Loading...
HomeMy WebLinkAbout2012-03-31 Report of Change Orders Authorized REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 3/16/12-3/31/12 Legend: Change Order CO Supplemental Agreement SA Professional Services PS Construction C Price Term Agreement PTA Other Goods & Services GS OriginalOriginal % ofCumulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Time extension while new Ground Work for Signal Big Island Steve specifications are being finalized and & Street Light Repairs Electrical 3/20/2012IFB2692N/APTADPW$0.003/30/20111$0.00#DIV/0!$0.00#DIV/0!Open Wilhelm to put term of the contract on a fiscal & InstallationService, LLC year basis. Carvalho Park & Site Jeff Ochi, Modification of ballfield perimeter Piihonua Gym Engineering 3/20/2012B-3650C.003180CDPR$793,000.006/15/20114$12,098.411.53%$32,351.414.08%Open P&Rfencing to address safety issues. Accessibility Inc. Improvements Federal Aid Project - Actual pre-bid work more extensive and exhaustive than projected. Supplement is for Bob Yanabu - Reed's Island Bridge Harold Special necessary post bid work that is still 3/20/2012E-4069C.003347PSDPW$42,000.0011/29/20111$39,000.0092.86%$39,000.0092.86%Open RehabilitationSugiyama, LLC Projectsrequired on requirements and specifications that existing consultant already familiar with. Yamada Paint Waiakea Uka Parks & Kevin Sakai, Additional work to provide improved Contracting, Gym Accessibility 3/20/2012PR-4010C.003396CDPW$930,566.001/24/20122$7,848.000.84%$95,695.0010.28%Open P&Rtie-in with pavement transition. Inc. dba GW Improvements Construction For extra work needed to relocate Waimea ADA Sidealks Kason drywell with catch basin due to and Ramps, Pacheco - Goodfellow unforeseen circumstances, 3/20/2012E-3761C.003049CDPW$696,490.002/15/20114-$2,180.16-0.31%$76,001.3110.91%Open Mamalahoa Hwy, FAP Bros., Inc.Engineering reconstruct re-designed curb ramps No. ARR-109-1(42)Division due to water ponding, and for deductive items. REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 3/16/12-3/31/12 OriginalOriginal % ofCumulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Contract extension for Ane Keohokalole project. Services 3/28/2012N/AN/ACultural MonitorGSDPW$20.00/hr4/6/20102$0.00#VALUE!$0.00#VALUE!Nicole LuiDiane ShiroOpen required by Historical Preservation Area working group as part of MOA. To bisect the construction plans to allow two separate construction components; one for the Lakeland Island-Wide Bus Imata & Casey bus shelters, to be constructed in- 3/22/2012E-3981BC.002783PSDPW$84,500.006/4/20102$9,130.0010.80%$27,505.0032.55%Open SheltersAssociates Inc.Yanagihara house, and the other remaining shelters to be built with the conventional design-bid-build process. Goodwill 3/28/2012RFPC.003256Work Force InvestmentGSHousing$252,258.408/2/20111$44,586.0017.67%$44,586.0017.67%Tobi FevesOpenAdd'l funding received. Industries of Hawaii Total # ofTotal Original Contract Total CO/SA 8$2,798,814.408 ContractsAmount for Period Total CO/SA $110,482.25 Amount for Period