HomeMy WebLinkAboutPermitting a Residential Photovoltaic System2.19.16GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
Revised 10.10.12
This guideline is to assist applicants in the permit process for photovoltaic (PV) systems. To
determine a property’s flood zone designation, complete the form
http://records.co.hawaii.hi.us/Weblink8/Browse.aspx?dbid=1&startid=58075 and email the
completed form to dpweng@hawaiicounty.gov To obtain an unofficial estimate of the
property’s flood zone designation, click on the Flood Hazard Assessment Tool at
http://gis.hawaiinfip.org/fhat/
EAST HAWAI‘I: Aupuni Center, 101 Pauahi Street, Suite 7, Hilo, HI 96720
PHONE NUMBER: (808) 961-8331: FAX NUMBER: (808) 961-8410
WEST HAWAI‘I: 74-5044 Ane Keohokalole Highway, Bldg E, 1st Floor, Kailua-Kona, HI 96740
PHONE NUMBER: (808) 323-4720 FAX NUMBER: (808) 327-3509
Department of Public Works, Building Division
7:45 AM to 4:30 weekdays. Closed First Friday, weekends, and holidays.
http://www.hawaiicounty.gov/public-works-building
Email: cohbuild@hawaiicounty.gov
County of Hawai‘i is an Equal Opportunity Provider and Employer.
The Guidelines include:
Structural Evaluation
Plans and Specifications
Fees
Documentation
Inserts
Structural Evaluation Worksheet
Building Permit Worksheet
Electrical Permit Application
Exhibits
A – Site Plan
B – Standard Electrical Diagram
C – Notes for Electrical Diagram
PV Bulletin
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
STRUCTURAL EVALUATION
The structural evaluation worksheet is to be completed by the applicant and attached to the
drawings.
Steps 1 and 2 of the evaluation worksheet is inserted with this booklet.
PLANS AND SPECIFICATIONS
A) Building
1) A location site plan showing the location of major structures on the property
1” = 20’ or larger is preferred.
2) A roof plan (scale 1”=8’) with PV arrays on dwellings with a 3' clear space
along the roof ridge.
a) Show array supports, framing members.
b) Provide information on roof mounting structure(s) construction.
c) Detail the module attachment method. Fasteners must not occur in roof
framing beyond the exterior wall line without engineered calculations
B) Electrical (See Exhibits A-C).
1) Location plan showing structures and their vicinity 1” = 20’ or larger is
preferred.
2) Provide information on roof mounting systems.
3) A standard electrical diagram showing PV array configuration, wiring system,
over current protection, inverter, disconnects, required markings or labels and
AC connection to the building.
4) Provide specification sheets, and installation manuals for all manufactured
components including, but not limited to PV modules, inverters, combiner
box, and mounting system. These will be returned after the review.
5) The electrical diagram (E1.1) maybe used to accurately represent the PV
system.
FEES
Calculate the fees for all the work to be performed on the electrical permit application and
building permit worksheet. On the building permit worksheet, complete the “Estimated
Valuation for all work to be performed.”
Hawai‘i County Code, Chapter 9, Electricity Permit
Division 2. Fees and Charges
Section 9-40. Fee schedule.
(q) Generators, Capacitors, Reactors, Transformers Fixed, and all other alternate energy power
sources.
For the purpose of this subsection, 1 kw is equivalent to 1 kva.
Not more than 5 kw................................................................................................................ $10
Over 5 kw but not over 15 kw................................................................................................ $24
Over 15kw.............................................................................................................................. $40
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
Hawai‘i County Code, Chapter 5, Building Permit
Section 5-35. Table 1-A.
TABLE 1-A – BUILDING PERMIT FEES
Fees shall be as follows:
$0 to $500 $10.00
$501 to $2,000 $10.00 for the first $500 plus $1.50 for each
additional $100 or fraction thereof, to and
including $2,000
$2,001 to $25,000 $32.50 for the first $2,000 plus $7.50 for
each additional $1,000 or fraction thereof,
to and including $25,000.
$25,001 to $50,000 $205.00 for the first $25,000 plus $6.00 for
each additional $1,000 or fraction thereof,
to and including $50,000.
$50,001 and up $355.00 for the first $50,000 plus $3.00 for
each additional $1,000 or fraction thereof.
If a value is not provided the determination shall be made by the Building Official.1
DOCUMENTATION
A) Include two sets of drawings of site plans stamped by an electrical engineer in
accordance with HRS section 4442, and product submittals as required.
B) Complete the building permit worksheet, and electrical permit application.
C) Submit a check payable to the County Director of Finance for the required fees.
Hawai‘i County Code, Chapter 9, Electricity, Section 9-33. Plans and specifications
requirements; deviations.
“(b) All photovoltaic systems for residential and non-residential installations shall require a building permit.
Electrical design drawings and specifications shall bear the approval of an electrical engineer registered in the State
of Hawai‘i.
(c) No person shall materially deviate from any reviewed plan or specifications or fail, neglect or refuse to comply
herewith, unless permission to do so has first been obtained from the electrical engineer on record. Revised
drawings and or a letter approving such deviations shall be submitted to the authority having jurisdiction for
review.”
1 Hawai‘i County Code, Chapter 5, Sec 5-31
2 Under the Hawai‘i Revised Statutes section 444 permits are issued to Hawai‘i State licensed building, electrical, or photovoltaic contractors.
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
SPAN TABLES3:
A framing plan is required only if the combined weight of the PV array exceed 5 pounds per
square foot (PSF or lbs/ ft2) or, the existing rafters are over-spanned. The following may help
determine if the rafters are over-spanned.
Use this table for rafter spans that have conventional lightweight dead loads. If there is a roof
system that doesn’t fall within these tables consider obtaining the advice of a State of Hawaii
registered professional Architect or Structural Engineer.
10 PSF Dead Load
Roof live load= 20 psf, ceiling not attached to rafters, L/Δ= 180
Rafter Size 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12
Spacing
(inches) Species Grade The measurements below are in feet-inches
(e.g. 9-10=9 feet, 10 inches)
16 Douglas
Fir-larch
#2 or
better 9-10 14-4 18-2 22-3 25-9
24 Douglas
Fir-larch
#2 or
better 8-0 11-9 14-10 18-2 21-0
Use this table for rafter spans with a ceiling attached, and conventional light dead loads
10 PSF Dead Load
Roof live load= 20 psf, ceiling not attached to rafters, L/Δ= 240
Rafter Size 2 x 4 2 x 6 2 x 8 2 x 10 2 x 12
Spacing
(inches) Species Grade The measurements below are in feet-inches
(e.g. 9-10=9 feet, 10 inches)
16 Douglas
Fir-larch
#2 or
better 8-11 14-1 18-2 22-3 25-9
24 Douglas
Fir-larch
#2 or
better 7-10 11-9 14-10 18-2 21-0
If the roof system has:
a. Over-spanned rafters or trusses,
b. The array is over 5 lbs/ft2 on any roof construction, or
c. The attachments with a dead load exceeds 45 lbs per attachment;
It is required that you provide one of the following:
I. A framing plan showing details how you will strengthen the rafters using
the supplied span tables.
3 The Span Tables and Exhibits A-C were printed with permission from the Solar America Board of Codes & Standards.
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit A
SAMPLE ONLY
DO NOT SUBMIT WITH PLANS
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit B
SAMPLE ONLY
DO NOT SUBMIT WITH PLANS
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS Exhibit C
SAMPLE ONLY
DO NOT SUBMIT WITH PLANS
GUIDELINES FOR PERMITTING A RESIDENTIAL
PHOTOVOLTAIC (PV) SYSTEM