PUNA COMMUNITY DEVELOPMENT PLAN
Transportation: 4.3 Roadway Network
Action 4.3.3.b (page 4-6)
Medium Term (2013-2017)
Construct a two-lane PMAR roadway that connects Kaloli Drive
between approximately 16th Avenue and 10th Avenue in HPP to either Highway 11 or Highway 130 in the vicinity of Kea'au;
Construct a two-lane, unpaved, gated emergency access roadway
between Kahakai Boulevard to HPP which can later be converted into a future extension of PMAR;
Construct a two-lane roadway between Nānāwale and Kahakai Boulevard that can be used as
both an emergency access route and a future extension of PMAR; and
Study the need, desirability and feasibility of adding an alternative route between Pāhoa and Highway 11 and between
Highway 11 and Stainback Highway in the stretch between Glenwood and Kurtistown, as generally depicted on Figure 4-1.
(4.3.1) Goals:
a) There are adequate emergency and evacuation
routes and connectivity throughout Puna’s roadway network.
b) Improvements are phased so that short-term actions support and lead toward projects that will take a longer time to implement.
c) Roadways are pedestrian and bicycle friendly.
d) Traffic congestion and traffic-related health risks are reduced.
(4.3.2) Objectives:
Create alternative, redundant routes
for existing Highways 11, 130 and 132 utilizing existing routes wherever possible.
Develop PMAR along the general route shown in Figure 4-1, with the specific design and alignment to
be determined based on an environmental impact study that identifies a project having the least environmental and socio-economic impact.
Designate new connectivity points for local traffic
and emergency and evacuation routes within the existing roadway network.
Develop a phased implementation plan for coordinated actions by County and State transportation and public works
departments.
Improve appropriate “roads in limbo” that are used widely for public access.
Action 4.3.3.b.1
Medium Term (2013-2017)
Construct a two-lane PMAR roadway that connects Kaloli Drive between approximately 16th Avenue and 10th Avenue in HPP to either Highway 11 or
Highway 130 in the vicinity of Kea'au;
Action Status:
Lead Task Group(s)/Champion(s):
Subcommittee Chairperson/Members:
CDP Proposed Timeframe:
Start Date: Completion Date:
Budget: Fu
nding Source:
Progress to Date:
Next Step(s):
Description:
Champion:
Goal Date:
Other Notes:
Related Actions
(Other PCDP Actions that need to be completed before or concurrent
with this specific Action)
Page #
Reference Documents
Page #
Action 4.3.3.b.2
Medium Term (2013-2017)
Construct a two-lane, unpaved, gated emergency access roadway between Kahakai Boulevard to HPP which can later be converted into a future extension
of PMAR;
Action Status:
Lead Task Group(s)/Champion(s):
Subcommittee Chairperson/Members:
CDP Proposed Timeframe:
Start Date: Completion Date:
Budget: Funding Source:
Progress to Date:
Next Step(s):
Description:
Champion:
Goal Date:
Other Notes:
Related Actions
(Other PCDP Actions that need to be completed before or concurrent with this specific
Action)
Page #
Action 4.3.3.b.3
Medium Term (2013-2017)
Construct a two-lane roadway between Nānāwale and Kahakai Boulevard that can be used as both an emergency access route and a future extension
of PMAR; and
Action Status:
Lead Task Group(s)/Champion(s):
Subcommittee Chairperson/Members:
CDP Proposed Timeframe:
Start Date: Completion Date:
Budget: Funding Source:
Progress to Date:
Next Step(s):
Description:
Champion:
Goal Date:
Other Notes:
Related Actions
(Other PCDP Actions that need to be completed before or concurrent with this specific
Action)
Page #
Action 4.3.3.b.4
Medium Term (2013-2017)
Study the need, desirability and feasibility of adding an alternative route between Pāhoa and Highway 11 and between Highway 11 and Stainback
Highway in the stretch between Glenwood and Kurtistown, as generally depicted on Figure 4-1.
Action Status:
Lead Task Group(s)/Champion(s):
Subcommittee Chairperson/Members:
CDP Proposed
Timeframe:
Start Date: Completion Date:
Budget: Funding Source:
Progress to Date:
Next Step(s):
Description:
Champion:
Goal Date:
Other Notes:
Related Actions
(Other
PCDP Actions that need to be completed before or concurrent with this specific Action)
Page #
Action / Tasks
Progress Status
Champion/
Task Leader
Date of Implementation
Action / Task Results
Additional Information
Action 4.3.3.b
Medium Term (2013-2017)
Construct
a two-lane PMAR roadway that connects Kaloli Drive between approximately 16th Avenue and 10th Avenue in HPP to either Highway 11 or Highway 130 in the vicinity of Kea'au;
Construct
a two-lane, unpaved, gated emergency access roadway between Kahakai Boulevard to HPP which can later be converted into a future extension of PMAR;
Construct a two-lane roadway
between Nānāwale and Kahakai Boulevard that can be used as both an emergency access route and a future extension of PMAR; and
Study the need, desirability and feasibility
of adding an alternative route between Pāhoa and Highway 11 and between Highway 11 and Stainback Highway in the stretch between Glenwood and Kurtistown, as generally depicted on Figure
4-1.