Loading...
HomeMy WebLinkAbout2012-04-15 Report of Change Orders Authorized REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 4/1/12-4/15/12 Legend: Change Order CO Supplemental Agreement SA Professional Services PS Construction C Price Term Agreement PTA Other Goods & Services GS OriginalOriginal % ofCumulative% of ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus Time extension up to 180 days or Landfill Diversion Puna Kamalii Gilbert until commencement of service 4/2/2012RFP-2298C.001312GSDEM$4,500.008/27/20076$0.000.00%$7,937.50176.39%Open Incentive ProgramFlowers Inc.Benevides begins under award of new contract, whichever comes first. Time extension up to 180 days or Landfill Diversion Atlas Recycling Gilbert until commencement of service 4/2/2012RFP-2298C.001308GSDEM$309,750.0011/29/20076$0.000.00%$470,275.00151.82%Open Incentive ProgramCenters LLCBenevides begins under award of new contract, whichever comes first. Planning, Design, and Isemoto Casey Construction of Island Contracting Co 4/2/2012E-4066AC.003314CDPW$397,100.0010/10/20111$5,817.391.46%$5,817.391.46%OpenRevised bus site location. Yanagihara Wide Bus Stops and Ltd Shelters, Part A Existing hide storage shed was Architectural and determined to be non-compliant with David Engineering Services Yamamoto, code and would require extensive State Fleming & for Paauilo 4/10/2012B-3854PSDPW$127,920.001/26/20121$46,542.0036.38%$46,542.0036.38%Open 60770Associates LLCBuilding repairs. A replacement hide storage Slaughterhouse Divisionis needed and its design proposed Improvement for inclusion with existing contract. Total # ofTotal Original Contract Total CO/SA 4$839,270.004 ContractsAmount for Period Total CO/SA $52,359.39 Amount for Period