My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0524.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0524.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 2:04:22 PM
Creation date
11/24/2021 8:09:27 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0524
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 2021-12-22 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2022-01-05 2020-2022
(Related)
Path:
\Council Records\Agendas\2020-2022\Council
AGE FC 2021/12/07 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Finance Committee (FC)
BIL 094 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP FC 099 2021/12/07 2020-2022
(Related)
Path:
\Council Records\Reports\2020-2022\Finance Commitee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form#: B-52 <br /> 7/18/91 <br /> i <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Environmental Management DATE: 11/10/21 <br /> STAFF Eric Takamura PHONE: 961-8333 <br /> CONTACT: <br /> A. REQUEST: I <br /> r <br /> Request to amend FY21-22 Capital Improvement Budget, Ordinance 21-39, to add the following project: <br /> I <br /> Pua Force Main Installation and Rehabilitation $530,000 from State Revolving Fund <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED) <br /> The existing 24-inch force main sewer that runs from the Pua Sewage Pump Station (SPS) to the Hilo <br /> Wastewater Treatment Plant is exhibiting signs of deterioration. The County did experience a break of the <br /> existing force main back in 2011. During that repair, it was discovered that the liner in the pipe was starting to <br /> peel away from the inner wall causing potential blockage. This project is to install a second Sewage Force <br /> Main and rehabilitate the existing Force Main to address operational problems and provide redundancy <br /> The project is currently in the design phase. This request is to appropriate funds for additional design work. <br /> Based on a meeting with Hawaii DOT-Airports, the County discovered that the Hilo International Airport <br /> Runway Safety Planning Study, recommends the existing runway to be extended approximately 3,400 linear <br /> feet to the east. As a result, the future extended runway will be located over the existing 24-inch force main <br /> and 42-inch effluent line. The design consultant scope of work needs to be amended to redesign the <br /> alignment section of sewer lines affected by the future runway extension. <br /> e <br /> A Project Data/Financial Impact Statement and map are attached. <br /> SIGNS <br /> DATE: �-- <br /> Departmen Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.