Laserfiche WebLink
Program (Na Ala Hele) and Ala Kahakai National Historic Trail Program (Ala Kahakai), <br /> a revised AIS was prepared in August 2021. The revised AIS reconsidered treatment <br /> recommendations for two (2) sites (Site 26871 trail and portions of the Site 31230 trail, <br /> which were identified as part of a mauka-makai trail network)that were subsequently <br /> recommended for preservation via a Site Preservation Plan(Planning Department 9— <br /> Revised Draft MS by Haun and Associates dated August 2021). This revised AIS was <br /> submitted to SHPD for review. In the interim both Na Ala Hele and Ala Kahakai <br /> submitted comments requesting additional revisions of the AIS to include the <br /> preservation of Site 26873, which they identified as the location of a previously <br /> excavated lava tube and other features'on a pahoehoe rise. According to Ala Kahakai, <br /> within the overall trail network, the trails appear to link to the natural pahoehoe area and <br /> Site 26871, Site 31230 and possibly led makai bound trail users in the direction of the <br /> ancient Ala Loa and/or `Anaeho`omalu Bay. Additionally, Ala Kahakai requested that the <br /> three (3) sites also be assessed as significant under criterion "e" (cultural value). Finally, <br /> both Ala Kahakai and Na Ala Hele requested that the AIS memorialize further <br /> preservation agreements for a segment of the Ala Loa(aka Forerunner) trail, located <br /> outside of and adjacent to "Area A" of the proposed project area. These agreements <br /> include the removal of ironwood trees encroaching on the trail and within its existing 10- <br /> foot buffer,the removal of ironwood duff that blows onto the trail/buffer area, and the <br /> establishment of an additional 30-foot buffer and "vegetative transition" between the trail <br /> and any buildings that are proposed for sub-area"J2" of"Area A." In response, the <br /> applicant submitted another revised draft AIS dated October 2021, agreeing to the <br /> requested preservation determination for Site 26873 and the additional significance <br /> assessment for the three sites now slated for preservation. In addition, the AIS <br /> recommends the development of a Site Preservation Plan (SPP) for SHPD and Planning <br /> Department review and approval affecting Sites 26871, 26873, and 31230 as well as <br /> addressing the maintenance agreements and updated buffer treatments related to the Ala <br /> Loa trail section in proximity to "Area A" (Planning Department Exhibit 10—Revised <br /> Draft AIS by Haun and Associates dated October 2021). The October 2021 AIS was <br /> submitted to SHPD for approval; however, SHPD has not responded as of the date of this <br /> writing. Finally,none of the sites identified within the Kumu Hou project area are listed <br /> -13- <br />