Laserfiche WebLink
recorded document shall be filed with the Planning Department upon its receipt <br />from the Bureau of Conveyances. <br />[0:] N. A National Pollutant Discharge Elimination System (NPDES) permit and an <br />Underground Injection Control (UIC) permit, if required, shall be secured from <br />the State Department of Health before the commencement of construction <br />activities. <br />[PL.] O. All development -generated runoff shall be disposed of on site and shall not be <br />directed toward any adjacent properties. <br />[Q:] P. The applicant shall perform an engineering study to determine if the sewer line <br />has adequate capacity to handle the proposed flows. If the offsite sewer line does <br />not have adequate capacity, the applicant shall be responsible for necessary <br />improvements. Sewer lines shall be installed within the development to connect <br />with the County's sewer system, meeting with the approval of the Department of <br />Environmental Management, and prior to the issuance of a Certificate of <br />Occupancy. <br />[R-] Q A Solid Waste Management Plan shall be submitted to the Department of <br />Environmental Management for review and approval prior to the issuance of a <br />Certificate of Occupancy. <br />[S-.] R. A Data Recovery Plan and/or an Archaeological Preservation and Burial <br />Treatment Plan, if required, shall be submitted for the review and approval of the <br />Planning Director, in consultation with the Department of Land and Natural <br />Resources — State Historic Preservation Division (DLNR-SHPD). Proposed <br />mitigation treatment for the burial sites, within the subject property shall be <br />approved by the SHPD's Hawaii Island Burial Council before detailed mitigation <br />plans are finalized for these sites. A copy of the approved Final Archaeological <br />Preservation and Burial Treatment Plan shall be submitted to the Planning <br />in <br />