HomeMy WebLinkAbout6-9-003:018 GaragercvcmraL EMERGENCY MANAGEMENT AGENCY
• NATIONAL FLOOD INSURANCE PRO
• ELEVATION CERTIFICA
Important• Read the instructions on pages 1 7
BUILDING OWNER'S NAME SECTION A - PROPERTY OWNER INFORMATION
icahel Kimball
UILDING STREET ADDRESS (including API, UNI, Suite, andlor Bldg. No.) OR P.O. ROUTE AND BOX NO.
Pusko Sands Elua Lot B Unit A Puakc Road
CITY
O.M.B. No. 3067-0077 4
[_Ey
plres JWy 31, 2002
.+--„vvvrvmsf 1 we (Ur I rvrwr) HORIZONTAL DATUM: SOURCE: ❑ GPS (Type):
MM.MM• or 00AolOn ❑ NAD 1527 ® NAD 1983 17 USGS Quad
Map D other.
SECTION B -FLOOD INSURANCE RATE MAP (FIRMI INFORMATION
01. NFIP COMMUNITY NAME 8 COMMUNITY NUMBER B2 COUNTY NAME B3. STATE
Hawait County 165188 Newel HI
B4. MAP AND PANEL B5. SUFFIX 85. FIRM INDEX 67. FIRM PANEL 88. FLOOD a9. BASE FLOOD ELEVATION(S)
NUMBER DATE EFFECTIVE/REVISED DATE NE(S)
(Zone AO, use depth.or flooding)
0277 C 2Jun96 188ep88 AE g
810. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in B9.
[3 FIS Profile ® FIRM ❑ Community Determined ❑ Other (Describe):
811. Indicate the elevation datum used for the SFE In B9: ® NGVD 1929 ❑ NAVD 1988 ❑ Other (Describe):
812. Is the building located Ina Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ®No
Designation Date
SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REOwRFn1
C1. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Construction' ® Finished Construction
•A new Elevation Certificate will be required when construction of the building is complete.
f[Building Diagram Number § (Select the building diagram most similar to the building for which this certificate Is being completed - see
pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.)
Elevedons — Zona A1430.(&AH, A (with BFE), VE, V1430, V (wtth BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO
Complete Items C3a4 below according to the building diagram specified In item C2. State the datum used. If the datum Is different from
the datum used for the SFE in Section B, convert the datum to that used for the BFE. Show field measurements and datum conversion
calculation. Use the space provided or the Comments area of Section D or Section G, as appropriate, to document the datum conversion.
Datum USGS ConversionfCommerds N/A -P-)'C- 9UAteO 7A 1 r7
Elevation reference mark used _Does the elevation reference mark used appear on the FIRM? ❑ Yes ®No
IP a) Top of bottom floor (including basement or enclosure) Z. 11(m)
O b) Top of next higher floor NIB.• _ft(m)� JGE E. Vvi
O c) Bottom of lowest horizontal structural member (V zones only) NA. _fL(m) Q �
O d) Attached garage (top of slab) 1/ __A(M)LICENSED �9
ROF
O e) Lowest elevation of machinery and/or equipment o ...: ;.., ONAL
servicing the building _R(m) ENC' .+_.R
O f) Lowest adjacent grade (LAG) elm)
III Highest adjacent grade (HAG) Z P&(m) Kao. 11�
IP h) No. of permanent openings (flood vents) within 1 A. above adjacent grade ♦ " c
O 1) Total area of all permanent openings (flood vents) In C3h
jy(gsq. in. (sq. cm) 1}
SECTION D - SURVEYOR ENGINEER, OR ARCHITECT CERTIFICA
This certification Is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information.
I caddy that the intormation In Sections A, A and C on this certificate represents my beat efforts to Interpret the data available.
^''� •" ' -- false statement —
or
TITLEPrirxapal COMPANY NAME Witcher Engineering LLP
FEMA Form 81-31, A0&9 SEE REVERSE SID FOR CONTINUATION REPLACES ALL PREVIOUS EDITIONS