My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0143.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0143.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 4:25:27 PM
Creation date
2/26/2021 10:26:56 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0143
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2021-04-07 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2021-04-21 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2021/03/17 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 026 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP PC 015 2021/03/17 (2020-2022)
(Related)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> I <br /> I <br /> A. The applicant(s), its successors or assigns shall be responsible for complying with <br /> all of the stated conditions of approval. <br /> i <br /> 3 <br /> B. Prior to the issuance of a water commitment by the Department of Water Supply, <br /> i <br /> the applicant(s) shall submit the anticipated maximum daily water usage I <br /> I <br /> calculations as recommended by a registered engineer,and a water commitment <br /> 3 <br /> deposit in accordance with the"Water Commitment Guidelines Policy"to the <br /> Department of Water Supply within one hundred and eighty(180)days from the <br /> effective date of this ordinance. <br /> C. The applicant(s) shall install a reduced pressure type backflow prevention <br /> assembly within five(5)feet of the water meter on private property,which shall <br /> be inspected and approved by the Department of Water Supply prior to the <br /> issuance of Certificate of Occupancy for any commercial use of the building. <br /> D. Construction of the proposed development shall be completed with five(5)years <br /> from the effective date of this ordinance. Prior to construction, the applicants, <br /> successors or assigns shall secure Final Plan Approval for the proposed <br /> development from the Planning Director in accordance with Section 25-2-70, <br /> Chapter 25 (Zoning Code),Hawaii County Code. Plans shall identify all existing <br /> and/or proposed structures, paved driveway access and parking stalls associated <br /> with the proposed development. Any large bay door openings must face Highway <br /> 11. Landscaping shall also be indicated on the plans for the purpose of mitigating <br /> any adverse noise or visual impacts to adjacent properties in accordance with the <br /> requirements of Planning Department's Rule No. 17 (Landscaping Requirements), <br /> Chapter 25 (Zoning Code), 1lawai'i County Code, In addition, a solid noise- <br /> buffering fence shall be erected around the subject property. Parking associated <br /> with any activities located on the subject property shall be maintained on-site and <br />
The URL can be used to link to this page
Your browser does not support the video tag.