Laserfiche WebLink
RManonoComerLLCREZ ja.12-27-2023 <br /> COUNTY OF HAWAI`I PLANNING DEPARTMENT <br /> RECOMMENDATION <br /> MANONO CORNER, LLC <br /> CHANGE OF ZONE APPLICATION NO. PL-REZ-2023-000053 <br /> Upon careful review of the request against the guidelines for granting a change of zone, <br /> the Planning Director is recommending that a favorable recommendation of the Change of <br /> Zone request be forwarded to the County Council. Since this recommendation is made <br /> without the benefit of public testimony, the Planning Director reserves the right to modify and/or <br /> alter this position based upon additional information presented at the public hearing. This <br /> favorable recommendation is based on the following findings: <br /> The applicant is requesting a Change of Zone from a Single-Family Residential- <br /> 10,000 square feet(RS-10) zoning district to an Industrial-Commercial Mixed-20,000 <br /> square feet(MCX-20) zoning district for a 21,023-square-foot parcel of land. The MCX <br /> zoning district, with a minimum area required for each building site of 20,000 square <br /> feet, would allow a maximum density of 1 building site. The applicant proposes to <br /> demolish 3 existing structures and construct a single-story, 4,950-square-foot structure <br /> for retail and/or office uses, on-site parking and access driveways. According to the <br /> applicant, the Waiakea House Lots area is undergoing a land use transition from single- <br /> family residential to commercial and light industrial uses and the request is in accordance <br /> with this transition. The applicant anticipates completing the proposed development <br /> within 8-10 years of the approval date of the Change of Zone, at an estimated cost of <br /> $850,000. <br /> In order to consider an area for any type of zoning designation, the applicable <br /> goals,policies, and standards of the General Plan must be adequately addressed. It is only <br /> through such a comprehensive policy analysis approach that evaluations and decisions <br /> can be made to better time and stage developments to achieve growth determined by the <br /> General Plan and related planning documents. The implications of these evaluations and <br /> decisions must also be considered as they may have an impact on similar areas in the <br /> County. <br /> -1- <br />