HomeMy WebLinkAbout2013-17 AC-PD 2013-14 CIP Budget Requests-SupplimentalWilliam P. Kenoi
Mayor
County of Hawaii
PLANNING DEPARTMENT
BJ Leithead Todd
Director
Margaret Masunaga
Deputy Director
PUNA COMMUNITY DEVELOPMENT PLAN ACTION COMMITTEE
Aupuni Center • 101 Pauahi Street, Suite 3 • Hilo, Hawaii 96720
Phone (808) 961 -8288 • Fax (808) 961 -8742
Date: March 12, 2013
BJ Leithead Todd
Planning Director
Planning Department
101 Pauahi Street, Suite 3
Hilo, HI 96720
Subject: Supplemental CIP Budget Requests
Aloha Director Leithead Todd,
Communication No. 2013 -17
Encl. Two (2) completed Project Data/Financial Impact Statements
Hawai `i County is an Equal Opportunity Provider and Employer
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Fiscal Year 2013 to 2014
1. DEPARTMENT AND DIVISION: Planning Department 2. DATE: 3/13/2013
3. PROJECT NAME: Pahoa Regional Town Center Master Plan 4. SUBMITTER: Puna CDP Action Committee (Larry Brown)
5. COUNCIL BENEFIT DISTRICT(S): 4 & 5 6. TMK /JUDICIAL: Various /Puna
7. LOCATION (COUNCIL DISTRICT): 4 & 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $150,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Planning, feasibility, or design studies.
10. PROJECT /PROGRAM DESCRIPTION: Create a Master Plan for the Pahoa Regional Town Center through a public participation process together with the Pahoa Regional Town Center Plan Steering
Committee, being a subcommittee of the Puna CDP Action Committee. Sections 3.1.3.b.1) & 2.1.3.a.2) of the Puna CDP identifies Pahoa as one of three Regional Town Centers for Puna that should
include design standards and review procedures. Sec. 5.2.1 further calls for the preparation of regional town center plans through an inclusive community based process. The PRTCP shall be a strategic
plan addressing all infrastructure improvements necessary to realize commercial, residential and industrial growth necessary to serve the greater surrounding service area that generally coincides with
the 96778 Zip Code area of SE Puna.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety through a strategic plan that will identify necessary improvements to basic infrastructure
(wastewater, water, traffic, etc.); inadequate levels of service and facilities including medical /dental services, low- income housing, local access to daily necessities and educational, cultural and
recreational facilities; enhances quality of life for residents and visitors alike by defining a sustainable, walkable, and liviable town center based on the vision of its people.
12. LONG RANGE PLANS /COMMUNITY VALUES: General Plan, Sec. 15.1; Puna CDP, Sec. 3.1.3.b.1), 2.1.3.a.2) and 5.2.1.
13. COUNTY MATCHING FUNDS REQ'D? (Y /N) No DESCRIBE: IF 1
14. LEGAL MADATE? (Y /N) No DESCRIBE: IF-
15. IMPACT ON OPERATIONAL BUDGET:
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitatlity, strengthens and sustains our community, enhances education, culture and the arts, promotes heatlh and safety, manages
growth and fosters inter - departmental collaboration and cross - sector implementation.
17. PROJECT READINESS (List all that apply): Currently underway (grass roots effort minimally supported by existing Planning Dept. staff without specific budget; status of work includes community
survey, beginning of asset mapping, draft design guidelines in public review process; CDP project manager available to manage project; able to identify and contract with appropriate consultant(s) within
Prior Funds
Allotted
This FY 13 -14
Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request
FY 14 -15
FY 15 -16
FY 16 -17
FY 17 -18
FY 18 -19
Years
TOTAL:
Planning
150
$150
Land Acquisition
Design /Survey
Construction
TOTAL:
$150
$150
119. O & M COSTS (x $1000):
F
F
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
150
$150
State Revolving Fund
State CIP
Federal (including ARRA - Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TO
F $150
$150
CIP 2013 -14 FIS Templates.xlxs Revised October 2012
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Fiscal Year 2013 to 2014
1. DEPARTMENT AND DIVISION: Planning Department 2. DATE: 3/13/2013
3. PROJECT NAME: Volcano Village Center Master Plan 4. SUBMITTER: Puna CDP Action Committee (Larry Brown)
5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: Various /Puna & Kau
7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Planning, feasibility, or design studies.
10. PROJECT /PROGRAM DESCRIPTION: Create a Master Plan for the Volcano Village Center through a public participation process together with the Volcano Community Association. Sections 3.1.3.b.2)
& 2.1.3.a.1) of the Puna CDP identifies Volcano as a Village Center with a historic core and proposed for designation as a Special Design District with detailed planning, design standards and review
procedures. Sec. 2.2.3.a further calls for a separate biosphere buffer reserve overlay district for the Volcano area. Sec. 5.2.3 calls for the preparation of regional town center or village center plan to
define land uses, design themes and architectual and site design standards.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety through a strategic plan that will identify necessary improvements to basic infrastructure necessary to
support the appropriate levels of service; enhances quality of life for residents and visitors alike by defining a sustainable, walkable, and liviable town center based on the vision of its people.
12. LONG RANGE PLANS /COMMUNITY VALUES: General Plan, Sec. 15.1; Puna CDP, Sec. 3.1.3.b.2), 2.1.3.a.1), 2.2.3.a. and 5.2.3.
13. COUNTY MATCHING FUNDS REQ'D? (Y /N) No DESCRIBE: IF 1
14. LEGAL MADATE? (Y /N) No DESCRIBE: IF-
15. IMPACT ON OPERATIONAL BUDGET:
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitatlity, strengthens and sustains our community, promotes heatlh and safety, manages growth and fosters inter - departmental
collaboration and cross - sector implementation.
17. PROJECT READINESS (List all that apply): Currently underway (grass roots effort minimally supported by existing Planning Dept. staff without specific budget; status of work includes community
survey, beginning of asset mapping, conceptual draft elements in public review process; CDP project manager available to manage project; able to identify and contract with appropriate consultant(s)
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 13 -14
Request
FY 14 -15
FY 15 -16
FY 16 -17
FY 17 -18
FY 18 -19
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design /Survey
Construction
100
$100
TOTAL:
$100
$100
119. O & M COSTS (x $1000):
F
F
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
100
$100
State Revolving Fund
State CIP
Federal (including ARRA - Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TO
F $100
$1001
CIP 2013 -14 FIS Templates.xlxs Revised October 2012