HomeMy WebLinkAbout2011-12-15 Report of Change Orders Authorized REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 12/1/11-12/15/11 Legend: Change Order CO Supplemental Agreement SA Professional Services PS Construction C Price Term Agreement PTA Other Goods & Services GS OriginalOriginal % ofCumulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Contract documents allow for price adjustment of certain short supply Mamalahoa Hwy. Isemoto Ben Ishii - materials if the price of such short Earthquake repairs. Contracting Co. Engineering 12/1/2011P-3780C.002678CDPW$4,269,280.001/5/20103$16,945.560.40%$82,945.561.94%Open supply materials is increased by Federal Aid project ER- Ltd.Division more than 5%. The proposal for this 15(9) project lists reinforcing steel as a short supply material. Request for an additional 180 day extension period while working on Organics Diversion and EKO Systems, Gilbert 12/6/2011RFP2036C.000450GSDEM$900,000.006/17/200520$1,600,000.00177.78%$11,344,000.001260.44%Open new specification, cumulative total Organics ProgramInc.Benevides includes all supplemental agreements. Fair Housing Analysis Belt Collins Time extension requested: Housing 12/9/2011N/AC.003163PSHousing$25,000.006/29/20111$0.000.00%$0.000.00%Alan RudoOpen of ImpedimentsHawaii Ltd.Policy study data needed. Quantities of contract items and extra Mamalahoa Hwy. work items need to be increased due Isemoto Ben Ishii- Earthquake repairs. Contracting Co Engineering to differing subsurface site conditions 12/9/2011P-3780C.002678CDPW$4,269,280.001/5/20104$130,108.003.05%$213,053.564.99%Open Federal Aid project ER- LtdDivisionencountered during rock anchor 15(9) installation process. REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 12/1/11-12/15/11 OriginalOriginal % ofCumulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Quantities of contract items and extra work items need to be modified due to the existing waterline that was Mamalahoa Hwy. found to be higher than as-built Isemoto Ben Ishii- Earthquake repairs. drawings from DWS - culvert needs Contracting Co Engineering 12/9/2011P-3780C.002678CDPW$4,269,280.001/5/20105$58,707.001.38%$271,760.566.37%Open Federal Aid project ER- to be installed under waterline LtdDivision 15(9) instead of above in order to maintain minimum required cover below the road and minimum separation from the waterline. Actual costs of force account work for Lindsey Road Bridge Global Bob Yanabu - additional water pollution, dust, and Rehabilitation. Fed. Specialty Special 12/9/2011E-4018C.003062CDPW$465,500.003/16/20111-$93,461.67-20.08%-$93,461.67-20.08%Open erosion control less than anticipated, Project No. STP-109- Contractors IncProjects additional police officers and/or 1(43) control devices not needed. Request for an additional 180 day Removal, Recycling Big Island extension period while working on Gilbert and/or Reuse of Scrap Metal 12/14/2011IFB2160C.000506GSDEM$150,000.002/2/200610$260,000.00173.33%$1,310,000.00873.33%Open new specification, cumulative total Benevides Vehicle Tires.LLC includes all supplemental agreements. Request for an additional 180 day HMP Inc. dba extension period while working on Collection of Gilbert Business 12/14/2011IFB2299C.001281GSDEM$484,030.0011/29/20076$397,200.0082.06%$4,207,030.00869.17%Open new specification, cumulative total Recyclable MaterialsBenevides Services Hawaii includes all supplemental agreements. Kalapana Viewing Site Jan-Guard Gilbert Optional extension for 6 months as 12/14/2011RFP2657C.002995GSParks$145,848.9812/15/20103$131,340.0090.05%$262,681.14180.10%Open Management ServicesHawaii Inc.Benevidesallowed by bid agreement. Ane Keohokalole Ben Ishii - Extend roadway connection from ARR- Highway, Hina Lani Engineering West Hawaii Civic Center to Hina 12/13/2011C.002698CDPW$29,893,336.762/22/201013$2,542,555.008.51%$4,345,235.9014.54%Nan, Inc.Open 1880(1) Street to WHCCDiv.Lani Street. 100% federally funded. Total # ofTotal Original Contract Total CO/SA 10$44,871,555.7410 ContractsAmount for Period Total CO/SA $5,043,393.89 Amount for Period