HomeMy WebLinkAbout2011-10-15 Report of Change Orders AuthorizedREPORT OF CHANGE ORDERS AUTHORIZED
FOR THE PERIOD OF: 10/l/11-10/15/11
Legend:
CO
Change Order
SA
Supplemental Agreement
PS
Professional Services
C
Construction
PTA
Price Term Agreement
GS
10ther Goods & Services
Original
Original
% of
Cummulatfve
% of
Execution
lob
Contract
Project
Contract
Dept.
Contract
Contract
CO /SA
CO /SA
Orfg
CO /SA
Orfg
Contractor
Project
Project
Purpose
Date
#
#
Title
Type
Amount
Date
No.
Amount
Cont
Total
Cont
Manager
Status
Realign and increase influent line to
the Pua Pump Station from 42" to 54"
Kalanianaole
piping to address pump cavitation
9/30/2011
N/A
C.002996
Interceptor Sewer
PS
DEM
$287,295.00
12/16/2010
1
$40,990.00
14.27%
$40,990.00
14.27%
Brown &
Lyle Hirota
Open
problems that were identified.
Rehabilitation -Phase 2
Caldwell
Modification will significantly extend
the life of the pumps utilized at the
SPS and reduce the potential for
equipment damage at the facility.
Day -Lum
Extension for the 1 st Option Year
10/14/2011
RFP2655
C.002974
Kulaimano Elderly
GS
Housing
$30,000.00
12/7/2010
1
$31,200.00
104.00%
$31,200.00
104.00%
Rentals &
Gilbert
Open
0 en
for services as Project
Facility Management
Management,
Benevides
Manager for Kulaimano Elderly
Inc.
Housing Pro ect for OHCD.
Punaluu Park
Site
Jeff Ochi,
Bid Alternate Nos. 1 and 2 deleted
10/14/2011
B -37647
C.003097
Accessibility
C
DPW
$102,609.00
4/26/2011
2
- $1,809.00
-1.76%
- $272.65
-0.27%
Engineering,
P &R
Open
from the scope of work, not required
Improvements
Inc.
for ADA compliance.
1)Catch basin - repair of the
Waimea ADA
Kason
demolished CMU wall, 2) Additional
10/10/2011
E -3761
C.003049
Sidewalks and Ramps,
C
DPW
$696,490.00
2/15/2011
1
$14,595.49
o
2.10%
$14,595.49
o
2.10%
Goodfellow
Pacheco-
Open
pavement striping (thermoplastic
Mamalahoa Hwy., FAP
Bros, Inc.
Engineering
extrusion) for stop bar and 3)
No. ARR- 109 -1(42)
Division
Unforseen conditions resulting in
emergency repair.
Marine
Extend existing contract by an
Short -Term Chronic
Research
Steve
additional 180 days as new
10/6/2011
IFB -2379
C.003306
Toxicity Testing
PS
DEM
$117,534.00
1/22/2008
6
$54,568.00
46.43%
$309,625.00
263.43%
Consultants,
Wilhelm
Open
specifications are completed.
Inc.
Cumulative C/O amount represents
2.5 1 vears of service.
REPORT OF CHANGE ORDERS AUTHORIZED
FOR THE PERIOD OF: 10/1/11-10/15/11
Execution
Date
lob
#
Contract
#
Project
Title
Contract
Type
Dept.
Original
Contract
Amount
Original
Contract
Date
CO /SA
No.
CO /SA
Amount
% of
Orfg
Cont
Cummulatfve
CO /SA
Total
% of
Orfg
Cont
Contractor
Project
Manager
Project
Status
Purpose
10/14/2011
N/A
C.003271
COPS Drug Court
GS
PA
$12,850.00
8/11/2011
1
$0.00
0.00%
$0.00
0.00%
Research Corp.
of the Univ. of
Nancy Kelly
Open
No cost time extension through
Enhancement project.
Hawaii
1/31/12.
DPW Facilities ADA
Site
James
Waimea Police Station's electrical
10/14/2011
B -3765
C.002564
Compliance and
C
DPW
$4,118,169.00
7/29/2009
5
$12,686.00
0
0.31 /o
$23,078.00
0
0.56 /o
Engineering,
Imanaka,
Open
service upgrade from transformer to
Improvements -
Inc.
Building
meter main for photovoltaic system.
Phase 1.
Division
Total # of Total Original Contract $5364947 Total CO /SA 7
Contracts 7 Amount ,,.00 for Period
Total CO /SA $152,230.49
Amount for Period