Laserfiche WebLink
Section [2413]21-04-03. Sewer mains. <br /> Sewer mains shall be of length, type and size necessary to provide the area with adequate <br /> sewage disposal and so located as not to be contrary to the location fixed for utilities by the <br /> County master plan. <br /> Section [21 14.121-04-04. Laterals. <br /> A lateral shall be installed to provide service to each lot in accordance with section <br /> [21 22.] 21-04-33. When a lateral is required by the County in order for the landowner to <br /> receive the final inspection approval, the County shall construct the lateral within six months <br /> from the date of the requirement. <br /> Section [21 15.]21-04-05. Construction standards. <br /> All sewage works construction shall be performed in accordance with the latest edition of <br /> the standard specifications for public works construction and the standard details for public <br /> works construction. <br /> Division 2. Subdivisions. <br /> Section [21 16.]21-04-21. Cost of construction. <br /> (a) In every subdivision where sewers, sewage pumping station, force main, outfall and <br /> sewage treatment units are deemed necessary by the director and State department of <br /> health, the cost of constructing such sewage works shall be borne by the owner of the <br /> subdivision. <br /> (b) Additional costs brought about by increasing the pipe sizes or depths of laying or the <br /> capacity of the pumping station, force main, outfall or treatment plant to serve areas other <br /> than the subdivision shall be borne by the County. <br /> Section [21-1 ]21-04-22. Approval of plans required; time limit for beginning work. <br /> All construction plans and specifications for sewage works shall be approved by the <br /> director. In the event that construction has not commenced within one year after date of <br /> approval, the construction plans and specifications shall be resubmitted for reapproval. <br /> Section [21 18.]21-04-23. Inspections during construction required; costs. <br /> (a) During the construction of all sewage works, the County shall have access thereto for <br /> inspection purposes and, if considered advisable by the director, to require an inspector on <br /> the job continuously. At no time shall sewer work be backfilled or covered until the <br /> director has been notified of and approved the work after proper inspection and test. If the <br /> work is not approved, it shall be repaired or removed and reconstructed, as directed by the <br /> director. The subdivision sewer may then be connected to the public sewer. <br /> (b) All costs of inspection, testing and connection to the public sewers shall be borne by the <br /> owner of the subdivision. <br /> Section [21-19.]21-04-24. Acceptance of sewage works and treatment facilities. <br /> (a) All sewage works found acceptable by the director shall become the property of the County <br /> and shall be maintained and operated as part of the public system. Prior to final acceptance, <br /> the subdivider shall deliver to the County perpetual easements for all portions of the <br /> 9 <br />