Loading...
HomeMy WebLinkAboutMulti-Hazard Mitigation Plan: Plan Review Crosswalk CIVIL DEFENSE AGENCY COUNTY OF HAWAII 920 ULULANI STREET HILO,HAWAII 96720 r f LJ 23. Plan Review Crosswalk -4L MITIGATION PLAN REVIEW CROSSWALK INSTRUCTIONS FOR USING THE PLAN REVIEW CROSSWALK FOR REVIEW OF LOCAL MITIGATION PLANS Attached is a Plan Review Crosswalk based on the Local Multi-Hazard Mitigation Planning Guidance,published by FEMA in July,2008. This Plan Review Crosswalk is consistent with the Robert T Stafford Disaster Relief and Emergency Assistance Act(Stafford Act),as amended by Section 322 of the Disaster Mitigation Act of 2000(P.L.106-390),the National Flood Insurance Act of 1968,as amended by the National Flood Insurance Reform Act of 2004(P.L.108-264) and 44 Code of Federal Regulations(CFR)Part 201—Mitigation Planning,inclusive of all amendments through October 31,2007. SCORING SYSTEM N—Needs Improvement: The plan does not meet the minimum for the requirement. Reviewer's comments must be provided. S—Satisfactory: The plan meets the minimum for the requirement. Reviewer's comments are encouraged,but not required. Each requirement includes separate elements.All elements of a requirement must be rated"Satisfactory'in order for the requirement to be fulfilled and receive a summary score of"Satisfactory." A"Needs Improvement"score on elements shaded in gray(recommended but not required)will not preclude the plan from passing. When reviewing single jurisdiction plans,reviewers may want to put an N/A in the boxes for multi-jurisdictional plan requirements.When reviewing multi- jurisdictional plans,however,all elements apply. States that have additional requirements can add them in the appropriate sections of the Local Multi-Hazard Mitigation Planning Guidance or create a new section and modify this Plan Review Crosswalk to record the score for those requirements. Optional matrices for assisting in the review of sections on profiling hazards,assessing vulnerability,and identifying and analyzing mitigation actions are found at the end of the Plan Review Crosswalk. The example below illustrates how to fill in the Plan Review Crosswalk.: Assessing Vulnerability: Overview Requirement§201.6(c)(2)(ii): [The risk assessment shall include a]description of the jurisdiction's vulnerability to the hazards described in paragraph(c)(2)(i)of this section. This description shall include an overall summary of each hazard and its impact on the community. Location in the Plan(section or SCORE Element annex and page#) Reviewer's Comments N S A. Does the new or updated plan include an Section II,pp.4-10 The plan describes the types of assets that are located within geographically defined overall summary description of the hazard areas as well as those that would be affected by winter storms. jurisdiction's vulnerability to each hazard? B. Does the new or updated plan address Section II,pp.10- The plan does not address the impact of two of the five hazards addressed in the plan. the impact of each hazard on the 20 Required Revisions: jurisdiction? Include a description of the impact of floods and earthquakes on the assets. Recommended Revisions: This information can be presented in terms of dollar value or percentages of damage. SUMMARY SCORE J U L Y i , 2 0 0 8 (W I D F I R M ) A- 1 LOCAL MITIGATION PLAN REVIEW CROSSWALK Local Mitigation Plan Review and Approval Status Jurisdiction: County of Hawaii Title of Plan: Date of Plan: County of Hawaii Mult-Hazard Miti ation Plan Aril 2010 Local Point of Contact:Quince T.Mento Address: Title:Administrator Agency:Count of Hawaii Civil Defense Agency Phone Number: 808 935-0031 E-Mail:gmento@co.hawaii.hi.us State Reviewer:Dawn Johnson Title: Date: FEMA Reviewer: Title: Date: Diane Earl Plan Reviewer July 19,2010 Date Received in FEMA Region Insert# Plan Not Approved X Plan Approved Date Approved dFIRM Adopted Participating Risk Mitigation NFIP Status in Ian? Assessment Action Y/N Y/N Y/N Y/N Y/N Y/N N NIA CRS Jurisdiction: Class 1. Y Y Y Y Y Y 2. 3. [ATTACH PAGE(S)WITH ADDITIONAL JURISDICTIONS Notes: Y=Participating N=Not Participating N/A=Not Mapped J U L Y 1 , 2 0 0 8 (W I D F I R M) 2 LOCAL MITIGATION PLAN REVIEW CROSSWALK LOCAL MITIGATION PLAN REVIEW SUMMARY The plan cannot be approved if the plan has not been formally adopted. Each SCORING SYSTEM requirement includes separate elements.All elements of the requirement must be Please check one of the following for each requirement. rated"Satisfactory"in order for the requirement to be fulfilled and receive a score of "Satisfactory."Elements of each requirement are listed on the following pages of the N-Needs Improvement: The plan does not meet the minimum for the Plan Review Crosswalk. A"Needs Improvement"score on elements shaded in gray requirement.Reviewer's comments must be provided. (recommended but not required)will not preclude the plan from passing. Reviewer's comments must be provided for requirements receiving a"Needs Improvement" S-Satisfactory: The plan meets the minimum for the requirement. score. Reviewer's comments are encouraged,but not required. Prerequisite(s)(Check Applicable Box) NOT MET MET Mitigation Strategy N S 1. Adoption by the Local Governing Body: X 13.Local Hazard Mitigation Goals:§201.6(c)(3)(i) §201.6(c)(5) OR 14.Identification and Analysis of Mitigation Actions: §201.6(c)(3)(ii) 2. Multi-Jurisdictional Plan Adoption:§201.6(c)(5) NIA 15. Identification and Analysis of Mitigation AND Actions: NFIP Compliance.§201.6(c)(3)(ii) 3. Multi-Jurisdictional Planning Participation:§201.6(a)(3) NIA 16. Implementation of Mitigation Actions: X §201.6(c)(3)(iii) 17. Multi-Jurisdictional Mitigation Actions: NIA Planning Process N S §201.6(c)(3)(iv) 4. Documentation of the Planning Process:§201.6(b) and§201.6(c)(1) Plan Maintenance Process N S 18. Monitoring,Evaluating,and Updating the Plan: Risk Assessment N S §201.6(c)(4)(ii) 19. Incorporation into Existing Planning 5. Identifying Hazards:§201.6(c)(2)(i) X Mechanisms:§201.6(c)(4)(ii) 6. Profiling Hazards:§201.6(c)(2)(i) 20.Continued Public Involvement:§201.6(c)(4)(iii) X 7. Assessing Vulnerability: Overview:§201.6(c)(2)(ii) X 8.Assessing Vulnerability: Addressing Repetitive Additional State Requirements` t* S Loss Properties.§201.6(c)(2)(11) 9. Assessing Vulnerability: Identifying Structures, Insert State Requirement Infrastructure,and Critical Facilities: 201.6 c 2 ii B X § O( )()O Insert State Requirement 10. Assessing Vulnerability: Estimating Potential Losses: §201.6(c)(2)(ii)(B) X Insert State Requirement 11. Assessing Vulnerability: Analyzing Development X Trends:§201.6(c)(2)(ii)(C) 12. Multi-Jurisdictional Risk Assessment:§201.6(c)(2)(iii) NIA LOCAL MITIGATION PLAN APPROVAL STATUS PLAN NOT APPROVED EEI 'States that have additional requirements can add them in the appropriate sections of the Local Multi-Hazard Mitigation Planning Guidance or create a new section and See Reviewer's Comments modify this Plan Review Crosswalk to record the score for those requirements. PLAN APPROVED J U L Y 1 , 2 0 0 8 (W I D F I R M) See`Summary of Significant Plan Revisions 3 Subsequent to FEMA July 23,2010 Crosswalk." LOCAL MITIGATION P PREREQUISITE(S) 1. Adoption by the Local Governing Body Requirement§201.6(c)(5): [The local hazard mitigation plan shall include]documentation that the plan has been formally adopted by the governing body of the jurisdiction requesting approval of the plan(e.g.,City Council,County Commissioner, Tribal Council). Location in the SCORE Plan(section or NOT Element annex and page# Reviewer's Comments MET MET A. Has the local governing body adopted new See August 16,2010 The updated plan must be adopted by the County of Hawaii. or updated plan? Approval Required Revision: Adoption by the County of Hawaii. X B. Is supporting documentation,such as a See August 16,2010 Required:County Resolution documentation. resolution,included? Approval Required Revision:Documentation of adoption of the April 20 X IO plan by the County of Hawaii. SUMMARY SCORE 2. Multi-Jurisdictional Plan Adoption Requirement§201.6(c)(5): For multi jurisdictional plans,each jurisdiction requesting approval of the plan must document that it has been forma ly adopted. Location in the SCORE Plan(section or NOT Element annex and a e#) Reviewer's Comments MET MET A.Does the new or updated plan indicate the N/A specific jurisdictions re resented in the Ian? B. For each jurisdiction,has the local governing N/A body adopted the new or updated Ian? C.Is supporting documentation,such as a resolution, N/A included for each participating jurisdiction? SUMMARYSCORE 3. Multi-Jurisdictional Planning Participation Requirement§201.6(a)(3): Multi jurisdictional plans(e.g.,watershed plans)may be accepted,as appropriate,as long as each jurisdiction has participa ed in the process...Statewide plans will not be accepted as multi jurisdictional plans. SCORE Location in the Plan(section NOT Element or annex and page# Reviewer's Comments MET MET A. Does the updated plan document how the planning team NIA reviewed and analyzed this section of the plan and whether this section was revised as part of the update process? B. Does the new or updated plan describe how each N/A J U L Y 1 , 2 0 0 8 (W I D F I R M) 4 jurisdiction participated in the plan's development? C. Does the updated plan identify all participating jurisdictions,including new,continuing,and the jurisdictions that no longer participate in the Ian? SLIMMARYSCORE N/A PLANNING PROCESS: §201.6(75): An open public involvernen1 process is essenlial to the developmeru of an ejjeclive plan. 4.Documentation of the Planning Process Requirement§201.6(b): In order to develop a more comprehensive approach to reducing the effects of natural disasters,the planning process shall include: (1) An opportunity for the public to comment on the plan during the drafting stage and prior to plan approval; (2) An opportunity for neighboring communities,local and regional agencies involved in hazard mitigation activities,and agencies that have the authority to regulate development,as well as businesses,academia and other private and non-profit interests to be involved in the planning process;and (3) Review and incorporation,if appropriate,of existing plans,studies,reports,and technical information. Requirement§201.6(c)(1): [The plan shall document]the planning process used to develop the plan,including how it was prepared,who was involved in the process,and how the public was involved. Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the plan provide a narrative description of the Chapter 2 Element satisfied in Chapter 2 X process followed to prepare the new or updated plan? B. Does the updated plan document how the planning Chapter 1 Element discussed in Chapter 1,Appendix A.This Appendix team reviewed and analyzed each element of this Appendix A discusses the overall reorganization of the 2010 Plan.It addresses section of the plan and whether this section was revised the updates and revisions in the updated 2010 plan. as part of the update process? Referenced Although it contains a good description of this element;there is a sentence is portion missing in the 4n,section which states,"Each hazard- completed. specific chapter discusses previous/current mitigation efforts and future mitigation plan activities,so that specific recommendations are focused on each hazard.These recommendations are then---- --" that is where it ends.They need to finish the sentence. X Recommended Revision: • Complete the above referenced sentence. • Provide a more detailed statement of how the planning team reviewed each element of the plan. J U L Y 1 , 2 0 0 8 (W I D F I R M) A-5 �ATION PLAN REVIEW CROSSWALK 4.Documentation of the Planning Process Requirement§201.6(b): In order to develop a more comprehensive approach to reducing the effects of natural disasters,the planning process shall include: (1) An opportunity for the public to comment on the plan during the drafting stage and prior to plan approval; (2) An opportunity for neighboring communities,local and regional agencies involved in hazard mitigation activities,and agencies that have the authority to regulate development,as well as businesses,academia and other private and non-profit interests to be involved in the planning process;and (3) Review and incorporation,if appropriate,of existing plans,studies,reports,and technical information. Requirement§201.6(c)(1): [The plan shall document]the planning process used to develop the plan,including how it was prepared,who was involved in the process,and how the public was involved. Location in the SCORE C. Does the new or updated plan indicate who was Chapter 2, Element satisfied in Chapter 2 involved in the current planning process? (For section 2.1.1 example,who led the development at the staff level and were there any external contributors such as contractors?Who participated on the plan committee, provided information,reviewed drafts,etc.? D. Does the new or updated plan indicate how the public Chapter 2, Element addressed in Ch 2 Mitigation Planning. was involved? (Was the public provided an opportunity Section 2.1.2 to comment an the plan during the drafting stage and There is a lot of discussion about various public venues;however, prior to the plan approval?) the only substantial documentation I could find is a Survey.The narrative and/or the Survey do not show figures as to how many people responded to the survey.As far as I could tell by looking at the graphical sampling of the results is that one question received the most responses and the total who answered that question was 1,111 respondents.That is LESS than 1%of the island's residents (175,784). There is a good analysis of the survey;response may be low based on the population,however,the data collected yields useable information for Mitigation Actions. Recommend Revision: X • P.2-3 states there is a draft available for review on the State website.The link is broken;upload the approved plan on the State website. • Hawaii County Resident Survey:Could use more information on the number of people who filled out the surveys.The number of respondents varies widely with each question. E. Does the new or updated plan discuss the Chapter 2 narrative discusses agencies,academia and various opportunity for neighboring communities,agencies, interested parties,but does not discuss businesses or X businesses,academia,nonprofits,and other interested nonprofits(e.g.the Pacific Tsunami Museum).It does state that parties to be involved in the planning process? the American Red Cross was involved. J U L Y 1 , 2 0 0 8 (W I D F I R M) A-6 �ATION PLAN REVIEW CROSSWALK 4.Documentation of the Planning Process Requirement§201.6(b): In order to develop a more comprehensive approach to reducing the effects of natural disasters,the planning process shall include: (1) An opportunity for the public to comment on the plan during the drafting stage and prior to plan approval; (2) An opportunity for neighboring communities,local and regional agencies involved in hazard mitigation activities,and agencies that have the authority to regulate development,as well as businesses,academia and other private and non-profit interests to be involved in the planning process;and (3) Review and incorporation,if appropriate,of existing plans,studies,reports,and technical information. Requirement§201.6(c)(1): [The plan shall document]the planning process used to develop the plan,including how it was prepared,who was involved in the process,and how the public was involved. Location in the SCORE Recommended Revision: • Include any representation from the private sector such as the hotel industry or other businesses that have been involved with the planning process. • Recommend briefing the Chamber of Commerce,health care and retail sectors. F. Does the planning process describe the review and Several plans and studies have been reviewed and portions incorporation,if appropriate,of existing plans,studies, incorporated into this plan.Specifically—Hawaii State Drought reports,and technical information? Plan,County of Hawaii General Plan,Hurricane Flood X Insurance Study,Structural Assessment of Buildings for Hurricane Shelter Classifications and ASCE 7-10. SLIMMARYSCORE RISK ASSESSMENT: y201.6(c)(2): The plan shall include a risk assessment that provides the factual basis for activities proposed in the strategy to reduce losses from identified hazards. Local risk assessments must provide sufficient information to enable the.jurisdiction to identify and prioritize appropriate mitigation actions to reduce losses from identified hazards. 5.Identifying Hazards Requirement§201.6(c)(2)(i): [The risk assessment shall include a]description of the type...of all natural hazards that can affect the jurisdiction. Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document Chapter 1 Appendix A Chapter 1,Appendix,pgs.Al-1 through A1-5 provides a good how the planning team reviewed and description of the review and updates. analyzed this section of the plan and X whether this section was revised as part of the update process? B. Does the new or updated plan Chapter 4,Section 4.1 Each Hazard is described and discussed in depth in separate include a description of the types of Chapter 5,Section 5.1 chapters. all natural hazards that affect the J U L Y 1 , 2 0 0 8 (W I D F I R M) X 7 jurisdiction? Chapter 6,Section 6.1 Chapter 7,Section 7.1 Chapter 8,Section 8.1 Chapter 9,Section 9.1 Chapter 10,Section 10.1 Chapter 11,Section 11.1 Chapter 12,Section 12.1 Chapter 13,Section 13.1 Chapter 14,Section 14.1 Chapter 15,Section 15.1 Chapter 16,Section 16.1 Chapter 17 SLIMMARYSCORE 6.Profiling Hazards X Requirement§201.6(c)(2)(i): [The risk assessment shall include a]description of the...location and extent of all natural hazards that can affect the jurisdiction. The plan shall include information on previous occurrences of hazard events and on the probability of future hazard events. Location in the SCORE Plan(section or N S Element annex and page# Reviewer's Comments A. Does the updated plan document Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. how the planning team reviewed and analyzed each element in this section of the plan and whether any was revised as part of the update process? B. Does the risk assessment identify the Chapter 4,Section 4.1 Well described in each hazard's chapter. location(i.e.,geographic area Chapter 5,Section 5.3.2 affected)of each natural hazard Chapter 6,Section 6.1.1,Section 6.4 Recommended Revision: addressed in the new or updated Chapter 7,Section 7.1,Section Landslides:Figure 6-3 is hard to read.Include an 11/17 plan? 7.3.1.1,Section 7.3.1.2 sized map. Chapter 8,Section 8.1.1,Section Dam Failure:There are 13 dams included in the list for the 8.3.1 Island of Hawaii;however,Figure 11-1 shows just 11. Chapter 9,Section 9.3.2 Include the additional two dams. Chapter 10,Section 10.1.2,Section Coastal Erosion:Location could be discusses more 10.3.1 substantially in narrative. Chapter 11,Section 11.1 X Chapter 12,Section 12.2 Chapter 13,Section 13.1 Chapter 14,Section 14.3.1 Chapter 15,Section 15.3 J U L Y 1 , 2 0 0 8 (W I D F I R M) A-8 C. Does the risk assessment identify the Chapter 4,Section 4.4 Magnitude or severity is described for Hurricane,Landslides and extent(i.e.,magnitude or severity)of Chapter 5,Section 5.3.2 Rock Falls,Earthquakes,Lava and Vag,Tsunami,Floods,High each hazard addressed in the new or Chapter 6,Section 6.3 Surf,Drought. updated plan? Chapter 7,Section 7.3.1 Recommended Revision: Chapter 8,Section 8.3.1 Ch.11 Dams-Briefly described in narrative.Mapping done Chapter 9,Section 9.3.2 by Pacific Disaster Center could be added to further Chapter 10,Section 10.3.1 illustrate actual scenarios of dam failures in Hawaii County. Chapter 11,Section 11.2 Ch.13 Coastal Erosion is not a major risk so extent is not Chapter 12,Section 12.2 addressed.Suggest inclusion of cliff erosion that has Chapter 13,Section 13.2 impacted structures in the past. X Chapter 14,Section 14.2 Ch.15 Wildfires-briefly discussed.Expand to include a Chapter 15,Section 15.2 detailed narrative or map. D.Does the plan provide information on Chapter 4,Section 4.2 Previous occurrences for all hazards are discussed,some in more previous occurrences of each Chapter 5,Section 5.2 detail than others.If there have been no occurrences of a specific hazard addressed in the new or Chapter 6,Section 6.2 hazard since 2007,i.e.,high winds,hurricanes and wildfires,make updated plan? Chapter 7,Section 7.2 a statement to that effect in each of the appropriate chapters. Chapter 8,Section 8.2 Recommended Revision: Chapter 9,Section 9.2 Landslides:List the year the occurrence(s)occurred in Chapter 10,Section 10.2 Figure 6-6 Chapter 11,Section 11.2 Lava:State if there has been no occurrence(s)since 2005 Chapter 12,Section 12.2 Tsunami:The information is from 1975.If there are more Chapter 13,Section 13.2 recent occurrence(s),include this information. Chapter 14,Section 14.2 Flooding:Update Figure 10-3 X Chapter 15,Section 15.2 Dam Failure:Delete information related to Kauai's dam failures or provide a statement of how this information is Current Drought conditions are relative to the County of Hawaii. discussed. Drought:include more recent occurrence if applicable. E. Does the plan include the probability Chapter 4,Section 4.3 Probability of future events is discussed for High Wind Storms, of future events(i.e.,chance of Chapter 5,Section 5.3 Hurricane,Landslides and Rock Falls,Earthquakes,Lava and occurrence)for each hazard Chapter 6,Section 6.3 Vog,Tsunami,Floods,Dam Failures,High Surf,Coastal Erosion, addressed in the new or updated Chapter 7,Section 7.3 Drought,Wildfires. plan? Chapter 8,Section 8.3 Recommended Revisions: Chapter 9,Section 9.3 Dam Failure:The HMP discusses it in terms of Hawaii State; Chapter 10,Section 10.3 provide a narrative or discussion specifically for the County Chapter 11,Section 11.3 of Hawaii. Chapter 12,Section 12.3 Coastal Erosion:discusses probability of future events in a Chapter 13,Section 13.3 general way;provide a narrative or discussion specifically X Chapter 14,Section 14.3 for the County of Hawaii. Chapter 15,Section 15.3 Drought&Wildfire probabilities should include more detail. SUMMARYSCORE J U L Y 1 , 2 0 0 8 (W I D F I R M) X A-9 7.Assessing Vulnerability: Overview Requirement§201.6(c)(2)(ii): [The risk assessment shall include a]description of the jurisdiction's vulnerability to the hazards described in paragraph(c)(2)(i) of this section. This description shall include an overall summary of each hazard and its impact on the community. Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. how the planning team reviewed and analyzed each element in this section of the plan and whether any was revised as part of the update process? B. Does the new or updated plan Executive Summary The summary descriptions of vulnerability to each hazard are quite include an overall summary Chapter 18,Sections 18.1,18.2 varied in the detail;a few chapters indicate specific vulnerability to description of the jurisdiction's Chapter 18,Section 18.3.3 the hazard discussed;others have indications of vulnerability vulnerability to each hazard? scattered throughout the text.The plan would be much more"user friendly"if there were a consistent statement of vulnerability within each chapter. Recommended Revision: • Provide a statement/discussion/narrative for each hazard within the specific chapter that clearly states the County of Hawaii's vulnerability to the hazard. • Coastal Erosion and Wildfire should have additional X information that states vulnerability to these hazards. • Include a discussion of historical/cultural areas in the vulnerability statements. C.Does the new or updated plan Chapter 4,Section 4.4 Hazard impact is not included for all hazards. address the impact of each hazard Chapter 5,Section 5.4 on the jurisdiction? Chapter 6,Section 6.5 Required Revision: Chapter 7,Section 7.4 The information for the impact of dam failures on pg.11-7 is Chapter 8,Section 8.4 generic to the State of Hawaii.There must be a discussion Chapter 9,Section 9.4 of the impact of dam failure specific for the County of Chapter 10,Section 10.3.1 Hawaii.This could be inferred from the provided information; however,the requirement is for the jurisdiction of this plan. Chapter 11,Section 11.4 X Chapter 12,Section 12.4 Wildfire information is inadequate.Again,most of it is for the Chapter 13,Section 13.4 State of Hawaii and not specific to the County of Hawaii. Chapter 14,Section 14.4 Chapter 15,Section 15.4 • See revised section 11.5.2.2 and new Figure 11-9. J U L Y 1 , 2 0 0 8 (W I D F I R M) A- 10 • See revised Chapter 15 which has Hawaii County specific information and mitigation actions further developed by the Hawaii Wildfire Management Or anization. SUMMARYSCORE X B. Assessing Vulnerability: Addressing Repetitive Loss Properties Requirement§201.6(c)(2)(ii): [The risk assessment]must also address National Flood Insurance Program(NFIP)insured structures that have been repetitively damaged floods. Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document how the Ch.10 Floods satisfies this element,well done. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update rocess? B.Does the new or updated plan describe Chapter 10,Section 10.3.1.2 Ch.10 Floods satisfies this element. X vulnerability in terms of the types and See 10.3.1.1 NFIP Flood Insurance Profile for Hawaii County. numbers of repetitive loss properties X located in the identified hazard areas? Note:This requirement becomes effective for all local plans approved after October 1,2008. SUMMARYSCORE 9. Assessing Vulnerability: Identifying Structures X Requirement§201.6(c)(2)(ii)(A): The plan should describe vulnerability in terms of the types and numbers of existing and future buildings,infrastructure,and critical facilities located in the identified hazard area.... Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update rocess? B. Does the new or updated plan describe Chapter 5,Section 5.5.1.1 This element is addressed in Ch 5,Ch 7,Ch 8,and Ch 18. X vulnerability in terms of the types and Chapter 7,Section 7.4 numbers of existing buildings,infrastructure, Chapter 7,Section 7.5.1 Note: A"Needs Improvement"score on this requirement will X and critical facilities located in the identified Chapter 8,Section 8.4 not preclude the plan from passing. hazard areas? Chapter 18,Sections 18.1.7,18.1.8,18.3.3 J U L Y 1 , 2 0 0 8 (W I D F I R M) 11 LOCAL MITIGATION PLAN REVIEW CF C. Does the new or updated plan describe Chapter 3,Section 3.3.1 This element is discussed in Ch 3 and Ch 17. vulnerability in terms of the types and Chapter 17,Section 17.3 Note: A"Needs Improvement"score on this requirement will numbers of future buildings,infrastructure, Chapter 17,Section 17.4 not preclude the plan from passing. X and critical facilities located in the identified hazard areas? SUMMARY SCORE X 10.Assessing Vulnerability: Estimating Potential Losses Requirement§201.6(c)(2)(ii)(8): [The plan should describe vulnerability in terms of an]estimate of the potential dollar losses to vulnerable structures identified in paragraph(c)(2)(ii)(A)of this section and a description of the methodology used to prepare the estimate.... Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. planning team reviewed and analyzed this section of the plan and whether this section X was revised as part of the update process? B. Does the new or updated plan estimate Chapter 7,Section 7.4 This element is discussed in Ch 7,Section 7.4;Ch 8,Section 8.4; potential dollar losses to vulnerable Chapter 8,Section 8.4 Ch 18,Sections 18.1.7,18.1.8(University of Hawaii)and 18.3.3 structures? Chapter 18,Sections X 18.1.7,18.1.8,18.3.3 Note: A"Needs Improvement"score on this requirement will not preclude the plan from passing. C.Does the new or updated plan describe the Chapter 5,Section 5.4 This element is satisfied in Ch 5,section 5.4;Ch 8,Section 8.4; methodology used to prepare the estimate? Chapter 8,Section 8.4 and Ch 18,Sections 18.1.7,18.1.8,and 18.3.3 Chapter 18,Sections X 18.1.7,18.1.8,18.33 Note: A"Needs Improvement"score on this requirement will not preclude the plan from passing. SUMMARYSCORE X J U L Y 1 , 2 0 0 8 (W I D F I R M) 12 CRC 11.Assessing Vulnerability:Analyzing Development Trends Requirement§201.6(c)(2)(ii)(C): (The plan should describe vulnerability in terms oq providing a general description of land uses and development trends within the community so that mitigation options can be considered in future land use decisions. Location in the SCORE Plan(section or N S Element annex and pa e# Reviewer's Comments A. Does the updated plan document how the See updated Chapter 3, There is no documentation as to how the planning team reviewed, planning team reviewed and analyzed this Section 3.4 analysis for this analyzed and/or revised each element in this section. section of the plan and whether this section statement. Required revision: was revised as part of the update process? Provide a statement which describes how the planning team X reviewed the vulnerability of any development trends to the identified hazards.Recommend reviewing FEMA How-To-Guide 42(FEMA 386-2) B. Does the new or updated plan describe land Chapter 3,Sections 3.1, This element is satisfied in Chapter 3 and Chapter 18. uses and development trends? 3.2,3.3 X Chapter 18,Section 18.3 Note: A"Needs Improvement"score on this requirement will not preclude the plan from passing. SUMMARYSCORE X 12.Multi-Jurisdictional Risk Assessment Requirement§201.6(c)(2)(iii): For multi jurisdictional plans,the risk assessment must assess each jurisdiction's risks where they vary from the risks facing the entire planning area. Location in the SCORE Plan(section or N S Element annex and a e# Reviewer's Comments A. Does the updated plan document how the N/A planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update process? B.Does the new or updated plan include a risk N/A assessment for each participating jurisdiction as needed to reflect unique or varied risks? SUMMARYSCORE N/A J U L Y 1 , 2 0 0 8 (W I D F I R M) 13 L MITH MITIGATION STRATEGY: §201.6(e)(3): The plan shall include a mitigation strategy that provides the jrnisdiction's hlueprintfijr reducing the potential losses identified ht the risk assessment,based on existing authorities,policies,programs and resources,and its ahility to expand on and improve these existing tools. 13.Local Hazard Mitigation Goals Requirement§201.6(c)(3)(i): [The hazard mitigation strategy shall include a]description of mitigation goals to reduce or avoid long-term vulnerabilities to the identified hazards. Location in the SCORE Plan(section or N S Element annex and a e# Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A satisfies this requirement. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update rocess? B.Does the new or updated plan include a Chapter 19,Section 19.1 Hazard Mitigation Goals are listed in Ch 19,Section 19.1 X description of mitigation goals to reduce or avoid long-term vulnerabilities to the identified hazards? SUMMARYSCORE X 14.Identification and Analysis of Mitigation Actions X Requirement§201.6(c)(3)(ii): [The mitigation strategy shall include a]section that identifies and analyzes a comprehensive range of specific mitigation actions and projects being considered to reduce the effects of each hazard,with particular emphasis on new and existing buildings and infrastructure. Location in the SCORE Plan(section or N S Element annex and a e# Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A satisfies this requirement. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update rocess? B.Does the new or updated plan identify and Chapter 4,Section 4.5.2 Ch.19 section 19.1 lists Mitigation Goals and Objectives X analyze a comprehensive range of specific Chapter 5,Section 5.5.2 Section 19.2 discusses Mitigation Actions by category(i.e., mitigation actions and projects for each Chapter 6,Section 6.5.2 prevention,property protection,public education and hazard? Chapter 7,Section 7.5.2 awareness,etc. Chapter 8,Section 8.5.2 In Sections 19.2.10-19.2.7 specific hazards(Hurricanes and Chapter 9,Section 9.5.2 Wind Storm,Earthquakes,Tsunamis,Rainfall Flooding and Chapter 10,Section 10.4.2 High Waves,Lava Flows,Droughts and Wildfires and Chapter 11,Section 11.5.3 Landslides and Sea Cliff Erosion)are discussed. Chapter 12,Section 12.5 X Chapter 13,Section 13.5 Ch.17-is dedicated totally to shelters. Chapter 14,Section 14.5.2 J U L Y 1 , 2 0 0 8 (W I D F I R M) A- 14 Chapter 15,Section 15.5.1 Chapter 16,Section Chapter 17,Section 17.5 Chapter 19,Section 19.2 and 19.4 C.Do the identified actions and projects Chapter 5,Section 5.5.2 This element is satisfied in Ch 5(Tropical Cyclone), address reducing the effects of hazards on Chapter 9,Section 9.5.2 Section 5.5.2;Ch 9(Tsunami),Section 9.5.2,and Ch 17 new buildings and infrastructure? Chapter 17,Section 17.5 (Shelters),Section 17.5. X Chapter 19,Section 19.4 Chapter 19,Section 19.5 D. Do the identified actions and projects Chapter 5,Section 5.5.2 This element is satisfied in Ch 5(Tropical Cyclone), address reducing the effects of hazards on Chapter 17,Section 17.5 Section 5.5.2 and Ch 17(Shelters),Section 17.5. X existing buildings and infrastructure? Chapter 19,Section 19.4 19.5 Mitigation Actions also satisfies this element.Nicely Chapter 19,Section 19.5 done. SUMMARYSCORE 15.Identification and Analysis of Mitigation Actions: National Flood Insurance Program(NFIP)Compliance X Requirement:§201.6(c)(3)(ii): [The mitigation strategy]must also address the jurisdiction's participation in the National Flood Insurance Program(NFIP),and continued compliance with NFIP requirements,as appropriate. Location in the SCORE Plan(section or N S Element annex and a e#) Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A satisfies this requirement. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update process? B. Does the new or updated plan describe Chapter 10,Section 10.4.1.1 This element is satisfied in Ch 10,Section 10.4.1.1 X the jurisdiction(s)participation in the Note:This requirement becomes effective for all local NFIP? mitigation plans approved after October 1,2008. X Recommended Revision: • Explicitly state that the County of Hawaii is a NFIP participant. C.Does the mitigation strategy identify, Chapter 10,Section 10.3.1 This element is satisfied in Ch 10,Section 10.3.1 and analyze and prioritize actions related to Section 10.4.1.1 Section 10.4.1.1 continued compliance with the NFIP? Note:This requirement becomes effective for all local mitigation plans approved after October 1,2008. SUMMARYSCORE J U L Y 1 , 2 0 0 8 (W I D F I R M) X 15 16.Implementation of Mitigation Actions Requirement:§201.6(c)(3)(iii): [The mitigation strategy section shall include]an action plan describing how the actions identified in section(c)(3)(4)will be prioritized,implemented,and administered by the local jurisdiction. Prioritization shall include a special emphasis on the extent to which benefits are maximized according to a cost benefit review of the proposed projects and their associated costs. Location in the SCORE Plan(section or N S Element annex and a e#) Reviewer's Comments A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A satisfies this requirement. planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update rocess? B.Does the new or updated mitigation strategy Chapter 19,Section 19.4 Ch 19,Section 19.4 addresses mitigation strategies X include how the actions are prioritized?(For and how the actions were prioritized.The STAPLE-E X example,is there a discussion of the process process was used. and criteria used? C.Does the new or updated mitigation strategy Chapter 19,Section 19.5 Ch 19,Section 19.5 Implementation Actions satisfies address how the actions will be implemented this element. and administered,including the responsible department,existing and potential resources and the timeframe to complete each action? D.Does the new or updated prioritization Chapter 18,Sections 18.1.7,18.3.3 Ch 18,Sections 18.1.7 and 18.3.3 and Ch 19, process include an emphasis on the use of a Chapter 19,Section 19.4 Section 19.4 satisfy this element. X cost-benefit review to maximize benefits? E.Does the updated plan identify the Executive Summary xiv to xviiii The mitigation strategy,actions and implementation completed,deleted or deferred mitigation Chapter 4,Section 4.5.1 plan in Chapter 19 are excellent.I do not find any actions as a benchmark for progress,and if Chapter 5,Section 5.5.1 reference to the review of the 2007 plan mitigation activities are unchanged(i.e.,deferred),does Chapter 6,Section 6.5.1 actions or comments as required in this element. the updated plan describe why no changes Chapter 7,Section 7.5.1 occurred? Chapter 8,Section 8.5.1 Required Revision: Chapter 9,Section 9.5.1 Provide a table/narrative/discussion of Chapter 10,Section 10.4.1 completed,deleted or deferred mitigation X Chapter 11,Section 11.5.2 actions as an indication of progress. Chapter 14,Section 14.5.1 . If the activities are unchanged,provide a statement as to why. See new Section 19.5 Discussion of Past Implementation Actions,and editorially revised Section 19.6 Present Implementation Actions. SLIMMARYSCORE X J U L Y 1 , 2 0 0 8 (W I D F I R M) 16 17.Multi-Jurisdictional Mitigation Actions Requirement§201.6(c)(3)(iv): For multi jurisdictional plans,there must be identifiable action items specific to the jurisdiction requesting FEMA approval or credit of the plan. Location in the SCORE Plan(section or N S Element annex and page# Reviewer's Comments A. Does the updated plan document how the planning team reviewed and analyzed this section of the plan and whether this section was revised as part of the update process? B.Does the new or updated plan include identifiable action items for each jurisdiction requesting FEMA approval of the Ian? C. Does the updated plan identify the completed,deleted or deferred mitigation actions as a benchmark for progress, and if activities are unchanged(i.e.,deferred),does the updated plan describe why no changes occurred? SUMMARY SCORE PLAN MAINTENANCE PROCESS N/A 18. Monitoring,Evaluating,and Updating the Plan Requirement§201.6(c)(4)(i):[The plan maintenance process shall include a]section describing the method and schedule of monitoring,evaluating,and updating the mitigation plan within a five-year cycle. Location in the SCORE Plan(section or N S Element annex and a e#) Reviewer's Comments A. Does the updated plan document how the planning team Chapter 1 Appendix Chapter 1—Appendix A satisfies this requirement. reviewed and analyzed this section of the plan and whether A this section was revised as part of the update process? B. Does the new or updated plan describe the method and Chapter 20 The HMP Committee will meet on a semi-annual basis. schedule for monitoring the plan,including the responsible The HMP Committee will include members from each X department? county agency or department. C.Does the new or updated plan describe the method and Chapter 20 The semi-annual reports will enable the Planning schedule for evaluating the plan,including how,when and by committee to participate in an annual workshop which X X whom(i.e.the responsible department)? I will serve as an evaluation tool measuring the progress. D.Does the new or updated plan describe the method and Chapter 20 Annual briefing will be conducted with semi-annual X schedule for updating the plan within the five-year cycle? reports. SUMMARYSCORE J U L Y 1 , 2 0 0 8 (W I D F I R M) X 17 19. Incorporation into Existing Planning Mechanisms Requirement§201.6(c)(4)(ii):[The plan shall include a]process by which local governments incorporate the requirements of the mitigation plan into other planning mechanisms such as comprehensive or capital improvement plans,when appropriate. Location in the SCORE Plan(section or N S Element annex and page#) Reviewer's Comments A. Does the updated plan document how the planning team reviewed and analyzed this section of the plan and whether X this section was revised as part of the update process? B. Does the new or updated plan identify other local planning The table in Chapter 20,pg 20-2 satisfies this mechanisms available for incorporating the mitigation requirement. requirements of the mitigation Ian? C.Does the new or updated plan include a process by which As above.Nicely described. the local government will incorporate the mitigation strategy Process for monitoring projects in described on pg 20- X and other information contained in the plan(e.g.,risk 1. assessment)into other planning mechanisms,when appropriate? D. Does the updated plan explain how the local government As above. X incorporated the mitigation strategy and other information X contained in the plan(e.g.,risk assessment)into other planning mechanisms,when appropriate? SUMMARYSCORE X J U L Y 1 , 2 0 0 8 (W I D F I R M) 18 20. Continued Public Involvement Requirement§201.6(c)(4)(iii): [The plan maintenance process shall include a]discussion on how the community will continue public participation in the plan maintenance process. Location in the SCORE Plan(section or N S Element annex and page# Reviewer's Comments A. Does the updated plan document how the planning team See revised Chapter There is no information as to how the planning team reviewed and analyzed this section of the plan and whether 20 for completion of reviewed this section of the plan.Pg.Al-5.#20,states this section was revised as part of the update process? the revision. that the Plan Maintenance chapter is presently being revised.Has this been completed? Required Revision: X • Provide a discussion that describes how this section of the plan was reviewed and analyzed for updating to the 2010 plan. B.Does the new or updated plan explain how continued Chapter 20 The Plan Update Procedures on pg.20-3 reference public public participation will be obtained?(For example,will awareness community-based workshops and symposia.It there be public notices,an on-going mitigation plan is unclear if these are intended as education or public committee,or annual review meetings with stakeholders?) participation in the planning process. Required Revision: X • Provide information regarding how the public/community will be continually involved with the plan update process. SUMMARYSCORE X J U L Y 1 , 2 0 0 8 (W I D F I R M) 19 -4L MITIGATION PLAN R MATRIX A:PROFILING HAZARDS This matrix can assist FEMA and the State in scoring each hazard. Local jurisdictions may find the matrix useful to ensure that their plan addresses each natural hazard that can affect the jurisdiction. Completing the matrix is not required. Note: First,check which hazards are identified in requirement§201.6(c)(2)(i). Then,place a checkmark in either the N or S box for each applicable hazard. An"N"for any element of any identified hazard will result in a"Needs Improvement"score for this requirement. List the hazard and its related shortcoming in the comments section of the Plan Review Crosswalk. Hazard Type Hazards Identified C. Previous D. Probability of Per Requirement A. Location B. Extent Occurrences Future Events 201.6 c 2 i Yes N S N s N s N S T Avalanche C/i b ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ occk 1) o xes \ Coastal Erosion ® ❑ ® ❑ ® ❑ ® ❑ ® Change th t he bpX o4b/e 1. Coastal Storm ® ❑ ® ❑ ® ❑ ® ❑ ® \- to.. a defa4/t and Dam Failure ® E] ® E] ® El ® E] E] Checked"Va 14e Drought ® ❑ ® ❑ ® ❑ ® ❑ ® Earthquake ® ❑ ® ❑ ® ❑ ® ❑ Expansive Soils ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Levee Failure ® ❑ ® ❑ ® ❑ ❑ ❑ ❑ Flood ® ❑ ® ❑ ® ❑ ® ❑ Hailstorm ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Hurricane ® ❑ ® ❑ ® ❑ ® ❑ Land Subsidence ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Landslide ® ❑ ® ❑ ® ❑ ® ❑ ❑ Severe Winter Storm ® ❑ ® ❑ ® ❑ ® ❑ Tornado ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Tsunami ® ❑ ® ❑ ® ❑ ® ❑ Volcano ® ❑ ® ❑ ® ❑ ® ❑ Wildfire ® ❑ ® ❑ ® ❑ ® ❑ Windstorm ® ❑ ® ❑ ® ❑ ® ❑ Other Shelters ® ❑ ® ❑ ® ❑ ❑ ❑ ❑ Other Volcanic Gas ® ❑ ® ❑ ® ❑ ® ❑ Other HAZMAT ® ❑ ® ❑ ® ❑ ❑ ❑ ❑ Legend: §201.6(c)(2)(i)profiling Hazards A. Does the risk assessment identify the location(i.e.,geographic area affected)of each hazard addressed in the new or updated plan? B. Does the risk assessment identify the extent(i.e.,magnitude or severity)of each hazard addressed in the new or updated plan? C. Does the plan provide information on previous occurrences of each natural hazard addressed in the new or updated plan? D. Does the plan include the probability of future events(i.e.,chance of occurrence)for each hazard addressed in the plan? JULY 1 , 2008 (WIDFIRM) A-20 TIGATION PLAN REVIEW CROSSWALK MATRIX B:ASSESSING VULNERABILITY This matrix can assist FEMA and the State in scoring each hazard. Local jurisdictions may find the matrix useful to ensure that the new or updated plan addresses each requirement. Completing the matrix is not required. Note: First,check which hazards are identified in requirement§201.6(c)(2)(i). Then,place a checkmark in either the N or S box for each applicable hazard. An "N"for any element of any identified hazard will result in a"Needs Improvement"score for this requirement. List the hazard and its related shor.q no in the comments section of the Plan Review Crosswalk. Note: Receiving an N in the shaded columns will not preclude the plan from passing. r—,/ r� r,ehee Hazards A.Overall A.Types and Number B.T s and e cA- Identified Per Summary B. Hazard of Existing Structures Number of Future char rhehe boxan bre A. Loss Estimate B. Methodolo y to.,c o'e fa tl Hazard Type Requirement Description of Impact in Hazard Area Structures in Hazard hee�ed�rV a%e §201.6(c)(2)(1) Vulnerability Estimate Area Estimate w \ Yes N S N S N S N S I N S N S Avalanche ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ — ❑ ❑ ❑ ❑ Coastal Erasion ® v ❑ ® ❑ ® m ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Coastal Storm ® 2 ❑ E ❑ ® a ❑ S ❑ ❑ a ❑ S ❑ S Dam Failure E O' ❑ E ❑ E - ❑ ❑ ❑ ❑ a ❑ ❑ ❑ ❑ Drought ® 2 ❑ ® ❑ ® c ❑ ❑ ❑ ❑ L ❑ ❑ ❑ ❑ Earthquake ® - ❑ E ❑ S a ❑ E ❑ ❑ E ❑ S ❑ S Expansive Soils ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ W ❑ ❑ ❑ ❑ Levee Failure ® 3 ❑ ® ❑ ® ? ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ Flood ® s ❑ ® ❑ ® ❑ E ❑ ❑ _ ❑ S ❑ S Hailstorm ❑ 5 ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Hurricane S ❑ S ❑ S > ❑ E ❑ ❑ ❑ E ❑ S Land Subsidence ❑ a ❑ ❑ ❑ ❑ �' ❑ ❑ ❑ ❑ a, ❑ ❑ ❑ ❑ Landslide E _ ❑ E ❑ E ❑ ❑ ❑ ❑ c ❑ ❑ ❑ ❑ Severe Winter Storm E ❑ E ❑ E ❑ E ❑ ❑ ❑ ❑ ❑ ❑ Tornado ❑ ❑ ❑ ❑ ❑ G ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Tsunami E ❑ E ❑ E ❑ ❑ ❑ ❑ a ❑ ❑ ❑ ❑ Volcano E ❑ E ❑ E _ ❑ E ❑ ❑ ❑ E ❑ E Wildfire S ❑ E ❑ S ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ Windstorm S ❑ E ❑ S ❑ E ❑ ❑ ❑ ❑ ❑ ❑ Other Shelters E ❑ E ❑ E ❑ E ❑ ❑ ❑ ❑ ❑ ❑ other Volcanic Gas ® ❑ S ❑ E ❑ S ❑ ❑ ❑ ❑ ❑ ❑ Other HAZMAT S ❑ E ❑ S ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Legend: §201.6(c)(2)(ii)Assessing Vulnerability:Overview A. Does the new or updated plan include an overall summary description of the jurisdiction's B. Does the new or updated plan describe vulnerability in terms of the types and numbers of vulnerability to each hazard? future buildings,infrastructure,and critical facilities located in the identified hazard areas? B. Does the new or updated plan address the impact of each hazard on the jurisdiction? §201.6(c)(2)(ii)(B)Assessing Vulnerability:Estimating Potential Lasses §201.6(c)(2)(ii)(A)Assessing Vulnerability: Identifying Structures A. Does the new or updated plan estimate potential dollar losses to vulnerable structures? A. Does the new or updated plan describe vulnerability in terms of the types and numbers of B. Does the new or updated plan describe the methodology used to prepare the estimate? existing buildings,infrastructure,and critical facilities located in the identified hazard areas? J U L Y 1 , 2 0 0 8 (W I D F I R M) A-21 LOCAL MITIGATION PLAN REVIEW CROSSWALK MATRIX C:IDENTIFICATION AND ANALYSIS OF MITIGATION ACTIONS This matrix can assist FEMA and the State in scoring each hazard. Local jurisdictions may find the matrix useful to ensure consideration of a range of actions for each hazard. Completing the matrix is not required. Note: First,check which hazards are identified in requirement§201.6(c)(2)(i). Then,place a checkmark in either the Nor S box for each applicable hazard. An "N"for any identified hazard will result in a"Needs Improvement"score for this requirement. List the hazard and its related shortcoming in the comments section of the Plan Review Crosswalk. Hazards Identified A. Comprehensive Per Requirement Range of Actions To Hazard Type 201.6 c 2 i and Pro'ects �l heck Yes N S (� ch rck,c box QS, Avalanche ❑ ❑ ❑ �_ an the de bo,anb 1. Coastal Erosion ® ❑ ® �"the kea.,V d Coastal Storm ® ❑ ® Ckety„ dl4e Dam Failure ® ❑ Drought ® ❑ Earthquake ® ❑ Expansive Soils ❑ ❑ ❑ Levee Failure ® ❑ Flood ® ❑ Hailstorm ❑ ❑ ❑ Hurricane ® ❑ Land Subsidence ❑ ❑ ❑ Landslide ® ❑ Severe Winter Storm ® ❑ Tornado ❑ ❑ ❑ Tsunami ® ❑ Volcano ® ❑ Wildfire ® ❑ Windstorm ® ❑ Other Shelters ® ❑ other Volcanic Gas— ® ❑ Other HAZMAT ® ❑ Legend: §201.6(c)(3)(ii)Identification and Analysis of Mitigation Actions A. Does the new or updated plan identify and analyze a comprehensive range of specific mitigation actions and projects for each hazard? JULY 1 , 2008 (WIDFIRM) A-22 Chapter 23:Plan Review Crosswalk Summary of Significant Plan Revisions Subsequent to FEMA July 23, 2010 Crosswalk Section/Chapter Revision Executive Summary . Description of Section 406(2)of the Stafford Act clarified • Change to Plan Update and Maintenance chapter is described 1. Introduction . Appendix A: Overall reorganization and reformatting of the 2010 plan recommendation in Chapter 19 • Changes to the new Plan Maintenance chapter described 2. Mitigation Planning Minor editorial corrections 3. Land Use and . Section on Economy-Agriculture discussion Development . Section of Analysis of Development Trends impacting hazard mitigation planning is added 5. Tropical Cyclones . Reference added to Figure 5-2 • Future Plans—Hawaii Residential Safe Room discussion is updated for new mitigation project 11. Dam Failure . Figure numbers are corrected • Section on PDC Dam Failure Inundation Map Project and Future Plans are updated relating to hazard mitigation measures 14. Droughts . Discussion of current drought conditions is added to the Section on Significant Historic Events Table 14-2 • Future Plans Projects are updated 15. Wildfires • Discussion of recent wildfires is added to Significant Historic Events • A new section on Community Wildfire Protection Plans is added • Section on Mitigation Strategies is updated and completed as of 2010,and establishes priorities 17. Shelters Future Mitigation Plans are updated for anew 2010 project follow- up for the Hawaii Residential Safe Room 19. Mitigation Strategy . Section 19.5 discusses the status of past implementation actions listed in the 2005 plan. • Section 19.6 is editorially revised to indicate actions that are similar or continuations of the 2005 plan actions 20. Plan Update Procedures The revised approach to Chapter 20 is explained.Elaborated information is given by other anticipated work in the next 1 to 4 years(in addition to the specific maintenance checklist). 21. References Updated list 23. Plan Review Crosswalk The responses to the July 23,2010 FEMA Crosswalk Review is given, along with this summary of significant changes to the Final Plan. Hawaii County Multi-Hazard Mitigation Plan