Laserfiche WebLink
<br />REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 3/16/12-3/31/12 <br />Legend: <br />Change Order <br />CO <br />Supplemental Agreement <br />SA <br />Professional Services <br />PS <br />Construction <br />C <br />Price Term Agreement <br />PTA <br />Other Goods & Services <br />GS <br />OriginalOriginal % ofCumulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />Time extension while new <br />Ground Work for Signal Big Island <br />Steve <br />specifications are being finalized and <br />& Street Light Repairs Electrical <br />3/20/2012IFB2692N/APTADPW$0.003/30/20111$0.00#DIV/0!$0.00#DIV/0!Open <br />Wilhelm <br />to put term of the contract on a fiscal <br />& InstallationService, LLC <br />year basis. <br />Carvalho Park & <br />Site <br />Jeff Ochi, Modification of ballfield perimeter <br />Piihonua Gym <br />Engineering <br />3/20/2012B-3650C.003180CDPR$793,000.006/15/20114$12,098.411.53%$32,351.414.08%Open <br />P&Rfencing to address safety issues. <br />Accessibility <br />Inc. <br />Improvements <br />Federal Aid Project - Actual pre-bid <br />work more extensive and exhaustive <br />than projected. Supplement is for <br />Bob Yanabu - <br />Reed's Island Bridge Harold <br />Special necessary post bid work that is still <br />3/20/2012E-4069C.003347PSDPW$42,000.0011/29/20111$39,000.0092.86%$39,000.0092.86%Open <br />RehabilitationSugiyama, LLC <br />Projectsrequired on requirements and <br />specifications that existing consultant <br />already familiar with. <br />Yamada Paint <br />Waiakea Uka Parks & <br />Kevin Sakai, Additional work to provide improved <br />Contracting, <br />Gym Accessibility <br />3/20/2012PR-4010C.003396CDPW$930,566.001/24/20122$7,848.000.84%$95,695.0010.28%Open <br />P&Rtie-in with pavement transition. <br />Inc. dba GW <br />Improvements <br />Construction <br />For extra work needed to relocate <br />Waimea ADA Sidealks Kason <br />drywell with catch basin due to <br />and Ramps, Pacheco - <br />Goodfellow <br />unforeseen circumstances, <br />3/20/2012E-3761C.003049CDPW$696,490.002/15/20114-$2,180.16-0.31%$76,001.3110.91%Open <br />Mamalahoa Hwy, FAP Bros., Inc.Engineering <br />reconstruct re-designed curb ramps <br />No. ARR-109-1(42)Division <br />due to water ponding, and for <br />deductive items. <br /> <br />