HomeMy WebLinkAboutwest hawaii project FD2017v21 2 Mission Statement Working together as ONE to improvethe quality of service for the health and safety of our Big Island `Ohana. 3 4 Projects design and construction Amount Ali'i Drive Shoulder Improvements $800,000 Nani Kailua Extension $4,000,000 Ane Keohokāole Highway Phase III $40,000,000 Ka'iminani Drive Phase III In house Henry Street Reconstruction (Palani Rd. to Queen K. Hwy.)$4,000,000 Ali'i Drive Culvert Replacement $11,000,000 Lako Street Extension Private Funding Kuakini Highway Widening, South of Hualālai Road $50,000,000 Māmalahoa Highway Widening (Mud Lane to Mānā Road)$8,000,000 Shoulder widening on the Mauka side of Ali‘i Drive fronting Kona Islander Inn. NTP = June 2017 Current Status: In the Rebidding process. Advertised bid date will be in April 2017. (1st round of bids came in too high) 5 Construct a new mauka to makai connector roadway between Ali‘i Drive and Kuakini Highway. Sidewalks and bike lanes will be included. NTP = February 2018 Current Status: In design phase. 6 Extending Ane Keohokālole Highway from Hina Lani Street to Ka'iminani Drive. NTP = December 2020 Current Status: In the consultant selection process. 7 Roadway improvements/resurfacing from planned intersection of Ka'iminani Dr. with Ane Keohokālole Hwy. to the Queen Ka‘ahumanu Hwy. NTP = June 2017 8 Roadway reconstruction from Palani Road to the Queen Ka‘ahumanu Highway. A left turn pocket (left turn onto Henry St.) will be installed at the Palani Rd. and Henry St. intersection. NTP = TBA Current status: In design phase. 9 Replacing the functionally obsolete Ali‘i Drive culvert with a new bridge. STIP: Qualifies for 80% FHWA funding NTP = March 2018 Current status: In planning and design process. Compiling plans specs and estimates. 10 Developer wants to construct the roadway. A round-a-bout at the future Ali‘i Drive and Lako Street intersection. Developer is working with the county to implement “complete streets” design. NTP = 4th Quarter of 2017 Current Status: In design phase. 11 Currently in Environmental Assessment Phase Design Cost: $1,500,000 Estimated Construction Cost, Part A, $16,000,000 STIP: Qualifies for 80% FHWA funding Project consists of widening Kuakini Highway from Hualālai Road to the intersection of the proposed Ali'i Highway, drainage improvements, and enhancements to pedestrian and bicycle facilities. Currently in CIP and FFY 2017 STIP; and consultant designing. Preliminary Engineering Cost: $1,600,000 Estimated Construction Cost $8,000,000 STIP: Qualifies for 80% FHWA funding. Project consists of widening the Māmalahoa Highway at 18 major intersections; with left-turn pockets and drainage improvements. Roadway Resurfacing and Improvements 15 Hōlualoa Waikoloa Shoulder Improvements The construction of nine foot asphalt concrete shoulders on both sides of the Waikoloa Road, from Highway 190 to Queen Ka‘ahumanu Highway. Roadway Resurfacing and Improvements 16 Roadside Maintenance -Sidewalks 17 Waikoloa Village Sidewalk –“Before” Waikoloa Village Sidewalk –“After” FY 15-16 FY 16-17 Māmalahoa Hwy –Palani junction to Onizuka Store Kealakaa –old intersection to Uluaoa St FY 15-16 FY16-17 Nāpo'opo'o Rd –Coffee mill to end Coffee Mill (continuation) FY 15-16 FY 16-17 South Kohala South Kohala Kahilu Puunani –Hwy 19 to Puu Nanea Pu’uhuluhulu Waikoloa –horsestable to 6.5 m North Kohala Kynnersley –Rubbish dump Rd to East Lindsey (kaauhuhu Rd) –Hawi to first turn 143 122.8 110.5 162 0 50 100 150 200 250 300 FY 12-13 FY 13-14 FY 14-15 FY 15-16 est. Actual Goal 20 21 2222Kamehameha Avenue/Manono Street The Traffics Division converted 11,926 LPS streetlights with LED lighting as of February 3, 2017. All streetlights on the county ROW have been converted. Residential Highway 23 24