HomeMy WebLinkAbout2012-06-15 Report of Change Orders Authorized
REPORT OF CHANGE ORDERS AUTHORIZED
FOR THE PERIOD OF: 6/1/12-6/15/12
Legend:
Change Order
CO
Supplemental Agreement
SA
Professional Services
PS
Construction
C
Price Term Agreement
PTA
Other Goods & Services
GS
OriginalOriginal % ofCumulative% of
ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose
Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus
Ane Keohokalole Hwy,
Ben Ishii, Bio-retention basins must be installed
Hina Lani Street to
Engineering based on the environmental
6/13/2012P-3944C.002698CDPW$29,893,336.762/22/201017$128,557.860.43%$4,678,648.5115.65%Nan, Inc.Open
Palani Rd. FAP No.
Div.assessment.
ARR-1880(1)
Modify Scope of Work to relocate
Naalehu and Pahala
Wastewater Treatment Plant in
Fukunaga &
Wastewater Collection
6/14/2012N/AC.001454PSDEM$971,350.0010/11/20072$239,483.0024.65%$461,910.0047.55%Lyle HirotaOpen
Associates, Inc.Naalehu due to the identification of
& Treatment System
significant archeological sites in area.
Supplemental agreement for an
Kalapana Lava Viewing Jan-Guard Gilbert
additional 90 day extension period
6/14/2012RFP-2657C.002995GSParks$145,848.9812/15/20104$65,670.5745.03%$328,351.71225.13%Open
ServiceHawaii IncBenevides
while new specification and bid
completed.
JM Consulting
RFP-Health and Educational Pauline Option year extension from (6 month
6/13/2012C.003274GSAging$55,000.009/6/20111$0.000.00%$0.000.00%Open
Services
103FServicesFukunagaextension only at this time).
Planning, Design and
Isemoto
Casey
Construction of Island
Contracting Co.
6/13/2012E-4066BC.003315CDPW$599,000.0010/10/20111$0.000.00%$0.000.00%OpenNumber of working days increased.
Yanagihara
Wide Bus Stops and
Ltd.
Shelters, Part B
Planning, Design and
Isemoto
Casey
Construction of Island
Contracting Co.
6/13/2012E-4066AC.003314CDPW$397,100.0010/10/20112$0.000.00%$5,817.391.46%OpenNumber of working days increased.
Yanagihara
Wide Bus Stops and
Ltd.
Shelters, Part A
David
Engineering Services Add electrical engineering services
Engineering
Yamamoto,
for DPW Facilities for coordination with mechanical
6/14/2012B-3831C.001420PSDPW$47,100.008/27/20071$20,230.0042.95%$20,230.0042.95%Open
Partners Inc
Building
Mechanical Systems.system design.
Division
REPORT OF CHANGE ORDERS AUTHORIZED
FOR THE PERIOD OF: 6/1/12-6/15/12
OriginalOriginal % ofCumulative% of
ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose
Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus
Reconstruction of additional
pavement sections initially weakened
Mamalahoa Highway
from earthquake and further
Isemoto Ben Ishii
Earthquake Repairs.
Contracting Co Engineering deteriorated; allow for price
6/13/2012P-3780C.002678CDPW$4,269,280.001/5/20106$218,351.255.11%$490,111.8111.48%Open
Federal Aid Project No.
Ltd.Divisionadjustment of short supply materials;
ER-15(9)
additional time required for additional
excavation and additional paving.
To address hidden structural damage
Waimea Park Ballfield Jeff Ochi,
to light poles' bases and ensure their
6/13/2012PR-4080C.003320CDPW$164,000.0010/14/20112$3,498.542.13%$19,003.6911.59%E Ten, Inc.Open
Lights ReplacementP&R
integrity upon reinstallation.
Total # ofTotal Original Contract
Total CO/SA
9$36,542,015.749
ContractsAmount
for Period
Total CO/SA
$675,791.22
Amount for Period