My WebLink
|
Help
|
About
|
Sign Out
Home
Bid Results - WW-4024 (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Bid Results
>
2011 - Bid Results
>
2011 - Formal Construction Projects - Bid Results
>
Bid Results - WW-4024 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2012 11:13:28 AM
Creation date
3/27/2012 11:04:57 AM
Metadata
Document Relationships
Bid Results - WW-4024
(Original Version)
Path:
\Public Works\Administration Division\99_Archive\02_Bid Information\Bid Results\2011 - Bid Results\2011 - Formal Construction Projects - Bid Results
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Title: Honoka`a Wastewater Treatment Plant Upgrade - Phase 2 Date: february 10, 2011 <br />Job No.: WW -4024 <br />CONTRACTOR <br />BASIC BID <br />ADDITIVE <br />ALTERNATE <br />NO. 1 <br />TOTAL - BASIC <br />BID AND <br />ADDITIVE <br />ALTERNATE NO. <br />1 <br />REMARKS <br />Isemoto Contracting Co Ltd <br />$4,531,363.00 <br />$257,660.00 <br />$4,789,023.00 <br />Witnesses: <br />Gene Quiamas - DEM /WWD <br />Jas W Glover Ltd <br />$5,138,651.00 <br />$211,702.60 <br />$5,350,353.60 <br />Riz Mangaoang - DEM /WWD <br />Goodfellow Bros Inc <br />$3,989,795.00 <br />$177,904.00 <br />$4,167,699.00 <br />Toni Nakatani - DEM /WWD <br />Summit Construction Inc <br />$6,026,134.00 <br />$351,021.00 <br />$6,377,155.00 <br />Jeff Ochi - P &R <br />F & H Construction <br />$5,428,000.00 <br />$297,536.00 <br />$5,725,536.00 <br />Iris Oshiro - DPW Admin <br />Kiewit Infrastructure West Co <br />$4,355,642.00 <br />$223,358.00 <br />$4,579,000.00 <br />Tina Cawagas - William C Loeffler Construction Inc <br />James Takase - Kiewit Infrastructure West Co <br />Tracey Ludwig - Ludwig Construction Inc <br />Cecily Unoki - Jas W Glover Ltd <br />Calvin Shimizu - Jas W Glover Ltd <br />Liz Criss - Willocks Construction Corp <br />Creighton Ching - RK Construction Co LLC <br />Tana Grant - Summit Construction Inc <br />Karen Fujii - Summit Construction Inc <br />Dana Leatherwood - F &H Construction <br />Harrison V - Geotech Solutions <br />Yanis Nora - Goodfellow Bros Inc <br />Ann Ozaki - Yamada Paint Contracting Inc dba GW Construction <br />Via T /C: <br />Lee Loeffler - DPW Kona Engineering Division <br />Estimated Cost by C of HI <br />$3,800,000.00 <br />Via T /C: <br />I Kevin Murakane - Goodfellow Bros Inc <br />Note: Contractors in BOLD - Bid's received in Kona Engineering Division <br />Apparent Low Bidder Subcontractors: Grace Pacific - paving <br />Resort Management Group - landscaping <br />Industrial Group - structural steel <br />Beachside Roofing - roofing /sheetmetal <br />Wasa Electrical Services Inc - electrical <br />Goodfellow Bros Inc - stone masonry <br />Big Island Mechanical - plumbing <br />Layfield Environmental - water proofing <br />Delima's Drilling - injection wells <br />Islandwide Fencing - fencing <br />Endo Painting Service - painting <br />Big Island Mechanical - institutional /commercial equip. <br />South Pacific Steel - reinforcing <br />County of Hawaii is an Equal Opportunity Provider and Employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.