Loading...
HomeMy WebLinkAbout2011-10-15 Report of Change Orders AuthorizedREPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 10/l/11-10/15/11 Legend: CO Change Order SA Supplemental Agreement PS Professional Services C Construction PTA Price Term Agreement GS 10ther Goods & Services Original Original % of Cummulatfve % of Execution lob Contract Project Contract Dept. Contract Contract CO /SA CO /SA Orfg CO /SA Orfg Contractor Project Project Purpose Date # # Title Type Amount Date No. Amount Cont Total Cont Manager Status Realign and increase influent line to the Pua Pump Station from 42" to 54" Kalanianaole piping to address pump cavitation 9/30/2011 N/A C.002996 Interceptor Sewer PS DEM $287,295.00 12/16/2010 1 $40,990.00 14.27% $40,990.00 14.27% Brown & Lyle Hirota Open problems that were identified. Rehabilitation -Phase 2 Caldwell Modification will significantly extend the life of the pumps utilized at the SPS and reduce the potential for equipment damage at the facility. Day -Lum Extension for the 1 st Option Year 10/14/2011 RFP2655 C.002974 Kulaimano Elderly GS Housing $30,000.00 12/7/2010 1 $31,200.00 104.00% $31,200.00 104.00% Rentals & Gilbert Open 0 en for services as Project Facility Management Management, Benevides Manager for Kulaimano Elderly Inc. Housing Pro ect for OHCD. Punaluu Park Site Jeff Ochi, Bid Alternate Nos. 1 and 2 deleted 10/14/2011 B -37647 C.003097 Accessibility C DPW $102,609.00 4/26/2011 2 - $1,809.00 -1.76% - $272.65 -0.27% Engineering, P &R Open from the scope of work, not required Improvements Inc. for ADA compliance. 1)Catch basin - repair of the Waimea ADA Kason demolished CMU wall, 2) Additional 10/10/2011 E -3761 C.003049 Sidewalks and Ramps, C DPW $696,490.00 2/15/2011 1 $14,595.49 o 2.10% $14,595.49 o 2.10% Goodfellow Pacheco- Open pavement striping (thermoplastic Mamalahoa Hwy., FAP Bros, Inc. Engineering extrusion) for stop bar and 3) No. ARR- 109 -1(42) Division Unforseen conditions resulting in emergency repair. Marine Extend existing contract by an Short -Term Chronic Research Steve additional 180 days as new 10/6/2011 IFB -2379 C.003306 Toxicity Testing PS DEM $117,534.00 1/22/2008 6 $54,568.00 46.43% $309,625.00 263.43% Consultants, Wilhelm Open specifications are completed. Inc. Cumulative C/O amount represents 2.5 1 vears of service. REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 10/1/11-10/15/11 Execution Date lob # Contract # Project Title Contract Type Dept. Original Contract Amount Original Contract Date CO /SA No. CO /SA Amount % of Orfg Cont Cummulatfve CO /SA Total % of Orfg Cont Contractor Project Manager Project Status Purpose 10/14/2011 N/A C.003271 COPS Drug Court GS PA $12,850.00 8/11/2011 1 $0.00 0.00% $0.00 0.00% Research Corp. of the Univ. of Nancy Kelly Open No cost time extension through Enhancement project. Hawaii 1/31/12. DPW Facilities ADA Site James Waimea Police Station's electrical 10/14/2011 B -3765 C.002564 Compliance and C DPW $4,118,169.00 7/29/2009 5 $12,686.00 0 0.31 /o $23,078.00 0 0.56 /o Engineering, Imanaka, Open service upgrade from transformer to Improvements - Inc. Building meter main for photovoltaic system. Phase 1. Division Total # of Total Original Contract $5364947 Total CO /SA 7 Contracts 7 Amount ,,.00 for Period Total CO /SA $152,230.49 Amount for Period