Laserfiche WebLink
i <br /> ( <br /> Section [21 25.121-04-36. Permit to connect[;] or disconnect; plumbing permit <br /> prerequisite; fee. <br /> (a) A permit [to met] shall be obtained from the wastewater division[,departfnerl-4 <br /> eN< ental management, be f re] rip or to making any connection or disconnection to the <br /> lateral. An application for a permit may be obtained from the wastewater division. <br /> (b) [Tho eenneeti ] A permit for connection [shall] may be issued only after a [plumbing] <br /> permit authorizing performance of the plumbing work has been [obtained from] issued by <br /> the building division, department of public works. <br /> (c) [ale] Department rules shall establish a fee [sh-aIl] to be charged for the permit [to eonnee ]. <br /> Section 21-04-37. Sewer Monitoring Program. <br /> As part of a sewer monitoring program, the department is authorized to do the following: <br /> (1) Inspect sewer laterals, located on private property, that connect to the County sewer <br /> after providing the property owner not less than ten calendar days' written notice, to <br /> detect leaks from laterals infiltration and inflow; or <br /> (2) Compel the owner of private propegy upon which a sewer lateral is located that <br /> connects to the County sewer to inspect that lateral for leaks, infiltration, and inflow <br /> and to perform repairs as necessary. <br /> Division 4. Extensions. <br /> Section [21-26.]21-04-41. Applications for extensions. <br /> Any individual wishing to extend or connect to the public sewer system shall submit [an <br /> appheation to the difeetof of designee. The appheation shall be in the fefffi Of a lettef detailing <br /> there and.0 y the sewef extension is being requested.] to the director an application in a form <br /> prescribed by the department. The application shall be processed in the manner set forth in this <br /> article. <br /> Section [21 26.1121-04-42. Approval of extensions of the public sewer system. <br /> (a) All sewer extensions shall be approved by resolution of the County council. <br /> (b) Private [develapfnepA and eenstfuetion.] development and construction. <br /> Once an application for an extension of the public sewer system has been approved by the <br /> director or their designee, the application and a recommendation from the director shall be <br /> forwarded to the County council with all of the supporting material attached. Upon review <br /> of the recommendation of the director and the payment mechanism chosen by the applicant, <br /> the council may approve the application. <br /> Section [21-27]21-04-43. Determination of construction specifications. <br /> The County shall make, or allow the applicant to make, the extension, including any lateral, <br /> to serve the applicant's property. The [Eeunty] director shall determine or approve a plan <br /> submitted by the applicant for[,]_the alignment[,];the materials to be used[,];,and the manner of <br /> construction. The property owner shall not have any title to the extension. <br /> Section [21-28]21-04-44. Payment of costs; construction by the applicant or by the County. <br /> (a) If the applicant chooses to construct the extension, then the applicant shall bear the total cost <br /> of the construction. However, the applicant may receive for ten years after completion of the <br /> 11 <br /> i <br /> i <br />