Laserfiche WebLink
Section [5:]21-04-36. Permit to connect[;] or disconnect; plumbing permit <br />prerequisite; fee. <br />(a) A permit [to eenne^+] shall be obtained from the wastewater division[, ,ao,-,a,-+ffle-„+ Of <br />eTSLal maftagefnQt*, before] prior to making any connection or disconnection to the <br />lateral. An application for a permit may be obtained from the wastewater division. <br />(b) [The eetmee+' ^N] A permit for connection [s ] may be issued only after a [plumbing] <br />permit authorizingperformance of the plumbing work has been [ ] issued by <br />the building division, department of public works. <br />(c) [Ne] Department rules shall establish a fee [sal] to be charged for the permit [to no,^, eet.] <br />Section 21-04-37. Sewer MonitorinIZ ProLyram. <br />As Dart of a sewer monitoring program, the department is authorized to do the following: <br />(1) Inspect sewer laterals, located on private property, that connect to the Count sewer <br />ewer <br />after providing the property owner not less than ten calendar days' written notice, to <br />detect leaks from laterals, infiltration, and inflow; or <br />(2) Compel the owner of private property upon which a sewer lateral is located that <br />connects to the County sewer to inspect that lateral for leaks, infiltration, and inflow <br />and to perform repairs as necessary. <br />Division 4. Extensions. <br />Section [21 26.]21-04-41. Applications for extensions. <br />Any individual wishing to extend or connect to the public sewer system shall submit [an <br />apphealien to the dir-eeter- of designee. The appheation shall be in the form of a letter deta4ing <br />where and why the sewer- extensio is being requested.] to the director an application in a form <br />prescribed by the department. The application shall be processed in the manner set forth in this <br />article. <br />Section [2126.1]21-04-42. Approval of extensions of the public sewer system. <br />(a) All sewer extensions shall be approved by resolution of the County council. <br />(b) Private [ .] development and construction. <br />Once an application for an extension of the public sewer system has been approved by the <br />director or their designee, the application and a recommendation from the director shall be <br />forwarded to the County council with all of the supporting material attached. Upon review <br />of the recommendation of the director and the payment mechanism chosen by the applicant, <br />the council may approve the application. <br />Section [21-27]21-04-43. Determination of construction specifications. <br />The County shall make, or allow the applicant to make, the extension, including any lateral, <br />to serve the applicant's property. The [Camey] director shall determine or approve a plan <br />submitted by the applicant for[;]_ the alignment[) the materials to be used[) and the manner of <br />construction. The property owner shall not have any title to the extension. <br />Section [21 28]21-04-44. Payment of costs; construction by the applicant or by the County. <br />(a) If the applicant chooses to construct the extension, then the applicant shall bear the total cost <br />of the construction. However, the applicant may receive for ten years after completion of the <br />11 <br />