HomeMy WebLinkAbout2015-08-25 Water Board MinutesMINUTES
DEPARTMENT OF WATER SUPPLY
COUNTY OF HAWAII
WATER BOARD MEETING
August 25, 2015
West Hawaii Civic Center, Community Center, Bldg. G, 74-5044 Ane Keohokalole Hwy, Kailua-Kona
MEMBERS PRESENT: Mr. Rick Robinson, Chairperson
Mr. Craig Takamine, Vice -Chairperson
Mr. Russell Arikawa
Mr. Bryant Balog
Mr. Leningrad Elarionoff
Ms. Susan Lee Loy
Mr. Jay Uyeda
Ms. Kanoe Wilson
ABSENT:
Ms. Brenda Iokepa-Moses, Water Board Member
Mr. Duane Kanuha, Director, Planning Department (ex -officio member)
Mr. Warren Lee, Director, Department of Public Works (ex -officio
member)
OTHERS PRESENT: Ms. Amy Self, Deputy Corporation Counsel
M. Steve Bolles, Process Energy Services, LLC
Nr. Dave Thomas
Mr. Sterling Chow, State Highways Division
Mr. Sal Panem, State Highways Division
Ms. Lisa Reddinger
Mr. Blaine Banks
Mr. John Makoff
Mr. Simon Poole
Mr. Jeff Zimpfer, National Park Service
Department of Water Supply Staff
Mr. Keith Okamoto, Manager -Chief Engineer
Mr. Kawika Uyehara, Deputy
Mr. Kurt Inaba, Engineering Division Head
Mr. Richard Sumada, Waterworks Controller
Mr. Clyde Young, Operations
Mr. Eric Takamoto, Operations
Ms. Judy Hayducsko, Operations
Ms. Kanani Aton, Public Information and Education Specialist
1) CALL TO ORDER — Chairperson Robinson called the meeting to order at 10:00 a.m.
2) STATEMENTS FROM THE PUBLIC
None.
3) APPROVAL OF MINUTES
Page 1 of 33 Water Board Minutes 8-25-15 js
The Chairperson entertained a Motion to approve the Minutes of the July 28, 2015, Water Board
meeting.
ACTION: Mr. Uyeda moved to approve; seconded by Mr. Arikawa; and carried unanimously by
voice vote.
4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA
None.
5) HAMAKUA:
A. USE AND OCCUPANCY AGREEMENT — AHUALOA — HONOKA`A:
The Department has received the subject Use and Occupancy Agreement (UOA) 126 from the
State Department of Transportation, Highways Division's Right -of -Way Branch, and finds it
acceptable as submitted. The UOA is for the 12" waterline installation crossing Hawaii Belt
Road between Ahualoa and Honoka`a town. Acceptance of the UOA will allow the contractor
for the subject project to obtain the necessary permits to perform the installation of the waterline
within the State right-of-way.
The Manager -Chief Engineer recommended that the Water Board accept Use and Occupancy
Agreement 126, and that either the Manager -Chief Engineer or the Deputy be authorized to sign
the document subject to the approval of the Corporation Counsel.
MOTION: Mr. Arikawa moved to approve; seconded by Ms. Wilson.
The Manager -Chief Engineer noted that this Use and Occupancy Agreement has posed a
challenge for DWS, for any work involving State Highways' right-of-way. Hope dawned in the
course of working with Mr. Ed Sniffen, Deputy Director of State Highways Division; Mr. Sniffen
understood DWS's problem with a small section of the Agreement that entailed DWS forgoing its
rights per HRS 264-33. During a conference call with Mr. Sniffen and District staff from
Highways Division, including the Right -of -Way Branch manager, DWS was able to resolve that
issue. The result is a Use and Occupancy Agreement that is acceptable to DWS; the Department
no longer forgoes its rights, and now things can move forward. The Manager -Chief Engineer
said that DWS wants to take advantage of this understanding, and move forward with all pending
State Highway right-of-way matters, including service laterals. Somewhere down the road, the
Department would want to draft a Resolution that would involve all of the service laterals, etc., at
one time — without having to come before the Board one by one.
Ms. Lee Loy asked if this understanding will fit in with the Pauka`a Waterline Relocation Project
as well.
The Manager -Chief Engineer confirmed this.
Ms. Lee Loy asked if this Use and Occupancy Agreement becomes a template.
Mr. Inaba said that it is a template; there is project -specific information that still needs to be
folded in.
Ms. Lee Loy said this was really good.
Page 2 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer said that this was specifically good for the Ahualoa-Honoka`a
project at this point; DWS will be using this as a model for future Use and Occupancy
Agreements.
Chairperson Robinson asked whether this Agreement could be used in the case of other laterals
that would be in the State Highway right-of-way.
The Manager -Chief Engineer said that was correct. He thanked everyone who assisted with the
process of achieving this Use and Occupancy Agreement, and commended Mr. Sniffen in
particular for his help.
ACTION: Motion carried unanimously by voice vote.
6) SOUTH HILO:
A. JOB NO. 2015-1023, EMERGENCY GENERATOR SET REPAIR AND MAINTENANCE
FOR THE DEPARTMENT OF WATER SUPPLY:
This project generally consists of an in -frame repair of a Caterpillar CAT C27 ATAAC diesel
engine in -frame, which is part of a 750 kW Caterpillar generator set; inspecting and repairing
engine exhaust system; performing preventative maintenance service; performing miscellaneous
repairs and improvements to container; resurfacing container, trailer and fuel tank; and
transporting the generator set to shop and to the Department of Water Supply's Pana`ewa Well
site after completion.
Bids for this project were opened on August 13, at 2:00 p.m., and the following are the bid
results:
Bidder Bid Amount
Hawthorne Pacific Corp Non -Responsive
The Manager -Chief Engineer recommended that the Board not award the contract for
JOB NO. 2015-1023, EMERGENCY GENERATOR SET REPAIR AND MAINTENANCE
FOR THE DEPARTMENT OF WATER SUPPLY, due to no qualified bids received. Staff will
seek alternate methods of procurement, in accordance to procurement rules.
MOTION: Ms. Lee Loy moved to approve the Recommendation not to award; seconded by
Ms. Wilson.
Mr. Elarionoff asked about the Department's intention to now seek alternative methods of
procurement; he asked what that meant.
The Manager -Chief Engineer said there were several options available under procurement law, in
the event that DWS does not have any responsive bidders. One option is to do direct
negotiations, and the other option is to solicit quotes, etc. For the most part, DWS in the past has
sought quotes so as to have some element of competition. In this particular instance, the one
bidder failed to submit some required documentation, and therefore that bid could not be
considered. When DWS enters into direct negotiations with a sole bidder, the Department tries to
make sure that the price is still within reason; DWS staff had an estimated amount for this
particular repair job, the Manager -Chief Engineer said. Summing up, he said that DWS will
either do direct negotiations or solicit quotes.
Ms. Lee Loy asked for clarification that this is an emergency generator, i.e., a back-up generator
— not an emergency repair job.
Page 3 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer said that was a good catch; it is not an emergency project. It is a
repair of the emergency generator.
Mr. Balog asked what the estimated amount for this repair was.
Mr. Young said the estimate was $75,000.00.
Mr. Uyeda asked if it made sense for DWS to sell this generator and buy a new one, instead of
continuing to repair an old piece of equipment.
The Manager -Chief Engineer said that DWS actually obtained this generator as part of a grant
administered by Civil Defense, so it was obtained at no cost to DWS. He asked Mr. Young
whether this generator had undergone prior repairs.
Mr. Young said no, this would be the first repair.
The Manager -Chief Engineer asked how much a generator of this capacity would typically cost
new.
Mr. Young said it would cost about $200,000.00
Mr. Uyeda said that he would recommend that the Department look at a replacement, as the
equipment ages; at some point, it will reach the point of no return.
The Manager -Chief Engineer agreed, and said that he would analyze whether it would be
worthwhile. At this point, in the absence of any responsive bids, DWS could do that evaluation
prior to awarding a repair job.
Mr. Balog suggested that DWS do a tear -down assessment; this would be pretty cheap to do, and
it would give an indication of whether it would cost more than anticipated to do the repair.
Mr. Young said that DWS had done a tear -down assessment, for $7,000.00; that led to the
recommendation to do a complete overhaul.
Mr. Balog said it was good that the tear -down assessment had been done.
The Manager -Chief Engineer said that the Department believed that the repair job would fix the
generator.
Ms. Wilson asked how old the generator was.
Mr. Young said that the generator, which was at the Hawi depot site, was only six years old. Tree
leaves and debris got into one of the wells where the muffler is located. The debris plugged the
drain hole, and heavy rains flooded the engine. DWS is working on modifications of the
generator, and has already modified some of its other generators. This problem of heavy rain and
debris basically ruins the whole engine, he said.
ACTION: Motion carried unanimously by voice vote.
B. EQUIPMENT BID NO. 2015-06, FURNISHING AND DELIVERING EQUIPMENT TO
THE DEPARTMENT OF WATER SUPPLY:
Bids for this project were opened at 2:30 p.m. on August 13, 2015, and the following are the bid
results.
Page 4 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer recommended that the Board award EQUIPMENT BID NO. 2015-
06, FURNISHING AND DELIVERING EQUIPMENT TO THE DEPARTMENT OF WATER
SUPPLY, to Allied Machinery Corporation for Parts "A" and `B" at a total cost of $143,436.58,
and that either the Chairperson or the Vice -Chairperson be authorized to sign the contract subject
to approval of the contract as to form and legality by Corporation Counsel.
MOTION: Mr. Arikawa moved to approve; seconded by Ms. Wilson.
The Manager -Chief Engineer said that this bid was for much-needed equipment that will boost
efficiency for DWS field personnel. The equipment includes two small excavators and two
trailers to transport them.
Mr. Balog asked if the bids matched the specifications for the equipment, and asked if all of the
specifications dovetailed with manufacturer warranties, etc.
The Manager -Chief Engineer asked Ms. Hayducsko, the project engineer who prepared the
specifications and reviewed the bids, to give the details.
Ms. Hayducsko explained that the Department looked at mini -excavators of the same
classification, taking the minimum standards for all of them so that DWS could get competitive
bids from all of the different contractors.
Mr. Balog returned to his question about warranties, saying that DWS would want to be sure to
obtain a good amount of warranty, so that the Department does not have to pay for problems.
Ms. Hayducsko said that the standard warranty for one of the equipment manufacturers was one
year, while the one manufacturer's warranty was for one year. DWS had specified one year, but
the low bidder has a two-year warranty.
Mr. Balog said that was good. He asked out of curiosity why DWS went with the minimum
warranty, noting that manufacturers do have options for extended warranties.
Ms. Hayducsko said that is one thing that DWS can consider when the Department does the final
contract; DWS could do an Addendum to have an extended warranty. She said that DWS wanted
to make sure that the bid opening drew some qualified bidders, who were able to bid on the
minimum standards.
ACTION: Motion carried unanimously by voice vote.
Page 5 of 33 Water Board Minutes 8-25-15 js
Allied
Machinery
Corp.
American
Machinery
Hawthorne
Pacific Corp.
Part "A"
Two(2) only 2015 or later Mini -Excavator
Total Delivery Price
$116,353.42
$117,236.75
$124,978.36
Part `B"
Two (2) only 2015 or later Dual Purpose
Dump Trailer
Total Delivery Price
$27,083.16
No Bid
$41,249.74
The Manager -Chief Engineer recommended that the Board award EQUIPMENT BID NO. 2015-
06, FURNISHING AND DELIVERING EQUIPMENT TO THE DEPARTMENT OF WATER
SUPPLY, to Allied Machinery Corporation for Parts "A" and `B" at a total cost of $143,436.58,
and that either the Chairperson or the Vice -Chairperson be authorized to sign the contract subject
to approval of the contract as to form and legality by Corporation Counsel.
MOTION: Mr. Arikawa moved to approve; seconded by Ms. Wilson.
The Manager -Chief Engineer said that this bid was for much-needed equipment that will boost
efficiency for DWS field personnel. The equipment includes two small excavators and two
trailers to transport them.
Mr. Balog asked if the bids matched the specifications for the equipment, and asked if all of the
specifications dovetailed with manufacturer warranties, etc.
The Manager -Chief Engineer asked Ms. Hayducsko, the project engineer who prepared the
specifications and reviewed the bids, to give the details.
Ms. Hayducsko explained that the Department looked at mini -excavators of the same
classification, taking the minimum standards for all of them so that DWS could get competitive
bids from all of the different contractors.
Mr. Balog returned to his question about warranties, saying that DWS would want to be sure to
obtain a good amount of warranty, so that the Department does not have to pay for problems.
Ms. Hayducsko said that the standard warranty for one of the equipment manufacturers was one
year, while the one manufacturer's warranty was for one year. DWS had specified one year, but
the low bidder has a two-year warranty.
Mr. Balog said that was good. He asked out of curiosity why DWS went with the minimum
warranty, noting that manufacturers do have options for extended warranties.
Ms. Hayducsko said that is one thing that DWS can consider when the Department does the final
contract; DWS could do an Addendum to have an extended warranty. She said that DWS wanted
to make sure that the bid opening drew some qualified bidders, who were able to bid on the
minimum standards.
ACTION: Motion carried unanimously by voice vote.
Page 5 of 33 Water Board Minutes 8-25-15 js
7)
NORTH KONA:
A. AMENDMENT TO MEMORANDUM OF UNDERSTANDING NO. 2088 - QUE
KA`AHUMANU HIGHWAY WIDENING — KEALAKEHE TO KEAHOLE 16"
WATERLINE INSTALLATION — STATE HIGHWAY PROJECT (QUEEN
KA`AHUMANU HIGHWAY WIDENING, PHASE 2):
Memorandum of Understanding No. 2088 (MOU 2088) was entered into between the Water
Board and the State Department of Transportation on October 28, 2010. The Department of
Water Supply subsequently submitted a check for $3,444,000.00, to the State, to cover the design
and construction of the subject project, of which, $164,000.00 was intended for contingencies.
The project has since been delayed due to permitting issues beyond the control of the contractor.
Therefore, the contractor has submitted proposals for price escalation costs for materials, labor
and equipment in the amount of $244,240.00.
The State has agreed to give the Department a credit of $50,242.23 for the interest earned on the
funds that were deposited with the State. This would result in a net increase of $193,997.77 in
cost to the Department. Therefore, it is proposed that an Amendment to MOU 2088 be executed,
to increase the Department's overall cost on the project from $3,444,000.00 to $3,637,997.77.
Staff has reviewed the cost proposals, and the Amendment to MOU 2088 and finds it acceptable.
The Manager -Chief Engineer recommended that the Water Board accept the increase in cost of
$193,997.77, and that either the Chairperson or Vice -Chairperson be authorized to execute the
AMENDMENT TO MEMORANDUM OF UNDERSTANDING NO. 2088 - QUEEN
KA`AHUMANU HIGHWAY WIDENING — KEALAKEHE TO KEAHOLE 16" WATERLINE
INSTALLATION — STATE HIGHWAY PROJECT (QUEEN KA`AHUMANU HIGHWAY
WIDENING, PHASE 2), subject to approval of our Corporation Counsel.
MOTION: Mr. Balog moved to approve; seconded by Mr. Takamine.
The Manager -Chief Engineer noted that the Additional Cost Summary for this project was
distributed today. The original amount for the additional costs had been close to $500,000.00, but
that has since been pared down considerably, to $193,997.77. This was due in part to State
Highways' administration having removed the costs for gasket replacement, testing and
recertifying valves, replacement of the brass fittings, as well as applying the interest earned on the
money that DWS had provided State Highways up front in 2010. DWS believes that the new
amount for additional costs is a fair amount that the Department can move forward with.
Chairperson Robinson asked about the blessing for the project that is supposed to take place soon.
The Manager -Chief Engineer said yes, the blessing will be next Thursday, September 3, at
3:15 p.m., and DWS plans to attend. There is also a community meeting regarding the project
tonight at 6:00 p.m. at Kealakehe High School, which DWS will also attend.
Chairperson Robinson asked about the red construction fence on the makai side of the road.
Mr. Sterling Chow, Assistant District Engineer for State Highways, said that the orange fencing
has been installed for two purposes: to delineate the archaeological sites from the project
boundaries, and to separate the work from the National Park. There is a long linear fence in front
of the National Park, to separate the work from the park. The other fence is around the
archaeological sites, he said.
Page 6 of 33 Water Board Minutes 8-25-15 js
Chairperson Robinson said that he noticed recently that the contractor was doing either a
reconnaissance survey or a recovery survey.
Mr. Chow said yes, they were doing field data collection, to get more information from the
archaeological sites. At the same time, they installed the construction fence, he added.
Chairperson Robinson asked if the State Historical Preservation Division had signed off on
everything.
Mr. Chow said yes, the contractor had followed through with getting the grading permits, etc., so
construction is ready to go.
Chairperson Robinson asked whether the gaskets within the pipes would all need to be replaced.
He asked whether that would be a laborious process, or simple to do.
Mr. Chow said he is not a water guy, but his understanding is that the gaskets are separate, and
are installed as the pipes are fitted together.
The Manager -Chief Engineer said this was correct.
Mr. Chow said that the contractor is disposing of the old gaskets, and a new shipment is being
brought in.
Chairperson Robinson acknowledged that the gaskets are not in the pipes already, and instead, the
gaskets were stored somewhere separately.
Mr. Chow said the only ones that the contractor is checking on are the gaskets and other parts in
the valves. That task is coming up next month; at that time, the contractor will see if they need to
be retro -fitted or replaced.
Chairperson Robinson, noting that he rides his bicycle up and down the highway four times a
week, asked whether allowances would be made for cyclists during the construction.
Mr. Chow said yes, the contractor is required to keep the shoulders clear for cyclists, and during
the Iron Man competition, construction work will stop, so as not to interfere with the race and its
practice period.
(An unidentified State Highways official spoke up to note that tonight's community meeting would
provide more details)
Ms. Lee Loy credited Mr. Sniffen, who attended last month's Board meeting, for having listened
to the Board and staff on moving this project forward. She wished that the additional costs were
a little lower, because DWS had floated a lot of money up front, but she was happy nonetheless
that things were moving forward.
Mr. Arikawa asked whether there was a warranty for the valves, and if so, how long the warranty
was.
Mr. Inaba said that DWS has been working with the contractor to ensure that DWS gets the
manufacturer's standard warranty; this will come through the contractor.
Chairperson Robinson asked what size of pipe would be used.
Mr. Inaba said it was mostly 16 -inch pipe, although there was some 12 -inch and 8 -inch pipe as
well.
Page 7 of 33 Water Board Minutes 8-25-15 js
Chairperson Robinson noted that last month there was talk of DWS diving under the sewer pipe;
he asked if the different sizes of pipe would create a Venturi effect (i.e., whereby a reduction in
fluid pressure occurs when a fluid flows through a constricted section of pipe.)
Mr. Inaba said no, the portion in question is all 16 -inch pipe. This could just be a drainage
structure where the top of it is too close to the surface of the road for DWS to go over it;
therefore, DWS will dive under it.
The Manager -Chief Engineer noted that DWS as a water utility typically has pressure in its pipes,
so that DWS can accommodate changes in pressure such as this. With drainage, it mainly
involves gravity.
ACTION: Motion carried unanimously by voice vote.
8) KA`U:
JOB NO. 2015-1024, HAWAIIAN OCEAN VIEW ESTATES DEEPWELL REPAIR:
This project generally consists of the replacement of the existing deep well submersible motor,
pump, power cable, column pipe, discharge head and all appurtenant equipment, such as
strapping, chlorination of the well and pumping assembly, and the removal and replacement of
the existing soft starter and VFD equipment with a new VFD and filter system, in accordance
with the plans and specifications.
Bids for this project were opened on August 13, 2015, at 1:00 p.m., and the following are the bid
results:
Bidder
Bid Amount
Beylik Drilling and Pump Service, Inc.
Non -Responsive
Derrick's Well Drilling and Pump Services, LLC.
Non -Responsive
The Manager -Chief Engineer recommended that the Board not award the contract for
JOB NO. 2015-1024, HAWAIIAN OCEAN VIEW ESTATES DEEPWELL REPAIR, due to no
qualified bids received. Staff will seek alternate methods of procurement, in accordance with
procurement rules.
MOTION: Mr. Balog moved to approve; seconded by Mr. Arikawa.
The Manager -Chief Engineer said because both of the bids were non-responsive, the Department
will seek alternative methods of procurement, either by seeking quotations or through direct
negotiations.
Mr. Balog asked whether this case was the same as the previous one, where the prospective
bidder simply did not have the right paperwork.
The Manager -Chief Engineer said he believed that the two companies had varying degrees of
being non-responsive. One company was non-responsive due to not having the proper
paperwork, while with the other company, there was a discrepancy in the bid regarding
equipment that was not specified. DWS will evaluate whether the Department can consider
different equipment; if so, DWS may be able to get more competitive quotations. If not, DWS
still has the option of direct negotiations with either of the two companies, he said.
Mr. Arikawa asked if the reason to replace this is because it is showing signs of wear.
Page 8 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer, recalling last month's discussion, said that the GPMs (gallons per
minute) pumped have dropped off. Before getting to the point where this becomes an emergency
repair job, DWS wants to stay ahead of the game, and get the repair going before the pump and
motor actually break down.
Mr. Arikawa asked whether the GPMs are still dropping, or have stabilized.
The Manager -Chief Engineer said the GPMs are still dropping.
Mr. Takamine asked about the time sensitivity of this project, asking whether this will affect the
community's water source any time soon.
The Manager -Chief Engineer explained that this Ocean View system is unique because it does
not serve a distribution system, and does not go directly to people's homes. This system serves
an emergency spigot and standpipe facility. In the past, when the well broke down, DWS had to
re -direct people to its existing facilities at Ho`okena on the Kona side, and Wai`ohinu on the
Volcano side. There is still that option available if things get to that point. However, the
Department felt that there is time now to try to get a competitive bid out, and avoid going the
emergency route to get the repairs done. He told Mr. Takamine that it was hard to say whether it
would affect the community's water source any time soon.
Mr. Uyeda asked whether having non-responsive bids like this was a cause for concern; he asked
if the Department's specifications were too restrictive. He asked if these companies are having a
hard time competing with other jobs, as DWS has experienced.
The Manager -Chief Engineer said that he is starting to attend pre-bid meetings for these well
repair jobs now. His aim is to reinforce and re-emphasize to the potential bidders that they need
to get all their paperwork done, they need to review the specifications, they need to review the bid
documents accordingly, etc. Staff is on hand to advise the potential bidders regarding any
requirements that are out -of -the norm; that information is also included in the Reminders to
Bidders, he said. The paperwork that was missing involved Data Sheets for transformer
replacement. The Manager -Chief Engineer said that while some of the required paperwork may
seem trivial, if the required bid documentation is not submitted, DWS must consider the bidder to
be non-responsive. It is not fair to the other party who may have submitted everything that they
were required to submit, he said.
Mr. Elarionoff noted that last month the Department had said that the motor failed because it had
to run slower than it was designed for. He asked if DWS had corrected the problem, or taken the
problem into consideration.
Mr. Young said that for the future repair, DWS is definitely sizing it; this time around, DWS has
the time to make sure that the equipment is sized properly, which will ensure that DWS gets a
better life out of the equipment.
Mr. Elarionoff asked about Mr. Young saying: "Now that we have the time."
Mr. Young said that this time, DWS is not in an emergency situation, unlike the previous repair.
He said that it is not an emergency so long as the pump still runs, but it can fail at any time.
The Manager -Chief Engineer noted as a refresher that the previous repair at the Ocean View well
was an emergency repair; the well went down, so DWS had to fix it. Ocean View is faced with
both a power issue and a water resource issue; DWS cannot pump too much, for fear of
increasing the chlorides in the aquifer. When the emergency bid was put out, somebody had a
large -capacity pump and motor available in the State, so DWS decided to go with that option.
Page 9 of 33 Water Board Minutes 8-25-15 js
DWS beefed up the controls, and harbored hopes that the larger -capacity equipment would be
more robust and more capable of handling the fluctuations in power. DWS tried to bump the
GPMs up to the 300 -GPM range, but the chlorides started showing up, and DWS had to drop it
back down to 100 GPMs, he said. As mentioned last month, the pump was not designed to
operate at only 100 GPMs, so DWS ultimately did not benefit from the larger pump and motor.
Summing up the factors that went into DWS's decision last time, the Manager -Chief Engineer
said that it was an emergency situation; the pump and motor were available in -State; and after
installing the pump and motor, the chloride issue arose. Therefore, on this go -round, DWS
decided to size the pump and motor more appropriately; it will be more in the 100 -GPM range.
Mr. Elarionoff asked what will happen to the over -sized motor, once it is removed.
Mr. Young said it will be disposed of.
Mr. Elarionoff expressed surprise.
Mr. Young said that depending on the type of motor, some motors are disposable; this motor
might be rebuildable, but DWS would have to match it up with an existing system. In most cases,
motors, and especially pumps, are disposed of. Pumps slated for disposal are damaged; it is just
cheaper to get a new one, Mr. Young said. When a pump or motor is rebuilt, a certain degree of
efficiency is lost, and the Department will pay a bit more in electrical costs as a result.
Mr. Elarionoff said he imagined that DWS would evaluate the repair, etc., before disposing of the
motor.
Mr. Young confirmed this.
The Manager -Chief Engineer said that in other cases, the motor would be rebuilt.
Mr. Young said that in other cases, DWS would rebuild; it depends on the cost of the motor,
among other factors.
The Manager -Chief Engineer said that DWS has that option in Kona, where the Department has
wells of similar elevation, pumping up similar heights.
Chairperson Robinson asked if the kerfuffle among the water haulers over the water spigot
permits in Ocean View had blown over.
The Manager -Chief Engineer confirmed this.
Chairperson Robinson asked if the well would be shut down for a certain period of time, during
repairs.
The Manager -Chief Engineer confirmed this.
Chairperson Robinson asked if the water haulers would have to haul from a greater distance.
The Manager -Chief Engineer confirmed this. He said that DWS in the past has accommodated
the water haulers by re -directing them to either Ho`okena or Wai`ohinu.
Mr. Elarionoff asked whether the customers pay for the water or just for the hauling.
The Manager -Chief Engineer said he believed that they just pay for the hauling.
ACTION: Motion carried unanimously by voice vote.
Page 10 of 33 Water Board Minutes 8-25-15 js
9) MISCELLANEOUS:
A. DEDICATIONS:
The Department has received the following documents for action by the Water Board. The water
system has been constructed in accordance with the Department's standards and is in acceptable
condition for dedication.
1. AMENDED AND RESTATED GRANT OF EASEMENT
Grantors: Trustees of the Queen Lili'uokalani Trust.
Tax Map Key: (3) 7-4-010: 001 (portion)
2. RELEASE AND CANCELLATION OF GRANT OF EASEMENT
Grantors: Kohanaiki Shores, LLC
Tax Map Keys: (3) 7-3-068: 003, 037 and 038
(formerly a portion of TMK: 7-3-068: 003 and 004)
The Manager -Chief Engineer recommended that the Water Board accepts these documents
subject to the approval of the Corporation Counsel, and that either the Chairperson or the Vice -
Chairperson be authorized to sign the documents.
MOTION: Ms. Lee Loy moved to approve; seconded by Mr. Elarionoff.
Mr. Inaba explained that the first item, the Amended and Restated Grant of Easement, had
originally had a term limit on the originally easement. Ms. Self had worked with Queen
Lili`uokalani Trust (QLT) to make it a standard, i.e., perpetual, easement. DWS discovered that
the easement had expired today, amid negotiations by QLT to make improvements on their land.
The second item, regarding the Release and Cancellation of Grant of Easement, involves three
slivers of land with nothing on them, which DWS wants to get rid of because DWS does not need
them. The easement is now being developed upon, and the three slivers are part of a large
easement that went through the entire development for Kohanaiki's Phase 1. The slivers are
portions of frontage of parcels that became part of a new subdivision attached to the main road,
where the original Grant of Easement was. With the main infrastructure now in, Kohanaiki is
developing pods along that main road, with the main water line surrounding a loop road. Now
that the parcels are attaching to the roads, DWS is left with those slivers of land that it does not
need.
Mr. Uyeda said that it sounds like the waterlines are already in the roadway right-of-way; the
easement that DWS is cancelling would give the pods a clear title, because the easement would
no longer encumber those lands that are adjacent to the roadway.
Mr. Inaba confirmed this, noting that the easement actually extended a little beyond the road, for
ease of description on the original loop road easement. He noted that the property had a few
hydrants that extend beyond the roadway itself.
Mr. Uyeda asked whether there are conditions like this where DWS might cancel larger areas,
now that the waterlines are already in.
Mr. Inaba said that may happen, as the pods are developed.
Mr. Elarionoff took issue with the use of the term "acceptable" when describing water systems
slated for Dedication; he thought the term was too lukewarm.
Mr. Arikawa said it was just a matter of semantics.
Page 11 of 33 Water Board Minutes 8-25-15 js
Mr. Inaba explained that the intent is that the system in question meets DWS standards, and that
DWS can accept the system. He also explained that the use of the word "minimum," as in
"minimum standards," is the benchmark that developers must design for.
Mr. Elarionoff said that the threshold is "acceptable;" anything above that is still "acceptable."
Mr. Inaba confirmed that.
Ms. Wilson asked for an explanation of a "perpetual" easement.
Mr. Inaba said that there is no timeline associated with a perpetual easement; DWS holds the
easement until DWS no longer needs the easement, or DWS is willing to give it up.
Ms. Self said that before this, the Grant of Easement had a termination date whenever there was a
new QLT lessee. DWS has to have an easement which continues, notwithstanding a new lessee
coming in, she said. Therefore, Ms. Self revised the agreement so that it matches what DWS
normally gets in its Grants of Easement; the DWS easement will continue until such time as DWS
decides otherwise.
ACTION: Motion carried unanimously by voice vote.
B. POWER COST CHARGE:
The Department proposes reducing the Power Cost Charge from $2.32 to $1.85 per thousand
gallons to reflect a decline in power costs for the Department's wells and pumps. A Public
Hearing will have been prior to this Board meeting to accept public testimony on this change.
The Manager -Chief Engineer recommended that the Board approve the reduction of the Power
Cost Charge from $2.32 to $1.85, effective September 1, 2015.
ACTION: Mr. Arikawa moved to approve; seconded by Mr. Balog, and carried unanimously by
voice vote.
C. ENERGY STUDY UPDATE REPORT:
Mr. Young introduced Mr. Steve Bolles, energy consultant from Process Energy Services, who
provided a report on his energy evaluation study for all districts. Hawaii Energy provided
$65,000.00 for this study.
Mr. Bolles noted that in 2014, DWS used 50 million kilowatt-hours (kWh) of energy, at a cost of
$22 million, pumping approximately 17 billion gallons of water. He summarized some past
energy initiatives by DWS including:
• Creation of the Energy Analyst position;
• Use of premium efficiency motors;
• Investment in an aggressive leak detection program, which has been very successful;
• Application of Hawaiian Electric Light Company (HELCO) Rider M discount rate
schedules;
• Investment in the Waimea Treatment Plan Improvements, a recent project;
• Initiation of the Lalamilo Wind Farm project.
Mr. Bolles said that these are great initiatives that have improved energy efficiency, and
optimized system operations. These initiatives also reduced HELCO power plant emissions.
Page 12 of 33 Water Board Minutes 8-25-15 js
Turning to DWS's energy use and pumpage for the past five years, Mr. Bolles said that energy
use increased by 3.5 percent, and pumpage decreased by 10 percent. The drop in pumpage is
partly due to simple demand, and to some degree it is based on the leak detection program, which
has worked out well. Meanwhile, energy costs over the past five years have skyrocketed by 28
percent, he said.
Mr. Bolles explained that DWS's energy costs have increased due to the HELCO cost per kWh.
Other factors include the following:
• DWS has more deepwells on line. Mr. Bolles explained that this improves system
reliability, and allows greater flexibility in system operations. However, when the
additional high -horsepower large wells are taken offline and another deepwell is used,
DWS incurs demand costs that stick with that account. The upshot is that monthly, DWS
is charged for that demand charge even though DWS is not using the well anymore. That
demand cost has a significant impact, and is one major cause for the energy costs to
jump. He noted that operating deep wells continuously with variable frequency drives
(VFDs) improve well reliability, but if the GPMs are too low, it affects the efficiency of
the pump.
• Operator Priorities. DWS staff focuses on water quality and system reliability; these take
priority over efficiency, Mr. Bolles said. He said that energy costs should also be
emphasized to operators, so that they understand the actions that they take, and how the
actions affect energy use and costs.
Mr. Bolles explained that the energy evaluation study involved a review of DWS's major pump
systems, first focusing on the large -horsepower pump systems with higher energy costs, and then
collecting field data on all of the pumps. By analyzing all of the data, the study was able to
discover some opportunities for DWS to expand existing efforts to achieve greater energy
savings, Mr. Bolles said. He cited DWS's existing Rider M program, which has reduced energy
costs over the years. The study also looked at capturing potential energy savings by using more
springs and surface water sources to reduce pumping energy.
Mr. Young asked Mr. Bolles to explain the Rider M program.
Mr. Bolles said that Rider M is an agreement that DWS has with HELCO, whereby DWS curtails
pump operation over a two- to four-hour window in exchange for a credit on DWS's electricity
bill. DWS has been on this program for a number of years, and the energy credits average of
approximately $300,000.00 per year. It is a matter of determining which wells can be taken
offline during that four-hour window, he said. DWS operators noted to Mr. Bolles that there are
some limitations in the system that make taking some wells offline infeasible.
The study included various types of measures, or projects as follows:
• Operational Measures. These are cost-saving projects that pay for themselves in less than
a year, and do not require significant capital or construction costs;
• Energy Management Practices. These are projects that are considered "good efficiency
practices," but may not have measurable cost savings;
• Energy Conservation Measures. These are traditional energy projects that require a
capital investment, and have a simple payback of one to eight years.
• Energy Supply Measures. These include projects that reduce energy costs, but not energy
use. These measures include Rider M agreements and power factor correction capacitors.
These are any measures that save on demand, which do not affect DWS's consumption.
• Future Energy Measures. These are energy-related projects that can be considered as
design upgrades in the future. These do not have a payback that can be identified at this
time.
Page 13 of 33 Water Board Minutes 8-25-15 js
Mr. Bolles said the study identified total energy cost savings of $2.2 million, with an estimated
total project investment of $5.2 million, which provides a simple payback of 2.3 years. This is a
return on investment of 330 percent, using a 10 -year equipment life. The projects, taken all
together, would result in reduced power plant emissions, based on a savings of 5.6 million kWh.
Mr. Bolles said he believed it was well worth it to pursue these projects.
Mr. Bolles noted earlier that DWS already has in place a couple of recommended energy
management practices, including:
• Assignment of an Energy Management Analys. Ms. Hayducsko has taken on this
position, Mr. Bolles said.
• Hiring an additional water service investigator. This has already taken place.
Mr. Bolles recommended a surface water savings study, to explore the optimized use of the
remaining surface water sources that are available, and a study into water treatment versus
pumping from deepwells.
The formalization of an Energy Management Program would be a no -cost item, which could be
implemented quickly. It is a matter of establishing an Energy Policy, and formalizing the process
of how energy projects are pursued, Mr. Bolles said.
The surface water savings study would require some funding, but it would be well worth it,
considering the potential savings, Mr. Bolles said.
Turning to Energy Supply Measures, Mr. Bolles said that these would have a direct impact on
DWS's energy cost savings. The measures include:
• Power Factor Correction.
• Reduction of Two -Pump Operation. Some of the set points for the tank levels are set so
that two pumps come on at the same time. By having only one pump come on, and by
filling the tank a little bit slower, DWS can reduce its demand charge.
• Optimization the Ride M agreements.
• Adding new Rider M Agreements.
• Installation of VFDs for Back-up Wells. VFDs are used to reduce friction losses; by
slowing down the flow, overall energy use is reduced. Using VFDs for back-up wells
will reduce DWS's demand charges. When DWS needs to exercise its deepwells, it can
do so at a lower flow rate, and can avoid incurring the high demand charge, Mr. Bolles
said.
Some of the above measures can be pursued by in-house staff, and can be done fairly quickly.
Mr. Bolles said that some of the other measures can be pursued as part of a Performance
Contract, which Mr. Bolles promised to elaborate upon later in the presentation.
Mr. Bolles listed Operational Measures that have a payback of less than one year, including:
• Optimizing the use of existing springs;
• Using as much of the Waimea Water Treatment Plant flow as possible;
• Reduction of energy use from deepwells;
• Using the most efficient pumps available.
The above measures are easy to investigate, with a quick payback, Mr. Bolles said.
Regarding Energy Conservation Measures, Mr. Bolles cited the following:
• Purchase of leak detection loggers. This has already begun, and was supported with
$130,000.00 in funding from Hawaii Energy.
Page 14 of 33 Water Board Minutes 8-25-15 js
• Pump EfficiencImprovements. Mr. Bolles said that this was just a matter of improving
efficiency of some of the pumps which have degraded efficiency levels, which were
found during the study's field testing.
• Replacement of Cla Valves with Butterfly Valves. This reduces the overall frictional
head of the system. This has already been pursued, and it is just a matter of continuing
and expanding this program.
• Replacing Flow Meter Strainers. This has already been pursued, and it is just a matter of
continuing and expanding this program.
• Downsizing the Haleki`i Well Pump.
• Replacement of the VFD for the Haleki`i Well Pump.
Mr. Bolles identified Future Energy Measures as follows:
• Considering Larger Storage Tanks for New Sites.
• Investigation of Additional Hydro Generation Project.
• Evaluation of Cost Savings for Combining the Pi`ihonua 93 Accounts.
Funding energy projects has always been a challenge for DWS, especially with the Power Cost
Charge (PCC) set up the way it is, Mr. Bolles said. The study recommends that DWS redefine
the PCC, to allow DWS to set up a dedicated energy fund from the savings generated, to pursue
new energy projects. This would allow DWS to continually invest in energy projects; it would
require additional research to see how a redefinition of the PCC could be done.
The other recommended avenue for funding is to use Performance Contracts, Mr. Bolles said.
Performance contracting is a project -delivery method that DWS should consider; performance
contracting is basically packaging the projects and working with a performance contractor to
guarantee the project costs on a fast-track, design -build basis. The savings would be guaranteed,
and the savings will pay for the project. The performance contractor arranges for the financing,
which is typically in the form of a municipal lease, Mr. Bolles said. He described performance
contracting as a nicely packaged way of pursuing energy-related projects. This is a very fast
method that compiles the projects together, and projects can be done fairly quickly, he said.
DWS would be realizing savings very quickly using the performance contract method.
Mr. Bolles recommended the following initiatives:
• Pursue both funding options, to provide DWS with the option to choose the most
advantageous approach for each project;
• Formalize the Energy Management Program by developing an Energy Policy, to
emphasize the importance of the program to DWS staff,
• Have the Energy Analyst provide updates to the Board on a regular basis;
• Consider funding for the proposed surface water use evaluation, to provide detailed data
to evaluate long-term savings and costs.
• Encourage accountability and request measured "real" savings," instead of using the
original estimates. This needs to be done, to ensure that the projects provide the savings
originally intended.
Mr. Elarionoff asked how Mr. Bolles in one word would evaluate DWS's current measures.
Mr. Bolles said that DWS has pursued a lot of different ways of reducing energy costs and
improving efficiency; the challenge now is to raise the bar, to see if DWS can reach an even
higher level of efficiency. The study identified a few projects that could be proposed to achieve
that level of efficiency, which would put DWS in the top 10 percent of municipalities that
Mr. Bolles has encountered in his travels.
Page 15 of 33 Water Board Minutes 8-25-15 js
Mr. Uyeda said that he thought that HELCO no longer offered Rider M programs for commercial
uses, such as wells; instead, HELCO forces commercial projects onto Schedule J or Schedule P.
Mr. Bolles said that Schedules J and P are rate schedules, but Rider M is a separate agreement.
Mr. Uyeda said yes, but HELCO does not allow customers to go into Rider M anymore, and
instead forces them on to Schedule P.
Mr. Bolles said that even if a customer is on Schedule P, the customer can still have a Rider M
agreement as part of that.
Mr. Uyeda said that his company had tried that, but they could not get a Rider M agreement.
Mr. Bolles said that he had talked with Mr. Jon Arizumi at HELCO, and Mr. Arizumi indicated
that future projects could be brought under the Rider M program.
Mr. Young agreed, saying that DWS is looking at future projects under Rider M; he did not know
why HELCO would say it was not available anymore.
Mr. Uyeda said that he would be interested in hearing more about that.
Mr. Bolles said that Mr. Arizumi had reviewed the study and did not raise any issues regarding
the study's recommendations on future Rider M agreements.
Mr. Uyeda said that his company runs wells, just like DWS. HELCO would not let his company
do a Rider M agreement, he said. He noted that his company has seven wells, and an eighth well
is being drilled.
Mr. Inaba noted that this was not in the Keauhou Aquifer.
Ms. Lee Loy asked about the recommendation on Page 7 of the presentation, that DWS consider
larger storage tanks for new sites. She asked how large those sites are, and asked if there were a
formula for upsizing the tanks (for example, to go to a two million -gallon tank, from a one
million -gallon tank.)
Mr. Bolles said that it varies, and the study could not quantify. It is really a matter of the capacity
of the wells, and the usage of the system, while getting that two- or four-hour window of being
able to shut the pump off, and use the capacity of the tank during that time period.
Ms. Lee Loy said she just wanted to understand the formula. She said that she is involved in
planning matters, and asked if the study took into consideration the type of future growth in the
surrounding area.
Mr. Bolles said no, he did not get into that.
Ms. Lee Loy asked about the suggestion to redefine the Power Cost Charge (PCC), to allow DWS
to set up a dedicated energy fund. Directing her question to the Manager -Chief Engineer or
Corporation Counsel, Ms. Lee Loy asked how DWS would change its current PCC formula; she
said she thought it was codified in Hawaii Revised Statutes (HRS). She asked what kind of
amendments would be made; she asked whether it would be a DWS administrative policy
revision or a revision of HRS.
The Manager -Chief Engineer said that the Department could look at what legal requirements it is
bound by. He said that in any case, the Board and the Department would look into how it would
be done; he expected that any revision of the rate component would have to go to Public Hearing.
Page 16 of 33 Water Board Minutes 8-25-15 js
He said that the suggestion is that DWS needs to capture some sort of dedicated funding for
energy projects.
Ms. Lee Loy said yes, that would enable DWS to become more self-sufficient.
The Manager -Chief Engineer said that the way the PCC is now, there is really no incentive for
DWS to fund energy efficiency projects; all that DWS has is CIP funds and Operations and
Maintenance (O&M) funds. He noted that the PCC is linked to the fluctuation from the utility's
side, and is just passed on to the customer. If DWS were to put an energy efficiency project on
the CIP list, it would take funds away from some other project such as a pipeline replacement,
etc. Therefore, DWS needs to look at options that can be pursued to fund energy projects.
Ms. Lee Loy noted that later on today's Agenda, the Board will discuss the Rule Amendment.
There may be an opportunity there for the Board to open the door to the possibility of other Rule
changes that need to occur.
Chairperson Robinson said he was really impressed by the fact that DWS spent $22 million to
pump 17 billion gallons of water. He recalled seeing a chart that showed that the average water
use per customer in terms of gallons per day was actually decreasing. He asked if that was
correct.
Mr. Takamine said that came out of Ms. Ann Hajnosz's presentation of the water rate study
earlier this year.
Chairperson Robinson asked if that decrease in water use could be considered an energy-saving
cost, because with less usage, there is less pumpage. Consequently, DWS's costs of delivery
would be reduced. He noted that the population, meanwhile, continues to grow. He seemed to
recall that the average use was around 480 gallons per day.
The Manager -Chief Engineer said he did not recall the exact figure, but Ms. Hajnosz did report
that overall consumption had either remained flat or declined slightly. With the population
increasing, the consumption per household or per person is decreasing. He noted that the cost of
the study was $65,000.00, and there is still quite a bit more that could be done. He noted that
Mr. Bolles had proposed performance contracting. This would be something a bit new for DWS,
but it is something that DWS could pursue. The Manager -Chief Engineer said he would like to
pick the brains of his counterparts on Oahu, who are doing some performance contracting. He
said his understanding was that the process for performance contracting resembles the RFP
(Request for Proposals) process. The process is not cut-and-dried regarding specifications, unlike
some other projects. DWS would get some teams to put together their proposals, and the
challenge is on the teams to provide cost-saving measures. The teams would benefit by providing
cost savings to DWS, as the end user, he said. The performance contractor performs the contract
at virtually no out-of-pocket cost to DWS; they make their money by taking some of those
savings. This is basically a win-win scenario, with DWS currently having no such funding
mechanisms earmarked for energy projects. As Mr. Bolles said earlier, the performance
contracting projects could be bundled as site-specific projects; this would make it viable for a
contractor to pitch it to DWS as a cost-saving enterprise.
Chairperson Robinson asked if the Manager -Chief Engineer could envision this kind of
arrangement, whereby a contractor would perform all of these functions together.
The Manager -Chief Engineer said yes, he could.
Chairperson Robinson said this could be put out for bid, and there would be multiple bids.
Page 17 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer said yes, it would be like an RFP -type of procurement.
Mr. Bolles said that performance contractors are unique in that they are able to do a whole project
by fronting it as a design -build; they are actually the contractor, and they bring in the sub-
contractors. The performance contractor arranges the financing, and guarantees the savings; this
allows them to do a turn -key project. This has worked well in the past for a lot of municipalities,
Mr. Bolles said, citing a project done by the County of Kauai on some municipal buildings.
Chairperson Robinson asked how the financing for these improvements would work in DWS's
case.
Mr. Bolles said that typically a tax-exempt municipal lease is done; the performance contractors
can provide more details on the options available, but a tax-exempt municipal lease is usually the
way it is done. He said a performance contract is very easy to justify, because on one hand, there
are the savings that are guaranteed, and on the other hand, the project cost is guaranteed and is
turn -key. The financing company sees such a project as fairly straightforward, in terms of being
able to support the project with the savings.
The Manager -Chief Engineer clarified that the funding does not come from DWS.
Mr. Bolles confirmed that the funding is arranged separately.
Chairperson Robinson said that the returns on investment are incredible.
Mr. Bolles said yes, absolutely.
Chairperson Robinson, turning to Page 6 of the report, said that the first-year annual savings from
the recommended Operational Measures were a whopping 18 percent return. He asked what a
VFD was.
Mr. Bolles said that it is a Variable Frequency Drive, which helps to slow the pump down.
Chairperson Robinson said that doing all four of the recommended Operational Measures listed in
the report bring very big savings (i.e., $940,241.00 in first-year annual savings, versus an initial
cost of $156,667.00.)
Mr. Bolles said yes, it is a very good project.
Chairperson Robinson asked if Mr. Bolles had seen this done in other localities, where this degree
of savings was realized.
Mr. Bolles said he absolutely did. The nice part about the report is that a performance contractor,
even a contractor who was new to the area, could look at the report and see the opportunities right
there in the numbers. The performance contractor can see that it is worthwhile for them to invest
the time and energy to package the project; this is basically a gift -wrapped project, with all of the
numbers in place, Mr. Bolles said. The performance contractor would just need to go through
and finalize the numbers; the contractor could also expand the scope and do projects on some of
DWS's other buildings that the report did not cover. (He noted that he focused on the pump
systems for this report.) DWS could really capture a lot of savings that might be out there, he
said. The simplicity of doing all of these things in one contract is pretty nice, Mr. Bolles said.
The Manager -Chief Engineer said that there are advantages that come from being a small utility
and a County department. This kind of performance contracting has been done in the State, and
there already is an approved list of performance contractors with the State Procurement Office.
The beauty of that is that DWS does not need to screen the contractors, he said. The Honolulu
Page 18 of 33 Water Board Minutes 8-25-15 js
Board of Water Supply is apparently doing a performance contract right now, so DWS will not be
a guinea pig. Performance contracting has been done, and there is a track record of success, he
said. It is just a matter of DWS taking the first steps, and going forward, the Manager -Chief
Engineer said.
Chairperson Robinson expressed surprise that there was a list of already -approved performance
contractors.
The Manager -Chief Engineer said he did not know exactly who they were, but there is such a list.
Chairperson Robinson noted that some of the recommended Energy Conservation Measures did
not have a noteworthy return. However, the recommendation to downsize the Haleki`i Well
Pump promised substantial savings, just by replacing a pump.
Mr. Bolles said that there is a million -dollar energy cost to operate some of DWS's wells, and
there can be significant savings in making adjustments to how a well is operated. The Haleki`i
Well Pump presents real possibilities for significant savings, by adjusting the size of the pump
and adjusting how the VFD is operated.
Chairperson Robinson said that the hard numbers on the Energy Conservation Measures and
Energy Supply Measures show that doing these projects makes all the sense in the world.
Ms. Wilson asked Mr. Bolles how he prioritized his Action Items.
Mr. Bolles said that the numbering of the Action Items do not really represent a prioritization of
the projects; it was more of a progression of how the projects were identified in the report. It
would be tempting to just pick the really fast payback projects, but the comprehensive approach
would be to combine the fast -payback projects with the long -payback projects. In that way, DWS
would get a better package of improvements for overall efficiency. He reiterated that he did not
prioritize the projects.
Chairperson Robinson asked the Manager -Chief Engineer whether DWS would want to contract
out for the actual, hard improvements that are recommended here.
The Manager -Chief Engineer said definitely so. He said he had just been signaling to Mr. Young
that the Haleki`i project is something that DWS should take a look at. Among the
recommendations was to hire an Energy Management Analyst, he said, and Ms. Hayducsko was
hired to do both civil engineering duties and the energy management portfolio. DWS intends to
do quarterly energy updates, he said. DWS will definitely pursue some of these recommended
projects, the Manager -Chief Engineer said.
Chairperson Robinson asked whether DWS would look at them project by project by project, or
wrap them all up in one contract.
The Manager -Chief Engineer said DWS would do both. Some of the short -payback projects like
Haleki`i can be looked at on an individual basis. Longer-term payback projects, along with
smaller -scope projects, can perhaps be bundled in a performance contract. He noted that
Mr. Bolles's scope was admittedly limited, with a budget of only $65,000.00 to look at DWS's
entire operations. The Manager -Chief Engineer said he understood that a performance contractor
does a more in-depth audit for their RFP, looking deeply into equipment, savings, etc. The
performance contractor can throw in sweeteners like LED fixtures for the utility's buildings, or
photovoltaic panels for the parking lot. The performance contractors seeking DWS's business
will come up with a more enhanced, robust audit, and offer a proposal with guaranteed savings to
the Department and the Board. This would not be like a competitive sealed bid, where DWS
Page 19 of 33 Water Board Minutes 8-25-15 js
would be forced to take the lowest bid, he said. With an RFP, there are other criteria that can be
used, besides just cost alone; there can be things like guaranteed savings, warranty offers,
training, etc. Performance contracting will be a new thing for DWS, and it was time that the
Department took a look at it, the Manager -Chief Engineer said.
Mr. Elarionoff asked where Mr. Bolles's company was based.
Mr. Bolles said he was based in New Hampshire.
Mr. Elarionoff asked Mr. Bolles why Mr. Elarionoff should believe what Mr. Bolles put in his
report. He said he was serious in asking this, because he was trying to find out what qualified
Mr. Bolles to fly all the way over to tell the Board what can be done better.
Mr. Bolles explained that all he does is do energy evaluation work, looking at water and
wastewater facilities, municipalities, etc. He said he has been doing this for 20 years throughout
the United States and overseas, as one of 12 Department of Energy -certified pump system
analysts. He said that he also worked with the United Nations on a regular basis, doing projects
in other countries as far as helping them establish energy management projects. This is basically
what Mr. Bolles focuses on. Performance contractors also hire Mr. Bolles to do more detailed
evaluation and packaging of performance contract projects. Mr. Bolles said that he tried to bring
the DWS evaluation to a certain level, within the budget constraints; it will provide a framework
that performance contractors can add to, providing more detailed information. He said that he
believed that DWS was set up here for that next step.
The Manager -Chief Engineer noted that Mr. Bolles had communicated with HELCO, and had
included their rate schedules in the DWS evaluation.
Mr. Bolles confirmed that he had done this, to make sure that all of the recommendations were
based on real numbers, based on HELCO's rates. He noted that he had worked with DWS since
1998 or 1999 on previous evaluations, so he is familiar with DWS's system and staff.
Chairperson Robinson asked Mr. Bolles if he was an engineer.
Mr. Bolles confirmed this.
Chairperson Robinson thanked Hawaii Energy for funding the DWS evaluation.
D. MATERIAL BID NO. 2015-05, FURNISHING AND DELIVERING SPARE DEEPWELL
PUMP AND MOTOR SETS FOR WAIMEA DEEPWELL, KEAHUOLU #1 DEEPWELL,
AND PI`IHONUA #1 DEEPWELL C FOR THE DEPARTMENT OF WATER SUPPLY:
Bids were received and opened on August 13, 2015, at 1:30 p.m., and the following are the bid
results. All Sections are established price agreements for materials.
SECTION
DESCRIPTION
Beylik Drilling and Derrick's Well Drilling
Pump Service, Inc. and Pump Services, LLC
1
WAIMEA DEEPWELL
$647,000 No Bid
2
KEAHUOLU 91 DEEPWELL
$542,000 $161,239
3
PI`IHONUA 91 DEEPWELL C
$155,000 $165,279
The estimated cost for the various pump and motor sets were as follows:
• Waimea Deepwell: $380,000
• Keahuolu #1 Deepwell: $160,000
• Pi`ihonua #1 Deepwell C: $160,000
Page 20 of 33 Water Board Minutes 8-25-15 js
The Manager -Chief Engineer recommended that the Board award the contract to the following
bidders for MATERIAL BID NO. 2015-05, FURNISHING AND DELIVERING SPARE
DEEPWEEL PUMP AND MOTOR SETS FOR WAIMEA DEEPWELL, KEAHUOLU 91
DEEPWELL, AND PI`IHONUA 91 DEEPWELL C FOR THE DEPARTMENT OF WATER
SUPPLY, by Sections to the following for the amounts shown above, and that either the
Chairperson of the Vice -Chairperson be authorized to sign the contract(s), subject to review as to
form and legality of the contract(s) by Corporation Counsel.
Section 2 — Keahuola #1 Deepwell to Derrick's Well Drilling and Pump Services, LLC.
Section 3 — Pi`ihonua #1 Deepwell C to Beylik Drilling and Pump Service, Inc.
The Manager -Chief Engineer recommended that the Board not award Section 1 — Waimea
Deepwell, due to the high cost of the bid. Staff will seek alternate methods of procurement, in
accordance with procurement rules.
MOTION: Ms. Lee Loy moved to approve; seconded by Mr. Takamine.
The Manager -Chief Engineer noted that the low bids for Sections 2 and 3 fell within the
estimated cost, and DWS recommends award to the lowest responsible bidder for those Sections.
However, the sole bid for Section 1 did not fall within the estimated cost, so DWS has the option
to either enter into direct negotiations, or to solicit alternative methods of procurement, he said.
Mr. Uyeda asked if the cost for Sections 2 and 3 included the push-pull.
The Manager -Chief Engineer said no, this is just a spare pump and motor.
Mr. Uyeda asked how many working days it would take to have the equipment delivered.
The Manager -Chief Engineer said it would be 420 days for delivery on the Waimea equipment.
Mr. Takamoto said it was 240 days for Keahuolu, and 150 days for Pi`ihonua.
Mr. Elarionoff said he was really bothered by the fact that only one person bid on Section 1, and
by the fact that the price was so much higher than the estimated cost. He was also bothered the
bids on Section 2, which had such a wide difference in price. He asked if anyone knew why; he
also asked if this was the one bidder's way of passing up the bid.
Mr. Young said that in Sections 1 and 2, Beylik was bidding on a Byron -Jackson pump and
motor, the Cadillac of its class. Beylik had the opportunity to bid on the alternative brand of
motor, SME, he noted.
Mr. Takamoto said that the alternative pump brand was National Pump.
Mr. Elarionoff asked whether DWS would have been pleased if Beylik had come within the
estimated cost while using the Cadillac brand for its bid.
Mr. Young said that it really comes down to pricing. The bid would have to meet the
specifications, and if it was the SME that was the low bid, DWS would have awarded that. It
would be very unlikely that the much pricier Byron -Jackson pump and motor would have been
the low bid.
Mr. Elarionoff asked why Beylik used the Byron -Jackson.
Mr. Young said he said it was unusual; he did not know the reason.
Page 21 of 33 Water Board Minutes 8-25-15 js
Mr. Balog asked how long the life span of the Byron -Jackson was, versus the SME. He said that
if the lifespan was three times more, DWS should probably buy that pump.
Mr. Young said that DWS has a few SMEs in use, and they are doing fine. He did not have any
long-term data to compare the life spans of the two brands. Ideally, DWS would love to have the
Byron -Jackson, but its price was really high: about $500,000.00 for a pump and motor. The
SMEs have had a life span so far of two to three years, whereas the typical Byron -Jackson might
have seven to 10 years. Right now, DWS is getting at least two or three years' of service life
from the SMEs, but the long-term data is not yet available.
Mr. Balog asked if the manufacturer provides that kind of data.
Mr. Young said no, nobody is going to provide that kind of data.
The Manager -Chief Engineer agreed, and said that every down -hole situation is different, and the
alignment of the hole is going to be different, and the head that it is pumping will also vary, etc.
Each hole has had different characteristics. To answer Mr. Balog's question, he said that he did
not anticipate one piece of equipment to have three times the life span of another piece of
equipment — not on that order of magnitude, in any case.
Mr. Uyeda asked what determines which wells get a spare pump and motor, while other wells do
not get spare pumps and motors. He asked if it is DWS policy to get spare pumps for the
majority of the well sites.
The Manager -Chief Engineer said no, DWS does not have the luxury of having an unlimited
source of funds. He asked Operations staff to prioritize which well sites should have spares. One
of the factors was facilities that a certain pump and motor could fit. One criteria was wells where
there was no redundancy in the system, i.e., where that well was the only well serving the area, or
a well whose pump and motor had not been replaced in a while. He cited Haleki`i Well, saying
that if that well went down, Kona Hospital would not have water. The downside of having spares
stored on hand is that typically, the warranty runs out, so DWS does not want to have spares for
everything. That is the balance that the Department is trying to find, the Manager -Chief Engineer
said.
Mr. Young said that DWS looks at the size of the service area that the well serves, and the
Department also looks at whether a motor could be used elsewhere. He noted that DWS has quite
a few 600 -horsepower motors, citing Haleki`i and Hualalai wells. DWS is not keen to have a lot
of inventory, for fear that the warranty will run out and cost DWS money to service the
equipment. The Department is trying to avoid any potential emergency by having a pump and
motor on hand. Medical facilities like Kona Hospital, Hilo Hospital, etc., are where DWS makes
sure that it has back-ups. There are a lot of criteria, but the Department is trying to prioritize, he
said.
Mr. Balog asked why DWS is not buying equipment directly from the manufacturer, and is
instead buying it from drilling companies.
Mr. Young said that DWS would like to buy directly from the manufacturers, but they always tell
DWS to go through their dealer. The dealer, it turns out, is the drilling company. It is a lot easier
for the manufacturers to go through the local dealers, who are the drilling companies. He said he
wished that DWS could buy directly from the manufacturers, which would save DWS money on
the middle man.
Mr. Balog said that was why he asked the question.
Page 22 of 33 Water Board Minutes 8-25-15 js
Mr. Young said that he is always trying to do things more cheaply, whenever he can.
Mr. Elarionoff asked why there was such a difference between the two prices on the Section 2
bid.
Mr. Young said he was pretty sure that was because one bidder was using the Byron -Jackson, and
other bidder was using the SME.
Mr. Elarionoff asked what happened on Section 1.
Mr. Young said he did not know why Derrick's did not bid on that one.
Mr. Elarionoff asked why Beylik's bid was so much higher than the estimated cost.
Mr. Young said that the Department initially thought that Beylik would bid using the SME, but
they apparently bid the Cadillac, the Byron -Jackson.
Mr. Takamine asked if Beylik would be a factory -authorized dealer for Byron -Jackson, meaning
that nobody else can supply that product.
Mr. Young said that was correct; Beylik is the sole dealer here.
Mr. Takamine said that was why DWS cannot specify the equipment brand.
Mr. Young said that once DWS gets the motor, the Department can rebuild it and then anybody
can do it; it is just a matter of getting that core.
Mr. Takamine said that if DWS were to specify Byron -Jackson, then DWS would basically have
only one bidder.
Chairperson Robinson said he was bothered by how DWS appears to be held hostage by two
bidders. It seems that Beylik and Derrick's are the only two bidders that DWS has. If they do not
want a job, such as at Ocean View, they simply do not bid, he said. He asked how DWS could
get a bigger pool of bidders, and asked if DWS could strong-arm the drilling companies to take
jobs like Ocean View. He said that the contractors had to take the good with bad; he likened it to
buying a pool of mortgages, whereby one gets the good ones and the bad ones, but one gets them
all together.
Mr. Balog asked if DWS could wrap the bids into one package.
The Manager -Chief Engineer said yes, the Department could get a bit more creative in its
thinking, by putting together several jobs. DWS's challenge is that it is hand -cuffed by
Procurement Law requirements. He speculated that the shortage of bidders could be a matter of
economics; DWS heard of a potential start-up, but that has not happened yet. The third major
driller, Water Resources International, has chosen not to bid on these repair jobs, and it is only
bidding on drilling holes. In the absence of responsive bidders, DWS's only option is to resort to
direct negotiations. He expressed hope that DWS can communicate with one or two of the
parties, and encourage them to provide quotes. However, DWS cannot force them, he said.
Chairperson Robinson said that DWS will be looking for alternative methods of procurement for
the Waimea and Ocean View jobs. He asked whether DWS could explore if there are other
contractors besides Beylik and Derrick's.
The Manager -Chief Engineer said yes, DWS can see if there are others.
Page 23 of 33 Water Board Minutes 8-25-15 js
Mr. Young said there are other drilling companies, but the business calls for a big investment in
equipment. The drilling rigs are very expensive, and moving the rigs from one island to another
costs $10,000.00 one-way. With a $20,000.00 round-trip involved, contractors from Oahu would
have a hard time competing; they would also have to have personnel here. That narrows the pool
of drillers out there, he said.
The Manager -Chief Engineer said that the Department will see if it can do direct negotiations to
see if somebody will decide to make the investment in doing business here.
ACTION: Motion carried unanimously by voice vote.
E. UPDATE RE: NATIONAL PARKS SERVICE'S PETITION TO DESIGNATE
KEAUHOU AOUIFER AS A GROUND WATER MANAGEMENT AREA:
The Manager -Chief Engineer said that the Commission on Water Resource Management
(CWRM) came to Kona for their August 17, 2015, meeting. DWS staff shared the County's
Water Use and Development Plan (WUDP) update. Among the other Action Items was a request
by the Department of Hawaiian Home Lands (DHHL) for a reservation of 3.398 million gallons
per day (GPD) of water from the Keauhou Aquifer System Area.
Chairperson Robinson said that the Manager -Chief Engineer performed excellently.
The Manager -Chief Engineer said that CWRM decided to deny the National Parks Service's
Petition for Declaratory Order asking if CWRM could designate an area smaller than the entire
Keauhou Aquifer. CWRM approved DWS's WUDP update, preliminarily, and wants to see
Phase 2 of the update before the Commission gives its unconditional approval. The bottom line is
that DWS has now gotten approval to proceed with the time extension in order to provide CWRM
with a scope of work for Phase 2. Phase 2 will include some source development strategies, i.e.,
to indicate where DWS plans to put new wells; Phase 2 will also include a non -consumptive use
component. That effort will be a bit difficult to quantify, because of the lack of quantifiable
information available on Traditional and Customary Practices using ground water, where and
what amount of ground water is used in such practices, etc. There really is no such information
available, the Manager -Chief Engineer said. DWS is anticipating some kind of outreach effort on
that. There was no decision on the overall petition to designate the entire Keauhou Aquifer, the
Manager -Chief Engineer said.
Ms. Lee Loy praised the Manager -Chief Engineer and the DWS staff for their masterful
presentation at the CWRM meeting; everybody brought their "A" game. She cited the astute
explanation of DWS's long-range plans for water, relating the plans to build -out scenarios, but
unfortunately, the explanation was over the heads of some of those present. She noted the
collegial relationship between DWS and CWRM staff. She asked the Manager -Chief Engineer
for clarification regarding the denial of the Petition for Declaratory Order to designate a smaller
portion of the Keauhou area. She said that her understanding was that this process arose through
mediation; she asked if DWS had gotten any indication on whether mediation would continue.
She wondered if the parties are holding their respective positions until DWS completes its
Phase 2 of the WUDP update.
The Manager -Chief Engineer said that he had not heard anything specific about mediation talks.
He noted that in December 2014, CWRM issued a Preliminary Order directing the National Parks
Service (NPS) and the County to meet to discuss alternative paths to designation. There were two
such meetings in March, and a clean-up event in April in which the County participated at the
Kaloko-Honokohau Historical National Park. However, since then, no formal mediation
meetings have taken place. The Board's special attorney, Mr. Ben Kudo, offered to CWRM
Page 24 of 33 Water Board Minutes 8-25-15 js
another alternative, citing a provision in the HRS for CWRM to resolve disputes. Mr. Kudo's
recommendation to CWRM was to utilize that option available to them, to have their staff come
up with a reduced area for consideration. He also recommended that all of the parties, including
anyone with a vested interest in that area, such as land owners, etc., be part of this dispute
resolution. Commissioner Milton Pavao liked that idea, and Commissioner Kamana Beamer
seconded, but the recommendation did not pan out in formal discussion or action. However, the
CWRM Board as a result voted to deny the NPS Petition for Declaratory Order. Therefore, it
remains to be seen whether CWRM will pursue the dispute resolution option down the road, the
Manager -Chief Engineer said. While there is no indication of mediation right now, DWS does
plan to huddle with the Mayor's Office and the Planning Department to see what the County
wants to do, going forward. He thanked Ms. Lee Loy and the Board for their support.
Chairperson Robinson asked what amount of water that DHHL had sought for its reservation in
the Keauhou Aquifer.
The Manager -Chief Engineer said they were asking for 3.398 million GPD.
Chairperson Robinson asked if that was approved.
The Manager -Chief Engineer confirmed this.
Chairperson Robinson said the discussion at the CWRM took so many twists and turns, that it
was difficult to follow; it was not clear to him whether the DHHL request ever got approved.
Ms. Lee Loy, who attended the meeting, said that the reservation was folded into DWS's WUDP
update; those numbers are all there as far as full build -out scenarios. The numbers were not 20 -
year horizon projections.
The Manager -Chief Engineer said yes, that was everything that DWS knows of, including some
level of approval on State Land use, County zoning, water commitments, developer agreements,
empty service laterals, DHHL reservations, etc. There was no time frame or time horizon
assigned to the graph that showed 28 million GPD for full build -out, he said.
Chairperson Robinson agreed that the development community understands that while a
development may be permitted, it may never be built, or the development may be reduced
considerably. That concept seemed to be a difficult concept for some of the CWRM Board to
grasp, he said.
The Manager -Chief Engineer said DWS's approach was to present three methods of projection:
• Full build -out, based on what DWS calls "anticipated water demand," which dovetails
with CWRM's definition of "authorized planned use;"
• Full build -out of County zoning;
• Projections based on population growth.
He noted that people do not just do unlimited development, to full capacity, all at once. For this
reason, DWS gave the CWRM Board those three projection methods to consider.
F. EXECUTIVE SESSION RE: NATIONAL PARKS SERVICE'S PETITION TO
DESIGNATE KEAUHOU AQUIFER AS A GROUND WATER MANAGEMENT AREA:
No Executive Session was held.
Page 25 of 33 Water Board Minutes 8-25-15 js
G. DISCUSSION OF AMENDING RULES AND REGULATIONS REGARDING PLACING
RESPONSIBILITY WITH PROPERTY OWNERS FOR TENANTS' DELINQUENT
BILLS:
Ms. Lee Loy provided some background for the Board on the work on the Rule Amendments thus
far. Ms. Lee Loy, Chairperson Robinson and then -Deputy Corporation Counsel Kathy Garson
met months ago to address the Rule Amendments, whose impetus was the large glut of unpaid
water bills. Their sub -committee looked at refining the definition of "applicant" in the Rules,
feeling strongly that a re -definition would help close the gap on who was responsible for paying
the water bill. Ms. Lee Loy noted that the Board had only just gotten the draft Rule Amendments
last week, and asked the Board to review them and provide comments. Ms. Self is also reviewing
the draft Rule Amendments, and would like to use them as a conversation starter with the
Department of Environmental Management (DEM), as DEM moves through their own Rule
Amendments for their Waste Water Division. The two departments are looking to dovetail each
other's Rules regarding water/sewer bills.
Ms. Self noted that the County Council had passed an Ordinance to allow the Director of DEM to
request that DWS shut off the water for delinquent sewer bills. DWS needs to see what Rule
Amendments that DEM is going to do, but DWS's Rule Amendments in this regard will be less
of a change than DEM's Rule Amendments, she said. That is because DEM will be responsible
for pretty much everything; DWS will have to have something in its Rules that indicates that
DWS's Manager -Chief Engineer gets the request from the DEM Director to shut off the water. It
should not be that much of a Rule change for DWS, Ms. Self said.
Ms. Lee Loy said that she is wide open to any suggestions or comments; she believes that there is
still a lot more input to take in. At some point, the two Departments will need to collaborate with
each other.
Chairperson Robinson agreed, saying that in his experience, in many locales, the Water
Department and the Environmental Management Department are one and the same department.
Because DWS and DEM are two separate Departments, DWS has to cross over, which brings the
County Council into play.
Ms. Self said that it is helpful for the County as a whole to have DWS's help, because DWS has a
lot of power. If DWS gives a customer notice that their water is going to be shut off, the
customer in all likelihood will come in and pay the water bill to prevent shut-off. DEM does not
have that kind of authority as it stands now — DEM cannot shut off the sewer service for lack of
payment. Therefore, the threat of a water shut-off is a big hammer, Ms. Self said.
The Manager -Chief Engineer said that his understanding was that this was not an overnight
process. DEM did approach the Board for assistance, and the Board decided to assist with water
shut-off, to provide DEM with a tool to assist their financial situation. However, DWS was
concerned about situations where a good DWS customer, i.e., someone who paid their water bills
on time, would get the water shut-off due to a sewer bill delinquency. He gave the scenario of an
irate customer confronting DWS staff for a sewer bill -related delinquency that led to shut-off.
There are a number of challenges like these that were discussed among DWS management, the
DEM Director, and staff, he said. The Manager -Chief Engineer said his understanding was that
all of the administration of a sewer -related shut-off, even up to the point of being contested,
would be handled by DEM and its Environmental Management Commission. Only once that
process has been gone through and the shut-off is deemed to be warranted, would DWS provide
that shut-off. It would be DEM's collections clerk who would deal with the customer, including
on the day of shut-off, he said. His understanding was that DWS staff would only be there to turn
Page 26 of 33 Water Board Minutes 8-25-15 js
the valve on DWS's water meter. He agreed with Ms. Self that DWS would assist by shutting off
the water, but the Amendment to DWS's Rules would be somewhat minimal. It would basically
include language to the effect that if DEM deemed a shut-off to be warranted, DWS would shut
off the water.
Ms. Self said that DEM will have to do all of the footwork in the run-up to the shut-off because it
is their sewer bill delinquency that is involved. That is why DWS has to see what DEM does
with their Rule Amendments first, to make sure that DEM takes care of all of the run-up, and to
ensure that the amount of work that DWS does will be very limited.
Chairperson Robinson said that the two departments would be concurrent.
Mr. Balog asked if anybody had thought of a process for how DWS would have somebody
actually go shut off the water.
The Manager -Chief Engineer said that there would be some kind of Memorandum or other
documentation, whereby DEM would cover the costs for DWS's personnel expenses involved in
shutting off the water. He said that was his understanding.
Ms. Lee Loy agreed that all of those arrangements regarding billing, who was responsible, who
would actually do the shut-off, etc., were discussed in conversations with DEM. She noted that in
this Amendment, there is an opportunity provided for a larger fee. The Board increased the
deposit for establishing service to $150.00, but she said she was not clear on how those monies
would be held to help pay for bills. The intention of the increase in the deposit was to allow
DWS to cover unforeseen or potential costs, Ms. Lee Loy said. That is what is before the Board
in this proposed Rule Amendment.
Chairperson Robinson asked whether anybody ever considered having DWS take over the Waste
Water Division.
The Manager -Chief Engineer said that DEM did.
Ms. Lee Loy said the hardest part of that is that DWS is semi -autonomous, and DEM is a function
of the County.
Ms. Self agreed.
Ms. Lee Loy said that she would not even know where to begin to dovetail County services with
a semi -autonomous body; she said she was not interested.
Ms. Self said she was not interested, either.
H. MONTHLY PROGRESS REPORT:
Mr. Uyeda asked for an update on the Waimea Treatment Plant project, noting that the Board had
approved a substantial amount of money for it.
The Manager -Chief Engineer noted that the Deputy is still the project engineer for that project.
The Deputy said that the Notice to Proceed was issued on July 31, 2015. The contractor has
already indicated that he would probably not move until the first week of October, while he is
trying to finish up some other tasks. DWS has reminded the contractor on the construction
schedule; the contractor is working on the preparation of submittals for their long -lead items.
DWS has held at least one teleconference with the contractor, to make sure that they get their
Page 27 of 33 Water Board Minutes 8-25-15 js
ducks in a row for the submittal process, i.e., the membrane elements. The contractor is still
working on pulling their building permits for the project, the Deputy said.
The Manager -Chief Engineer acknowledged that this project is a sizeable investment, but it is
utilizing Drinking Water State Revolving Fund loans. Those are low-interest loans, carrying one
percent interest plus administrative fees, with a term of 20 years. This project is in line with
Mr. Bolles's presentation, he noted. DWS first put this project on the CIP list about 10 years ago,
at an estimated cost of $10 million. Electrical costs had been climbing, and DWS was reluctant
to invest the hefty sum of $10 million. Meanwhile, DWS was not comfortable with micro-
filtration as a treatment alternative; it was still quite pricey. However, DWS has hit that crossover
point, where utility costs have gone up so high, that DWS decided that an investment in treatment
is a more cost-effective means of providing water for the area. This project will allow DWS to
double the capacity of the existing plant, and will allow the plant to serve not only Waimea, but
all the way to Ahualoa, and if need be, to Honoka`a as well. It is therefore more cost-effective to
go this route, rather than pump the Waimea or Ahualoa Wells.
Mr. Takamine asked how the Laupahoehoe Reservoir project is going. He said it appeared to be
close to completion, but the completion percentage on the CIP report is only about 50 percent.
He asked if there were any issues with the project.
Mr. Inaba said that the contractor is pretty close to the existing completion date, but there have
been a number of rain -out days that will probably take the completion into November. Therefore,
the contractor is likely to submit a time extension request at next month's Board meeting, he said.
The Manager -Chief Engineer said that DWS is watching that closely, and the contractor, GW
Construction, is aware of that. He said that he himself had attended both the pre-bid and pre -
construction meetings; DWS emphasized to them that just because a task takes two weeks longer
than expected, it does not necessarily translate into a time extension of an additional two weeks.
Chairperson Robinson asked about what happened with the situation involving
Mr. Christian Twigg -Smith and his firm CTS Earthmoving.
Mr. Inaba said that he had discussed this with Ms. Self this morning; DWS has a claim filed by
the bonding company, which is being resolved.
Chairperson Robinson said Hallelujah.
Mr. Inaba said that DWS will be directed by the State Attorney -General on everything that DWS
does on this matter.
Chairperson Robinson expressed surprise at this.
Mr. Inaba said that he is working on Ms. Self, who expects that the matter will be taken care of.
Chairperson Robinson asked about the item on the CIP list regarding Ola`a No. 2 0.5 -MG
Reservoir Replacement, noting that DWS has to go through Land Court on the subdivision of that
property.
Mr. Inaba said yes, DWS had not included the surveying of the subdivision in its consulting
contract. He had spoken about this with DWS's Land Section surveyor, who is not a Land Court -
certified surveyor. The surveyor, who had done all of the in-house surveying, etc., recommended
to Mr. Inaba that DWS work with its consultant on submitting that subdivision to the Land Court.
Mr. Inaba said that he is in the process of negotiating that work with the consultant. He noted
that there are also issues to negotiate with the land owners.
Page 28 of 33 Water Board Minutes 8-25-15 js
Chairperson Robinson noted that he and Ms. Lee Loy had been beaten up by the Land Court on
numerous occasions.
Ms. Lee Loy described the tortuous process of dealing with the Land Court, and stressed that
everything on the Metes and Bounds Description, etc., must be accurate. Failure to have
everything precisely accurate will send one back to Square One, she warned. She urged DWS to
have several people check everything before submitting to the Land Court; doing so will save
DWS months. She noted that she herself has been working on one subdivision for the past 18
months.
Chairperson Robinson said that the beauty of the Land Court is that title is absolute, while the
problem with doing anything with the Land Court is like swimming in mud.
Ms. Lee Loy agreed; any little change to the submittal is kicked back, and the process starts all
over again.
Mr. Inaba noted that DWS had started the process, working with someone at Corporation Counsel
who handled the Land Court, but that person has since left.
Ms. Lee Loy offered to point out for DWS any potential "land mines" to avoid with the Land
Court.
I. REVIEW OF MONTHLY FINANCIAL STATEMENTS:
Mr. Elarionoff noted that the Balance Sheet shows that Construction Work in Progress increased
by $4,885,407.00, or 66 percent. He asked if that big increase could make everything else
unstable; he asked if it really matters.
Mr. Sumada said yes, it does matter, because it is an indication that more work is going on today,
at this point in time, compared to last year. He said that he provided a breakdown of much of the
work, but it did not indicate that the system was unstable.
Mr. Elarionoff said that DWS has staff inspecting all of these projects. He asked if it ever gets to
the point where there are not enough inspectors to keep up on what is going on, due to too much
construction.
The Manager -Chief Engineer said that this is not typical, run-of-the-mill, planned construction.
He noted that Mr. Sumada had done a good job of itemizing the projects that account for the bulk
of this construction work in progress; aside from the first two projects on the list, the rest are all
repair jobs. These repair jobs are not ones that DWS programmed for construction; they are
repairs of the wells that have gone down. Messrs. Young and Takamoto, along with another
mechanical engineer, Mr. Warren Ching, are managing these projects. There is concern for
DWS's personnel resources, but it has not become overwhelming yet, he said.
Mr. Inaba said there is a supervising inspector who assigns the Department's inspectors to these
projects. When there are projects that are out of the ordinary, DWS has done construction
management contracts, as in the case of the Waikoloa Reservoir No. 2 repairs. DWS tries to keep
construction management in-house, but when the expertise required is beyond in-house
capabilities, DWS does contract out.
The Manager -Chief Engineer said that DWS also contracts out when federal funding requires
dedicated construction management.
Page 29 of 33 Water Board Minutes 8-25-15 js
Ms. Wilson said that a 66 percent increase seems like a lot. She said she noticed, however, that
these are multi-year contracts. She asked if none of these were included in budget projections.
Mr. Sumada said that typically, construction projects do take more than a year, and will show up
on the CIP budgets because of this. Such projects might be in the CIP account for two or three
years, depending on how the project goes. Repair projects, for the most part, get finished within a
year. However, at this point in time, there are a lot of repair projects because of all the wells
going down.
Ms. Wilson asked if the delays were due to the bid process.
Mr. Inaba said that a lot of the projects do not start at the beginning of the fiscal year, so they tend
to cross over into the next year or so. It depends on when the projects start, he said. This applies
just to the regular contracts. He said that DWS is experiencing quite a lot of delays with regular
CIP projects and with a few of the repair projects.
Chairperson Robinson said that he and Ms. Lee Loy had attended a class for public officials at
one of the recent water conferences. One lecturer told the group that if a utility's accumulated
depreciation gets over one-third of its fixed asset value (i.e., utility plant value), it is a danger sign
that means that the utility is not putting enough money back into the plant equipment itself. He
said that DWS's accumulated depreciation is about two-fifths over fixed asset value. He asked
Mr. Sumada if he had any thoughts on that rule of thumb indicating the need to replace DWS's
aging infrastructure.
Mr. Sumada said he did not really have any insight on that. He asked if the lecturer was an
accountant or an engineer.
Chairperson Robinson said the lecturer was a university professor, who evidentally had headed a
utility, and was somebody that the AWWA valued enough to allow him to conduct the public
officials workshop all the way through. That was all he knew about the man, he said.
Mr. Sumada said that he would imagine that someone who made that kind of analysis would want
to get to see the assets in question, and would follow the aging and the condition of the assets —
which Mr. Sumada said he does not get to do. DWS's Operations staff would have a better
handle on the system, seeing it on a daily basis. Only looking at accumulated depreciation of
property would indicate the age but not condition of DWS's assets, since Mr. Sumada does not
get to see all of the infrastructure.
The Manager -Chief Engineer asked what the rule of thumb trigger was again.
Chairperson Robinson said it was just a rule of thumb that the lecturer threw out there as part of
his presentation, whereby if the utility's accumulated depreciation reaches more than one-third of
its plant assets, it indicates that the utility has an aging infrastructure that is not being replaced
quickly enough.
The Manager -Chief Engineer said that DWS would look into that.
Chairperson Robinson said that the presentation was really good; the lecturer gave some very
good indicators.
Mr. Arikawa asked if the lecturer was an equipment supplier.
Page 30 of 33 Water Board Minutes 8-25-15 js
Chairperson Robinson said that he should have been; the Chairperson said he was certainly
convinced by the presentation. The lecturer was a university professor who had served as the
head of utilities in several different counties.
Ms. Lee Loy said that there is data that can be used to extrapolate certain indicators, and this rule
of thumb was just one example. This rule of thumb regarding depreciation versus fixed asset
value provides a snapshot, which can be looked at to see if it warrants more investigation, she
said.
The Manager -Chief Engineer said that DWS had passed that one -thirds on accumulated
depreciation; he said that it is worth looking into.
J. MANAGER -CHIEF ENGINEER'S REPORT:
The Manager -Chief Engineer will provide an update or status on the following:
1) Public Information and Education Specialist Update -- Ms. Aton noted that DWS issued
press releases regarding the Akolea main break, the Kaiwiki water emergency and the
announcement of the new Deputy. DWS is currently producing an educational video
regarding source water protection. Chairperson Robinson asked Ms. Aton to do a press
release about Mr. Bolles's energy report, showing how the Board is taking proactive
action to save energy and reduce costs; he also suggested that Ms. Aton do a press
release regarding the Board's action today to reduce the Power Cost Charge.
2) Pauka`a Waterline Relocation Project -- The Manager -Chief Engineer said that DWS
will use the template regarding Use and Occupancy Agreements to re -start this project;
DWS will be able to accommodate Mr. Neal Herbert's concerns, and get the project
done.
K. CHAIRPERSON'S REPORT:
Chairperson Robinson, alluding to his letter of complaint to the CWRM Chairperson distributed
earlier, said that the Board was not going to sit idly by when DWS staff are being abused. That
letter, which complained about uncivil behavior by CWRM Commissioner Jonathan Starr, was
corrective action, he said.
(Several Board members commended the Chairperson for taking a stand.)
Ms. Lee Loy said she found it offensive that someone would cast aspersions at the information that
DWS provided to CWRM regarding the Water Use and Development Plan update. She said she
wanted to see some individuals write letters of apology, which should be posted on the CWRM
website. There is no place for rudeness towards the DWS staff, she said. She said she was glad
that the Chairperson was standing up against such behavior.
Chairperson Robinson said he was glad that CWRM Board member and DOH Director Virginia
Pressler had stood up; Dr. Pressler was the only person who protested Commissioner Starr's
behavior during the August 17, 2015, CWRM meeting, he said.
Ms. Wilson asked if this letter could be submitted by the Board as a unified front.
Chairperson Robinson said he would entertain a Motion and Action by the Board to support the
letter; this would be very helpful.
Ms. Self agreed, saying that she was going to suggest that a letter like this should be approved by
the Board.
Page 31 of 33 Water Board Minutes 8-25-15 js
MOTION: Ms. Lee Loy moved that the Board, as a body, support the Chairperson's letter dated
tomorrow, August 26, 2015, regarding Commissioner Starr's action at the August 17, 2015,
CWRM meeting; seconded by Ms. Wilson.
Mr. Arikawa asked if the letter should ask that the Commissioner be removed from the Board,
instead of removed from the meeting.
Chairperson Robinson said, no, that reference in the letter to having Commissioner Starr be
removed from the room was a quote from Dr. Pressler.
ACTION: Motion carried unanimously by voice vote.
Mr. Elarionoff asked to move that the letter be forwarded to the Governor, as the person who
appointed Commissioner Starr.
Chairperson Robinson said that the letter was already being forwarded to the Governor; he noted
that this Governor's predecessor had appointed Commissioner Starr, before being voted out of
office.
L. EXECUTIVE SESSION RE: LIBERTY MUTUAL INSURANCE COMPANY V. WATER
BOARD OF THE COUNTY OF HAWAII, ET AL:
The Water Board anticipates convening an executive meeting, closed to the public, pursuant to
Hawai'i Revised Statutes, Sections 92-4, 92-5(a)(2), for the purpose of consulting with the Water
Board's attorney regarding the Plaintiff's First Amended Complaint For Declaratory Judgment
filed in the above -referenced case.
ACTION: Ms. Lee Loy moved to go into Executive Session; seconded by Mr. Uyeda and carried
unanimously by voice vote.
(Executive Session began at 12:29 p.m., and ended at 12:52 p.m.)
ACTION: Ms. Lee Loy moved to approve Corporation Counsel's Recommendation and allow
the Chairperson to sign the agreement with Liberty Mutual Insurance Company; seconded by
Ms. Wilson, and carried unanimously by voice vote.
The Manager -Chief Engineer asked to return to Item 7(A), regarding the Amended Memorandum
of Understanding (MOU) on the Queen Ka`ahumanu Highway Widening project. He asked to
make a correction within the MOU itself, in the third paragraph starting with "Whereas." For the
record, the amount should be revised to $244,240.00, instead of $259,240.00.
Chairperson Robinson said that no action was needed on that; it was just a notation.
Ms. Self said that the Board was being notified of this correction, because the Board had received
the original handout.
10) ANNOUNCEMENTS:
1. Next Regular Meeting:
The next meeting of the Water Board is scheduled for 10:00 a.m. on September 22, 2015, at the
Department of Water Supply, Operations Center Conference Room, 889 Leilani Street, Hilo, HI.
Chairperson Robinson said that he would be out of town for this meeting, and therefore,
Vice -Chairperson Takamine will preside.
2. Following Meeting:
Page 32 of 33 Water Board Minutes 8-25-15 js
The following meeting of the Water Board will be held at 10:00 a.m. on October 27, 2015, at the
Department of Water Supply, Operations Center Conference Room, 889 Leilani Street, Hilo, HI.
11) ADJOURNMENT
ACTION: Mr. Arikawa moved to adjourn; seconded by Ms. Wilson, and carried unanimously by
voice vote.
The meeting adjourned at 12:55 p.m.
Secretary
The Department of Mater Supply is an Equal Opportunity provider and employer.
Notice to Lobbyists: If you are a lobbyist, you must register with the Hawai `i County Clerk within five days of becoming a lobbyist.
(Article 15, Section 2-91.3(b), Hawai `i County Code) A lobbyist means "any individual engaged for pay or other consideration who
spends more than five hours in any month or $275 in any six-month period for the purpose of attempting to influence legislative or
administrative action by communicating or urging others to communicate with public officials." (Article 15, Section 2-91.3(a) (6),
Hawai `i County Code) Registration forms and expenditure report documents are available at the Office of the County Clerk -Council,
Hilo, Hawai `i.
Page 33 of 33 Water Board Minutes 8-25-15 js