My WebLink
|
Help
|
About
|
Sign Out
Home
B-4405 - Bid Results (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Bid Results
>
2017 - Bid Results
>
2017 - Formal Construction Projects - Bid Results
>
B-4405 - Bid Results (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 1:43:59 PM
Creation date
4/11/2017 1:43:24 PM
Metadata
Document Relationships
B-4405 - Bid Results
(ADA Compliant Text Version)
Path:
\Public Works\Administration Division\99_Archive\02_Bid Information\Bid Results\2017 - Bid Results\2017 - Formal Construction Projects - Bid Results
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Title: April 6, 2017 <br />Radio Tower UpgradeDate: <br />Job No.: B-4405 <br />Claimed 5% <br />Apprenticeship Products <br />CONTRACTOR <br />BASIC BIDREMARKS <br />PreferencePreference <br />Disqualified <br />Eagle Construction Co Ltd*Witnesses:James Imanaka - Building <br />$328,439.00X <br />Isemoto Contracting Co LtdEva Braman - DPW Admin <br />Dave Moriuchi - Building <br />$300,000.00 <br />NOTE:*Eagle Construction Co Ltd disqualified due to nonsubmittal of bid security <br />Apparent Low Bidder's Subcontractors: Sky Jack Communications Inc - Tower Repair <br />Key Painting Inc - Painting <br />/ƚǒƓƷǤ ƚŅ IğǞğźȊź źƭ ğƓ 9ƨǒğƌ hƦƦƚƩƷǒƓźƷǤ tƩƚǝźķĻƩ ğƓķ 9ƒƦƌƚǤĻƩ͵ <br />
The URL can be used to link to this page
Your browser does not support the video tag.