Laserfiche WebLink
h frob <br /> Mr. Christopher J.Yuen, Planning Director <br /> Page 2 <br /> June 14,2005 <br /> 3. Submit construction plans and design calculations prepared by a professional engineer, <br /> architect,or land surveyor,registered in the State of Hawaii,for review and approval. <br /> 4. Remit the prevailing facilities charge, which is subject to change,of$5,500.00,as shown. <br /> below: <br /> Facilities Charge(PC): <br /> 2 existing services <br /> 1 additional unit at$5,500.00/unit $ 5,500.00 <br /> Total FC $5,500.00 <br /> This is due and payable iiPon completion of the installation of the required water system <br /> improvements and prior to final subdivision approval being granted. <br /> 5 Submit the appropriate documents,properly prepared and executed,to convey the water system <br /> improvements and necessary easements to the Water Board of the County of Hawaii prior to <br /> final subdivision appioval.being granted. A registered land surveyor shall stamp and certify the <br /> metes and bounds description within the c:onveyancc documents. However, prior to water <br /> meter services being granted to the development,or any lots within, the conveyance documents <br /> shall be accepted by the Water Board. <br /> Should there be any questions;please contact Mr. William Atkins of our Water Resources and <br /> Planning Branch at 961-8070,extension 254. <br /> Sincerely yours, <br /> f <br /> Mil n D Pavao, P.E. <br /> 1- Ma ag r <br /> WA:dfg <br /> • <br /> copy- (w/alt.)Ms. Lillian Mahi • <br /> (w/o att,)Wes Thomas Associates <br /> (W/o att)DWS Customer Service Section(Hilo) <br />