Project Title: Pana'ewa Zoo Office and Restroom Improvements Date: January 12, 2012
Job No.: PR -3913
CONTRACTOR
BASIC BID
REMARKS
Site Engineering Inc
$119,000.00
Witnesses:
Aubrey Summers - P &R
Stan's Contracting Inc
$137,300.00
Iris Oshiro - DPW Admin
Isemoto Contracting Co Ltd
$143,900.00
Yamada Paint Contracting Inc dba GW Construction
$183,443.00
Phillips Contracting LLC
$138,129.00
Estimated Cost by C of HI
$125,000.00
Apparent Low Bidder's Subcontractors: Mauna Kea Acoustic & Drywall, Inc. - C -1 Acoustical and Insulation
Site Engineering, Inc. - C -3a Asphalt Concrete Patching, Sealing and Striping
Site Engineering, Inc. - C -5 Cabinet, Millwork, and Carpentry Remodeling and Repairs
Site Engineering, Inc. - C -5b Siding Application
Site Engineering, Inc. - C -6 Carpentry Framing
Mauna Kea Acoustic & Drywall, Inc. - C -12 Drywall
Big Island Electrical Service, LLC - C -13 Electrical
Site Engineering, Inc. - C -17 Excavating, Grading, and Trenching
Site Engineering, Inc. - C -31a Cement Concrete
Affiliated Construction - C -31 e Concrete Cutting, Drilling, Sawing, Coring, and Pressure Grouting
Ace Contractor, Inc. - C -33 Painting and Decorating
De Lima's Plumbing, Inc. - C -37 Plumbing
Simmons Steel Corporation - C -41 Reinforcing Steel
Buck Roofing Co., Inc. - C -42 Roofing
Custom Sheetmetal, Inc. - C -44 Sheet Metal
Custom Sheetmetal, Inc. - C -44a Gutters
OCS Steel Contracting - C -48a Steel Door
Will Kill Termites Pests - Soil Treatment