Loading...
HomeMy WebLinkAboutGuidelines for Permitting a Residential Photovoltaic Roof Mounted System_120412GUIDELINES FOR PERMITTING A RESIDENTIAL PHOTOVOLTAIC (PV) ROOF MOUNTED SYSTEM Span Tables Exhibits A — Roof Plan B — Standard Electrical Diagram C — Notes for Electrical Diagram Inserts Structural Evaluation Worksheet County Pre Approved PV Mounting Systems 1. 0 FDepartment of Public Works, Building Division "/Al 7:45 AM to 4:30 PM weekdays. Closed weekends, and holidays. FRONT DESK CLERK ASSISTANCE 7:45 AM to 3:30 PM Monday -Friday, except, Wednesday in Hilo and aqT� OF HOOP` Thursday in Kona 7:45 AM to noon. EAST HAWAII: Aupuni Center, 101 Pauahi Street, Suite 7, Hilo, HI 96720 County of Hawai'i is an Equal Opportunity Provider and Employer. PHONE NUMBER: (808) 961-8331 FAX NUMBER: (808) 961-8410 WEST HAWAII: 74-5044 Ane Keohokalole Highway, Bldg E, 1st Floor, Kailua-Kona, HI 96740 PHONE NUMBER: (808) 323-4720 FAX NUMBER: (808) 327-3509 http://www.hawaiicounty.gov/public-works-building Email: cohbuild@hawaiicounty.gov Revised 12.04.12 PG:Be 11 This worksheet, to be completed by the applicant, is required for residential PV system applications. If the drawings are prepared and stamped by a Hawaii registered professional architect or structural engineer, then the worksheet is not required. The installation of a roof mounted PV system can be complex and it is recommended (but not required) that the stricture be reviewed by a registered professional architect or structural engineer. U W.11► M.11►1 /► A) Building 1) A location site plan must be to scale showing the location of major strictures on the property 1" = 20' or larger is preferred. Provide legal owner's name and tax map key on each drawing. 2) A roof plan (scale 1/8" = 1'-0") with PV arrays on dwellings with a minimum of 10 -inches clear space along the roof ridge. ICC Evaluation Service Acceptance (711teria For Modular Framing ,Systems Used to ,Support Photovoltaic Modules AC l28 3.1.3.1.1 and ASCE-7 Figures 6-11. (1) PV modules shall slot be installed urithin 10 inches of a roof edge or ridge; (?) The distance betiveen the roof or urall stn face and the PV module must be behreen 2 and 10 inches; (3) A mininium gap q/ 0.75 inch must exist behreen PV modules and adjacent i-otivs of modules. (See Exhibit A) a) Show array supports, framing members. b) Provide information on roof mounting structure(s) constriction. c) Detail the module attachment method. B) Electrical (See Exhibits B -C) 1) Location plan showing strictures and their vicinity 1" = 20' or larger is preferred. 2) Provide information on roof mounting systems. 3) A standard electrical diagram showing PV array configuration, wiring system, over current protection, inverter, disconnects, required markings or labels and AC connection to the building. 4) Provide specification sheets, and installation manuals for all manufactured components including, but not limited to PV modules, inverters, combiner box, and mounting system. These will be returned after the review. 5) The electrical diagram (E1.1) maybe used to accurately represent the PV system. 6) Please indicate the methods and product for this installation. Refer to the PV bulletins for the list of County pre approved PV mounting systems. 7) For Barriers, refer to NEC 690-31 on Wiring. C) Field revisions will require two sets of "as -built" drawings for review and approval. FEES Calculate the fees for all the work to be performed on the electrical permit application and building permit worksheet. On the building permit worksheet, complete the "Estimated Valuation for all work to be performed." PG:ge 12 Hawaii County Code, Chapter 9, Electricity Permit Division 2. Fees and Charges Section 9-40. Fee schedule. (q) Generators, Capacitors, Reactors, Transformers Fixed, and all other alternate energy power sources. For the purpose of this subsection, 1 kw is equivalent to 1 lova. Notmore than 5 kw................................................................................................................ $10 Over 5 kw but not over 15 kw................................................................................................ $24 Over15 kw............................................................................................................................. $40 Hawaii County Code, Chapter 5, Building Permit Section 5-35. Table 1-A. TABLE 1-A —BUILDING PERMIT FEES Fees shall be as follov,s: $0 to $500 $10.00 $501 to $2,000 $10.00 for the first $500 plus $1.50 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $32.50 for the first $2,000 plus $7.50 for each additional $1,000 or fraction thereof, to, and including $25,000. $25,001 to $50,000 $205.00 for the first $25,000 plus $6.00 for each additional $1,000 or fraction thereof, to, and including $50,000. $50,001 and up $355.00 for the first $50,000 plus $3.00 for each additional $1,000 or fraction thereof. If a reasonable value is not provided, a determination is made by the Building Official.' IMIAMI :111hyd0D I A) Attach the completed structural evaluation worksheet to each set of plans for review. B) Include two sets of site plan drawings stamped by an electrical engineer in accordance with HRS section 444, with product submittals as required. C) Submit a completed building permit worksheet, and electrical permit application. Ordinance 12-149, amended the Hawaii County Code Chapter 9, section 9-33. Plans and specifications requirements; deviations. (b) Installation ofphotovoltaic systems shall regWre: (1) A building permit for residential and non residential installations; (2) Electrical design drawings and specifications bearing the approval of an electrical engineer registered in the State ofHawai `i for residential and non residential installations; and (3) Plans and specifications for building work bearing the approval of an architect or stmcniral engineer registered in the State ofHawai `i for non residential installations only. 1 Hawai'i County Code, Chapter 5, Sec 5-31 2 Under the Hawai'i Revised Statutes section 444 permits are issued to Hawai'i State licensed building, electrical, or photovoltaic contractors. �3 A framing plan is required only if the combined weight of the PV array exceed 5 pounds per square foot (PSF or lbs/ ft') or, the existing rafters are over -spanned. The following may help determine if the rafters are over -spanned. Use the table below for rafter spans that have conventional lightweight dead loads, and do not have a ceiling attached. If there is a roof system that does not fall within these tables, provide a roof -framing plan for review. 10 PSF Dead Load Roof live load = 20 psf, ceiling not attached to rafters, L/A = 180 Rafter Size 2 x 4 1 2 x 6 1 2 x 8 2x 10 2x 12 Spacing Species Grade The measurements below are in feet -inches (inches) (e.g. 9 - 10 = 9 feet, 10 inches) Douglas 42 or 16 Fir -larch better 9-10 14-4 18-2 22-3 25-9 Douglas 42 or 24 Fir -larch better 8-0 11-9 14-10 18-2 21-0 Use this table for rafter spans with a ceiling attached, and conventional light dead loads 10 PSF Dead Load Roof live load = 20 psf, ceiling not attached to rafters, L/A = 240 Rafter Size 2 x 4 1 2 x 6 1 2 x 8 2x 10 2x 12 Spacing Species Grade The measurements below are in feet -inches (inches) (e.g. 9 - 10 = 9 feet, 10 inches) Douglas 42 or 16 Fir -larch better 8-11 14-1 18-2 22-3 25-9 Douglas 42 or 24 Fir -larch better 7-10 11-9 14-10 18-2 21-0 If the roof system has: a. Over -spanned rafters or trusses, b. The array is over 5 lbs/ft2 on any roof constriction, or c. The attachments with a dead load exceeds 45 lbs per attachment; It is required that you provide a framing plan showing details how this will strengthen the rafters using the supplied span tables. 3 The Span Tables and Exhibits B & C were printed with permission from the Solar America Board of Codes & Standards. Pogo 14 SAMPLE ONLY DO NOT SUBMIT WITH PLANS EXPEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit A Se Cc U) CIL 0 W CL Lei, n L:lI-- W Lij Cl. C!) Lh L&LuliW �z 0 > o 00 Ell CL. --J Cl <.�CIO L& ,ALJ ui f°fir f ^v. a U � O B Q (D LLJ L � � 1 N O U a O E O N U C N N U U n > C 2� } � fillm Uj o .-`CD o m 0 EXPEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit A Pogo 15 3 SAMPLE ONLY DO NOT SUBMIT WITH PLANS U zL>Lj ❑ oQ ..1 E aEi p d � Z UW U` C`6 T wI. W Q w Z Xp (6 U) O Z' O O ♦- aim c a0o ¢ U a O N W Q ppa' ~ 1 w W �Q< UO' W N ❑~ Q oa LL LuO z � U w N -a U) c iri (n v w ai U Ea Q (n C6 L) a E Z Q ° U °? > z z Q D (7 'W LL N ca 0 5 O c (n Q m Q U1 ❑ a U O ff Z W ui ui Z Q — 0 O vVi U > F z (n U Z W w U d ui m z Z Q a w co W p W J ❑ui W � � U J Z O>_ O LL w Z H WZ z d LL Q LL Z 0 W Z w W 0 a W Ir X m U Q O Q w > w ❑ 0> (/l a m �, O U U ❑ V ❑ C7 U Q w UJ O � SAMPLE ONLY DO NOT SUBMIT WITH PLANS EXPEDITED PERMIT PROCESS FOR PV SYSTEMS U zL>Lj ❑ oQ ..1 E aEi UW U` C`6 T wI. W Q w Z Xp (6 U) O Z' 2i aim c a0o ¢ U a O N W Q ppa' ~ 1 w Z �Q< UO' W N ❑~ Q oa LL LuO z EXPEDITED PERMIT PROCESS FOR PV SYSTEMS ❑ p 0 N U �ww Q Q Z Z 0 Z w a a U LL � O OF K U W Z) 07 z a � Z O u Z U W � ❑ C7 V Z ❑ o O 0 o w v ❑ ❑ ❑ z a U N ❑ N Fw ZO ❑ S = U S o O Z w af 0~ O O O O O U o d ❑ ❑ ❑ Z ❑ a N N U N U Lu d S S w S K 3w== U = U U > X X (7 Z X C7 Z a w `o `o w o w O LL �o LL ❑ ❑ p j ❑ O a' ElIL OU N N Q U `� Q Lu m = = z p = Z � v Exhibit B E aEi C`6 T (6 U) a o co W N -a U) c iri (n v cc N ai U Ea Q (n C6 L) a E Z Q ° U °? > z U) � � LL N ca 0 5 ❑ p 0 N U �ww Q Q Z Z 0 Z w a a U LL � O OF K U W Z) 07 z a � Z O u Z U W � ❑ C7 V Z ❑ o O 0 o w v ❑ ❑ ❑ z a U N ❑ N Fw ZO ❑ S = U S o O Z w af 0~ O O O O O U o d ❑ ❑ ❑ Z ❑ a N N U N U Lu d S S w S K 3w== U = U U > X X (7 Z X C7 Z a w `o `o w o w O LL �o LL ❑ ❑ p j ❑ O a' ElIL OU N N Q U `� Q Lu m = = z p = Z � v Exhibit B a Pogo 16 SAMPLE ONLY DO NOT SUBMIT WITH PLANS EZ'PEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit C Q > > Q Q � > w 0 ^ W W J � o � z ? e z W M U z O w a X � LU Q � Z O W � a X � � ¢ p > U � Z w O � z� Q W a � X � o o � ¢ O> X � cq a w Q F � U Z O F"> W ox ¢ pH W! � W Z w~ a w YCOZ � LL H W � = z z0 p S N LtJ T Cn O W p � W p U}� p z z U � a� a W LL oW v w o� Ow Z F_ Z O O O � Q� Q O � Q Z F O oW� z m� 0 h O z � O �= Q� p U U� F � co W mU p W y O o W Z Q O O z �� U �z O wZ Lli � W p U O Z p Z CO W } Q O O� z� (� Z w (� W �pa LL m M Q ' p w O w F �p UU LLJ Lu z U)OZ W co c0 F = 0 OQ ~ O> Z wumi Q N D p N U co ❑ W pQ Om z0 X U C m'p `� E -p Z m y. W❑ W O U "o £ O E Z Q E O m QQ W Z ❑Q z CGU QO y� N N N aU F " CD w �❑ a Om m 5 -G'o U H 5❑ O O- O T (n (!) cq H m0 U'S 00 WZ CGU' X§E Z 0 mz > mz �o UN H� Om N w U Q 10 ma w °� Ov W, N U W❑ H❑ Op aC.7 ZO Q� U or��W W OZ �m > > Q Q �} Oh. z} DU �Q Oh W� W .. W m W W1 �W >w FF Oz FW Y❑ � > U W W z 0 Z1w <W F-0 ww WWO zw az z� 0 zd z X C W PM LL CC W ¢ ¢} O LW ULli m H UU WO CSU nWjK nWj L] Ham❑ WO m a. 00..m U U m U ~ v¢ w ® m U O W �� W z W NCG ciu v0 az) 0 0 R Q� w U kx to O W K p J m m x U (� w O(if Z z z J F w W Q U Q o F V Z Z z F Q W W w? Q O Q 2vI xM LLJ 0 LuW L� >O Ja zz M O > W Q O M a �� �¢U U_Q UZQW -,Lu =Jo 0Q -,W m� W n IW- W W o 3S J U a ? Q O .. O W=~� QN ~~OQ 0w 0< W a Pp w w a `� ?_< z�� �I- Oz�z h O U Q2 O zm > z_ W W X z z < X X < 0z < X < �Ul Li U) SOW 000 OWO �0 =2a Z7i ZZ= wo-W �li O , WLLZ m? Wo. m2 O O W 0 0 a I� Z O H W o Q w c 0QZ O0W O- QOa Q -OW w m02 K4ap Um WQ U} to co :E JW Wv U MQ� ��=O }uj Um }O J O JF- J W oU) V W=W �QU -0 m zuiL�I QW ¢=O Wqz 00 QU N U FmW 0 w0 �Oz WzMw _ WW wl- Wm CCOX aWw Ww0 DlZ=^ O Fof wm0w wW U' d wW z e F N <3: Q� W Q UDW �¢� WFW 0 0ZFn mM= ¢a0�m a� a� U aa2 Z(npZO Ow OW (q F WWO a (n WWZQ- U UJ U Qw0 D � Oho CC) C� i -m¢ o~O0� 0z Zm¢ zmowo O°- Opm_ U W? i7�ZW 2 Q X>O �Mz QzwO¢ om om W ae WwO W0p Q=��W �o �O O W. O � J 2 J H z O z Q U W Q U o co W OWE SZ1 NUmQOU —�moF(n .x z O S, - DLJ z > a O z W N 2 N V U J t w EZ'PEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit C Q > > Q Q � > 0 ^ o � z ? e z W M U z O w a X � LU Q � Z O W � a X � � ¢ p > U � Z w O � z� Q W a � X � o o � ¢ O> X � cq a w Q F � U Z O F"> w ¢ pH � � W Z w~ a w m � LL H o.......... J U............ O> U W Zp ZZ aZ O W p O a a W p zJN �O �O U � Q a W Ow Z O O O � U � Q Z Q N O �= O EZ'PEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit C Q > > Q Q � > 0 ^ o � z ? e z W M U z O w a X � LU Q � Z O W � a X � � ¢ p > U � Z w O � _ I- W w � K U � O m a m w_ d' X � Q W a � X � o o � ¢ O> X � o ❑ U LL O d. hW- U O> O W � J a m w O O W J Y o � � W W > > p p � � EZ'PEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit C