My WebLink
|
Help
|
About
|
Sign Out
Home
PD Revised Background, Recommendation & Conditions of Approval Silber (PL-SPP-2022-016)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2023
>
2023-01-06 Windward
>
Item #1 Robert J. Silber (PL-SPP-2022-000016)
>
PD Revised Background, Recommendation & Conditions of Approval Silber (PL-SPP-2022-016)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 7:45:25 AM
Creation date
12/30/2022 7:45:22 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
12/28/2022
Permit Number
PL-SPP-2022-000016
Parcel Number
130021400000
Description
PD Revised Background, Recommendation & Conditions of Approval Silber (PL-SPP-2022-016)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RSilberSPP.revisedcond.12.28.22 <br /> ROBERT J. SILBER <br /> SPECIAL PERMIT APPLICATION NO. PL-SPP-2022-000016 <br /> REVISED BACKGROUND,RECOMMENDATION & CONDITIONS OF APPROVAL <br /> The Deputy Planning Director finds it prudent to revise the conditions of approval in order to clarify <br /> the total number of people allowed on the subject property, to revise the hours of operation and in <br /> response to a request from the applicant(Planning Department Exhibit 22—Letter from John <br /> Pipan dated October 31, 2022). <br /> The Deputy Planning Director recommends revising Condition 3, Condition 10 and <br /> Condition 11 as follows: <br /> 3. Applicant shall secure and finalize all required as-built building permits for existing <br /> structures used for the proposed holistic education center from the Department of <br /> Public Works - Building Division within [siyr fneiiths]one (1)year of the effective <br /> date of this permit, including change of use building permits for existing structures to <br /> be used for the proposed use. If any as-built or change of use building permits are not <br /> finalized within the prescribed amount of time, the holistic education center shall <br /> cease use of any unpermitted structures. <br /> 10. As represented by the Applicant, retreat events shall be limited to up to two retreats <br /> per month for up to 24 participants per retreat. Should there be additional rooms <br /> available, cabins and lodge buildings may be rented to the public for short-term <br /> accommodations, for a maximum of 20 non-retreat guests. There shall be no more <br /> than 44 [ ]people at one time on the subject property, including r-et+eat an <br /> guests, volunteers, and employ <br /> 11. [As represented by the Appliea+4, all r-et+eat events shall eeettr-between 7:00 a.m. and <br /> . .]All hours of <br /> operation shall occur between 7:00 am and 8:00 pm, with quiet time mandated <br /> between 8:00 pm and 8:00 am, with the exception that on Saturdays the hours of <br /> operation shall occur between 7:00 am and 9:00 pm, with quiet time mandated <br /> between 9:00 pm and 8:00 am. <br />
The URL can be used to link to this page
Your browser does not support the video tag.