My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0595.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0595.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 12:36:14 PM
Creation date
1/25/2022 10:15:52 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0595
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2022-03-23 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2022-04-06 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2022/02/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/02/22 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/03/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 112 Draft 01 2020-2022
(Related)
Path:
\Council Records\Bills\2020-2022
REP PC 048 2022/03/08 (2020-2022)
(Related To)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
has caused long-term financial challenges for the resort and analyses indicate that the <br /> resort's current and long-term future demands could be supported with 27 golf holes at <br /> the resort(18 holes in the makai Beach Course and a reconfiguration of nine (9)holes in <br /> the King's Course). Based on the preceding,the applicant has created a master plan in <br /> order to develop the Kumu Hou project area as described above. Instead of amending <br /> SMA 25 to include the Kumu Hou project, the applicant has chosen to amend SMA 25 to <br /> remove these areas and apply for three (3)new SMA permits to cover development and <br /> operations of the Kumu Hou project area. According to the applicant, the new SMA Use <br /> Permits would allow the development of the proposed new facilities and amenities, and to <br /> upgrade, repair, maintain, and operate existing or future facilities in the Kumu Hou <br /> project area. Furthermore,the new SMA Use Permits will support separate governance <br /> structures and conditions that will be relevant to differing development plans and <br /> ownership anticipated for each of the three (3) areas to be undertaken over an extended <br /> period of time. The change of zone applications are necessary for implementation of the <br /> Kumu Hou Master Plan. Finally, since the Resort is situated within the SMA, the Kumu <br /> Hou Master Plan has been designed in compliance with the objectives and policies in <br /> Chapter 205A, Hawai`i Revised Statutes (HRS),the SMA Guidelines set forth in Section <br /> 205A-26, HRS, and the objectives and policies in Rule 9, SMA, and County of Hawai`i <br /> Planning Commission Rules of Practice and Procedure. <br /> 4. Timeframe and Cost: The applicant anticipates that the project will be completed in <br /> three phases. According to the included Traffic Impact Report (TIR),the first phase <br /> (Phase I) would commence in 2025 with the anticipated construction of 301 timeshare <br /> units (151 in "Area A" and 150 in "Area B") and development of 25 single-family lots, <br /> with the first timeshare units ready for occupancy in 2027. Phase II would commence in <br /> 2030 and include an additional 376 timeshare units (113 in "Area A" and 263 in "Area <br /> B") and Phase III commencing in 2036 with complete buildout of the final 487 timeshare <br /> units in "Area B" anticipated by 2042. However,the applicant notes that these <br /> timeframes are conceptual and for modeling purposes, and that actual implementation of <br /> the master plan will be dependent on a myriad of factors (e.g., economic, market, finance, <br /> community, environmental, etc.)that will manifest over time. The estimated cost of the <br /> Kumu Hou project is$1.2 billion dollars. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.