Loading...
HomeMy WebLinkAboutPR-3913 - Bid Results (2)V V V Project Title: Pana'ewa Zoo Office and Restroom Improvements Date: January 12, 2012 Job No.: PR -3913 CONTRACTOR BASIC BID REMARKS Site Engineering Inc $119,000.00 Witnesses: Aubrey Summers - P &R Stan's Contracting Inc $137,300.00 Iris Oshiro - DPW Admin Isemoto Contracting Co Ltd $143,900.00 Yamada Paint Contracting Inc dba GW Construction $183,443.00 Phillips Contracting LLC $138,129.00 Estimated Cost by C of HI $125,000.00 Apparent Low Bidder's Subcontractors: Mauna Kea Acoustic & Drywall, Inc. - C -1 Acoustical and Insulation Site Engineering, Inc. - C -3a Asphalt Concrete Patching, Sealing and Striping Site Engineering, Inc. - C -5 Cabinet, Millwork, and Carpentry Remodeling and Repairs Site Engineering, Inc. - C -5b Siding Application Site Engineering, Inc. - C -6 Carpentry Framing Mauna Kea Acoustic & Drywall, Inc. - C -12 Drywall Big Island Electrical Service, LLC - C -13 Electrical Site Engineering, Inc. - C -17 Excavating, Grading, and Trenching Site Engineering, Inc. - C -31a Cement Concrete Affiliated Construction - C -31 e Concrete Cutting, Drilling, Sawing, Coring, and Pressure Grouting Ace Contractor, Inc. - C -33 Painting and Decorating De Lima's Plumbing, Inc. - C -37 Plumbing Simmons Steel Corporation - C -41 Reinforcing Steel Buck Roofing Co., Inc. - C -42 Roofing Custom Sheetmetal, Inc. - C -44 Sheet Metal Custom Sheetmetal, Inc. - C -44a Gutters OCS Steel Contracting - C -48a Steel Door Will Kill Termites Pests - Soil Treatment County of Hawaii is an Equal Opportunity Provider and Employer.