My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0233.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0233.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 12:02:26 PM
Creation date
5/6/2021 9:01:09 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0233
Point
001
Author
Zendo Kern, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2021/05/18 (2020-2022)
(Related To)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
position that changes of over time. The time it takes for a non-conforming use approval is <br /> substantial and is a deterrent for applicants. The impact on demand for leased space at the Hilo <br /> Iron Works site also impacts the lease rates, the lower the demand the lower the price. Non- <br /> conforming use also impacts the ability for the landowners and tenants to obtain financing. <br /> Lenders view non-conforming use a high-risk property. Risk also affects the cost of financing <br /> and so even if it is available, it will be at a higher then typical rate. Financing affects not only <br /> the ability to refinance but the ability to sell the property. Available financing increases the pool <br /> of buyers and impacts demand. Limited to no financing lowers the demand which in turn <br /> adversely affects the price of the property. <br /> The impact can be seen in the incomplete revitalization of the site Portions of the site need <br /> repair but without the ability to finance, the ability to attract attradEthe best tenants for the site it creates <br /> an economic hardship for the landowners. <br /> We, therefore, respectfully request approval of the_Change of Zone=to VICX-20. The goal is not <br /> to make any changes to the use or improvements an the property at thesent time. The goal is <br /> to go from non-conforming use to a legal conforming use. The Change zfZone request is in line <br /> with the General Plan designation, I want to point-outthat in the_two thousand five (2005) <br /> General Plan the Hilo Iron Works is specifically stated as appropriate for industrial-commercial <br /> zoning and uses. The Change of confirm to-tre7v011s, policies,and standards of the. <br /> land use and economic elements of the Genera_Plan, it will_confirm to the Land Use Pattern <br /> Allocation Guide Map (LUPAG). <br /> I will conclude by reiteratingthe„following-comment from the Planning Department. The <br /> Change of Zone will-tffifilementithe existing land-uses at the project site as well as the future <br /> development plans for Banyan Drive and Hilo urban areas. Approval of the Change of Zone <br /> request would result in ariTiappropria0 land use pattern that will further the public necessity and <br /> convenience and the general=welfare Mahalo for your time and consideration on this matter. <br /> REPLOGLE: Thank you Garth Fellow Commissioners or is there anymore from the other <br /> applicants to add to Garth'sstatement` <br /> V. YAMANAKA: Raised his hand. I'mVern. <br /> REPLOGLE: Okay Vern. <br /> V. YAMANAKA: You know_�Garth summed it up very well and the only thing I would say as <br /> getting involved with the property from the very beginning. We always saw the property as sort <br /> of the gateway to Downtown Hilo and the Hilo Development Agency saw it from the same <br /> perspective. As the property had fallen”—", I don't know if you can remember to back to 1983 <br /> there were over a hundred (100)jobs that were generated prior to that time when Hilo Iron <br /> Works was under full production. Part of our goal was to see how we could bring back a lot of <br /> the jobs because obviously economically we were suffering in those days and through that <br /> process from basically virtually zero jobs we've eventually today brought it back to almost 100 <br /> jobs. We've made substantial improvements to the property and if you remember what it looked <br /> like in eighty-three (83) I think we've gone to some extent to make the property much more <br /> 5 <br /> EXHIBIT B (DRAFT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.