My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 216 Draft 01 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 216 Draft 01 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 12:01:19 PM
Creation date
10/8/2020 2:29:09 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
216
Draft
01
Introducer
Herbert "Tim" Richards, III, Council Member
Referred To
AWEEMC
Action 1
AWEEMC-18: Recommends passage on first reading - 10/20/20
Action 2
Council: Bill 216 postponed to November 18, 2020, Council Meeting - 11/06/20
Action 3
Council: Bill 216 amended to Draft 2 - 11/18/20
Document Relationships
AGE AWEEMC 2020/10/20 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Agriculture, Water, Energy, & Environmental Management Committee (AWEEMC)
AGE COUNCIL 2020-11-06 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE COUNCIL 2020-11-18 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
COM 1119.000 2018-2020
(Related)
Path:
\Council Records\Communications\2018-2020
REP AWEEMC 018 2020/10/06 2018-2020
(Related To)
Path:
\Council Records\Reports\2018-2020\Agriculture, Water, Energy, & Environmental Management Committee (AWEEMC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Effect of order; right to appeal. <br />The provisions of the order issued by the director under this section shall become final <br />thirty calendar days after the date of the delivery of the order, unless appealed. The party <br />or parties responsible for the violation may request a meeting with the director, prior to the <br />end of the thirty calendar days Any final written decision by the director may be appealed <br />to the commission within fifteen days from the date of the final written decision. However, <br />an appeal to the commission shall not stay any provision of the order. <br />(d) Judicial enforcement of order. <br />The director may institute a civil action in any court of competent jurisdiction for the <br />enforcement of any notice of violation and order issued pursuant to this section, including <br />seeking a temporary, preliminary or permanent injunction. Where a civil action has been <br />instituted to enforce the civil fine imposed by an order, the director need only show that the <br />notice of violation and order was served, that a civil fine was imposed, the amount of the <br />civil fine imposed, and that the fine imposed has not been appealed in a timely manner nor <br />paid. <br />Section 21-02-23. Criminal Enforcement. <br />Any person convicted of violating any of the provisions of this chapter shall be guilty of a <br />petty misdemeanor and shall be punished by a fine not to exceed $1,000 and/or imprisonment up <br />to thirty days and shall be adjudged to pay all costs of the proceedings. The continuance of any <br />such violation after conviction shall be deemed a new offense for each day of such continuance. <br />Article 3. Public Sewers. <br />Section [21-3.121-03-01. Tampering with public sewers. <br />A written permit from the director shall be required for any person to: <br />(1) Obstruct or otherwise make inaccessible any portion of the public sewer; <br />(2) Uncover or molest in any way, any public sewer; or <br />(3) [Tbxo ]Deposit anything into any sewer manhole. <br />Section [21 4.121-03-02. Sealing disconnected sewers. <br />No person shall remove or demolish any building or structure with plumbing fixtures <br />connected directly or indirectly with the public sewer without first notifying the director of such <br />intention. All openings in the sewer line caused by the removal of any building or structures shall <br />be sealed in such a manner as to prevent earth, debris, rain, surface, storm or other water from <br />entering the public sewer system. <br />Section [21-5.]21-03-03. Connection to sewer required. <br />(a) Owners of all dwellings, buildings, or properties used for human occupancy, employment, <br />recreation, or other purposes, which are accessible to a sewer are required at their expense <br />to connect directly with the public sewer within one hundred eighty days after date of <br />official notice. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.