My WebLink
|
Help
|
About
|
Sign Out
Home
2019-07-09 Kailua Village Design Commission Minutes EXHIBIT A
PublicDocuments
>
Planning Department
>
Kailua Village Design Commission
>
Minutes
>
2006-2024
>
2019
>
2019-07-09 Kailua Village Design Commission Minutes EXHIBIT A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 4:10:03 PM
Creation date
8/15/2019 3:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KAILUA VILLAGE DESIGN COMMISSION ("KVDC") <br /> Meeting of July 9, 2019, Agenda Item#1 <br /> Presentation on behalf of Cuhaci &Peterson Architects, Engineers, Planners, Inc. <br /> (Safeway Fuel Center and Convenience Store,Niumalu Market Place) <br /> 1, BACKGROUND <br /> A. The Application seeks approval of the revised and supplemented plans for the Safeway <br /> Fuel Center and Convenience Store at the Niumalu Market Place project. <br /> B. The overall building plans for the project were approved in March of 2018. The approval <br /> included general designs for the Fuel Center and Convenience Store. <br /> C. The Application seeks approval of supplemental design information regarding the Fuel <br /> Center and Convenience Store, which is generally consistent with the plans approved in <br /> March of 2018. <br /> D. Previously, the KVDC approved unrelated revisions/supplements to the original plans. <br /> These revisions pertained to the "gathering place" located at the focal point of the project <br /> on the west end of the Safeway store (replacing a previously approved architectural <br /> feature in the area), supplemental information regarding the location of gas tanks and <br /> landscape screening thereof, and signage plans. Those revisions are not relevant here, but <br /> are mentioned for informational purposes. <br /> E. Notes Regarding Project Plans: <br /> 1. Due to an inadvertent oversight, the Design Review Submittal filed with the <br /> Application on May 28, 2019 did not depict the previously approved <br /> revisions/supplements to the project plans. Accordingly, we have circulated a <br /> revised Design Review Submittal that reflects these features. This revised <br /> submittal also includes further detail on ancillary structures proposed with the <br /> Fuel Center and Convenience Store (e.g., the trash dumpster enclosure and air <br /> station), as well as related landscaping features. <br /> 2. In our June 17, 2019 supplemental filing, we submitted exhibits for purposes of <br /> demonstrating landscape and screening features relevant to the Fuel Center and <br /> Convenience Store. Please note that the exhibits were intended to portray <br /> landscape features only. The images of the Fuel Center and Convenience Store <br /> (and other buildings) therein do not accurately represent the current plans for the <br /> buildings, which have changed over time (with KVDC approval). <br /> 4841-4394-7164.1.070144.00001 �v/ � / <br /> 7/9/19 �^ H ' �I 1j' A <Z1��4d46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.