HomeMy WebLinkAbout2014-70 Budget SC report 14Oct14 Communication No. 2014-70
OCTOBER 14, 2014 REPORT FROM THE BUDGET
SUBCOMMITTEE
We have communicated via e-mail and conversation in the last
month. At our last meeting we worked on prioritizing current
projects. We worked off a shortened list that had projects
relevant to the PCDP. We separated those requests into 3
groups according to which department they were under, DPW,
Planning or P & R. This is a summary of our meetings and our
communications since those meetings.
DPW is currently involved in a number of road projects in Puna
spurred on by the emergency. Two of these projects, the
connection of Hawaiian Shores and HPP via the Government
Beach Rd. and the connection of RR via Nanawale to HPP were
either CIP requests and/or connectivity routes as mentioned in
the Connectivity report. Therefore, we decided that
prioritization of any other DPW requests was not needed at this
time.
The one planning CIP request is for a planning consultant for
the Volcano Long Range Plan. This request would therefore be
our one planning priority.
There are, of course, CIP requests as they relate to the Pahoa
Plan. Those need to be considered in the context of the Pahoa
Plan and the decision was made to not address those CIP
requests via the budget sub-committee.
In reviewing the CIP requests, which are under the jurisdiction of P &
R, the 3 projects, which were priorities, were:
1 ) The restrooms at Ahalanui (priority #1 as the longest
standing request and the greatest need).
2) ADA Restroom facilities for the senior center in Mountain
View. Other Mountain View requests were of lower
priority because: From conversations with Mountain View
residents, it was determined that the gutters on the gym
had been replaced and the roof leaks were tolerable for
the immediacy (there are other gym roofs which are more
a priority in other districts.)
3) Feasibility study for the swimming area at Pohoiki. The
request needs to be increased to 1 25K because P & R has
said 40K are not adequate. Also, P & R has stated they
would like to be in partnership with the State from the
beginning and have the State also contribute funds (for a
total of 250K to 300K). The scope of the study would
also include an EIS. There is some time urgency, as if
funding from the state is to be pursued, it needs to be
requested soon. Russell Ruderman has pledged his
support.
New requests:
General Operations Funding for the Planning Assistant is
included.
General Operations request from Elmer for funding for
grubbing and grading brochures will be forthcoming.
We would solicit any other requests and input from the AC.
am providing a synopsis; if other budget sub-committee
members have something else to add/modify, feel free. Any
additional requests that may relate to the current state of
emergency are also requested.