My WebLink
|
Help
|
About
|
Sign Out
Home
PD Recommendation Report (PL-SPP-2023-000060)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-04-18 Leeward
>
#6 Makua Lani Christian Academy (Formerly Kona Christian Academy) (PL-SPP-2023-000060)
>
PD Recommendation Report (PL-SPP-2023-000060)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 10:13:29 AM
Creation date
4/11/2024 10:13:18 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
3/20/2024
Description
PD Recommendation report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BMakuaLaniSPP.3.20.2024 <br /> COUNTY OF IIAWAI`I PLANNING DEPARTMENT <br /> RECOMMENDATION <br /> MAKUA LANI CHRISTIAN ACADEMY (FORMERLY KONA CHRISTIAN <br /> ACADEMY) <br /> AMENDMENT TO SPECIAL PERMIT NO. 549 (PL-SPP-2023-000060) <br /> Upon careful review of the request against the guidelines for granting an amendment, the <br /> Planning Director recommends that the proposed amendments to Special Permit No. 549 be <br /> approved by the Planning Commission. Since this recommendation is made without the benefit <br /> of public testimony, the Director reserves the right to modify and/or alter this recommendation <br /> based upon additional information presented at the public hearing. This approval recommendation <br /> is based on the following findings: <br /> The applicant is requesting an amendment to Special Permit No. 549 (SPP 549), <br /> which allowed the establishment of a church and primary school facilities and related <br /> improvements, to include the following: <br /> • Amend Condition No. 9 of SPP 549 to allow an increase in the maximum <br /> enrollment from 180 to 210 students. The condition currently states "The <br /> primary school shall be limited to an enrollment of 180 students. <br /> • Add the adjacent 1.916-acre property, TMK (3) 7-4-006:046 (Parcel 46)to the <br /> permit area, for educational uses, thereby increasing the permit area to a total <br /> of approximately 7.003 acres. <br /> • Construct a 960-square foot modular building on Parcel 46 to accommodate 2 <br /> new elementary school classrooms. <br /> • Construct a 225-square foot bathroom building and new septic system on Parcel <br /> 46 to serve the new classrooms. <br /> The applicant was recently gifted the ownership of Parcel 46 and would like to use <br /> it for educational purposes, together with the existing primary school campus on TMK (3) <br /> 7-4-006:037 (Parcel 37), originally permitted under SPP 549. The request to increase the <br /> maximum enrollment is due to an increase in demand and to accommodate the return of 5th <br /> graders to the school campus. Over the past two years the school shifted 5th graders to the <br /> Makua Lani High School campus so that total enrollment did not exceed the maximum <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.