My WebLink
|
Help
|
About
|
Sign Out
Home
PR-4423 - Bid Results (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Bid Results
>
2017 - Bid Results
>
2017 - Formal Construction Projects - Bid Results
>
PR-4423 - Bid Results (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 1:06:25 PM
Creation date
6/23/2017 1:06:25 PM
Metadata
Document Relationships
PR-4423 - Bid Results
(Original Version)
Path:
\Public Works\Administration Division\99_Archive\02_Bid Information\Bid Results\2017 - Bid Results\2017 - Formal Construction Projects - Bid Results
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Title: May 4, 2017 <br />Pana'ewa Zoo Rain Shelter RepairsDate: <br />Job No.: PR-4423 <br />Products <br />CONTRACTOR <br />BASIC BIDAdditive Alt. #1REMARKS <br />Preference <br />$383,500.00$123,300.00X <br />Isemoto Contracting Co LtdWitnesses:Eva Braman - DPW Admin <br />$887,300.00$90,000.00 <br />Stan's Contracting IncEydie Komata - P&R <br />Valerie Tanimoto - DPW Admin <br />Neil Gyotoku - OHCD <br />Kaloa Robinson - OHCD <br />$180,000.00 <br />Apparent Low Bidder's Subcontractors: Isemoto Contracting Co Ltd - Carpentry Framing <br />R&M Painting LLC - Painting <br />Ultimate Roofing Inc - Pre-Finished Metal Roofing <br />Jonathan A Stevens dba J&H Sheetmetal - Sheetmetal/Flashing/Gutter <br />/ƚǒƓƷǤ ƚŅ IğǞğźȊź źƭ ğƓ 9ƨǒğƌ hƦƦƚƩƷǒƓźƷǤ tƩƚǝźķĻƩ ğƓķ 9ƒƦƌƚǤĻƩ͵ <br />
The URL can be used to link to this page
Your browser does not support the video tag.