My WebLink
|
Help
|
About
|
Sign Out
Home
WW-4402 - Bid Results (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Bid Results
>
2016 - Bid Results
>
2016 - Formal Construction Projects - Bid Results
>
WW-4402 - Bid Results (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 9:28:58 AM
Creation date
11/22/2016 9:28:26 AM
Metadata
Document Relationships
WW-4402 - Bid Results
(ADA Compliant Text Version)
Path:
\Public Works\Administration Division\99_Archive\02_Bid Information\Bid Results\2016 - Bid Results\2016 - Formal Construction Projects - Bid Results
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Title: Hilo Outfall Manhole Modification Date: November 3, 2016 <br /> Job No.: WW-4402 <br /> Claimed Hawaii <br /> CONTRACTOR BASIC BID Products REMARKS <br /> Preference <br /> �I Isemoto Contracting Co Ltd $62,321.00 Witnesses: Lyle Hirota - DEM/WWD <br /> �I James Ishii General Contracting Inc $42,400.00 Eva Braman - DPW ADM <br /> �I Jas W Glover Ltd $41,400.00 X Billy Kapololu - William K Kapololu Jr <br /> �I Site Engineering Inc $49,200.00 X Tresa Grace - Jas W Glover Ltd <br /> �I William K Kapololu Jr $44,556.00 <br /> Estimated Cost by County of Hawaii $327000.00 <br /> Apparent Low Bidder's Subcontractors: Associated Steel Workers Ltd - Reinforcing Steel Contractor <br /> Jas W Glover Ltd - Excavating <br /> Jas W Glover Ltd - Cement Concrete <br /> Jas W Glover Ltd - Sewer, Sewage Disposal, Drain, and Pipe Laying Contractor <br /> County of Hawaii is an Equal Opportunity Provider and Employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.