My WebLink
|
Help
|
About
|
Sign Out
Home
2016-10-20 Leeward Planning Commission Actions
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Actions
>
2007-2023
>
2016
>
2016-10-20 Leeward Planning Commission Actions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 1:51:51 PM
Creation date
10/20/2016 1:51:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />LEEWARD PLANNING COMMISSION <br />ACTIONS <br />OCTOBER 20, 2016 <br /> <br /> <br />1. APPLICANT: PR PUU PA, LLC (SPP 16-190) <br />Request for a Special Permit to establish a concrete ready-mix batching plant facility, the <br />manufacturing and storage of concrete precast products, and base yard for the storage of equipment, <br />materials, stockpiling of aggregates/sand, and related uses and improvements on an approximately <br />2.0-acre portion of a 13,285.024-acre parcel of land situated in the State Land Use Agricultural <br />District. The project site is located on the makai/west side of Māmalahoa Highway approximately <br />one-half (.5) mile to the south of Lalamilo Farm Road, Waikoloa, South Kohala, Hawaiʻi, TMK: 6- <br />8-001:Por. 001. <br /> <br />APPROVED WITH CONDITIONS. <br /> <br /> <br /> <br />Minutes of the September 15, 2016 meeting: APPROVED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.