My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0197.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0197.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 10:12:58 AM
Creation date
4/7/2021 3:54:45 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0197
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 2021-05-05 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE FC 2021/04/20 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Finance Committee (FC)
REP FC 036 2021/04/20 2020-2022
(Related)
Path:
\Council Records\Reports\2020-2022\Finance Commitee (FC)
RES 089 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Resolutions\2020-2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form#: B-52 <br /> 7118/91 <br /> DEPARTMENT OF FINANCE <br /> • <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Public Works DATE: 03/29/2021 <br /> STAFF CONTACT: Aaron Takaba PHONE: 808-961-8341 <br /> A. REQUEST: <br /> The Department of Public Works Traffic Division is requesting a resolution authorizing the payment of funds <br /> of a later fiscal year and of more than one fiscal year for a multi-year llease of one (1) Crane Truck for the <br /> Signals and Street Lights section. The lease to purchase would be for a period of no more than five (5) <br /> years. <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> The new crane truck will be used islandwide for hauling materials to job sites, changing Intersection <br /> Controller Cabinets and UPS Cabinets, and installing street light poles and traffic signal poles with mast <br /> arms. The current crane truck has a limited boom arm length of 24'which makes it challenging for the crew <br /> to restand street light poles and new traffic signal poles with mast arms. To remove and install taller traffic <br /> signal poles with mast arms, we currently hire a contractor with a large crane truck to assist with installation. • <br /> The new equipment will increase productivity, efficiency, reduces expenses in the long run and improve the <br /> ability of the Traffic Signal &Street Light crew with islandwide maintenance and installation. <br /> The purchase price is approximately$300,000.00 The estimated lease cost is approximately$5,000.00 per <br /> month or$60,000.00 annually. The County will own the Crane Truck at the end of the five (5)year lease <br /> period. <br /> This lease is funded in the FY2020-21 Highway Fund budget and proposed FY2021-22 budget <br /> • <br /> SIGNED: / <br /> DATE: MAR 3 Z 2021 <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.