HomeMy WebLinkAbout2026-09-29 PL-SMA-2026-000097 Email Applicant's Response to Henry J. Correa J. Comments of 9-24-26Daryn Arai
Land Use Planning Consultant
P.O. BOX 4501, HILO HAWAII 96720
PHONE: (808) 895-3218 EMAIL: DARYN ARAI@OUTLOOK.COM
September 29, 2026
Mr. Louis Daniele III, Chair and
Members of the Windward Planning Commission
101 Pauahi Street, Suite 3
Hilo, HI 96720
Dear Chair Daniele and Members of the Windward Planning Commission:
Subject: Response to Mr. Hank Correa’s letter dated September 24, 2026 regarding
Special Management Area Use Permit Application (PL-SMA-2026-000097)
Applicant: BHG Aloha LLC dba Wild Ginger Hotel
Request: To Construct and Operate a New Two-Story Thirty-Room Hotel Complex that
Includes a Pool, Café, Lounge Area and Related Improvements
Tax Map Key(s): (3) 2-6-002:008 and :012, Puʻuʻeo, South Hilo, Hawaiʻi
The Applicant, BHG Aloha LLC dba Wild Ginger Hotel, received the additional
comments offered by Mr. Henry Correa in his letter dated September 24, 2026 and wishes to
reassure him, as well as the Windward Planning Commission and Planning Department, that
every reasonable effort will be made to remove the hazardous effects of those trees within the
subject properties deemed hazardous by a professional tree removal service or other qualified
contractor within six (6) months from the date of approval of the requested SMA Permit.
The Applicant does not, however, agree with Mr. Correa’s recommendation that the
requested SMA Permit, if approved, be deemed automatically null and void upon failure to
complete mitigating action or the complete removal of the dangerous trees. The Applicant
believes that automatic nullification of the SMA Permit is too excessive an action when the
Applicant is subject to the scheduling and availability of these professional contractors,
especially when there could be intervening natural events that consumes the availability of all
professional contractors on the island. While the Applicant is confident that it secure the
services of a proper professional tree removal contractor and complete removal or hazard
mitigating actions within six (6) months from the date of approval of the SMA Permit, if there is
any unanticipated failure by the Applicant to comply with this deadline, the Applicant simply
wishes due process before the Windward Planning Commission like any other Applicant who
fails to comply with a condition of approval.
Mr. Louis Daniele III, Chair and
Members of the Windward Planning Commission
Page 2 of 2
September 29 2026
This all being said, the Applicant would like to offer the proposed amendment to
proposed Condition 5 as recommended by the Planning Director:
Proposed Condition 5 (material to be deleted is bracketed and struck-out, with added
material underscored):
As represented by the applicant, all hazardous albizia trees shall be removed from the
propert[y prior to commencing construction of the proposed hotel]ies or the hazards
effectively mitigated as deemed appropriate by a professional tree removal contractor
within a period of six (6) months from the effective date of this permit. This condition is
not subject to the opportunity for an initial extension of time as afforded by Condition
No. 17.
Thank you for the opportunity to discuss the concerns of our neighbor with you. Please
feel free to contact me should there be any questions or need for additional information.
Sincerely,
DARYN ARAI
Land Use Planning Consultant
cc via email: BHG Aloha LLC dba Wild Ginger Hotel
Mr. Sidney Fuke, Planning Consultant
Mr. Bruce Meyers, P.E., Okahara and Associates, Inc.
Mr. Robert Iopa, FAIA, WCIT
Mr. Henry “Hank” Correa, Jr.