0.47 0.60 0.36 0.33 0.78 0.23 0.16 0.34 0.78 0.22 Max: 0.80 Year 2045 Saturday Peak Hour Without Project Komohana Street & Ponahawai Street LOS D C A C C A B B A A B A B Delay 36.0 20.5 5.5 25.4 23.7 5.8 12.2 10.6 3.2 7.5 14.1 3.3 14.4 v/c 0.68 0.15 0.44 0.40 0.36 0.23 0.51 0.14 0.08 0.10 0.30 0.19 Max: 0.68 Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 24 Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.) Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection Year 2030 AM Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A D N/A A N/A C A A A N/A B Delay N/A N/A N/A 36.6 N/A 9.2 N/A 20.5 6.1 9.5 4.7 N/A 14.6 v/c N/A N/A N/A 0.56 N/A 0.64 N/A 0.70 0.22 0.57 0.20 N/A Max: 0.70 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A Delay N/A N/A N/A 15.5 N/A 15.5 N/A N/A N/A 10.1 - N/A 0.5 v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.07 - N/A N/A Year 2030 Midday Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A A A N/A B Delay N/A N/A N/A 31.2 N/A 7.1 N/A 13.2 2.8 8.1 8.0 N/A 11.0 v/c N/A N/A N/A 0.57 N/A 0.45 N/A 0.48 0.18 0.50 0.51 N/A Max: 0.57 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 16.5 N/A 12.6 N/A N/A N/A 9.0 - N/A 0.6 v/c N/A N/A N/A 0.03 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A Year 2030 PM Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A A A N/A B Delay N/A N/A N/A 31.1 N/A 7.2 N/A 11.3 3.4 5.6 7.4 N/A 10.3 v/c N/A N/A N/A 0.56 N/A 0.44 N/A 0.33 0.20 0.31 0.47 N/A Max: 0.56 Komohana Street & Site Access Driveway LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 14.9 N/A 11.1 N/A N/A N/A 8.3 - N/A 0.2 v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.01 - N/A N/A Year 2030 Saturday Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 29.4 N/A 8.1 N/A 7.3 2.3 3.8 4.6 N/A 8.9 v/c N/A N/A N/A 0.46 N/A 0.39 N/A 0.24 0.07 0.10 0.22 N/A Max: 0.46 Komohana Street & Site Access Driveway LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 11.7 N/A 10.3 N/A N/A N/A 8.0 - N/A 0.5 v/c N/A N/A N/A 0.02 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A Year 2035 AM Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A D N/A B N/A C A B A N/A B Delay N/A N/A N/A 36.5 N/A 12.6 N/A 23.9 6.6 17.8 5.0 N/A 17.7 v/c N/A N/A N/A 0.57 N/A 0.71 N/A 0.76 0.25 0.69 0.21 N/A Max: 0.76 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A Delay N/A N/A N/A 16.1 N/A 16.2 N/A N/A N/A 10.4 - N/A 0.4 v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.07 - N/A N/A Year 2035 Midday Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A B A N/A B Delay N/A N/A N/A 31.2 N/A 7.5 N/A 14.1 3.2 12.4 8.8 N/A 11.9 v/c N/A N/A N/A 0.58 N/A 0.60 N/A 0.51 0.19 0.64 0.53 N/A Max: 0.64 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 16.5 N/A 12.7 N/A N/A N/A 9.0 - N/A 0.6 v/c N/A N/A N/A 0.02 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 25 Table 3. Summary of Peak Hour Capacity Analysis (Cont’d.) Peak Hour Intersection MOE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Intersection Year 2035 PM Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A B A A A N/A B Delay N/A N/A N/A 31.0 N/A 7.2 N/A 11.9 2.8 6.6 8.1 N/A 10.5 v/c N/A N/A N/A 0.57 N/A 0.52 N/A 0.35 0.14 0.39 0.49 N/A Max: 0.57 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 15.1 N/A 11.1 N/A N/A N/A 8.4 - N/A 0.2 v/c N/A N/A N/A 0.01 N/A 0.01 N/A N/A N/A 0.01 - N/A N/A Year 2035 Saturday Peak Hour With Project Komohana Street & Ponahawai Street LOS N/A N/A N/A C N/A A N/A A A A A N/A A Delay N/A N/A N/A 30.1 N/A 8.0 N/A 9.5 2.6 4.4 5.1 N/A 9.6 v/c N/A N/A N/A 0.50 N/A 0.51 N/A 0.30 0.09 0.17 0.26 N/A Max: 0.51 Komohana Street & Site Access Driveway LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 12.3 N/A 10.7 N/A N/A N/A 8.1 - N/A 0.5 v/c N/A N/A N/A 0.02 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A Year 2045 AM Peak Hour With Project Komohana Street & Ponahawai Street LOS C C A C C B B C A C B A B Delay 28.0 23.5 5.5 32.8 22.9 11.7 10.7 25.0 6.4 23.0 13.3 1.5 18.1 v/c 0.49 0.35 0.41 0.62 0.31 0.61 0.39 0.77 0.28 0.70 0.20 0.07 Max: 0.77 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A C N/A N/A N/A B - N/A A Delay N/A N/A N/A 20.0 N/A 21.3 N/A N/A N/A 11.9 - N/A 0.4 v/c N/A N/A N/A 0.01 N/A 0.02 N/A N/A N/A 0.08 - N/A N/A Year 2045 Midday Peak Hour With Project Komohana Street & Ponahawai Street LOS D C B C C A D C B B C B C Delay 53.2 23.8 10.0 32.3 27.2 5.0 38.4 25.9 12.1 13.0 30.3 10.9 24.7 v/c 0.83 0.15 0.53 0.54 0.36 0.29 0.84 0.48 0.28 0.50 0.76 0.26 Max: 0.84 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 21.2 N/A 14.3 N/A N/A N/A 9.6 - N/A 0.5 v/c N/A N/A N/A 0.04 N/A 0.04 N/A N/A N/A 0.06 - N/A N/A Year 2045 PM Peak Hour With Project Komohana Street & Ponahawai Street LOS D C A D C A C B A A C A C Delay 51.0 24.7 5.9 35.8 27.8 5.9 29.3 14.9 3.4 9.5 32.5 4.6 22.8 v/c 0.80 0.16 0.48 0.61 0.36 0.33 0.79 0.23 0.16 0.35 0.79 0.22 Max: 0.80 Komohana Street & Site Access Driveway LOS N/A N/A N/A C N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 19.5 N/A 13.2 N/A N/A N/A 9.1 - N/A 0.1 v/c N/A N/A N/A 0.02 N/A 0.01 N/A N/A N/A 0.02 - N/A N/A Year 2045 Saturday Peak Hour With Project Komohana Street & Ponahawai Street LOS D C A C C A B B A A B A B Delay 36.0 20.5 5.5 25.8 23.7 5.8 12.6 10.7 3.5 7.5 14.2 3.3 14.5 v/c 0.68 0.15 0.44 0.42 0.36 0.23 0.53 0.15 0.09 0.10 0.30 0.19 Max: 0.68 Komohana Street & Site Access Driveway LOS N/A N/A N/A B N/A B N/A N/A N/A A - N/A A Delay N/A N/A N/A 14.3 N/A 12.0 N/A N/A N/A 8.6 - N/A 0.4 v/c N/A N/A N/A 0.03 N/A 0.03 N/A N/A N/A 0.01 - N/A N/A TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX A EXISTIN TRAFFIC COUNT DATA                        !"!  #$# %#& !' #! & !'(   #(#!"! )(#!"!  * '  +, -./   !#/01 0  1$#/2# 3 #,  +#"/&& 44#!,   55(#6$ $ #  2 2-751%$   *#$ 8,$ 8,$ .# !# 3    9   $   &#, 6666 : ) % 6666 :& ) % 6666 : & % 6666 :--    /  5 1 55     5 5 15  ;5;5 11;11; / 1 17 5     1 1 ;1;1 1;1; /1  15 ; 55   77 ;  55 11 11 /; 15 ; 55 5 5   ;  77 17;17; 2 "& ;1  5 5 15  1 ;7;7 7 ;7 7777 11 1/  1 ; 5 5 5 1  1 1 ;  7575 11 1/ 17 ; 55 55 5  7 7 ;7   77 11 1/1  ; ; 5 5   55  ; ;; 1717 1/; 11  7; 5   ;1     11 2 "& ;7 ;   1 ; 57 1 1      157157 ;/  ; 1; 77  1  1 1 ;; 1 ;; 1111 ;/ ;1 1; ; ;  1    1 51 5 ;/1   ; 77 7  77 ;; 1 77 1;51;5 ;/; 1 17     ;  11 5 5 2 "&  ; 1 ;1 ;7   1;1; ; ;; 7;7; 1;1; /  ;  7777 7  55 1   1 1   / ; 1 55  5 7575 5 51      /1  1 1 7;7; 1  7;7; 1;  11 ; ; /;   77 1; 7   5 75 77 2 "& ;;  1 7 7  7; 71 71  11 ;; ;;   7/  1   ;1     5 5555 11 7/ 11 1 7171 1  7171  ; 77 5 5 7/1  5 17 ;; 15 ;    ;  7171 7/; 7 ;7;7 1;  ;1;1   77   2 "&    5 5 75 ; 5 5 ;5 ; 7 7 755755 /    1;1;  7 1111  1 ;; 77 /   1515  7 1111  ;;   7 7 /1    1717 7 5 ; ;   7;7;  ; ; /; ; 1   5 1 1 7 1; ; ;  2 "& 7 77 11  5   1; ; 5 5 ;71;71 5/    ; ;   11  1 ;1;1  ; ; 5/   55  1 5 5 5    11 5/1    7 5 5 1 ;    5/;  ;    ; ; ; ; ; 77 2 "& 17 ; 5151 1 ;  7     1 1  /  ;     ;   7 7 1 1 55 /   55  1 ;;     /1  ;      ;    /;  7   ;   ; 5 ;; 2 "& 1;  77 7;   7   7 7 ; ;   7/   1  1 1 7171 ;1 ;5  1 1  /     ;1 1 11 ; ;1 5151 1;71;7 /1  1  1 1 ;5 ;1  7  55 ;1;1 /; ;    ; ; ;; 7 1 11 2 "&  1 5 151151      ;  151151 ;5;5 5/   1 5 5  1 15 77 ;; 7;  5 5 11 5/ ; 1 77 57 1   7 11 57 57 5/1  7 1 11  ; 1111 11 ;1 77 ;5 ;5 5/; 7 11 ;; 5 7    ;     2 "& 5 ; 7 7 15 17 55 5 5 1717 ; ; /  1 ; 11  1 ;; 1   ; ; 17 17 / ; ; 55 5   5 5 51 ; 1 1 ; ; /1  1 1 77; 1    7; 7 5 5 1 1 /; ; 1  7 1   15  ; ; 1 1  2 "& ;1 7 1 51 5 1   ;5 ;5 ; ; 751751 ;1;1 1/        1 ; ;; 1717 1/ 1 1 7575   ;   1 ;1 ; 1/1  ; 1 5 5   77 ;1 7 1 1 1717 1/; ; 1   ; 5151 ;5  5 77 1717 2 "&  1 1 71 7 71 5 1;51;5 7 ;; 771771 11 ;/  1; 11 77 71  55 ;  7 77 1 1 ;/ 1 1 7;7; 7 1 55 ;; 5 1111 57 57 ;/1   15  71  5;5; ; ; 5 5 171171 ;/; 11 15  ; 5  17 5    1 1 2 "& 5 ;     1 51 5 71 ;;; 7 7   1; 1; /  1; ; ;;;   1    1 1 / 15  7171 ; 7171  7 5757   /1  ; 5 7575  ; ;;   55 1 1 /; ; 5   1  ;; 5 7  77 2 "& 17     57 7 7 7 1  ; ;  11 7/  1; 7 7 7 ; ; 77 ; 7 5 5   7/ 5  11 7; 1  ; ;7 7 7 ;; 7/1  7 1 ;7;7 ;   1  7171 7;7; 7/; 1 ;1;1     7 55 5 5 2 "&   5757 7 1 ; ; 7 5 55 55  /  5  11 1;  ;;;;  ;; 11 1717 / ; 1;1; ; 7 7  ; 77    /1   5    ; 1 1 7 ;7     /; 1    5 5  11 ; ;   2 "& 7 7 55 7     1  5 5 ;;;; 5/   ;   7 5 5 1 1    5/   11  7   7 1 1515 ;; 5/1    ;;  ; 77     5/; 5 7 ;;  1 11 1 1 1   2 "& ;; 17 5 5 71  5 5   7 1111   /   5        1 1  /   ; 77 7   ; ; /1    55 1 1 1 1    /; 5  11   ;  1 1 77 2 "& 7   7 55        /  1 ;  5  ;; 1 11     /  ;     15 55 7 7  ; ; ;;;; /1  5 51    ;5  55 ;1;1 /; ; 5  1 1  1 77  17 5555 ; ;  2 "&   5 1 1 5 ;    5 15 15   5/  17 ;; 5 5 5 1;  1 1 ; 7  ; ; 1 1  5/  ; 77    5 5  5 55 ; ; 5/1  5    1;  ; ; ; 7;    5; 5; 5/;  1 ;;  1 1;1; 17  11 5 5 2 "&  ; ;7   11 17 ;5;5 ;7 ; 1515  7 7 /  11 ;7   1     5   1;1; / 15 7 ;;  11  5 5 ;1   ;5;5 1 1 /1  17 1   1   1 1 7777 11 /; ; ; 55 55 1;   ;  ; ; 1;11;1 2 "& ; 5 1 1  1  ;; 1 ; 7 ;7 ; ; 7; 7 1/   1 7777 57 5  ; ; ;1  7 7 11 11 1/ 1 ; 55 7  ; 17  1;1; 1/1  ; ; ;; 7 1  ; ; 55 17 17 1/; 1; 1 77   5 5 ;  ; ; 11 2 "& 15  1 1    15 15 5 ; 775775 17 17 ;/   ;  7 55     1 1 ;/ ;5 ;   ;   1   ; ; 1 1    *#$ 8,$ 8,$ .# !# 3    9   $   &#, 6666 : ) % 6666 :& ) % 6666 : & % 6666 :-- ;/1  ; ;1   7  5;5; 1  5 77 1;11;1 ;/; ;1 ; 5;5; ;5 7 ;; ;  1 1   2 "&   1717 ;1 55 1111 7 ; 7777 1 51 5 /  1 7 77;  7777 1 7  5 5   / 11  55    1 ;  ;7 ;7 /1  11 1 77 ;5 5 7777 7 75 ;;   /; 1    1 5 5   5 5   2 "& 1  ; ; ;  1 11 1  7 1 11 ;; 7/  1  77 1  ;;  7  5 5 7/ 1 1 77  7 11  ;; 5 5 7/1  1; ; 55   77 7 77  7/;  ;; ; ; 77 1 ;7  77 2 "&       75 75  ; 5; 5; ;; /  5 1 55   11  1 ;; 1717 / 1  1515 17  ;5;5  7;   /1  ;  11  5 11 7 15 ;;  7 7 /;  11 7  11  17 ;5;5 55 2 "& ; 7   5 1 11 ; 7 ; ; 11 5/   5   1 7    1; ;;;;   5/ 5  1 1   1 1 1 5 ;;  1 1 5/1     7 7 7  11 ; ; 55 5/; 5     1 ; ; 7  11 5555 2 "& 7 ;      17  ; 7 7 1717 /   1 1 1   5 5 ; ; ; 5;5; / 5 1   1 ;   ;;   /1      7 11 11  /;  5 55 1 1 7 7   55 7 7 2 "& ;7 ;     1 5      5 /   1;  1 7 77 7 55 1 1 / 1  ;5;5 7     ;1 7;7; 5 5 /1  7    ; 55  71 5555 ; ; /;   ;7;7   77  ; 77 77 2 "&  1 5 5   7 5 5  7 1 1 5555 1/  11 ;  ;     77 55 77 1/ 5 7 ;;;; ;  ;;   77 7 7 1/1    ;; 17 77  1 5151 11 1/;   ;;;; 1 7 77   5 5 11 2 "&      7 7 7 7;  11 ;;;; ;/  ;  ;;  ; ;1;1 5 ;; 7 7   ;/ 1  ;5;5 1;  ;;  1 7575 77 ;/1    ;7;7 ;  ;;  ; 77 77 ;/; 1 ;; ;    7 17   7575 2 "&  5 5;5;    5 5  1 ;1 ;1 7171 /  7 1515 ;1   1 1 7777  /   1515 ;5 7 7;7; 5 1 11  /1      15    5 1   /;  ;; 11   ; 7777 7777 2 "& 5  7 7 ; ;  57 7 7 77 7/  1  ;; 1  ;1;1 1 ; 7 7   7/     ;1 7 ;; 1  7;7; 7171 7/1  7 1515   7 7 5 ;     7/;  ; 11   11 ; 5 ; ; 77 2 "& ; 7    ; 11 ;5  5 5 55 /  7 1 11 5 7 1;1;  ;1      / 7 7 1 1 7 1   5 ;7 ;;  /1      1     ;     /;   ; ;   ; ; 1 ;    2 "& ; 77   5; 5   1  55 ;; 5/   ; 1 1   1 1  ; 11 5;5; 5/  7 11 ; 1    11 ; ; 5 5   *#$ 8,$ 8,$ .# !# 3    9   $   &#, 6666 : ) % 6666 :& ) % 6666 : & % 6666 :-- 5/1      1 1 1    7 7 5/;    1  55  1 1 1 77 2 "& 1 17 77 5 55 5   5 5 1 1 /    55      77 / 7   ;      ; ; /1     1 ;  7     /;  7     7   11 2 "& 1  77  7  5 7 5151    /  5 11  7 1  17 ;     / 1 7   1 ;  1 ;    1 1 /1      17 1;   7  11; ;; ; /; 17   7 7 ;5  1 1  1 ;; ; 1; 1 2 "&  7 5 157157 1 77  ; ; 7; 7 11 5/  1 ;; 77  17 55 ;7 ;  1 1  5/ 5 1; 7 7   1 1 1 17 7 77   5/1  1 1 77 7 ;;   1 ;     5/;  1 77   ; ;; 15 7  1 1 1 51 5 2 "&   ;7  ; 5    ; 17;17; 55 & & 15 ;1 555 5 7;   ; ; 151 ;71 1 11 1 1 1  1   <66 !<66 ! ;70< 10< < 70;< 107< <  505< 0 < <  <& <& < <07< 10;< < 0 < 0 < 701< 50< < 1;0;<1;0;<0< 50< < ; 07<; 07<  !"!  !"!  ;     7   < !"! < !"!   0< 0 < < 0< 0< 0 < < < 0 < 0 < 0< 0 < < 0 < 0 < 0 < # # 17 ;1;; 5; 5; 5;; 71   7 7 177 17 1 71 7 1 1 < #< # 07< 0 < < 0;<0;<505< 01<  < 50<50<501< 50< < 50<50<0 < $# %#& !'$# %#& !'      77 7 11  <$# %#& !'<$# %#& !'  01< 01< < 01< 01< 07< 0;< < 0< 0< 0;< 07< < 0< 0< 0<  #! & !' #! & !'   1 1 77   < #! & !'< #! & !'  < < < < < < 0< < 0< 0< < < < < < < ( (    ;;  1 5 5 ;  7777  5 <( <(   0< 01< < 0 < 0 < 01< 0< < 0 < 0 <0< 01< < 0< 0< 01< (#!"! )(#!"! )  ; ;; ;  <(#!"! )<(#!"! )  < < < < < < < < < < < < < < < <  #       ;         1 < #   <     ;0<           <  (#!"!  * '      ;         <(#!"!  * '  <     0<          <    *#$ 8,$ 8,$ .# !# 3    9   $   &#, 6666 : ) % 6666 :& ) % 6666 : & % 6666 :-- : #(#!"!  * '0 / 4)/)#&/& %/%&                             !"!  # $# %# & !'  #!  & !' (   # (#!"!   ) (#!"!    * '  +, -./    !#/ 01  0  1 $# / 2#  3 #,   +# "/ & & 44#! ,   55 (#6 $  $ #   2  2- 751 %$                                      !      "  ! ! "   "  #     ! #  !# !  ! !#    ! !!   !                         !" #" $ % $" %"&$ %"' ()" *+,- .- / ",-/0.- . - 0 /.  !$,12"")"" ($$,33" )" "" --44%5! !-/ . 1" 1* /4- #!  6 "'! 7)"! 7)"! +" 2"$ 6"$ 8"$ !"$ ) 5555 $9  & # 5555 $9  & # 5555 $9   # 5555 $9 *"*"    ,  - : .. --  -:.-:. / - - -: -:   ,-  : :/ 4/4/ 4- . - 4- 4 4 -:   : : ,   . ..-/: - - - : -- -4 -4 . . ,:  : . ././ .  - - 4 - -: -:  - -  -: -  4 4 - . - :4 :4 : : / 44 -:.-:. ;55;55 :0:; 0; ; .:0-; 0/; ;  04; .0 ; ;  ;; ; ;/0.; --0 ; ; 0/; 0/; :0 ; 40 ; ;  0.; 0.;- 0 ; -0 ; ; :0:;:0:; 1 1  04 - 04:  04 04  0.. 04/  04 04  0. 04  0. 0. 04..   - --- --  ;;  ; 0; ; 0; 0; 0; ; ; 0 ; 0 ; ; ; ; ; ; 0-;    -:- -:    - : :.:. : . . -:  ; ;  /40; //0:; ; //0 ;//0 ;/40; //0 ; ; /404;/404;/40 ; //0-; ; /404;/404;/404; !" #"!" #"  - -   ;!" #";!" #" -0:; ; ; 0; 0; 0; 04; ; 0:; 0:; ; 0:; ; 0; 0; 0:; $$     ;$;$  ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; %%   : / ;%;%  ; ; ; ; ; 04; ; ; 0; 0;-04; 0:; ; 0/; 0/; 0; %"&$%"&$     ;%"&$;%"&$  ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; $"      -         ; $"       - ;            %"'              ;%"'       ;            9 $""$%"'0,3 &,&  , #,#"                            !" #"  $  % $" % " &$ % " '  ()" *+, - .- / ", -/0.- . - 0 /.  ! $, 1 2"")" " ($$ ,  33 " )" "" --44 %5 ! ! -/ . 1" 1* /4- #!                                                                              !"# !$"%$!&' !'(&' )' (!$ )!$*( )!$+ ,-$ ./0 10 2  !$/02310 1 0 3 21  !(/4!5$!$-$$ ,!((/&#&66!$"-$ $'$ 00)!#7 '!02 1 4$'' 4. 280 % "  $#+! -#$ -#$ !!$ 5'$( '$( #'$( '#'$( &!- 7777 (9 * % 7777 (9 & * % 7777 (9 & % 7777 (9 .$.$    /  : 2 2  08 8282 8   0 0 /0   :: 8 0 1 1 0 : 8:8: 0 0 /  8 2 1 : 00 8  : : /:  0 :8:8 0 1 0 8181 00 : 8 8 082082 && 2 00  0 1 8 1 1 11 08 2 2 11 ;77#;77# : 31; :3; ; 1230; 32; ;  83; 131; ;  ;&;& ; ;0 30; 0:3; ; 83:; 83:; 3; 138; ; 83:;83:;23; 13:; ; 13 ;13 ; 4 4  320 30  30 30  32: 38  3 3 311 30  3 3  31      ;;  ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; !"# !"# 2 00    8  1 0 2 2 10 ; !"#; !"# 0 ; 0 ; ; 0 ;0 ;23 ; 0 ; ; 238;238;213:; 223 ; ; 223 ;223 ;2230; !$"%$!&'!$"%$!&'  0 00  0 00  ;!$"%$!&';!$"%$!&'  ; ; ; ; ; 3:; ; ; 3; 3; ; 3 ; ; 3; 3; 3; !'(&'!'(&'     ;!'(&';!'(&'  ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; )')'    : ;)';)'  ; ; ; ; ; 32; ; ; 31; 31; 38; ; ; 31; 31; 3 ; )!$*()!$*(  0 00  0 ;)!$*(;)!$*(  ; ; ; ; ; 3:; ; ; 3; 3; ; ; ; ; ; 30; (!$              ; (!$       ;            )!$+      0         ;)!$+       0 ;            9 (!$$()!$+3 / 6 */*!"# &/&#' %/%&'$                           !"# !$"%$! &' !'( &' )' (!$ )! $ *( )! $ +  ,-$ ./ 0 10 2 !$/ 02310 1 0 3 21  ! (/ 4! 5$!$-$ $ ,!(( / &# &66! $"-$ $'$ 00 )!#7  '! 02 1 4$'' 4. 280 %                                                                           ! "#$%&#'$('#  # ) * )#'*# ! '+)*# ! ',  -' ./  0 " #'012  1 0 2&#)#3'#'-'' #))!%44#  '$-' '' *#%5&&#0  '.062(& "$ 7 '%,#& 8-%'& 8-%'& /# #' 3') 7') 9%') &%') #- 55 55 ):" + ( 55 55 ): + ( 55 55 ):"  ( 55 55 ):.'.'   2 6 0 0  2 ; 0 0 2 ;    20 20 2  0 0 00 26 2;   6 0 2 2 ; ;; ; ; 26 0  6 6 ; 2 2  2 0;0; ; 2; 2  2 ;; 66  26    ;6 ;0 0 0 2 02 0   0 ;; 0 6  6 6 2 00 ;2;2 6 6 < 55 %< 55 %  01 <  1< < 1 < 21 < <  21< ;61 < <  << < <1< 16< < 61 < 61 <2 1<  1< < ;612<;612<;1<  1< < 1 < 1 <   122 1   1 1  102 1 0  10; 10; 162 120  106 106  10 ;  !   !       <  ! <  !   < < < < < < < < < < < 1 < < 1 < 1 < 1< "#$%"#$% 0 0 ; ;  6    2 0; ; ;  <"#$%<"#$% 001 < 0012< < 0012<0012<0012<  < < 001;<001;<0016< 01 < < 016<016<001 < &#'$('# &#'$('#     ; <&#'$('# <&#'$('#   < < < < < 1;< < < 12< 12< < 1 < < 1 < 1 < 12< # )  # )      < # ) < # )   < < < < < < < < < < < < < < < < **  22     <*<*  1< 1< < 1< 1< 1;< < < 12< 12< 1;< 1 < < 1 < 1 < 1;< *# ! '+)*# ! '+)      <*# ! '+)<*# ! '+)  < < < < < < < < < < < 1 < < 1 < 1 < 1< )#'                <)#'   <      <           <  *# ! ',              <*# ! ',  <     <          <  :)#'')*# ! ',1""4++#$%%(('                              !  "#$% &#'$('#   # )   * )#' *# !  ' +) *# !  ' ,  -' ./   0  " #' 012   1 0 2 &# ) # 3'#'-' ' #)) ! % 44# '$-' ''  *#%5 & &# 0  ' . 062 (&                                       !   !  "# !            # "    TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX B CAPACITY ANALYSIS WORKSHEETS EXISTIN TRAFFIC CONDITIONS TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX C CAPACITY ANALYSIS WORKSHEETS YEAR 2030 PEAK HOUR TRAFFIC WITHOUT PRO ECT TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX D CAPACITY ANALYSIS WORKSHEETS YEAR 2035 PEAK HOUR TRAFFIC WITHOUT PROJECT TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX E CAPACITY ANALYSIS WORKSHEETS YEAR 204 PEAK HOUR TRAFFIC WITHOUT PRO ECT TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX F CAPACITY ANALYSIS WORKSHEETS YEAR 2030 PEAK HOUR TRAFFIC WITH PRO ECT TRAFFIC IMPACT ANALYSIS REPORT FOR THE PROPOSED HILO ENTERTAINMENT CENTER SOUTH HILO, HAWAI`I ISLAND TAX MAP KEY: 2-3-037:006 APPENDIX CAPACITY ANALYSIS WORKSHEETS YEAR 203 PEAK HOUR TRAFFIC WITH PRO ECT KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response  KBXTREME HILO, LLC  Revised Supplement to Application Documents  June 12, 2026  County of Hawai'i Planning Department  Attn: Jessica Andrews, Planner V  101 Pauahi Street, Suite 3  Hilo, Hawai'i 96720  Subject: Supplemental Application Materials and Clarification  Request for Rezoning and Ordinance Amendment ‐ KBXtreme Hilo, LLC  REZ 09‐000113; Ordinance No. 10‐045  South Hilo, Hawai'i; TMK: (3) 2‐3‐037:006; 279 Komohana Street, Hilo  Aloha Ms. Andrews:  KBXtreme Hilo, LLC respectfully submits this revised supplement to address the Planning Department  completeness review items for the above‐referenced application. This revised supplement is intended to  supplement and clarify the January 14, 2026 revised application package. To the extent any prior narrative  language is inconsistent with this revised supplement, this revised supplement is intended to supersede the  inconsistent language only for the subjects addressed below.  The applicant remains committed to moving the application forward in a clear and coordinated manner and  appreciates the Planning Department's guidance in identifying the items that should be clarified before the  application is accepted as complete.  1. Condition B ‐ Time Extension and Building Permit Timing  The applicant acknowledges that the original Condition B of Ordinance No. 10‐45 required the anticipated  maximum daily water usage calculations, as recommended by a registered engineer, and the water commitment  deposit to be submitted to the Department of Water Supply within 180 days from the effective date of the  ordinance. The applicant further acknowledges that this requirement was not completed within the original 180‐ day period.  To address this directly, the applicant hereby expands and clarifies the pending ordinance amendment request to  include a time extension and amendment to Condition B. The requested amendment would extend the original  180‐day deadline and align the water commitment requirement with the current project request by requiring the  water usage calculations and required water commitment deposit to be completed before issuance of a  Department of Water Supply water commitment and before issuance of the first building permit for the project.  The applicant is not requesting that the Department of Water Supply requirement be waived. Rather, the  applicant requests that the timing be updated to match the present stage and realities of the project while  preserving the Department of Water Supply's full review authority. The water calculations and deposit should be  tied to the current family entertainment center project, current engineering, and the site plan that will be used for  the Planning Commission presentation, rather than to the former commercial office concept associated with the  original rezoning.  This timing is also important to the financial feasibility of the project. KBXtreme Hilo, LLC is making a significant  private investment in a community‐based facility intended to serve Hilo families, students, seniors, leagues, local  KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response  employees, and community events. The application narrative identifies the project as highly leveraged, with  construction costs expected to exceed $10 million. Requiring a water commitment deposit before the entitlement,  plan approval, construction drawing, financing, and building permit pieces are aligned would unnecessarily tie up  capital that is needed to move the project through the remaining pre‐construction steps. Aligning the payment  with the building permit stage allows the applicant to preserve project capital until the project is ready to proceed,  while still ensuring that no water commitment or building permit is issued until the Department of Water Supply  requirement is satisfied.  The applicant understands that the Department of Water Supply may require time to review the calculations and  process any water commitment before building permit issuance. The applicant will coordinate with the  Department of Water Supply sufficiently in advance of the building permit stage so that this condition can be  resolved without delaying construction once the project is otherwise ready to proceed.  Requested amended Condition B:  B. Prior to the issuance of a water commitment by the Department of Water Supply and prior to the  issuance of the first building permit for the proposed development, the applicant(s), successors or assigns  shall submit to the Department of Water Supply the anticipated maximum daily water usage calculations,  as recommended by a registered engineer, and a water commitment deposit in accordance with the Water  Commitment Guidelines Policy, or as otherwise required or approved by the Department of Water Supply.  The time for performance of this condition is hereby extended and amended from the original requirement  that performance occur within one hundred eighty (180) days from the effective date of Ordinance No. 10‐ 45 to the timing set forth in this amended condition. No water commitment shall be issued by the  Department of Water Supply, and no building permit for the proposed development shall be issued, until  the Department of Water Supply confirms that the requirements of this condition have been satisfied or  otherwise addressed to its satisfaction.  The applicant is willing to work with Planning Department staff, the Department of Water Supply, and the  Planning Commission on non‐substantive wording revisions needed to conform the requested Condition B  amendment to the County's preferred ordinance format, provided that the amended condition preserves the  requested extension to the building permit stage and continues to protect the Department of Water Supply's  authority.  2. Surrounding Property Owners Within 300 Feet  The applicant understands that the previously submitted surrounding property owner list was incomplete. The  applicant will replace the previously submitted Exhibit E with a revised Exhibit E generated using the County Real  Property Tax website buffer tool and consistent with the accurate list provided by the Planning Department.  The previously submitted Exhibit E should be considered superseded. Enclosed/uploaded with this supplement are  the corrected 300‐foot surrounding property owner list and corresponding mailing labels generated from the  County Real Property Tax website buffer tool. If the Planning Department requires any formatting change to the  mailing labels or owner list, the applicant will provide the requested revision promptly.  3. Controlling Site Plan for Planning Commission Presentation  The applicant confirms that the most accurate site plan for Planning Commission presentation is the site plan  included in the Final Traffic Impact Analysis Report dated July 21, 2025, specifically Figure 2, "Hilo Entertainment  Center Site Plan."  KBXtreme Hilo, LLC ‐ Revised Supplemental Application Response  Any different site plans included in the application narrative or earlier exhibit materials should be treated as  preliminary, supporting, or superseded drawings for purposes of Planning Commission presentation. The TIAR site  plan should be used as the controlling conceptual site plan at this stage.  This clarification does not change the applicant's understanding that final building layout, parking layout, civil  improvements, drainage, utility details, and other design items will be reviewed and finalized through Final Plan  Approval, Department of Public Works review, Department of Water Supply review, and the Building Permit  process. The purpose of this clarification is simply to provide a single site plan for the Planning Commission record  and staff presentation.  4. EPIC Contact and Billing Contact Update  Ralph Brown should be removed as the billing contact in EPIC, and the billing contact information should be  updated. The updated billing contact is:  Billing Contact Nancy Wang‐Ponthier  Title / Entity Accountant / Accounts Payable  Mailing Address 75‐5591 Palani Road, Suite 3008, Kailua‐Kona, Hawai'i 96740‐3633  Phone / Email 808‐930‐9208 /     If Planning Department staff still sees Ralph Brown associated with any billing or application‐contact role that  should be removed, please advise and the applicant will correct the EPIC entry promptly.  5. Request for Acceptance as Complete  With this revised supplement, the revised 300‐foot surrounding property owner list, the mailing labels, the  controlling TIAR site plan clarification, and the EPIC billing contact update, the applicant respectfully requests that  the Planning Department accept the application as complete and continue processing it for the Planning  Commission.  Mahalo for your continued assistance.  Sincerely,  Calvin C. M. Higa  Senior Vice President  WLW Development Methods, Inc.  Managing Member for KBXtreme Hilo, LLC  Enclosures / uploads:  ‐ Revised Exhibit E ‐ corrected surrounding property owner list within 300 feet of the subject property, generated  from the County Real Property Tax website buffer tool.  ‐ Controlling site plan for Planning Commission presentation: Final TIAR dated July 21, 2025, Figure 2, "Hilo  Entertainment Center Site Plan" (or duplicate copy attached as supplemental site‐plan exhibit, if requested by  staff).  Hilo Entertainment Center Traffic Impact Analysis Report July 21, 2025 3 Figure 2. Hilo Entertainment Center Site Plan 75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawaii 96740 (808) 329-0911 FAX (808) 329-0913 WLW Development Methods, Inc. _______________________________________________________________________________________________________________ William L. Wong, President Iris A. Wong, Vice President and Treasurer Calvin C.M. Higa Jr., Senior Vice President Elaine F. Higashi, Secretary Pamela M. Wong, Assistant Secretary July 1, 2026 Jessica Andrews, Planner V County of Hawai‘i Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawai‘i 96720 Re: Amendment to Rezone Application, PL-REZ-2024-000074 TMK: (3) 2-3-037-006:0000 Aloha Jessica, This letter is provided to clarify the ownership, applicant, and representative information for the above-referenced application. KBXtreme Hilo, LLC is the fee simple landowner of the property identified as TMK (3) 2-3- 037-006:0000. The application is being submitted by KBXtreme Hilo, LLC as the landowner, by and through its sole Managing Member, WLW Development Methods, Inc. WLW Development Methods, Inc. is the sole Managing Member of KBXtreme Hilo, LLC. I, Calvin C.M. Higa Jr., am a registered officer of WLW Development Methods, Inc. and serve as Senior Vice President of WLW Development Methods, Inc. In my capacity as Senior Vice President of WLW Development Methods, Inc., I am authorized to represent WLW Development Methods, Inc., as sole Managing Member of KBXtreme Hilo, LLC, in connection with this application. This includes submitting documents, signing correspondence, communicating with the Planning Department, and otherwise processing the application on behalf of KBXtreme Hilo, LLC, the fee simple landowner. Attached are DCCA records reflecting that WLW Development Methods, Inc. is the Managing Member of KBXtreme Hilo, LLC, and that I am a registered officer of WLW Development Methods, Inc. Also attached is an updated Application Form for the above-referenced application. This updated form is intended to supersede and correct the applicant, landowner, title, and representative information contained in the prior application form currently on file. The updated form clarifies that KBXtreme Hilo, LLC is the fee simple landowner and applicant, submitting the application by and through its sole Managing Member, WLW Development Methods, Inc., and that Calvin C.M. Higa Jr. is acting as the authorized representative/contact in his capacity as Senior Vice President of WLW Development Methods, Inc. Please let me know if the Planning Department requires any additional documentation or a formal corporate resolution. Mahalo, KBXtreme Hilo, LLC Fee Simple Landowner By: ___________________________ Calvin C.M. Higa Jr., Senior Vice President of WLW Development Methods, Inc., Sole Managing Member of KBXtreme Hilo, LLC DCCA State of Hawaii Downloaded on July 1, 2026.The information provided below is not a certification of good standing and does not constitute any other certification by the State.Website URL: http://hbe.ehawaii.gov/documents Business Information MASTER NAME KBXTREME HILO LLC BUSINESS TYPE Domestic Limited Liability Company (LLC) FILE NUMBER 168184 C5 STATUS Active ORGANIZED IN Hawaii UNITED STATES REGISTRATION DATE Jan 25, 2017 PRINCIPAL ADDRESS 75-5591 PALANI RD STE 3008 KAILUA-KONA, Hawaii 96740 UNITED STATES MAILING ADDRESS 75-5591 PALANI RD STE 3008 KAILUA-KONA, Hawaii 96740 UNITED STATES CROSS REFERENCE NAME KB XTREME HILO LLC CROSS REFERENCE NAME KB EXTREME HILO LLC MANAGED BY MANAGER(S) AGENT NAME WLW DEVELOPMENT METHODS, INC. AGENT ADDRESS 75-5591 PALANI RD STE 3008 KAILUA-KONA, Hawaii 96740 UNITED STATES Annual Filings FILING YEAR DATE RECEIVED STATUS 2026 Jan 26, 2026 Processed 2025 Feb 12, 2025 Processed 2024 Feb 22, 2024 Processed 2023 Jan 5, 2023 Processed 2022 Jan 14, 2022 Processed 2021 Feb 4, 2021 Processed 2020 Jan 9, 2020 Processed 2019 Jan 29, 2019 Processed 2018 Feb 5, 2018 Processed Officers NAME OFFICE DATE WLW DEVELOPMENT METHODS, INC.MGR Mar 1, 2017 DCCA State of Hawaii Downloaded on July 1, 2026.The information provided below is not a certification of good standing and does not constitute any other certification by the State.Website URL: http://hbe.ehawaii.gov/documents Business Information MASTER NAME WLW DEVELOPMENT METHODS, INC. BUSINESS TYPE Domestic Profit Corporation FILE NUMBER 58949 D1 STATUS Active PURPOSE COMMERCIAL DEVELOPMENT OF REAL PROPERTY ORGANIZED IN Hawaii UNITED STATES INCORPORATION DATE Nov 30, 1984 PRINCIPAL ADDRESS 75-5591 PALANI RD STE 3008 KAILUA KONA, Hawaii 96740 UNITED STATES MAILING ADDRESS 75-5591 PALANI RD STE 3008 KAILUA KONA, Hawaii 96740 UNITED STATES TERM PER AGENT NAME WILLIAM L. WONG AGENT ADDRESS 75-5591 PALANI ROAD SUITE 3008 KAILUA KONA, Hawaii 96740 UNITED STATES Annual Filings FILING YEAR DATE RECEIVED STATUS 2025 Oct 6, 2025 Processed 2024 Oct 24, 2024 Processed 2023 Oct 23, 2023 Processed 2022 Oct 28, 2022 Processed 2021 Oct 21, 2021 Processed 2020 Oct 21, 2020 Processed 2019 Oct 21, 2019 Processed 2018 Oct 2, 2018 Processed 2017 Oct 3, 2017 Processed 2016 Oct 25, 2016 Processed 2015 Oct 16, 2015 Processed 2014 Oct 23, 2014 Processed 2013 Oct 3, 2013 Processed 2012 Oct 3, 2012 Processed 2011 Oct 24, 2011 Processed 2010 Oct 20, 2010 Processed 2009 Oct 5, 2009 Processed 2008 Nov 6, 2008 Processed 2007 Oct 24, 2007 Processed 2006 Oct 18, 2006 Processed 2005 Nov 2, 2005 Processed 2004 Oct 19, 2004 Processed 2003 Jun 23, 2004 Processed 2002 Not Required 2001 Processed 2000 Processed 1999 Processed Officers NAME OFFICE DATE WONG,WILLIAM L P/D Oct 1, 2018 HIGA,CALVIN C M JR SRV/D Oct 1, 2021 WONG,IRIS A V/T/D Oct 1, 2020 HIGASHI,ELAINE F S/D Oct 1, 2021 WONG, PAMELA M AS/D Oct 1, 2021 Stocks DATE CLASS SHARES PAID SHARES PAR VALUE STOCK AMOUNT Oct 1, 2015 COMMON 10,000 3,000 1. CHANGE OF ZONE APPLICATION COUNTY OF HAWAIދ, PLANNING COMMISSION (Type or legibly print the requested information) APPLICANT(S): APPLICANT’S SIGNATURE: DATE: ADDRESS: LIST APPLICANT’S INTEREST (if not owner): PHONE: (Bus.) (Res.) (Email) REQUEST: TO (Existing Zoning) (Proposed Zoning) TAX MAP KEY(S): SIZEOFPROPERTY ORAFFECTED AREA(S)TO BE REZONED: LANDOWNER(S): FEE SIMPLE LANDOWNER(S) WRITTEN AUTHORIZATION (may be provided by letter with the below statement included): DATE: DATE: AGENT: AGENT ADDRESS: PHONE: (Bus.) (Res.) (Email) Please indicate to whom original correspondence and copies should be sent. ORIGINAL: COPIES: KBXtreme Hilo, LLC 12/06/2024 Calvin CM Higa Jr, Sr Vice President of WLW Development Methods, Inc.Managing Member for KBXtreme Hilo, LLC 75-5591 Palani Road, Suite 3008, Kailua Kona, HI 96740 808-329-0911 & A-1a CN-20 (3) 2-3-037-006:0000 5.075 Acres KBXtreme Hilo, LLC Applicant N/A - Applicant is the fee simple landowner N/A Applicant LINDA LINGLE OOVIANOR OF HAWAII PLANNING DJEPA ^I'ENTCfiV. 7010 JAN 1 1 AM 7: 55 January 8, 2010 STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES STATE HISTORIC PRESERVATION DIVISION 601 KAMOIU ABOULEVARD, ROOM 555 KAPOLEI, HAWAII 96707 Bobby Jean Leithead-Todd, Planning Director Attention: Norman Hayashi County of Hawaii Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawaii 96720-4224 Dear Ms. Leithead-Todd: AURA 11. n11ELNN C1WRFIfl 4 BOARD OF LNN AND NATURAL RL'90URC19 CTWMBSIW ON WAMP R1300141I:MANA iIIAIIO' RUSSELL Y. FUJI PONT I)l1'Nl' KEN C NAWAIIARA INIUT1' WRR{l'DII . wait AQUATIC, RESOUR tS WMn1f AND UI,NN InteR ATION BUREAU OFCONVEV WL 3 fWINLt4WN ON WATER RLSOURtl MMIMmIMINr IONSERVAllaa AND l VAYrAL INBri IUNSERVAl11W AND RISOURrON FNIRMRTMINr FBOLIIYIFBSRTRyflISEIWAi0N RMINl1AW!!BRAND INSF.RVE([W Ml1ICN LADSTATRIANRR LOG NO: 2009.4203 DOC NO: 1001TD08 Archaeology SUBJECT: Chapter 6E-8 Historic Preservation Review — Change of Zone Application (REZ 09-000113) for Gillie & Jane Silva Ponahawai Ahupua'a, South Hilo District, Island of Hawaii TMK: (3) 2-3-037: 006 Thank you for requesting our comments pertaining to the subject application, which was received in our office December 10, 2009. The applicants are requesting a zone change from agriculture to commercial neighborhood, in preparation for a new office building on the 5 -acre parcel. We have previously reviewed this application (Log 2009.1575, Doc 0904MD01), and our letter to the Silvas is attached to the application. We have received no new information regarding the condition of the property since our last review. The property has been grubbing in the recent past and it was intensively cultivated for sugar prior to 1971. We determine that no historic properties will be affected by this project because: Grubbing/grading has altered the land Development/urbanization has altered the land Intensive agriculture has altered the land SHPD previously reviewed this project and determined that no historic properties would be affected (see above) In the event that historic resources, including human skeletal remains, lava tubes, and lava blisters/bubbles are identified during the activities, all work should cease in the immediate vicinity of the find, the find should be protected from additional disturbance, and the State Historic Preservation Division, Hawaii Island Section, should be contacted immediately. Please contact Theresa Donham at 808) 933-7653 if you have any questions or concerns regarding this letter. Al heresa K. Donham, Lead Archaeologist Hawaii Island Section State Historic Preservation Division 053615 JOSH GREEN, M.D. KENNETH S. FINK, M.D, MGA, MPH GOVERNOR OF HAWAII DIRECTOR OF HEALTH KE KIA’AINA O KA MOKU’AINA O HAWAI’I KA LUNA HO’OKELE STATE OF HAWAII DEPARTMENT OF HEALTH P.O. BOX 916 HILO, HAWAII 96721-0916 MEMORANDUM DATE: July 14, 2026 TO: Mr. Jeffrey W. Darrow Planning Director, County of Hawaii FROM: Eric Honda District Environmental Health Program Chief SUBJECT: Change of Zone Amendment Application (PL-REZ-2024-000074) Amendment to Change of Zone Ordinance No. 10-45 (REZ-09-000113) Applicant: KBXtreme Hilo, LLC Request: Amend Ordinance No. 10-45 to Delete the 180-Day Timeframe for Condition B (Water Commitment), Allow a 10-Year Time Extension to Condition E (Complete Construction), Delete Condition G (Access Easement), Delete Condition H (Limitations to Komohana St. Access), Delete Condition J (Full Improvements to Komohana St.), Delete Condition K (Streetlights & Traffic Control Devices), and to Add 2 New Conditions TMK: 2-3-037:006, Ponahawai, South Hilo, Hawaiʻi In most cases, the District Health Office will no longer provide individual comments to agencies or project owners to expedite the land use review and process. Agencies, project owners, and their agents should apply Department of Health “Standard Comments” regarding land use to their standard project comments in their submittal. Standard comments can be found on the Land Use Planning Review section of the Department of Health website: https://health.hawaii.gov/epo/landuse/. Contact information for each Branch/Office is available on that website. Note: Agencies and project owners are responsible for adhering to all applicable standard comments and obtaining proper and necessary permits before the commencement of any work. Jeffrey W. Darrow July 14, 2026 Page 2 of 4 General summary comments have been included for your convenience. However, these comments are not all-inclusive and do not substitute for review of and compliance with all applicable standard comments for the various DOH individual programs. Clean Air Branch 1. All project activities shall comply with the Hawaii Administrative Rules (HAR), Chapters 11-59 and 11-60.1. 2. Control of Fugitive Dust: You must reasonably control the generation of all airborne, visible fugitive dust and comply with the fugitive dust provisions of HAR §11-60.1-33. Note that activities that occur near existing residences, businesses, public areas, and major thoroughfares exacerbate potential dust concerns. It is recommended that a dust control management plan be developed which identifies and mitigates all activities that may generate airborne and visible fugitive dust and that buffer zones be established wherever possible. 3. Standard comments for the Clean Air Branch are at: https://health.hawaii.gov/epo/landuse/ Clean Water Branch 1. All project activities shall comply with the HAR, Chapters 11-53, 11-54, and 11-55. 1. The following Clean Water Branch website contains information for agencies and/or project owners who are seeking comments regarding environmental compliance for their projects with HAR, Chapters 11-53, 11-54, and 11-55: https://health.hawaii.gov/cwb/clean-water-branch-home- page/cwb- standard-comments/. Hazard Evaluation & Emergency Response Office 1. A Phase I Environmental Site Assessment (ESA) and Phase II Site Investigation should be conducted for projects wherever current or former activities on site may have resulted in releases of hazardous substances, including oil or chemicals. Areas of concern include current and former industrial areas, harbors, airports, and formerly and currently zoned agricultural lands used for growing sugar, pineapple or other agricultural products. 2. Standard comments for the Hazard Evaluation & Emergency Response Office are at: https://health.hawaii.gov/epo/landuse/. Indoor and Radiological Health Branch 1. Project activities shall comply with HAR Chapters 11-39, 11-45, 11-46, 11-501, 11-502, 11-503, and 11-504. 2. Noise may be generated during demolition and/or construction. The applicable maximum permissible sound levels, as stated in Title 11, HAR, Chapter 11-46, “Community Noise Control,” shall not be exceeded unless a noise permit is obtained from the Department of Health. Jeffrey W. Darrow July 14, 2026 Page 3 of 4 3. Construction/Demolition Involving Asbestos: If the proposed project includes renovation/demolition activities that may involve asbestos, the applicant should contact the Asbestos and Lead Section of the Branch at https://health.hawaii.gov/irhb/asbestos/. Safe Drinking Water Branch 1. Agencies and/or project owners are responsible for ensuring environmental compliance for their projects in the areas of 1) Public Water Systems; 2) Underground Injection Control; and 3) Groundwater and Source Water Protection in accordance with HAR Chapters 11-19, 11-20, 11-21, 11-23, 11-23A, and 11- 25. They may be responsible for fulfilling additional requirements related to the Safe Drinking Water program: https://health.hawaii.gov/sdwb/. 2. Standard comments for the Safe Drinking Water Branch can be found at: https://health.hawaii.gov/epo/landuse/. Solid & Hazardous Waste Branch 1. Hazardous Waste Program - The state regulations for hazardous waste and used oil are in HAR Chapters 11-260.1 to 11-279.1. These rules apply to the identification, handling, transportation, storage, and disposal of regulated hazardous waste and used oil. 2. Solid Waste Programs - The laws and regulations are contained in HRS Chapters 339D, 342G, 342H, and 342I, and HAR Chapters 11-58.1 and 11-282. Generators and handlers of solid waste shall ensure proper recycling or disposal at DOH-permitted solid waste management facilities. If possible, waste prevention, reuse, and recycling are preferred options over disposal. The Office of Solid Waste Management also oversees the electronic device recycling and recovery law, the glass advanced disposal fee program, and the deposit beverage container program. 3. Underground Storage Tank Program – The state regulations for underground storage tanks are in HAR Chapter 11-280.1. These rules apply to the design, operation, closure, and release response requirements for underground storage tank systems, including unknown underground tanks identified during construction. 4. Standard comments for the Solid & Hazardous Waste Branch can be found at: https://health.hawaii.gov/epo/landuse/. Wastewater Branch For comments, please email the Wastewater Branch at doh.wwb@doh.hawaii.gov. Sanitation / Local DOH Comments: 1. According to HAR §11-26-35, No person, firm, or corporation shall demolish or Jeffrey W. Darrow July 14, 2026 Page 4 of 4 clear any structure without first ascertaining the presence or absence of rodents that may endanger public health by dispersal from such premises. Should any such inspection reveal the presence of rodents, the rodents shall be eradicated before demolishing or clearing the structure. A demolition permit is required prior to demolition. Other 1. CDC - Healthy Places - Healthy Community Design Checklist Toolkit recommends that state and county planning departments, developers, planners, engineers, and other interested parties apply these principles when planning or reviewing new developments or redevelopment projects. 2. If new information is found or changes are made to your submittal, DOH reserves the right to implement appropriate environmental health restrictions as required. Should there be any questions on this matter, please contact the Department of Health, Hawaii District Health Office, at (808) 933-0917. F WATEg S W4 GAA 19' 49 o DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAI`I oF:..... 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAI'I 96720 TELEPHONE (808) 961-8050 • FAX (808)961-8657 July 24, 2026 RECT HAND DELIVERED TO: Mr. Jeffrey Darrow, Director Planning Department N PLANNING EE r FROM: Keith K. Okamoto, Manager-Chief Engineer JUL 27 9026 p2:4: SUBJECT: Change of Zone Amendment Application Amendment to Change of Zone Ordinance No. 10-45 (REZ-09-000113) Applicant: KBXtreme Hilo,LLC Request: Amend Ordinance No. 10-45 to Delete the 180-Day Timeframe for Condition B (Water Commitment),Allow a 10-Year Time Extension to Condition E (Complete Construction),Delete Condition G (Access Easement), Delete Condition H(Limitations to Komohana St.Access),Delete Condition J Full Improvements to Komohana St.),Delete Condition K(Streetlights& Traffic Control Devices),and to Add 2 New Conditions Tax Map Key 2-3-037:006 (PL-REZ-2024-000074) We have reviewed the subject application for the proposed development and have the following comments: Please be informed that there is an existing 5/8-inch meter serving the subject parcel (Acct.No. 300-58600, Meter No. 221263754), which is limited to an average daily usage of 400 gallons and suitable for only one(1) single-family dwelling. Comments from our January 4,2010 memo are still applicable and attached for your reference. We would also like to emphasize the importance of submitting the required water usage calculations and establishing a water commitment with the Department as soon as possible rather than waiting until just prior to the issuance of a building permit as proposed under Section IV. Rezoning Conditions, Item B of the application. Unless a water commitment is officially issued, water availability is subject to change without notice, depending on the water situation. Should there be any questions, please contact Ms. Robyn Matsumoto of our Water Resources and Planning Branch at(808) 961-8070,extension 255. Sincerely yours, Keith K. Okamoto, P.E. Manager-Chief Engineer RM:dfg Enc. copy— KBXtreme HILO LLC Water, Our gliost Precious Resource. . . Ka Wai A Kane . . . The Department of Water Supply is an Equal Opportunity provider and employer. spa g.Y f f4 t49 r., l. DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII Gy- aFHAWP\\• 3 4 5 KF.KUANAO A STREET. SUITE 23 • HILO HAWAII 96720 TELEPHONE 808, 981-8050 • FAX ,808t 961-3657 January.4, 2010 TO: Ms. I3J Leithead-"Todd, Planning Director Planning Department FROM: Milton D. Pavao, Manager SUBJECT: CHANGE OF ZONE APPLICATION (REZ 09-000113) APPLICANT—GILLIE AND JANE SILVA REQUEST: A-la TO CN-20 TAX MAP KEY 2-3-037:006 We have reviewed the subject application and have the following comments and conditions. Water is available from an existing 8-inch waterline within Ponahawai Street and from an existing 12- inch waterline within Komohana Street, both fronting the subject parcel. There is an existing 1-inch service lateral to the subject parcel, capable of accommodating a 5/8-inch meter, which is limited to a maximum daily usage of 600 gallons. The Department has no objection to the proposed application: however, prior to issuing a water commitment, the applicant shall comply with the following conditions: 1. The Department requests that the applicant submit estimated maximum daily water usage calculations for review and approval. The water usage calculations shall be prepared by a professional engineer licensed in the State of Hawaii and should include the estimated peak flow in gallons per minute (GPM) and the total estimated maximum daily water usage in gallons per day, including all irrigation'landscaping use. Upon receipt of the water usage calculations above, the Department will make a determination as to the water commitment deposit amount_ prevailing facilities charge(subject to change) to be paid. and any water system improvements required for final approval. Based on the water usage calculations provided, if the existing 5'8-inch meter cannot accommodate the estimated demand, a larger or additional meter will need to be installed and remittance of the prevailing facilities charge, will be required. 2. The proposed zoning will require the installation of a reduced pressure type backllow prevention assembly, within live (5) feet ofthe existing meter on private property. if a larger or additional meter is required, rt hackflow prevention assembly will also be required for that meter. The installation of the backflow prevention assembly(s) must be inspected and approved by the Department before water service can be activated. t t titer, Our f%lost Precious RE c'urce . . .Mime . . Ms. BJ Leithead-Todd, Planning Director Page 2 January 4. 2010 3. For your information, the existing 12-inch waterline within Komohana Street is adequate to provide 2,000 GPM for tare protection as required per our Water System Standards for the proposed type of land use. 4. Subject to other agencies' requirements to construct improvements within the road right-of-way fronting the property affected by the proposed development,the applicant shall be responsible for the relocation and adjustment of the Department's affected water system facilities, should they be necessary. Should there be any questions, you may contact Mr. Finn McCall of our Water Resources and Planning Branch at 961-8070, extension 255. Sincerely yours, i734 Milton D. Pavao, P.E. Manager FM:dfg copy - Gillie and Jane Silva All Aina Services WL W Development Methods, Inc. William L. Wong,President Iris A. Wong, Vice President and Treasurer Calvin C.M.Higa Jr.,Senior Vice President Elaine F.Higashi,Secretary Pamela M. Wong,Assistant Secretary COH PLANNING DEPT August 3, 2026 AUG 10 7026 17'.4 07 Keith K. Okamoto, P.E. REC'Q BY iitAIL Manager-Chief Engineer Department of Water Supply, County of Hawaii 345 Kekuanao`a Street, Suite 20 Hilo, Hawaii 96720 Re: Change of Zone Amendment Application Amendment to Change of Zone Ordinance No. 10-45, REZ-09-000113 Applicant: KBXtreme Hilo, LLC Tax Map Key: (3) 2-3-037:006 Planning Department Application No. PL-REZ-2024-000074 Dear Mr. Okamoto: Thank you for your July 24, 2026 letter regarding the above-referenced Change of Zone Amendment Application for KBXtreme Hilo, LLC. We appreciate the Department of Water Supply's review, comments, and recommendations regarding the existing water meter, the need for anticipated water usage calculations, and the importance of establishing a water commitment. We understand DWS's comment that the existing 5/8-inch meter serving the subject parcel is limited to an average daily usage of 400 gallons and is suitable only for one single-family dwelling. We also understand DWS's recommendation that the required water usage calculations be submitted and that a water commitment be established as soon as possible, since water availability may change until a water commitment is officially issued. In response, we have reached out to our project architect, Shane Labeth, and Bruce Meyers of Okahara and Associates, Inc., to review the prior project files and assist us in determining whether any prior water demand calculations, plumbing fixture schedules, mechanical plans, or related documentation were previously prepared. If those calculations were not previously completed, we will work with the appropriate design professionals to determine what is needed to prepare the required water usage calculations for DWS review. 75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawaii 96740 (808) 329-0911 FAX(808) 329-0913 As background, this is a complex, community-based project with substantial private capital at risk. We are working to move the project forward in a fiscally responsible manner while also trying to defer certain project costs until the entitlement, plan approval, construction drawing, financing, and building permit pieces are properly aligned. Bowling and family entertainment facilities are not generally high-margin or financially lucrative businesses, but we believe this project can provide a meaningful benefit to the Hilo community by creating a safe, indoor, family-friendly recreational facility for residents, students, seniors, local families, and visitors. Our intent is not to delay necessary coordination with DWS, but rather to proceed carefully and responsibly as we get the project's requirements in order. We appreciate DWS's guidance and will coordinate with our consultants regarding the water usage calculations and next steps for establishing the appropriate water commitment. Thank you again for your input and recommendations. We look forward to working with the Department of Water Supply, the Planning Department, and the County as we continue moving toward bringing this project to life for the Hilo community. Mahalo, KBXtreme Hilo, LLC Fee Simple Landowner By: ae. Z Calvin C.M. Higa Jr., Senior Vice President of WLW Development Methods, Inc., Sole Managing Member of KBXtreme Hilo, LLC cc: Jeffrey W. Darrow, Planning Director, County of Hawaii Planning Department Robyn Matsumoto, Water Resources and Planning Branch, Department of Water Supply September 8, 2026 Windward Planning Commission County of Hawai‘i Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawai‘i 96720 Re: Update Regarding Condition B / Department of Water Supply Water Commitment KBXtreme Hilo, LLC PL-REZ-2024-000074 / Amend REZ-09-000113 TMK: (3) 2-3-037:006 279 Komohana Street, Ponahawai, South Hilo, Hawai‘i Dear Chair Daniele and Members of the Windward Planning Commission: On behalf of KBXtreme Hilo, LLC, we respectfully submit this correspondence to provide an update regarding Condition B of Change of Zone Ordinance No. 10-45, relating to the Department of Water Supply water commitment requirement. As part of our Change of Zone Amendment Application, KBXtreme Hilo, LLC requested relief from the original 180-day timeframe in Condition B. The purpose of that request was to address the fact that the original timeframe had passed and to better align the water commitment requirement with the current status of the project, including the need to complete entitlement, plan approval, construction drawing, financing, and building permit steps in a fiscally responsible manner. Since submitting the application, however, KBXtreme Hilo, LLC has been actively coordinating with the Department of Water Supply to address its comments and move the water commitment process forward. After receiving DWS’s comments, we contacted our project consultants and coordinated with Okahara and Associates, Inc. to prepare preliminary water use calculations for the proposed family entertainment center. Those calculations were submitted to DWS for review. We understand that DWS has reviewed the matter further and has advised regarding the applicable water commitment requirements, including arranging for a payment plan for the required fee. KBXtreme Hilo, LLC appreciates DWS’s assistance and guidance, and we are continuing to work cooperatively with DWS to further the water commitment process. Accordingly, while our application included a request for relief from the original 180-day timeframe in Condition B, we wish to clarify for the Commission that KBXtreme Hilo, LLC is not seeking to avoid the water commitment requirement. Rather, we requested relief to address the expired timing condition and to allow the project to proceed in an orderly and financially responsible manner. We have since taken active steps to satisfy DWS’s concerns and are working toward securing the required water commitment. To the extent the Planning Department, Department of Water Supply, or the Commission determines that the requested Condition B relief is no longer necessary or should be revised in light of the ongoing DWS coordination and payment-plan arrangement, KBXtreme Hilo, LLC is amenable to modifying that portion of the request accordingly. Our intent is to keep the record accurate, remain responsive to agency comments, and continue moving this community-based project forward in cooperation with the County. KBXtreme Hilo, LLC remains committed to developing a family entertainment center that can provide a safe, indoor, community-oriented recreational facility for Hilo residents, local families, students, seniors, and visitors. We appreciate the County’s review and the opportunity to provide this update. Respectfully submitted, Calvin C. M. Higa Jr. Senior Vice President WLW Development Methods, Inc. Managing Member for KBXtreme Hilo, LLC 75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawai‘i 96740 Direct: (808) 930-9209 Email: September 8, 2026 Jessica Andrews, Planner V County of Hawai‘i Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawai‘i 96720 Re: Response to Department of Public Works Engineering Comments PL-REZ-2024-000074 / Amendment to REZ-09-000113 KBXtreme Hilo, LLC TMK: (3) 2-3-037:006 Aloha Jessica: Thank you for forwarding the September 4, 2026 comments from the Department of Public Works, Engineering Division. We sincerely appreciate DPW’s review of our application and the time taken to evaluate the requested amendments. KBXtreme Hilo, LLC respectfully provides the following responses. Item H – Komohana Street Access We appreciate DPW Engineering’s concurrence with removing the existing right-turn- in/right-turn-out restriction for the Komohana Street access. We understand and agree that the ultimate access improvements, including any auxiliary lanes along Komohana Street, should be consistent with the recommendations of the favorable consideration of this requested amendment. Item J – Komohana Street Frontage Improvements We respectfully request further consideration of the requirement for full curb, gutter, and sidewalk improvements along the project frontage. There are presently no adjoining sidewalks immediately north or south of the subject property extending toward the Ponahawai Street intersection. The existing condition along this portion of Komohana Street consists primarily of paved roadway shoulders. Requiring curb, gutter, and sidewalk improvements solely along the KBXtreme frontage would therefore create an isolated section of sidewalk that would not presently connect to a continuous pedestrian system. We are also mindful that Komohana Street functions as a busy Hilo thoroughfare and that including bicycle travel. The proposed KBXtreme Hilo facility intends to provide bicycle racks for patrons, and we anticipate that University of Hawai‘i at Hilo students and other nearby residents may utilize bicycles to access the facility. Rather than constructing an isolated curb-and-sidewalk segment, we respectfully request the opportunity to preserve and, where necessary, improve the existing paved shoulder in a manner that safely accommodates bicycle and pedestrian movement and remains consistent with the existing character of Komohana Street. We recognize DPW Engineering’s recommendation that Condition J remain subject to further discussion during construction plan review. As an alternative to complete deletion tage improvements to be determined by DPW during construction plan review, with consideration given to maintaining a safe paved shoulder or other bicycle- and pedestrian- compatible treatment in lieu of mandatory curb, gutter, and sidewalk improvements where appropriate. Our objective is to construct the frontage improvements in a safe, functional, and cost- to similar infrastructure on adjoining properties. Item K – We agree with DPW that adequate lighting at the project entrance is necessary for public safety, particularly given the anticipated evening operating hours of the facility. However, existing street lighting is already present within the surrounding Komohana Street project entrance is illuminated. -site streetlight infrastructure, we propose installing appropriately designed on-site lighting at the project driveway entrance. Our intent would be to utilize downward-facing light standards designed to provide the maximum practical illumination permitted under applicable County lighting requirements while minimizing glare, light spill, and impacts to neighboring properties. Locating these improvements on the project site would allow the necessary entrance lighting to be installed and maintained directly by the applicant, while reducing the -site streetlight infrastructure. -site entrance lighting can satisfy the public--site streetlights. We are not requesting relief from the responsibility to provide adequate lighting. Rather, we Item L – been included with the application. KBXtreme will continue to coordinate with DPW required as part of project design and permitting. We sincerely appreciate DPW Engineering’s review and recommendations. KBXtreme Hilo is a substantial community-based project, and we are working to move it forward in a manner that balances public safety, sound engineering, compatibility with existing infrastructure, and the substantial costs associated with development. We respectfully request that these responses and proposed alternatives be considered as the Planning Department prepares its recommendation to the Windward Planning Commission. Mahalo, Calvin C. M. Higa Jr. Senior Vice President Managing Memberfor KBXtreme Hilo, LLC 75-5591 Palani Road, Suite 3008 Kailua-Kona, Hawai‘i 96740 Direct: (808) 930-9209 Email: