HomeMy WebLinkAboutCHC 1990-03-20 DPW COUNTY CHARTER REVIEW wi BERNARD K. AKANA
mayor
• HUGH Y. ONO
/Niv°c ., • ChiefEngtneer
J.•
•-° .., DEPARTMENT OF PUBLIC WORKSBRUUCC oev Er>otneer
•. ., �ad,,.• CE CC. McCLURE
C.
Tom.
..; I3 COUNTY OF HAWAII -25 AUPUNI STREET-HILO,HAWAII 96720-TELEPHONE(8081961-8321
March 20, 1989
MR ROBERT E BETHEA CHAIRMAN
AND MEMBERS
COUNTY CHARTER COMMISSION
101 AUPUNI STREET #235
HILO HI 96720
SUBJECT: COUNTY CHARTER REVIEW
Thank you again for the opportunity to address the Commission on
March 8th.
As requested, our suggestions are as follows:
Section 6.2-2. Chief Engineer
My re-evaluation concludes there is no need to include the Deputy Chief
Engineer, as his status is covered under Section 4-5(a) . Therefore, no
change is necessary.
Changes in Organizational Structure
In response to inquiries from commissioners, we respond as follows:
° Wastewater Division performs the following functions: sewer system
operation and maintenance, service fee collections and fiscal
administration, and sewer projects administration. The options
available are as follows:
o Create a Wastewater Management Department independent of other
departments. Some counties have created separate wastewater
authorities.
o Assign the division in entirety to the Department of Water
Supply.
o Remain as is with Public Works as its own division.
We have purposely excluded the alternative of, assignment to the
Department of Health, as_ being anti-home rule. I have attached.
force-field analysis for two of the above alternatives.
- a
County Charter Commission
Page 2
March 20, 1989
° Solid Waste Division performs landfill operation and maintenance
and refuse transfer operations. Because administrative and support
capability has not been fully developed, this division should
remain as part of Public Works which provide these support services
for Solid Waste.
Furthermore, with regard to combining this division with Wastewater
Division, other than environmentally related, there would be no
advantage to a consolidation.
HUGH Y.. ONO, P.E.
Chief Engineer
HYO:ctc
Attachments
cc: Department of Water Supply
DPW
DEP
ADM
WWM
SWM
FORCE FIELD ANALYSIS
Alternative: Create a Department of Wastewater
EVALUATION
"FOR" FACTORS "AGAINST"
o Could be established by either a separate Policy Setting ° Creation of another department in
Commission or continue under the County addition to the ones that already
Council . exists.
o Wastewater achieves departmental status
and has its own goals and objectives with
equal importance as other departments.
Administration ° An additional administration is needed
to include minimum of one each
department head, secretary, and clerk.
o A special fund "Sewer" already exists. Fiscal/Special Funds This department will not have adequate
operational revenues unless subsidized
from the General Fund.
o Billing system is in place. Revenue Collections ° Must continue to rely on Data
Processing for support.
° Does not have an effective collection
method for non-payment of monthly sewer
billings.
Capital Improvements ° Must continue to rely on G.O. Bonds.
No change. Environmental Policy No change.
No change. Operations/Maintenance No change.
FORCE FIELD ANALYSIS
Alternative: Assign the Wastewater Division to the Department of Water Supply.
EVALUATION
"FOR" FACTORS "AGAINST"
o Water Commission is already in place. Policy Setting ° County Council relinquishes policy role.
o Would become semi-autonomous. Semi-Autonomy ° Would discontinue being a county-type
operation.
o DWS is fully staffed with the Administration ° DWS will have to be diverse in its area
administrative capabilities. of responsibility.
• Addition of another division to DWS:
division Chief, superintendent,
2-fiscal/clerical , 33 operations
positions.
o Wastewater is a special fund called Fiscal-Special Funds ° Wastewater is currently subsidized
the "Sewer" fund. 40%-45%. This policy would need to be
defined.
° The addition of the Sewer fund will
have toeither be amended in the
Charter or be adopted as an addition to
the water fund. .
(Sec. 8-4, Charter 1980)
•
o Billing system already in-place. Revenue Collections
o Non-payment procedures of DWS (water
shut-off) is better incentive to
assure payment.
Page 2 - Alternative: Assign the Wastewater Division to the Department of Water Supply
i G•
EVALUATION
"FOR" FACTORS "AGAINST"
o Debt service could be distributed among Captial Improvements ° Additional financial responsibilities to
total user accounts similar to G.O. DWS for wastewater development.
•
Bond approach.
o With EPA construction funds being •
discontinued in 1990, this maybe an
ideal time to transfer this function.
o If pre-treatment of effluent is being Environmental Policy ° DWS will not and is not planning on
considered before water re-use then DWS pre-treating effluent for re-use as
is the likely agency. potable water.
o The treatment of water would be the ° DWS will be assigned the additional
responsibility of a single agency from responsibility of after-use treatment.
developmentto disposal .
o System maintenance is mechanically similar. Operations/Maintenance ° Operations of the DWS will be increased
by increasing their functional area.
o Staffs can be cross-trained on water and
wastewater.