Loading...
HomeMy WebLinkAbout2011-09-30 Rreport of Change Orders Authorized REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 9/16/11-9/30/11 Legend: Change Order CO Supplemental Agreement SA Professional Services PS Construction C Price Term Agreement PTA Other Goods & Services GS OriginalOriginal % ofCummulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus 2nd Supplemental agreement for an Kalapana Viewing Site Jan-Guard Gilbert 9/16/2011RFP-2657C.002995GSParks$145,848.9812/15/20102$65,670.5745.03%$131,341.1490.05%Open additional 3 month extension period Management ServicesHawaii Inc.Benevides from 9/16/11-12/15/11. Pahala Ballfield Time extension due to delays in Jeff Ochi, Accessibility fabrication and shipping of bleachers; 9/16/2011B-3648C.002964CDPW$292,463.0010/8/20101-$3,000.00-1.03%-$3,000.00-1.03%Bolton Inc.Open P&R Improvementsassessment of liquidated damages. Two existing electrical conduits that Punaluu Park Site were not shown on the plans were Jeff Ochi, Acessibility Engineering 9/21/2011B-3647C.003097CDPW$102,609.004/26/20111$1,536.351.50%$1,536.351.50%Open damaged during the demolition of the P&R ImprovementsInc. existing concrete slab and needed to be replaced. Project was satisfactorily accomplished without invoking Project 19 Sewage Keauhou Kona Rizalino Additive Alternate No. 1. Additional Pump Station Wet Construction 9/19/2011WW-4056C.003178CDPW$23,985.006/29/20111-$570.00-2.38%-$570.00-2.38%Open Mangaoang material procurement was required to Well Improvements.Corp. address the unforeseen condition of the existing wet well configuration. DPW Facilities ADA James Site Re-key Waimea Police Station Compliance and Imanaka, Engineering, exterior doors lockset cylinders to 9/21/2011B-3765C.002564CDPW$4,118,169.007/29/20094$199.000.00%$10,392.000.25%Open Improvements - Phase Building Inc.accommodate staff keys. 1Division Daren Extend metal roofing up the ridge to South Hilo Baseyard B-3893a Heartwood Kodani, provide required support for new Improvements, Phase 9/23/2011C.003176CDPW$544,631.216/29/20111$3,334.390.61%$3,334.390.61%Open ( R)Pacific, LLC Building ridge cap, roof anchor and roof 1 Divisionventilators. REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 9/16/11-9/30/11 OriginalOriginal % ofCummulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Changed metal doors to wood to A.J. Watt Gym (Mt. Site Jeff Ochi, compliment the wood frames and View) Accessibility Engineering, 9/23/2011B-3632C.003004CDPW$376,300.001/13/20111$0.000.00%$0.000.00%Open P&R granted additional time extension for ImprovementsInc. long-lead electrical items. To provide additional site work Phase 1 construction for complexes A, B and Isemoto Improvements for Dan Russell, Contracting C of the Kaloko Housing Project. 9/23/2011H-3964C.002781CDPW$3,324,738.004/27/20103$1,088,490.0032.74%$1,026,687.0030.88%Open Kaloko Housing Housing Co., Ltd.Additional work is possible because Project of additional federal funding received. Valerie Ferrari Noelani Create Traffic Safety Extension in completion date through 9/23/2011N/AC.003101PSDPW$9,609.315/10/20111$0.000.00%$0.000.00%Open dba Windward Whittington - Educational Materials9/30/11. DesignsPIES To complete additional Ane Keohokalole Hwy. Ben Ishii, archaeological services required by Extension and Imp Belt Collins Engineering 9/23/2011P-3944C.002347PSDPW$2,278,400.006/8/20091$35,699.171.57%$35,699.171.57%Open the State Historic Preservation (Henry St to Hina Lani Hawaii Ltd. Division Division (SHPD) for approval of the St) construction plans. Manuiwa Helicopter flight Gilbert Airways dba operations & 9/28/2011IFB-2671N/AGSFire$0.001/24/20111$0.00#DIV/0!$0.00#DIV/0!OpenExercise option year. Benevides Volcano maintenance. Helicopters No cost amendment to extend time of WIA Dislocated State of Hawaii performance - PY 2010 WIA 9/28/2011N/AC.002959GSHousing$546,323.0010/27/20102$0.000.00%-$24,914.43-4.56%K. NielsonOpen Worker ProgramDept. of Labor Dislocated Worker, through 12/31/11. No cost amendment to extend time of State of Hawaii 9/28/2011N/AC.002958WIA Adult ProgramGSHousing$474,845.0010/27/20102$0.000.00%$117,566.3724.76%K. NielsonOpen performance - PY 2010 WIA Adult, Dept. of Labor through 12/31/11. Total # ofTotal Original Contract Total CO/SA 13$12,237,921.5013 ContractsAmount for Period Total CO/SA $1,191,359.48 Amount for Period