My WebLink
|
Help
|
About
|
Sign Out
Home
PV 2012-01
PublicDocuments
>
Public Works
>
Building Division
>
Bulletins
>
PV 2012-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 4:17:36 PM
Creation date
2/3/2017 4:17:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BUILDINGDIVISION-DPW <br />COUNTYOFHAWAl'I-101 PauahiStreet,Suite 7-Hilo,Hawai'i 96720 <br />HiloOffice(808)961-8331•Fax(808)961-8410 KonaOffice(808)323-4720•Fax(808)327-3509 <br />BulletinNo:PV2012-01 <br />Date:September17&August24,2012and revised February 13, 2014 <br />Code/Edition:HawaiiCountyCode Chapter9andthe2008NationalElectricalCode <br />(NEC) <br />Subject:Photovoltaic(PV)energysystems <br />ThefollowingclarificationsaretheresultofdiscussionsatthepublicPVworkshopsconductedon <br />September17,August 14,and15,2012,bytheDepartmentofPublicWorks: <br />A.PV-GENERAL <br />1.Inspection <br />Buildingandelectricalinspectionsmayberequestedinanyorderfollowing <br />installationofpanelsonroof. <br />B.PV-ROOFMOUNTED <br />1.Inspection <br />BuildingDivisionhasdecidedtoprovideladderstoinspectors.Intheinterim, <br />contractors,pleasecontinuetoprovideladdersandfallprotectionatthetime <br />ofinspection. <br />2.PlanReviewandApproval <br />Perthemanufacturers'literatureandICCEvaluationReportsforIronRidge <br />MountingSystemsandmountingattachments--Unirac and Solar Mount <br />systemsareapprovedforuseandmaybeinstalledtoamaximumheightof30'in <br />WindZonesA,B,CorDandSeismicZonesA,B,C,orD. Notrequireis a <br />licensedHawai'istatearchitectorstructuralengineerreviewandapproval(a <br />professionalstamp). ApplicationswithinWindExposureD(1/4mileofthe <br />ocean)and/orSeismicZonesEorFrequirealicensedHawai'istatearchitector <br />structuralengineerreviewandapproval. <br />3.HawaiiEngineeringGroup,Inc.presidentAtherR.Dar,PE,certification, <br />specifications, anddetailsprovidedonSeptember5,2012--GraceSolarGrasol <br />roofmountingstandardaluminum(6005-T5)railisapprovedforuse,andmay <br />beinstalledonresidentialhomeswithgableroofsinWindZonesA,B,C,orD <br />andSeismicZonesA,B,C,DorE. Approvalandprofessionalstampisnot <br />requiredfromalicensedHawaiistatearchitectandorstructuralengineer. <br />4.Murar Engineering & Design Inc, Kevin MurarPE & SE, revised the SunEarth <br />SolarStrut photovoltaic racking system and found it in accordance with wind and <br />seismic design requirements for Hawai‘i island. The requirements are acceptable <br />up to a seismic design category E or less. <br />Thankyouagainforyourparticipation.For questions, pleaseemailNeilErickson, Plans <br />ExaminingManager --nerickson@co.hawaii.hi.us <br />Issuedby: DavidYamamoto, BuildingDivisionChief <br />TheCountyofHawai'iisanEqualOpportunityEmployerandProvider <br />
The URL can be used to link to this page
Your browser does not support the video tag.